Stormwater Management Guidance Manual: Customizing and optimizing stormwater requirements for port-specific land uses and customers.

Similar documents
New Development Stormwater Guidelines

5/22/2012. Low Impact Development through NPDES Permits TAKE AWAY MESSAGES. Municipal Stormwater NPDES Permits

Chapter 4 - Preparation of Stormwater Site Plans

3. Are there any projects exempt from the definition of Regulated Projects?

Appendix E: Illustrative Green Infrastructure Examples

Background on LID in Western WA

Annual Reporting for FY Regional Supplement for New Development and Redevelopment

Draft Rhode Island Stormwater Design and Installation Standards Manual

PROP. 84 REMOVING BARRIERS TO LID: MUNICIPAL CODE UPDATE ASSISTANCE CASE STUDY: CODE UPDATES IN ARCATA

New Tools/Resources for

City of Richland Stormwater Management Plan

Low-Impact Development Code Update. Thurston County Community Stakeholder Group June 25, 2015

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

4. UTILITIES ELEMENT.

BASMAA Development Committee. Guidance for Identifying Green Infrastructure Potential in Municipal Capital Improvement Program Projects May 6, 2016

Chapter 1: General Program Information

DEPARTMENT OF PUBLIC WORKS & UTILITIES

Technical guidance to meet stormwater management design requirements; and,

Phase II Storm Water Permit Program MS4 Permit

STORMWATER SITE PLAN INSTRUCTIONS AND SUBMITTAL TEMPLATE Medium and Large Projects

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

Agenda. NPDES Phase II Program (US EPA, 2003 Pending 2009) Costs of Stormwater Management and How to Structure a Stormwater Utility

Heights, Elk Grove, Folsom, Galt, Rancho Cordova and Sacramento. For more information, see the Glossary.

Phase II NPDES Permit application for the Montgomery County Department of Parks

Chapter 1. Introduction

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

Low Impact Development in Coastal South Carolina: A Planning and Design Guide

4. CONCEPT PLAN DEVELOPMENT

Fred Civian MassDEP Stormwater Coordinator.

Portland International Airport Storm Water Master Plan June 5, Susan Aha Water Quality Manager

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Sustainable Urban Drainage Systems Design Manual

THE CITY OF DELAWARE, OHIO ILLICIT DISCHARGE DETECTION AND ELIMINATION PLAN

CHAPTER ONE INTRODUCTION

Pennsylvania Stormwater Best Management Practices Manual. Chapter 1. Introduction and Purpose

Project Applicant Checklist for NPDES Permit Requirements SAN MATEO COUNTYWIDE STORMWATER POLLUTION PREVENTION PROGRAM

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

2/10/2017 INSTRUCTORS WESTERN WASHINGTON. REBECCA DUGOPOLSKI, PE Senior Engineer Key project experience: Stormwater monitoring,

J. Paul Guyer, P.E., R.A.

Planning Commission March 14, Presented by: City of Bellingham Port of Bellingham

Stormwater Technical Guide

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

CITY OF SIGNAL HILL Cherry Avenue Signal Hill, CA PROCEDURES RELATIVE TO CITY COUNCIL PUBLIC HEARINGS

Low Impact Development a great program that helps make the best use of something we re all familiar with - rainwater. practices.

Welcome to the Oakridge Centre Open House

Case studies. B1.1 Lloyds Crossing, Portland (USA)

Bay County RESTORE Act Direct Component Proposals The project will encompass all of Unincorporated Bay County as a whole.

INTRODUCTION TO THE ADAPTING TO RISING TIDES EXISTING CONDITIONS AND STRESSORS REPORT

Sewer & Storm Drain Systems

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Blueprint Columbus GI Implementation & Design Guidelines One Water 2014 Technical Conference & Expo

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

Selecting Appropriate Stormwater Control Measures for Your Development Project

Shoreline Master Program Town of La Conner, Washington

Can Urban Redevelopment Restore Aquatic Resources

Appendix I. Checklists

Green Infrastructure on Brownfields

Maryland Association of Floodplain and Stormwater Managers. State of the State - Stormwater Management October 12, 2017

E x E C U T I v E S U M M A R y / P L A N N I N G C O N T E x T 14 //

Post - Construction Hydromodification Development Requirements

ENVIRONMENTAL STEWARDSHIP, COMMITMENTS, AND COMPLIANCE

STORMWATER MANAGEMENT Special Management Areas

VACANT TO VIBRANT : GREEN INFRASTRUCTURE & URBAN REVITALIZATION

Outflow to Saw Mill Run

Background / Regulatory Requirements

CITY OF ST. AUGUSTA STEARNS COUNTY MINNESOTA ORDIANCE NO AN ORDINANCE ESTABLISHING REGULATIONS FOR STORMWATER MANAGEMENT

PSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION

Three threshold measures will be applied together to capture project scale and scope and impacts:

