NGC-UIT-ORD User interface terminal for Raychem NGC systems Installation Instructions

Similar documents
TOUCH 1500 User Interface Terminal for Raychem NGC Systems Installation Instructions

NGC-UIT2-ORD-R Remote User Interface Terminal for Raychem NGC Systems Installation Instructions

RAYCHEM NGC-30 COMPONENTS

PANEL MOUNTED ELECTRONIC MULTI-CIRCUIT HEAT-TRACING CONTROL, MONITORING AND POWER DISTRIBUTION SYSTEM mm. 100 mm

NGC-40 PANEL MOUNTED ADVANCED MODULAR HEAT-TRACING CONTROL SYSTEM HTC HTC3

ACCS-30. Multipoint commercial heat-tracing control system

THERMAL BUILDING SOLUTIONS EN-TraceTekTTSIM1A-IM-H /16

NGC-40 PANEL MOUNTED ADVANCED MODULAR HEAT-TRACING CONTROL SYSTEM HTC HTC3 PRODUCT OVERVIEW

TTSIM-2 TRACETEK SENSOR INTERFACE MODULE WITH LCD AND RELAY INSTALLATION/OPERATION INSTRUCTIONS

910 Series Single-point heat-tracing control system

ACS-30 MULTIPOINT COMMERCIAL HEAT-TRACING SYSTEM PRODUCT OVERVIEW. ACS-30 System

NGC-UIT2 MODBUS PROTOCOL INTERFACE MAPPING FOR NGC-30 SYSTEMS. Firmware versions up to V2.0.X

DESCRIPTION. 42 mm. 125 mm

NGC-40 Advanced Heat-Tracing Control System

JBS-100-EC Electronic controller replacement kit for JBS-100-ECP-A and JBS-100-ECW-A Installation Instructions

CSI Master Format 2004 Guide Specification for: Freezer Frost Heave Prevention (Mineral Insulated)

Sensor Interface Module Installation/Operation Instructions

JBS-100-ECP-A COMBINATION POWER CONNECTION BOX AND DIGITAL ELECTRONIC CONTROLLER INSTALLATION INSTRUCTIONS

Dual-point heat-tracing control system

CSI Master Format 2004 Guide Specification for: Flow Maintenance of Above Ground Greasy Waste Disposal Lines

C SINGLE-POINT HEAT-TRACING CONTROL SYSTEM PRODUCT OVERVIEW

CSI Master Format 2004 Guide Specification for: Flow Maintenance of Aboveground Fuel Oil Lines

C SINGLE-POINT HEAT-TRACING CONTROL SYSTEM. product overview

NGC-40-IO Control and monitoring modules for use with the Raychem NGC-40 system Installation Instructions

HTC-915-CONT. Heat-Trace Control system

CSI Master Format 2004 Guide Specification for: Snow Melting (Mineral Insulated)

THERMAL MANAGEMENT SOLUTIONS

For Raychem ACS-30 Controls Systems

THERMAL MANAGEMENT SOLUTIONS

Supervisor Standard Edition

HHS-WWH HOPPER HEATING SYSTEM WRAP-WOUND HEATER INSTALLATION INSTRUCTIONS DESCRIPTION. HHS-WWH PRODUCT SPECIfICATIONS

FreezGard. Self-regulating crankcase heater. Product Overview

ECW-GF, ECW-GF-DP DIGITAL ELECTRONIC CONTROLLERS AND REMOTE DISPLAY PANEL PRODUCT OVERVIEW

JB-RTD-STAND RTD PIPE STAND FOR COMBINATION POWER CONNECTION BOX AND ELECTRONIC CONTROLLER INSTALLATION INSTRUCTIONS

CSI Master Format 2012 Guide Specification for: Hot Water Temperature Maintenance (HWAT) Systems

TTSIM-1A. TraceTek Sensor Interface Module with Relay. Installation/Operation Instructions. Installation Items (not supplied) Tools Required.

