ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

Similar documents
A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

SEQUENCE OF OPERATION GUIDELINE. AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

Florida Department of Transportation

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

DIGI-VAV APPLICATIONS

Chilled Water DOAS Fan Powered Terminal Units

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

Job Name Control Systems Description Date

AIR DISTRIBUTION. C. Section Building Automation and Control System Guidelines. D. Section Fire Alarm System & Detection Systems

Air Handler Unit (AHU) Equipment Purchase and Delivery Invitation to Bid

terminal unit accessories

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

HVAC Controls Upgrades: Requirement Details ( )

SECTION AIR DUCT ACCESSORIES

DIVISION 15 MECHANICAL

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

SINGLE DUCT TERMINAL UNITS

HVAC Controls Upgrades: Requirement Details ( )

SECTION SPECIFICATION FOR HI-VELOCITY FAN COIL SYSTEMS

CALL FOR TENDER - MUNICIPALITY OF THE DISTRICT OF CLARE LITTLE BROOK, N.S.

A. American National Standards Institute (ANSI) : Establishes requirements applicable to certifying direct gas-fired heaters.

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

Design Standard. Thermal Systems (Chilled Water and Hot Water Systems) Detailed specifications follow. CHW AND HHW SUPPLY TEMPERATURE RESET

1. Delete BID FORM in its entirety and replace with the BID FORM attached to this Addendum.

Technical Assignment 3 11/15/04. Executive Summary

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

Modular Heating & Ventilating Unit Model IGX-HV

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Selected Laboratory Energy Efficiency Measures

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

FAN TERMINAL UNITS Constant Volume (Series Flow), Standard Design

1.1 This section applies to air handling units for HVAC Systems.

Power and Energy Management Solutions

COMcheck Software Version Review Mechanical Compliance Certificate

Digital Precise Air Control - DPAC

OSU Alumni Center Phase I Implementation Review. Oregon State University 130 Oak Creek Bldg. Corvallis, Oregon

DACC Health Sciences Building Air Handler Assessment/Study

IAQ: Re-tuning Commercial Buildings

THIS ADDENDUM MUST BE ACKNOWLEDGED.

SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING.

10+ HVAC Troubleshooting Tips for Healthcare Facilities Jerry Hirsch JCI Facility O&M Performance Development Manager.

UNIVERSITY OF ALASKA FAIRBANKS DIVISION 25- INTEGRATED AUTOMATION DESIGN STANDARDS SECTION INTEGRATED CONTROL OF FACILITY LAB FUME HOODS

Your Home. Jacco & Assoc.

BULLETIN. Temperature Controls (Chilled / Hot Water)

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner

DX-9100 Applications from Engineering Services

Building Automation System (BAS) Design Criteria

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Verasys System Operation Overview Technical Bulletin

Tualatin Valley Fire & Rescue Finance Department SW 70 th Ave., Tigard, OR Phone: , Fax:

A. American National Standards Institute (ANSI): Establishes requirements applicable to certifying direct gas-fired heaters.

York 25-Ton VAV Rooftop Unit

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

15900 HVAC INSTRUMENTATION AND CONTROLS

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

ISERIES VERTICAL AHU ENGINEERING SPECIFICATIONS

Modular Supply Make-Up Air Unit

SECTION AIR COOLED WATER CHILLERS

BOOK 1 OVERVIEW RD2XRT INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

Industrial Space Heating Direct Gas-Fired Heating. Greenheat 50/50 Recirculation

HVAC DISTRIBUTION and DELIVERY SYSTEMS

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

SECTION AIR COILS

THE FOLLOWING CHANGES/ADDITIONS TO THE ABOVE CITED SOLICITATION ARE ANNOUNCED:

Computing Services Center

PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY

Zoning System Design Manual

BULLETIN. Temperature Controls (Chilled Water) Phase III only (3/11/2010)

Problems Air and Water Distribution Systems

American University Design Standards

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

Virginia Tech Standards for Building Automation System

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS

Plenum Fans. Model HPA. Direct Drive

THERMA FUSER SIDEWALL LINEAR VAV DIFFUSER

Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1

control sequences model QST / EST Series Table 47: QST / EST Analog Electronic Control Strategies Fan Powered Air Terminals

Civil Engineering Building

SECTION PACKAGED, OUTDOOR, CENTRAL-STATION AIR-HANDLING UNITS

SECTION AIR COILS

Sequence of Operations (excerpt)

4. OVERVIEW OF MECHANICAL SYSTEM

BOOK 1 OVERVIEW RD2XIN INSTALLATION AND OPERATION MANUAL. Table of Contents ABOUT BOOK 1:

SUBJECT: ADDENDUM NO. 1 RFP# , FIRE ALARM SYSTEM SERVICE (DISTRICTWIDE) REPOST

CITY OF MILTON INVITATION TO BID (THIS IS NOT AN ORDER)

VariCool VAV Engineering Guide

ATTACHMENT D #1 - HVAC (OIL) - SINGLE FAMILY DWELLINGS Category C: OIL

THE ULTIMATE ROOFTOP SOLUTION

Yes, any other system must be clean agent, and the Fire Alarm Control Panel must be a single addressable Fire Alarm Control Panel.