Development of LID Design Guide in Edmonton

ORDINANCE NO WHEREAS, the City provided the proposed code amendments to the Washington State Department of Commerce on September 20, 2017; and

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi

implementation r expression in landscape

2.1.4 Roof Downspout Rain Gardens

Work Plan. Introduction:

STORMWATER UTILITY FREQUENTLY ASKED QUESTIONS

Urban Stormwater Management. Rebecca Leonardson Rui Teles Brooke Ray Smith

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

Gravel Roads and Parking

Presentation Item C Annotated Model Outline for a Framework for a Green Infrastructure Plan

Maintenance Plan for Vegetated Portions of the MS4

Green Streets. Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay

Guidelines and Princi les FINANCIAL ACTION SUMMARY

Camden SMART Initiative Stormwater Management and Resource Training

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

Non-Residential&Multi-Family PropertyCreditManual

Pier 70 Master Plan. Port of San Francisco

CHAPTER 3 REGULATED LAND-DISTURBING ACTIVITIES AND APPLICABLE REQUIREMENTS

2012 Saginaw Bay Watershed Conference

The Benefits and Challenges Associated with Green Infrastructure Practices

The Art and Science of Stormwater Retrofitting

FOR THE PERIOD JANUARY 1, TO DECEMBER 31, GENERAL INFORMATION

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Retrofitting SuDS. Virginia Stovin. Department of Civil and Structural Engineering Pennine Water Group University of Sheffield.

ROGUE VALLEY SEWER SERVICES STORMWATER MANAGEMENT PROGRAM (SWMP)

I.A.10 Total Area of Site: acres Total Area of land disturbed during construction (include clearing, grading, excavating and stockpile area: acres.

CITIES. OVER a BARREL RESIDENTIAL STORMWATER SOLUTIONS 2016 TORONTO AUTOMATED RAIN BARREL PILOT PROJECT SUMMARY REPORT

C.3 and C.6 Development Review Checklist Municipal Regional Stormwater Permit (MRP) Stormwater Controls for Development Projects

Low Impact Development Short Course for Developers and Builders

Transcription:

Stormwater Management Guidance Manual: Customizing and optimizing stormwater requirements for port-specific land uses and customers. June 30, 2016 Port of Tacoma Environmental Project Manager: Anita Fichthorn Port Customers: Husky, AWC, Railroads, Grand Alliance, Commercial Real Estate, all future industrial customers

Table of Contents Introduction... 2 Goals and Objectives: A Strategic Approach to Preventing Stormwater Contamination... 3 Background: Why do we need a Stormwater Management Guidance Manual for Ports?... 3 1. Phase I Municipal Stormwater Permit (MS4):... 3 2. Industrial Stormwater General Permit... 4 Objectives and Methodology... 5 3. Stormwater Management Guidance Manual Contents... 5 4. The Manual contains the tools for BMP selection to include:... 5 5. Stormwater Management Guidance Manual Chapters... 6 Chapter 1 Explains the purpose, regulatory framework, and definitions.... 6 Chapter 2 Stormwater Requirement for Port properties - Water Quality Treatment... 6 Chapter 3 LID Feasibility Guidance and Flow chart for BMP selection... 6 Chapter 4 BMP Selection (treatment) for development/redevelopment... 7 Stormwater Management Guidance Manual Fulfills the Six Award Criteria... 8 1. Level and nature of benefits to environmental quality, beautification, or community involvement.... 8 2. Level of independent involvement and effort by the Port of Tacoma... 8 3. Creativity of the Solution or programs.... 8 4. Whether the project or program results are apparent.... 8 5. Cost effectiveness of the activity... 9 6. Transferability of the technology or idea to port industry.... 9 Appendix A Decision Matrix...10 Appendix B Low Impact Development Matrix...10 Appendix C Pilot Data Decision Matrix and Performance Evaluation...10 Figure 1 Port of Tacoma... 2 Figure 2 Port of Tacoma stormwater permits... 4 Figure 3 Horizon Consumer... 8