HWT-P HWAT POWER CONNECTION KIT WITH END SEAL INSTALLATION INSTRUCTIONS

NGC-20-C-E and NGC-20-CL-E

1SC-SSC Splice Connection Kit Installation Instructions

NGC-20-C-E and NGC-20-CL-E

Modular Sensing Cable Installation Instructions

Longline Heating. Contents. Introduction

HOT WATER TEMPERATURE MAINTENANCE HWAT SYSTEM

TYPE CM-2201 NELSON SINGLE POINT CIRCUIT MANAGEMENT SYSTEM

TraceTek Sensing Module Installation, Operation and Maintenance Instructions DESCRIPTION SPECIFICATIONS APPROVALS TYPE NM

SMPG3 SNOW MELTING AND DE-ICING POWER DISTRIBUTION AND CONTROL PANEL. For three-phase heating cables PRODUCT OVERVIEW

SAFETY INFORMATION AND WARNINGS

MODEL FPT-130 SINGLE POINT FREEZE PROTECTION HEAT TRACE CONTROL

920 Series. A dry contact relay is provided for alarm annunciation back to a distributed control system (DCS).

C910 Series. Single-point heat-tracing control system

Single Point Freeze Protection Heat Trace Control TRACON MODEL FPT 130 Installation and Operation Manual

NGC-20 LOCAL CONTROL CENTRAL MONITORING

IMPORTANT INSTRUCTIONS READ & SAVE

MODEL GPT-130 SINGLE POINT HEAT TRACE CONTROL THERMOSTAT

Design Guide Design Notes Design Examples Technical Data Sheets Expanded Capabilities Specifications Warranty

Model: M630-44FDC CAUTION:

FTC-HST WARNING: CAUTION:

Pipe Freeze Protection Control SCFP-CO-F130 Installation and Operation Manual

Square D Clipsal Outdoor Light-Level Sensor

DigiTrace T2000 Heat Trace Controller

BC3250. Blowdown Controller

INSTALLATION INSTRUCTIONS

NGC-40 Bridge. Modbus Overview. Raychem-AR-H58862-NGC40BridgeModbusOV-EN-1805 nvent.com 1

SLATE. Sub-Base Module INSTALLATION INSTRUCTIONS R8001S9001

Duct and Rough Service Carbon Monoxide Sensor

IMPORTANT INSTRUCTIONS READ & SAVE

MEGA. cal electronic gas alarm. Installation, Operation, and Maintenance Instructions. Part No Rev. D Pg.

Everbrite LCD OrderRite Order Confirmation System

Installing the Cisco ONS FAP-4 Fuse Alarm Panel

Colibri. Automatic Tank Gauge CL6 Series Installation Guide

NGC-20-C-E and NGC-20-CL-E

YP7999A1000 ControLinks Fuel Air Ratio Control Panel

IMPORTANT INSTRUCTIONS READ & SAVE

ACCURATE ELECTRONICS INC PO BOX SW HALL BLVD BEAVERTON OR USA FAX

TMC. Installation and Operation Manual TMC. Temperature and Pressure Monitoring for Heating and Cooling Applications. Temperature Monitoring Control

TT3000 and TT5000 Series

ACCURATE ELECTRONICS INC

sulfur transport pipelines Safe, Reliable and Cost-Effective Heat Management System

Frost Heave Protection System Installation and Operation Manual

HDCVI PTZ Camera. 6C Series. Quick Start Guide Version Dahua Technology USA Inc.

UNC100 Integra Manual

Greentrol Automation, Inc.