TESTING, ADJUSTING AND BALANCING

Addendum Downsville Pike Hagerstown MD April 29, 2016

Transcription:

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT February 29, 2012 RFP NO: 17 PROJECT: Josephine County Justice Center HVAC Upgrades BID CLOSING DATE: NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM This Solicitation Addendum is issued to the above referenced bid and forms a part of the contract documents and modifies the original scope of work, specifications and drawings, requirements and deadlines. Except as changed by this Addendum, all terms, conditions, scope of work, plans, specification, requirements and deadlines in the original ITB and previous addenda remain unchanged. This Solicitation Addendum must be acknowledged by inserting its number on the appropriate blank lines in the Invitation to Bid. Failure to do so may result in rejection of Bid. ================================================================================ 1 Modification to Submission Requirements This item is included as a reminder. Addendum #2 It originally appeared in Prequalification Applications Insurance Certification Requirement. For those contractors who submitted prequalification applications to work with Josephine County, the insurance certificate indicating the required coverage will be due as a part of the bid submission due on March 8, 2012 no later than 2:00 PM. 2 Change Addendum 3 Attachment #1. One (1) page titled Section 1; Bid Form. To replace in its entirety page 2 of 13 from the ITB/Bid Response section. This revision adds three Alternates (F, G, and H) for DDC system. This is the second revision to this form. Ensure you submit the correct Bid Form with your Bid. 3 Change Addendum 3 Attachment #2. Three (3) pages labeled Attachment #2 provides additions and revisions to the Specifications including sections: 15880 Air Distribution, and 15900 DDC Controls; responses to Substitution Requests; and list of attached sketches. 4 Change Addendum 3 Attachment #3. Four (4) 8 ½ x 11 pages labeled Attachment #3 provides revisions to drawings M0.0, M5.1, M5.2. End of Addendum 3

Addendum 3 Attachment #1 SECTION 1: BID FORM Justice Center HVAC Upgrades The undersigned agrees, if this Bid is accepted, to enter into a contract with County to provide all labor, materials, transportation, equipment, services, and testing required to make a complete and finished Project as shown in the Project Drawings and Specifications and in accordance with the Project Schedule. ENERGY EFFICIENCY MEASURE #1 (DDC system): ENERGY EFFICIENCY MEASURE #2 (Replace existing mixing box to VAV s): ENERGY EFFICIENCY MEASURE #3 (Replace electric heating coils to hot water coils/new boilers): Base Bid: Base Bid: Base Bid: ADD ALTERNATES: TOTAL BASE BID: $ Energy Efficiency Measure #1 Alternates. Respond with a -0- for the vendor used in the Base Bid. Alternate A Alerton Technologies Alternate B Andover Controls Alternate C Delta Controls Alternate D Reliable Controls Corp. Alternate F Siemens Corp. Alternate G Johnson Controls Corp. Alternate H Honeywell Controls Corp. Other Alternates Alternate E Modifications to air handler serving the basement including $9,800 allowance for controls: Bidder s Signature: Print Name of Bidder: Date: BID RESPONSE Josephine County Page 2 of 13 Justice Center HVAC Upgrades

Addendum 3 Attachment #2 ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT February 29, 2012 PROJECT: Josephine County Justice Center HVAC Upgrades BID CLOSING DATE: March 8, 2012 / NOT LATER THAN 2:00 PM SPECIFICATIONS Note: Additions are shown in bold, deletions have a strikethrough. 15880 Air Distribution 1. 15880-2 Line 17 Variable Air Volume Terminal Box: Construct unit casings of 22 gauge galvanized steel fully lined with 1/2", 2 lb. density, neoprene coated fiberglass complying with the UL Standard 181 for erosion, and NFPA 90A for fire resistivity. Unit Inlets: Double round, oval, or rectangular with double thickness gasketed damper blade mounted in selflubricating bearings unless otherwise noted. Provide with attenuator or mixer to allow operation of heating & cooling duct damper in mixing range with heating and mixing airflow rate equal to 50% cooling air flow rate, and with cooling and heating duct inlet sizes the same. See schedule for size. VAV-1-13 shall be single duct without reheat section. ARI Certified: Test in accordance with ARI Standard 880. 15900 DDC Controls 1. 15900-39 Line 25 Heating Section Control: The heating system shall modulate based on percent heating load. During occupied mode, the BAS will modulate the heating valve to maintain discharge temperature setpoint (at hot deck temperature sensor) according to discharge temperature reset schedule. Heating system shall remain off during cool-down, night high limit, as well as during night purge mode. The heating system shall be off when outside air temperature is above 60 F (adjustable). Provide operator screen switch to enable operation of electric heating coil. Operation of electric heating coil is only for back-up heat on failure of boiler system serving this air handler. When energized electric heating system shall stage elements (2 stages) to maintain discharge temperature per sequence above. 2. 15900-44 Line 21 SEQUENCE OF OPERATION SINGLE ZONE CONSTANT VOLUME AIR HANDLING SYSTEMS (HV-1) (HV-2) Fan Enable / Optimal Start Control (Heating Mode) or Warm-Up Mode: Page 1 of 3

