ANNUAL MAINTENANCE CONTRACT TO COVER FIRE EXTINGUISHER SERVICE FROM JULY, 208 THROUGH JUNE 30, 209 Supply labor and materials to perform annual maintenance service, inspection and certification for campus fire extinguishers and kitchen fire suppression systems in accordance with New Jersey Uniform Fire Code; International Fire Code New Jersey Edition 2006 and NFPA0 and NFPA 7A for the Edison Campus, New Brunswick Center and Perth Amboy Center from July, 208 through June 30, 209. The initial service must be completed within 30 days of contract award. Fire extinguisher maintenance includes recharge, hydrostatic and maintenance tests as required by law. The supplier must provide MCC with loaner extinguishers without charge where any extinguishers are removed to complete testing from its current location. As soon as it is determined that a fire extinguisher is not serviceable, the supplier must notify the MCC Health and Safety Department. When the extinguishers are tested, the supplier shall place an indicator uniformly on each making the testing date clearly visible. New tags should include dates of service. All added fire extinguishers must be supplied with wall brackets. All prices quoted must be guaranteed for the fiscal year July, 208 to June 30, 209 and must include delivery and any hazardous waste transportation fees or other charges incidental to the delivery of the items quoted. The College has the option to renew for one additional year July, 209 through June 30, 2020. The balance of this contract is to include service to all fire extinguishers on an as needed basis. Page
Special Quote # 0489 FIRE EXTINGUISHER SERVICE JULY, 208 THROUGH JUNE 30, 209 EXISTING FIRE EXTINGUISHER INSPECTION 6/5 YR MAINTENANCE EXTINGUISHERS TO BE CHECKED INCLUDING LOANER EXTINGUISHERS 2 /2 lb ABC AND TAGGED AS NEEDED TYPE QTY UNIT COST COST EST. QTY 2 5 lb ABC 35 5 0 lb ABC 445 20 lb ABC 3 2 5 lb BC 0 lb BC 7 20 lb BC 6 5 lb CO2 2 NA 0 lb CO2 NA 5 lb CO2 7 NA 20 lb CO2 NA 5 lb Halotron 2 0 lb Halotron 2 6 Liter Wet Chem 8 30 lb Class D Metal 20 lb Purple Pk 559 Page 2 NOTE: ALL COLUMNS MUST BE COMPLETED TO BE CONSIDERED FOR AWARD.
EXISTING FIRE EXTINGUISHERS TYPE 2 /2 lb ABC 5 lb ABC 0 lb ABC 20 lb ABC Special Quote # 0489 FIRE EXTINGUISHER SERVICE JULY, 208 THROUGH JUNE 30, 209 RE-PRESSURIZE HYDROSTATIC TESTING INCLUDING LOANER EXTINGUISHERS INCLUDING LOANER EXTINGUISHERS AS NEEDED AS NEEDED EST. QTY EST. QTY. 5 5 5 lb BC 0 lb BC 20 lb BC 6 5 lb CO2 0 lb CO2 5 lb CO2 20 lb CO2 22 0 2 5 lb Halotron 0 lb Halotron 6 Liter Wet Chem 30 lb Class D Metal 20 lb Purple Pk Page 3
EXISTING FIRE EXTINGUISHERS TYPE 2 /2 lb ABC 5 lb ABC 0 lb ABC 20 lb ABC Special Quote # 0489 FIRE EXTINGUISHER SERVICE JULY, 208 THROUGH JUNE 30, 209 RECHARGE PURCHASE OF COST NEW EXTINGUISHERS AS NEEDED AS NEEDED EST. QTY. UNIT COST COST EST. QTY. 5 lb BC 0 lb BC 20 lb BC 5 lb CO2 0 lb CO2 5 lb CO2 20 lb CO2 5 lb Halotron 0 lb Halotron 6 Liter Wet Chem 30 lb Class D Metal 20 lb Purple Pk Page 4
CONTINUING SERVICE Supply labor and materials for the following miscellaneous items to be used in connection with fire extinguishers for the period JULY, 208 through JUNE 30, 209: NOTE: A UNIT COST MUST BE PROVIDED FOR EACH ITEM OR QUOTE WILL NOT BE CONSIDERED FOR AWARD. DESCRIPTION ESTIMATED QUANTITY Supply and Install Locking Pin 0 Replace Pressure Gauge 0 Replace Co2 Valve 0 Rebuild Extinguisher Valve 0 Replace Valve Handle 0 Replace Syphon Tube 0 Replace Discharge Hose 0 CO2 Hose and Hose Assembly 0 DC 0 lb. Hose Assembly 0 Neck Collar 25 Pull Tite Flag Seal 559 PYRO Chem Cartridge CO2 Cartridge for Ansul systems 4 Replace Valve Stem 0 Replace Handle Assembly 0 Replace Safety Disc 0 Rebuild Extinguisher Valve 0 Hose Straps with Clips 0 O-Rings 25 Check Stem 0 Schrader Valve 0 DOT Label 0 Page 5
Supply labor and materials to perform an inspection and maintenance service for kitchen fire suppression systems in accordance with NJAC F 52. and NFPA 7A for wet systems. All Inspection costs must include changing of all fusible links at no additional cost. Service required July 208 and January 209. FREQUENCY QUANTITY SYSTEM DESCRIPTION 2 x per year system Edison Hall Child Care Center Ansul 3 gal. (wet chemical) 2 x per year 2 systems College Center, Winners Circle Kidde (wet chemical) WHDR400 & WHDR600 2 x per year system College Center, HRI Room 09 Protex 2000 (wet chemical) 2 x per year system Crabiel Hall, Culinary Demo Lab Protex II (wet chemical) 2 x per year 26 each Replace 350 Degree Fusible Link 2 x per year 3 each Replace 500 Degree Fusible Link as needed 30 each Replace Grease Cap Labor Cost Per Hour : If a problem is found during inspection, cost of returning for re-inspection after repairs: Page 6
Special Quote # 0489 FIRE EXTINGUISHER SERVICE JULY, 209 THROUGH JUNE 30, 2020 EXISTING FIRE EXTINGUISHER INSPECTION 6/5 YR MAINTENANCE RE-PRESSURIZE EXTINGUISHERS TO BE CHECKED INCLUDING LOANER EXTINGUISHERS INCLUDING LOANER EXTINGUIS 2 /2 lb ABC AND TAGGED AS NEEDED AS NEEDED TYPE QTY EST. QTY EST. QTY 2 5 lb ABC 35 5 0 lb ABC 445 20 lb ABC 3 2 5 lb BC 0 lb BC 7 20 lb BC 6 5 lb CO2 2 NA 0 lb CO2 NA 5 lb CO2 7 NA 20 lb CO2 NA 5 lb Halotron 2 0 lb Halotron 2 6 Liter Wet Chem 8 30 lb Class D Metal 20 lb Purple Pk 559 Page 7 NOTE: ALL COLUMNS MUST BE COMPLETED TO BE CONSIDERED FOR AWARD.