M650-38A-OAK ELECTRIC FIREPLACE HEATER NDF-65NB-1 INSTRUCTION MANUAL

LC1350 Level Controller

Dual Point General Purpose Heat Trace Control TRACON MODEL GPT 230 Installation and Operation Manual

KT-100 Door Controller

SLATE. Base Module INSTALLATION INSTRUCTIONS R8001A1001

Room Sensor for BACnet VAV Actuator

Models NFPA 1221-A, NFPA 1221-B Public Safety DAS Annunciator Panel. Revision E 61117

C-Bus Four Channel General Input Unit Installation Instructions

Over-the-Range Microwave Oven Installation Instructions MVH130* MVH230* MVH330*

User s Manual. For the SHORE POWER CONNECTION MONITOR MODEL 9151

C-Bus Pascal Automation Controller 5500PACA. Installation Instructions

C Heat Trace Controller

APPLICATION DATA SHEET

Commercial in Confidence

Operating & Maintenance Manual. Alert-4 Ethernet LCD Master Alarm

INSTALLATION INSTRUCTIONS

HDCVI PTZ Network Camera

Model 6495 Freezing Rain Sensor. User's Manual. All Weather Inc National Drive Sacramento, CA USA

Transcription:

NGC-UIT-ORD User interface terminal for Raychem NGC systems Installation Instructions Description The NGC-UIT-ORD is a panel mounted display used in conjunction with other approved Raychem control and monitoring devices. The NGC-UIT-ORD is rated NEMA 12, and the display can best be viewed indoors. The NGC-UIT-ORD kit includes all hardware required for mounting in a suitable electrical panel. These instructions describe how to mount the NGC-UIT-ORD in an electrical panel and are intended only for personnel experienced in panel construction. Tools Required Masking tape #16 (3/16) drill bit 11/32 inch nut driver Metal file Jig saw (recommend using carbon steel blade with 24 TPI) Approvals/Certifications General Supply voltage Operating temperature EMC Vibration Shock Dimensions NGC-UIT-ORD kit shown installed in user s panel 100 240 Vac ±10%,.25 A max/25 VA, 50/60 Hz 40 F to 149 F ( 40 C to 65 C) Immunity Industrial Emission Commercial / Light Industrial Unit tested to IEC-60068-2-6 Unit tested to IEC-60068-2-27 10 1/4 in wide X 6 5/8 in high X 3 in deep (260 mm wide X 168 mm high X 76 mm deep) Control Outputs Relay outputs Three relay outputs, Form C contacts, switching loads up to 277 Vac/3 Amps Relays may be assigned for alarm outputs 11 position Phoenix-style pluggable screw terminal connector with retaining screws Status LEDs Relay Field Local/Remote USB host UIT status Three LEDs showing the ON/OFF Status for each relay, LED ON indicates relay is energized Transmit and Receive activity Transmit and Receive activity Three colors showing status: Red = USB key fault Green = USB key inserted Yellow = USB in use Three colors showing system status: Green = Normal Condition Red = Fault Condition Yellow = loading software/configuration Nonhazardous Locations LR67275 Network Connection Local port/ remote Field port LAN USB port LCD Display Display Touch screen RS-485/RS-232, selectable. Port may be used to communicate with Supervisor Software RS-232 is non-isolated, RJ-11 connection RS-485, 2-wire Isolated. Phoenix-style pluggable screw terminal connector with retaining screws. Maximum number of devices 256. Fail safe design with optional termination resistors Data Rate: 2400 to 57600 baud Maximum cable length for RS-485 not to exceed 4000 feet (1200 m). Cable to be shielded twisted pair RS-485 2-wire isolated. Used to communicate with external devices, such as NGC-30-CRM, 5GF-C and RMM2. Maximum cable length not to exceed 4000 ft (1200 m). Cable to be shielded twisted pair Phoenix style pluggable screw terminal connector with retaining screws. Maximum number of devices 256. Fail safe design with optional termination resistors Data rate to 9600 baud 10/100 Base-T Ethernet port with Link and Activity Status LEDs USB 2.0 Host port Type A receptacle LCD is a 6.5 inch QVGA, color TFT transflective device with integral CCFL backlight. 4-wire resistive touch screen interface for user entry. Usable with gloved fingers WARNING: This component is an electrical device which must be installed correctly to ensure proper operation and to prevent shock or INDUSTRIAL HEAT TRACING SOLUTIONS fire. Read these important warnings and carefully follow all the installation instructions. EN- RaychemNGCUITORD-IM-H57627 05/15 Component approvals and performance are based on the use of specified parts only. Do not use substitute parts. 1 / 8