Introduction The Port of Tacoma (Port) is responsible for managing stormwater runoff on over 2000 acres of property designated as heavy industrial maritime. The majority of the discharges end up in Commencement Bay (Bay) which until early 1980s, industry commonly discharged untreated stormwater and wastewater into the Bay. Pollutants associated with these discharges often build up in the sediments and had the potential to impact human health and the environment. The Port has spent over $175 million dollars over the last 30 years to remove these historically contaminated sediments from the waterways that feed the Bay. Those investments have created a vibrant working waterfront, creating jobs and driving the local economy. The need to protect this investment and continue improve water quality for future generations has compelled the Port take steps to prevent potential pollutants from discharging to the waterways. Figure 1 Port of Tacoma

Goals and Objectives: A Strategic Approach to Preventing Stormwater Contamination A key component of the Port of Tacoma Strategic Plan is to advance Environmental Stewardship by helping its customers solve challenging environmental problems. The goal of the Stormwater Management Guidance Manual (Manual) is to help guide internal and external customers in selecting appropriate stormwater treatment for their specific facilities based on operations and other activities. The objective of implementing such a Manual is to provide guidance during development and redevelopment actions (specific to port industrial operations where no other guidance specific to the industry exists) save time and money by creating a process matrix for decision-making and protect water quality by applying the appropriate amount of stormwater treatment for all new facilities. Background: Why do we need a Stormwater Management Guidance Manual for Ports? Stormwater is the main pollutant contributor to Commencement Bay and is Department of Ecology s top priority. Polluted stormwater runoff threatens our waterway clean-up efforts. There are many risks associated with untreated runoff such as significant impacts to operations, expensive retrofits and the potential for citizen lawsuits. The Department of Ecology develops and administers National Pollutant Discharge Elimination System (NPDES) stormwater permits in Washington State. The Port of Tacoma is subject to several types of stormwater permits governed by specific activities on Port-owned properties. Phase I Municipal Stormwater Permit (MS4): The MS4 permit requires the Port to develop a Stormwater Management Plan and Program that includes the following elements: Education program for Port staff and tenants Public involvement and participation:

Illicit Discharge Detection and Elimination Construction Stormwater Source Control. Post-construction Stormwater Management Minimum technical requirements for development and redevelopment: if the size of a development project exceeds specific parameters, long-term stormwater treatment must be implemented. Operations and Maintenance Program Source Control in existing developed areas The focus of this discussion is on how the Port has developed industry specific guidance that is above and beyond compliance with the Minimum Technical Requirements. Industrial Stormwater General Permit The majority of the Port s customers are in the heavy industrial maritime and transportation-related business. Facilities that engage in industrial activities and discharge stormwater to surface waters of the state are subject to the Industrial Stormwater General Permit (ISGP). The ISGP has water quality monitoring requirements that our customers need to meet in order to avoid expensive multi-million dollar retrofits of their stormwater infrastructure and operational interruptions due to construction that cost businesses valuable time and money. Figure 2 Port of Tacoma stormwater permits The Stormwater Management Guidance Manual was designed to meet the needs of the Port and its customers and create a simple process that will be cost effective and improve water quality.

Objectives and Methodology The Port of Tacoma Stormwater Management Guidance Manual (Manual) was developed as a tool to help our customers and stakeholders navigate the stormwater requirements associated with development actions and as part of the Port s Interlocal Agreement with the City of Tacoma. Stormwater Management Guidance Manual Contents The Manual contains Supplemental Guidelines that are specific to Port operations that are not contained in the City of Tacoma s Stormwater Manual. The Manual can assist any municipality in selecting the most appropriate stormwater treatment Best Management Practices (BMPs) based on: Performance using site specific water quality data and the treatment system type to determine pollutant removal rates; Cost-effectiveness of implementation to include life-cycle costs and operations & maintenance costs; Criteria to determine whether the BMP will be able to perform when associated with pollutant generating activities and specific land uses. The Manual contains the tools for BMP selection to include: Permit requirements decision-making flow charts. The Manual includes checklists for permittees, design engineers, facility occupants, and enforcement personnel. This section is meant to provide user-friendly tools for all levels during the development of a project. Site-specific treatment BMP selection process. Step-by-step process of selecting treatment BMPs for projects that trigger treatment requirements. As mentioned above, the BMP Selection process considers performance and cost of implementation. Selection process will also eliminate treatment systems that will not meet performance goals and in the future, will provide a cost-benefit curve for all BMPs that are proposed for use. This process is not specific to Port facilities and can be used by any municipality;