Addendum 3 Attachment #2 3. 15900-45 Line 50 Fan speed is reset to 0 (zero) Hz when the AHU is off. Coordinate signal from fire alarm panel to duct mounted smoke detector. One signal to detector disables fan (Hz = 0), waits 15 seconds (adjustable), and starts smoke damper closing. During morning warm-up, NNL, NHL, or purge operation fan static set point shall be at upper limit. Return Fan Control: Return fan will start (upon proof of operation) and stop with supply fan. Return fan speed shall modulate to maintain area served by air handler at 0.02 WC positive (Adj.) 4. 15900-49 Line 40 Zone Control: Individual zone temperature conditions during occupancy will be maintained within a heating/cooling range (initial setpoints, adjustable, 70 F heating and 75 F cooling, unless otherwise instructed by Engineer and Owner). Zone temperature heating/cooling setpoints will incorporate a throttling range of 2 F degrees (adjustable). Setpoints will be easily adjustable at both the operator s terminal and at the Maintenance Building remote operator s station. For zones that are cooling only operation (VAV-1-13) operate damper between full cooling mode and minimum to maintain space between 55º F and 85º F. Delete these zones from reset schedule calculation. During morning warm-up or night low limit,hot duct damper shall operate at full heating airflow position until space is at setpoint then modulate to maintain space temperature until occupied mode. During night purge high limit or morning cool down, operate cold duct damper at full cooling airflow position until space is at setpoint. Otherwise, modulate cooling or heating duct damper between heating and cooling ducts to maintain space temperature setpoint as follows: In cooling mode, as temperature approaches setpoint, cold air modulates from maximum to a minimum mix flow rate. Minimum flow rate equals heating flow rate. As temperature continues to drop, hot airflow modulates open as cold airflow closes, maintaining a minimum total flow rate. Lower heating flow rates require unequal inlet sizes to maintain control. A mixer/attenuator section is required. SUBSTITUTION REQUESTS 01030 Alternates 1. 01030-2 Line 5: Add following Alternates. Alternate F (EEM #1F): Provide direct digital controls system manufactured by Siemens Corp. and installed by an Siemens Corp. area representative only. Alternate G (EEM #1G): Provide direct digital controls system manufactured by Johnson Controls Corp. and installed by an Johnson Controls Corp. area representative only. Alternate H (EEM #1H): Provide direct digital controls system WEBs AX manufactured by Honeywell Controls Corp. and installed by an Honeywell Controls Corp. area representative only. Page 2 of 3

Addendum 3 Attachment #2 15050 Basic Mechanical Materials and Methods. 1. 15050-4 Line 5 Variable Speed Motor Controllers Add Yakzawa as an approved manufacturer. 15500 Heating Boilers 1. 15500-2 Line 42 Condensing Boilers Add Laars as an approved manufacturer. 2. 15500-4 Line 42 Copper Finned Boilers Add Laars as an approved manufacturer. 15880 Air Distribution 15880-2 Line 39 1. IAQ Damper - Add Greenheck IAQ - 42 damper with optional aluminum frame as approved product. 15900 DDC Controls 1. 15900-3 Line 12: Add following Alternates. Alternate F (EEM #1F): Provide direct digital controls system manufactured by Siemens Corp. and installed by an Siemens Corp. area representative only. Alternate G (EEM #1G): Provide direct digital controls system manufactured by Johnson Controls Corp. and installed by an Johnson Controls Corp. area representative only. Alternate H (EEM #1H): Provide direct digital controls system WEBs AX manufactured by Honeywell Controls Corp. and installed by an Honeywell Controls Corp. area representative only. DRAWINGS 1. ADD#3 M1-REF:M0.0 (8.5x11 revision sheet) Add Alternate F-H descriptions. 2. ADD#3-M2-REF:M5.1 (8.5x11 revision sheet) Revise chiller control schematic and points list as shown. 3. ADD#2-M3-REF:M5.2 (8.5x11 revision sheet) Revise VAV and HV-2 control schematics as shown. 4. ADD#3-M4-REF:M5.2 (8.5x11 revision sheet) Revise emergency generator, VAV and HV-2 points lists as shown. MFIA, Inc. Page 3 of 3

Addendum 3 / Attachment #3

Addendum 3 / Attachment #3

Addendum 3 / Attachment #3

Addendum 3 / Attachment #3