Kit Contents Item Qty Description A 1 NGC-UIT-ORD display B 1 Sealing gasket C 10 #8 washers (stainless steel) D 10 #8/32 locknuts (stainless steel) E 1 5 ft. (1.5 m) RS-232 adaptor cable A C D B E Overview of Installation Procedure for NGC-UIT-ORD Page # A. Provide suitable panel enclosure, and determine 2 locations for NGC-UIT-ORD assembly in panel B. Cut opening and mount NGC-UIT-ORD on front of panel 3 C. Installing common alarm light 4 D. Connect power and communication to the UIT 4 E. Servicing 5 F. Cleaning 5 G. Configuration switches 5 H. Reset switch 5 I. Cutting template 7 A. Provide suitable panel enclosure, and determine locations for NGC-UIT-ORD assembly in panel 1. Provide suitable panel enclosure To protect its electronic components, the NGC-UIT-ORD must be mounted in a minimum NEMA 1 enclosure. A NEMA 12 or better enclosure is recommended. The NGC-UIT-ORD assembly comes with a sealing gasket and hardware to mount the enclosure. Panel door NGC-UIT-ORD assembly location Panel C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 Note: The Raychem NGC-UIT-ORD is designed for operation in ambient temperatures from 40 F to 149 F ( 40 C to 65 C). If the ambient temperature is outside this range, a space heater and/or cooling fan will be required in the panel. 2. Determine locations for the NGC-UIT-ORD assembly in the electrical panel The NGC-UIT-ORD should be located on the front of the panel near eye level (for convenient viewing). The NGC-UIT-ORD assembly is an electronic unit and must not be located where it will be exposed to strong magnetic fields or excessive vibration. Alarm light 1 3 5 7 9 11 13 15 17 19 21 23 25 27 CB1 CB3 CB5 CB7 CB9 CB11 CB13 CB15 CB17 CB19 CB21 CB23 CB25 CB27 CB29 CB31 CB33 CB35 CB37 CB39 CB2 CB4 CB6 CB8 CB10 CB12 CB14 CB16 CB18 CB20 CB22 CB24 CB26 CB28 CB30 CB32 CB34 CB36 CB38 CB40 CB42 2 4 6 8 10 12 14 16 18 20 22 24 26 28 29 30 31 32 33 34 35 36 37 38 39 40 INDUSTRIAL HEAT TRACING SOLUTIONS EN- RaychemNGCUITORD-IM-H57627 05/15 2 / 8