Low Impact Development (LID) Guidance document- LID is not required at Port facilities; however, the Port is committed to implementing LID where feasible. This document includes an LID selection process using site characteristics to determine the viability of LID BMPs in areas where LID is difficult to implement due to environmental constraints. Retrofit guidelines that will provide guidance on how to deal with those small projects where treatment BMPs do not provide any water quality benefit and how to provide treatment where is it needed. Stormwater Management Guidance Manual Chapters The layout of the Manual is such that is follows the requirement of the MS4 permit and includes the following chapters: Chapter 1 Explains the purpose, regulatory framework, and definitions used in the manual. Chapter 2 Stormwater Requirement for Port properties - Water Quality Treatment Land use/activity trigger (Port-specific requirement) Preferred/Approved stormwater treatment systems for Port projects Conditionally allowed stormwater treatment system Pilot data will be required and proposed treatment will have performance standard of 80% (Port-specific requirement) Process Flow Chart o Project request initial Stormwater Project checklist one pager External: to be initiated by the tenant during the TI process Internal: to be initiated during pre-project planning, BOD and/or preliminary design o Pre-application meeting with Port to go over Stormwater Site Plan Checklist o Final submittal for review prior to submittal to City of Tacoma for permits o Plan review to be completed by Engineer (internal or consultant) Exemptions Chapter 3 LID Feasibility Guidance and Flow chart for BMP selection based on typical land uses within Port

Chapter 4 BMP Selection (treatment) for development/redevelopment Selection based on o Pollutant removal efficiency and performance o Construction cost o Operations & Maintenance cost Approved BMP if select from this menu no further action needed Conditionally approved BMPs on this list will require pilot data, stormwater characterization and supply expected results must meet current ISGP benchmarks 80% of the time t allowed - stormwater treatment system that will not be constructed at Port facilities unless absolutely required. If the stormwater treatment system is not listed on the menu (new technology), the proponent would need to run the data through the pilot study process and submit results for review. In order to keep updates to the Manual minimal unless there is a permit update, all appendices, reference materials, checklists, and figures, are located on Port s external website under Tenant Resources in order to have the readily available for use. For a full review of the Stormwater Management Guidance Manual, please visit Port of Tacoma s website at the following link: http://portoftacoma.com/real-estate/tenant-resources#stormwater

Stormwater Management Guidance Manual Fulfills the Six Award Criteria 1. Level and nature of benefits to environmental quality, beautification, or community involvement. As stated above a key component of the Port of Tacoma Strategic Plan is to advance Environmental Stewardship by helping its customers solve challenging environmental problems. Figure 3 Horizon Consumer The Stormwater Management Guidance Manual provides the necessary tools to help our customers and stakeholders cut costs for potential future expensive retrofit projects that impact operations and business viability, meet their stormwater permit obligations, and prevent recontamination of waterways associated with Commencement Bay and the Puget Sound. 2. Level of independent involvement and effort by the Port of Tacoma The Port of Tacoma funded and led all aspects of the project from consultant selection, drafting the framework, and developing Port-specific requirements to meeting with agencies, external customers, design engineers, and internal commercial, operations and capital project managers to provide education and outreach. 3. Creativity of the Solution or programs. The Stormwater Management Guidance Manual is the first of its kind developed for Portspecific heavy industrial maritime and transportation related facilities. The City of Tacoma and Department of Ecology stormwater manuals are aimed at private developments in an urban setting such as residential and commercial facilities. The Port Manual is designed to be used in conjunction with the other manuals; however, it provides a stormwater treatment selection process specifically for port facilities. 4. Whether the project or program results are apparent.

The Stormwater Management Guidance Manual has been in use for a little over a year. The result of implementation has saved the Port and our customers hundreds of thousands of dollars in design costs for capital projects. Prior to the launch of the Manual, design consultants would take one of two approaches to selecting stormwater treatment for large development projects. They would either reuse a design from another project or select technology that has not been tried or tested in an industrial application. There are measurable risks and benefits to those two approaches: Table 1 Risk and Benefit of designing without guidance Approach Risks Benefits a system from another System not based on site-specific Less time in design project characterization of stormwater discharges New technology or proprietary systems are extremely expensive. Manufacturers removal rates are based on controlled pollutant loading which is not based Latest technology can be very Choose an untested proprietary on field loading, storm intensity or geographical effective at removing technology location pollutants Proprietary system require special operations and maintenance adding to operational costs not anticipated during selection process The Port has reduced or eliminated potential risk of non-compliance, the risk of operational interruptions, and the risk of being required to invest in potentially large expensive retrofits of systems that were installed but do not perform as needed. 5. Cost effectiveness of the activity. Development of the Manual was roughly the same cost of designing a proprietary stormwater treatment system for a one retrofit project. The Port has completed four large retrofit projects over the last three years at a cost of $8.1 million dollars. The implementation of the Manual for development and redevelopment projects will reduce or eliminate the requirement for retrofit projects. 6. Transferability of the technology or idea to port industry. The Stormwater Management Guidance Manual is designed for port-specific land uses including container cargo, break bulk cargo, log sort yards, heavy equipment maintenance facilities, public roads and vehicle movement, outdoor raw materials storage, parking, industrial buildings, and rail operations. It also accounts for potentially

contaminated underground soils, operational constraints, and facilities that are typically built at the waters edge. Any one of these types of facilities could benefit from using the guidance in the Manual to implement decisions related to stormwater treatment selection for their facility. Appendix A Decision Matrix Appendix B Low Impact Development Matrix Appendix C Pilot Data Decision Matrix and Performance Evaluation