EXISTING FIRE EXTINGUISHERS TYPE 2 /2 lb ABC 5 lb ABC 0 lb ABC 20 lb ABC Special Quote # 0489 FIRE EXTINGUISHER SERVICE JULY, 209 THROUGH JUNE 30, 2020 HYDROSTATIC TESTING RECHARGE SHERS INCLUDING LOANER EXTINGUISHERS COST AS NEEDED AS NEEDED COST EST. QTY. EST. QTY. 5 5 5 lb BC 0 lb BC 20 lb BC 6 5 lb CO2 0 lb CO2 5 lb CO2 20 lb CO2 22 0 2 5 lb Halotron 0 lb Halotron 6 Liter Wet Chem 30 lb Class D Metal 20 lb Purple Pk Page 8
EXISTING FIRE EXTINGUISHERS TYPE 2 /2 lb ABC 5 lb ABC 0 lb ABC 20 lb ABC PURCHASE OF NEW EXTINGUISHERS AS NEEDED EST. QTY. Special Quote # 0489 FIRE EXTINGUISHER SERVICE JULY, 209 THROUGH JUNE 30, 2020 5 lb BC 0 lb BC 20 lb BC 5 lb CO2 0 lb CO2 5 lb CO2 20 lb CO2 5 lb Halotron 0 lb Halotron 6 Liter Wet Chem 30 lb Class D Metal 20 lb Purple Pk Page 9
CONTINUING SERVICE Supply labor and materials for the following miscellaneous items to be used in connection with fire extinguishers for the period JULY, 209 through JUNE 30, 2020: NOTE: A UNIT COST MUST BE PROVIDED FOR EACH ITEM OR QUOTE WILL NOT BE CONSIDERED FOR AWARD. DESCRIPTION ESTIMATED QUANTITY Supply and Install Locking Pin 0 Replace Pressure Gauge 0 Replace Co2 Valve 0 Rebuild Extinguisher Valve 0 Replace Valve Handle 0 Replace Syphon Tube 0 Replace Discharge Hose 0 CO2 Hose and Hose Assembly 0 DC 0 lb. Hose Assembly 0 Neck Collar 25 Pull Tite Flag Seal 559 PYRO Chem Cartridge CO2 Cartridge for Ansul systems 4 Replace Valve Stem 0 Replace Handle Assembly 0 Replace Safety Disc 0 Rebuild Extinguisher Valve 0 Hose Straps with Clips 0 O-Rings 25 Check Stem 0 Schrader Valve 0 DOT Label 0 Page 0
Supply labor and materials to perform an inspection and maintenance service for kitchen fire suppression systems in accordance with NJAC F 52. and NFPA 7A for wet systems. All Inspection costs must include changing of all fusible links at no additional cost. Service required July 209 and January 2020. FREQUENCY QUANTITY SYSTEM DESCRIPTION 2 x per year system Edison Hall Child Care Center Ansul 3 gal. (wet chemical) 2 x per year 2 systems College Center, Winners Circle Kidde (wet chemical) WHDR400 & WHDR600 2 x per year system College Center, HRI Room 09 Protex 2000 (wet chemical) 2 x per year system Crabiel Hall, Culinary Demo Lab Protex II (wet chemical) 2 x per year 26 each Replace 350 Degree Fusible Link 2 x per year 3 each Replace 500 Degree Fusible Link as needed 30 each Replace Grease Cap Labor Cost Per Hour : If a problem is found during inspection, cost of returning for re-inspection after repairs: Page
Min Note FY9 Minimum # of Extinguishers Required per Service Call *After Initial Re-Tag / Inspection: Service Charge Per Call Note: If Six/Five Year Maintenance Can be performed on site please indicate Yes No FY20 Minimum # of Extinguishers Required per Service Call *After Initial Re-Tag / Inspection: Service Charge Per Call Note: If Six/Five Year Maintenance Can be performed on site please indicate Yes No Page 2