B. Cut opening and mount NGC-UIT-ORD on front of panel 1. Locate the NGC-UIT-ORD on front of panel Locate the NGC-UIT-ORD assembly on the front of the panel at a level convenient for viewing. Make sure the cover on the back of the assembly will not interfere with existing panel hardware. (Refer to full size cut-out template with all dimensions on page 7.) 6. Mount the user interface assembly onto the panel door Place the NGC-UIT-ORD assembly in position; the ten mounting screws go through the ten holes on the NGC-UIT- ORD assembly mounting plate (see figure below). Panel door Cutting Template 5.54 in (140.7 mm) 9.1 in (231 mm) Cutting Area Sealing gasket UIT display UIT display Note: Cutting the opening for the display is a craft sensitive procedure; if it is not done correctly, the panel door can be damaged. The procedure for laying out and cutting the opening for the display must be undertaken with care, and by personnel qualified and experienced in panel construction. 2. Prepare and mark the position of the display opening and mounting holes Use the cut-out template on page 7 to lay out the opening for the NGC-UIT-ORD display. Apply two layers of masking tape around the outer perimeter of the intended opening to prevent scratching the panel surface with the jigsaw. Use the template on page 7 to mark the opening and the mounting holes for the user interface assembly. 3. Cut the display opening Cut the opening for the NGC-UIT-ORD with a jigsaw using a 24 TPI blade. Take care not to damage the panel door. Remove all rough edges and burrs with a metal file before proceeding. 4. Drill the mounting holes Drill the 10 holes with a #16 (3/16 in) drill bit to mount the NGC- UIT-ORD assembly in the panel. Note: The following steps are most easily accomplished if the panel door is on a horizontal surface. 5. Position the gasket on the outside of the panel door Place the sealing gasket between the NGC-UIT-ORD and front side of enclosure door. Inside of panel door Place a #8 washer and #8/32 locknut on each of the ten mounting studs; fasten only hand tight. Look at the front of the panel, and align the NGC-UIT-ORD assembly so it is level (loosen nuts if necessary to reposition the NGC-UIT-ORD assembly). After the display and gasket are properly positioned, tighten the nuts to 10 inch pounds of torque using an 11/32 inch nut driver. Do not overtighten and risk damage to hardware. INDUSTRIAL HEAT TRACING SOLUTIONS EN- RaychemNGCUITORD-IM-H57627 05/15 3 / 8

C. Installing Common Alarm Light An alarm light must be installed on the front of the enclosure to indicate when an alarm has occurred. Relay 1 has already been programmed for this purpose, and must be connected as shown. 1 2 3 4 5 6 7 8 9 10 11 R Relay 1 120 Vac If desired, install a push-to-test alarm light and/or interposing relay and test button. Relay 1 D. Connect power and communication to the UIT Power and Earth Ground 1. Connect 100 to 240 Vac ±10% to AC input terminals (Line/L1 and Neutral/L2). Maximum wire size is 12 AWG, minimum wire size is 18 AWG. Ensure that branch circuit breaker does not exceed 15A and is installed in accordance with local electrical codes. 2. A ground conductor must be terminated at the ground terminal of the AC Input connector. Communication Field side port 1. This port is used to communicate with ModBus devices. Connections to these terminals should be a shielded, twisted pair cable. (Belden CDT cable 8761 or equivalent, maximum length is 4,000 ft [1.2 km]). For more information, refer to the NGC-30 Programming Guide (H58186) and the NGC-30 Installation Manual (H57878). Local port 1. This port is used to communicate to a host computer and is user selectable for either RS-232, RS-485 or Ethernet. 2. If the RS-232 port is utilized, the supplied RJ-11 to RS-232 adaptor cable must be used. For more information, refer to the NGC-30 Programming Guide (H58186) and the NGC-30 Installation Manual (H57878). NGC-30-CRM PC Note: When using RS-485 communication, use Belden cable 8761 or equivalent. RS-485 cable must not exceed 4000 ft. S S + + Chassis GRD To next NGC-30-CRM Select either RS-232, RS-485 or Ethernet. Refer to the NGC-30 Programming Guide (H58186), and the NGC-30 Installation Manual (H57878) for further details. RS-485 cable RS-232 cable Ethernet cable R Load Typical of Relay 2 Relay 1 Relay 2 120 Vac Up to 277 Vac 3 Amps Line/L1 100 to N/L2 240 Vac ±10% 10/100 Ethernet 1 2 3 4 5 6 1 2 3 4 5 6 7 8 9 10 11 1 2 3 SIG SIG + Shield Field SIG SIG + Shield Remote RS-232 (DCE) Local Relay 1 Relay 2 Relay 3 Line/L1 N/L2 RS-485 Ports Fail Safe Relay Outputs AC input Note: Relays are shown in the energized position (without an alarm condition). INDUSTRIAL HEAT TRACING SOLUTIONS EN- RaychemNGCUITORD-IM-H57627 05/15 4 / 8