ACTION AND REVIEW DECISIONS Action Project Review Initiated Land Disturbance Exceptions BMPS Review and Approval* *As Applicable New or Renewed Lease Agreement (Refer to Section 2.6) Exceeds Thresholds? (Refer to Section 2.3) (Refer to Section 2.7) Exemptions Disturbance? BMP Selection or Approved List Construction SWPPP Stormwater Site Plan Review MR 1-12 Approve Stormwater Site Plan Review MR 1-3 Needs ISGP? Activity Change or Tenant Improvement Exceeds Thresholds? (Refer to Section 2.3) Change from ISGP to MS4 Permit Or Change Change from MS4 Permit to ISGP Using Bank? Waiver? Site SWPPP Approve SWPPP Review Acknowledge Process Complete Permit Change? Port - Initiated or Corrective Exceeds Thresholds? (Refer to Section 2.3) BMP Selection or Approved List to Extent Practicable Engineering Report Review Acknowledge Comply with ISGP? MS4: Municipal Separate Storm Sewer System ISGP: Industrial Stormwater General Permit FIGURE 3. Action and Review Decisions Refer to Section 2.6

Prohibited Conditional Port Required Port Allowed Container, Break Bulk, And Dry Bulk Terminals Log Yards Maintenance Permeable Flow Dispersion Bioretention Permeable Planter Boxes Flow Dispersion Permeable Rainwater And Flow Dispersion Planters And Tree Boxes Rainwater And Rainwater And Bioretention Bioretention Planters And Tree Boxes Depth to WT > 3 Known Soil Contamination (See Map) Site Elevation Above Hydraulic Limitations Passes Planter Criteria? 4 1 Hazardous Spill Risk Low? Do t LID Passes Operational Considerations For Containers? 7 Do t LID Connected to Other Treatment? Bioretention Planters Passes Planter Criteria? 4 Considerations Special Considerations Selection Restriction Refer to Section 3.7 for Criteria and Defined Considerations Public Roads and Vehicle Movement Outdoor Raw Materials Storage Permeable Bioretention Permeable Planter Boxes Flow Dispersion Rainwater And Flow Dispersion Bioretention Planters And Tree Boxes Passes Flow Dispersion Criteria? 8 Bioretention Flow Dispersion 1 Depth to WT > 3 Known Soil Contamination (See Map) Site Elevation Above Hydraulic Limitations Special 6 Considerations Apply? Planter Boxes Bioretention Special Considerations Apply? Planters And Tree Boxes 6 Do t LID Parking Buildings/ Roofs Rail Landscape LID t d LID t d Bioretention Planters And Tree Boxes Flow Dispersion Bioretention Vegetated Roofs Downspout Treatment Permeable Planters And Tree Boxes Rainwater And Flow Dispersion Rainwater And Depth to WT > 3 Known Soil Contamination (See Map) Site Elevation Above Hydraulic Limitations Structure Support Available? Viable Long-Term And Maintenance Plan 9 1 Do t Bioretention Permeable Downspout Treatment Do Loads On Activities Support Permeable? Space Available? Is Rainwater Needed For Irrigation? 5 Do t Permeable 10 2 Do t LID Choose Bioretention Or Permeable Connected to SW Treatment System? Flow Dispersion Passes Flow Dispersion Criteria? Dispersion Vegetated Roof Downspout Treatment 3 Planter Boxes Passes Planter Criteria? Planters 4 Do t LID Is Rainwater Needed For Irrigation? Rainwater 5 Other Rainwater FIGURE 5. Decision Assessment for Evaluating LID Feasibility

Port of Tacoma - BMP Performance Curve(s) 100% 90% 80% 70% Cumulative Frequency 60% 50% 40% 30% 20% 10% Benchmark (14 ug/l) BMP-1 (n = 91) BMP2 (n = 0) Data Set 3 (n = 0) Data Set 4 (n = 0) Data Set 5 (n = 0) Data Set 6 (n = 0) 0% - 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 Copper Concentration (ug/l)