E. Servicing The NGC-UIT-ORD contains no user-serviceable parts. Contact your Pentair Industrial Heat Tracing Solutions representative for service and an authorization number if required. Side View F. Cleaning The touch screen area of the NGC-UIT-ORD may be cleaned with a damp or dry cloth. Typical window cleaning agents may be applied to aid in the removal of dirt, dust and grease. Do not use abrasive cleaners. G. Configuration switches The configuration switches are found on the side of the NGC-UIT-ORD. Refer to the table below for settings. Position Switch On Off Comments TERM R-FIELD (Field Port Termination Select) Terminates local RS-485 network. TERM R-REMOTE (Remote Port Termination Select) Terminates remote RS-485 network connected to PC and Raychem Supervisor software. WDT (Watch Dog Timer) H. Reset switch 120 Ohm Termination Enabled (Factory Default) 120 Ohm Termination Enabled WDT Enabled (Factory Default) Termination Disabled Termination Disabled (Factory Default) WDT Disabled The Reset switch can be found on the side of the NGC-UIT- ORD. A pointed object is required to press the reset switch and restart the NGC-UIT software. For the local FIELD RS-485 network. If this NGC-UIT is the first or last RS-485 device in the network, it must be set to ENABLED/ON. If the NGC-UIT is NOT the first or last device, it must be set to DISABLED/OFF. For the REMOTE RS-485 network connected to a PC. If this NGC-UIT is the first or last RS-485 device in the remote network, it must be set to ENABLED/ON. If the NGC-UIT is NOT the first or last device, it must be set to DISABLED/OFF. WDT should normally be enabled INDUSTRIAL HEAT TRACING SOLUTIONS EN- RaychemNGCUITORD-IM-H57627 05/15 5 / 8

This Page Purposely Left Blank INDUSTRIAL HEAT TRACING SOLUTIONS EN- RaychemNGCUITORD-IM-H57627 05/15 6 / 8

0.24 in (6 mm) 1.84 in (47 mm) 3.0 in (76 mm) 1.84 in (47 mm) Cut here 0.24 in (6 mm) 2.12 in (54 mm) 3.0 in (76 mm) 3.0 in (76 mm) 2.12 in (54 mm) Cutting Template 5.54 in (140.7 mm) 9.1 in (231 mm) Cutout Area IMPORTANT: Before using this cutting template you must make sure it has printed to scale or you will damage your panel door. Printers* and copiers may make reductions from the original size. Please ensure the file has printed at 100% scale by using a ruler to confirm the dimensions are as marked on this template. *Adobe Acrobat may reduce the document layout by default to fit a generic printer's margins. Make sure scaling is turned off. 0.24 in (6 mm).ø 18 in (5 mm) THERMAL INDUSTRIAL MANAGEMENT HEAT TRACING 0.24 SOLUTIONS in (6 mm) EN-DigiTraceNGCUITORD-IM-H57627 10 places RaychemNGCUITORD-IM-H57627 01/13 05/15 7 / 8

WWW.PENTAIRTHERMAL.COM NORTH AMERICA Tel: +1.800.545.6258 Fax: +1.800.527.5703 Tel: +1.650.216.1526 Fax: +1.650.474.7711 thermal.info@pentair.com Europe, Middle East, Africa Tel: +32.16.213.511 Fax: +32.16.213.603 thermal.info@pentair.com Asia Pacific Tel: +86.21.2412.1688 Fax: +86.21.5426.2937 cn.thermal.info@pentair.com Latin America Tel: +1.713.868.4800 Fax: +1.713.868.2333 thermal.info@pentair.com Pentair and NGC are owned by Pentair or its global affiliates. All other trademarks are the property of their respective owners. Pentair reserves the right to change specifications without prior notice. 2013-2015 Pentair. INDUSTRIAL HEAT TRACING SOLUTIONS EN- RaychemNGCUITORD-IM-H57627 05/15 8 / 8