HOME. Installation and maintenance instructions. Installation and maintenance instructions. For the competent person GB, IE COMBI

Similar documents
Installation and maintenance

ecofit pure Installation and maintenance instructions Installation and maintenance instructions For the competent person GB, IE

ecofit pure Installation and maintenance instructions Installation and maintenance instructions For the competent person GB, IE

ecofit pure Installation and maintenance instructions Installation and maintenance instructions For the competent person GB, IE

Installation and maintenance

Operating instructions

Operating instructions

Operating instructions

ecotec plus Installation and maintenance instructions Installation and maintenance instructions For the competent person GB, IE

Operating instructions

Installation and maintenance

aurostor Installation and maintenance instructions Installation and maintenance instructions For the competent person GB, IE VIH S GB...

ecotec plus Installation and maintenance instructions Installation and maintenance instructions For the competent person GB, IE VU GB 656/4-5 A

ecocraft exclusive Installation and maintenance instructions Installation and maintenance instructions For the competent person GB, IE

Nitron Condense Nitron Condense 28 (H-TR)

ecotec pro Operating instructions Operating instructions For the operator GB, IE Gas-fired wall-hung high-efficiency boiler

ecotec pro Installation and maintenance instructions Installation and maintenance instructions For the competent person GB, IE VUW

ecotec plus boiler user guide

Installation and maintenance instructions. For the competent person. Installation and maintenance instructions. ecotec plus. VU 80, 100, 120 kw GB, IE

ecotec plus Installation and maintenance instructions Installation and maintenance instructions For the competent person GB, IE VU, VUW

ecotec plus Installation and maintenance instructions Installation and maintenance instructions For the competent person GB, IE VUI

For the owner. Operating manual. ecotec plus 937. Gas condensing storage combination boiler VUI

Operating instructions

Operating instructions. For the operator. Operating instructions. ecotec. Gas fired wall hung high efficiency boiler.

flexotherm exclusive Installation and maintenance instructions Installation and maintenance instructions For the competent person

Installation instructions. For the competent person. Installation instructions VRT 350 VRT 350 GB, IE

Operating instructions

Residential Gas Condensing Boiler Greenstar ZBR16/21/28/35/42-3A... ZWB28/35/42-3A...

/2010 US/CA

Installation instructions. For the heating engineer. Installation instructions. timeswitch VTS 160 GB, IE

T UNI 7000 F. Operating instructions For the user (2006/05) AU/GB

ecotec GB, IE Instructions for installation and servicing Wall hung room sealed fan assisted condensing boiler For the installer

Mikrofill Ethos Condensing combination boiler. Maintenance Instructions 24cc

O. Gas boiler. Gaz 6000 W WBN H-E-N/L-S2400. Operating instructions for the end customer (2017/09) en

Gas Instantaneous Water Heater

Mikrofill Ethos Condensing combination boiler

VIESMANN. Operating instructions VITODENS 050-W. for the system user. With constant temperature or weather-compensated control unit

Tankless Water Heater

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

allstor buffer cylinder Instructions for use Instructions for use For the operator Publisher/manufacturer Vaillant GmbH

Residential Gas Condensing Boiler Greenstar combi 100 p / 151 p ZWB28-3A... ZWB42-3A...

Standards of Training in Safe Gas Work Domestic Natural Gas Training Specification

Servicing manual. Wall-mounted condensing gas boiler 600 Series - 11S / 19S / 24S / 24C /2002 GB(EN) For trade use

Servicing manual. 600 Series - 11S / 19S / 24S / 24C. Wall-mounted condensing gas boiler. For trade use

Conversion Instructions Logano G234X. Gas boiler. Please read carefully before installing and servicing. Gas boiler

USER GUIDE. IMAX XTRA EL kW. For Installation Guide see reverse of book

User Manual FLOWMAX-90. for model. Condensing water heater 85,000 BTU. Installation, operating, commissioning and maintenance instructions.

POWERFLOW Series. Unvented Electric Storage Water Heaters. Installation & Operating Instructions Manual

Residential Gas Hybrid Water Heater

For the owner. Operating manual. ecotec. Gas wall boilers with condensing appliance technology VU 466/4 VU 656/4

USER GUIDE VOGUE COMBI GEN2 C26 C32 C40

Operating Instructions

SIME FORMAT WALL HUNG BOILERS MODEL 34i AND MODEL 34e. cod A

USER GUIDE LOGIC HEAT H

multimatic Operating instructions AT, BE (de), CH (de), DE VRC 700f/4

USER GUIDE VOGUE MAX SYSTEM

Installation and maintenance instructions

ecotec Instructions for installation and servicing Wall hung room sealed fan assisted condensing boiler For the installer

Universal Fire Tube Boiler Wall Mount Models

Operating instructions. For the operator. Operating instructions VRT 350. Room temperature-controlled controller GB, IE

User s Information Manual

CROWN WATER HEATERS CPU10 - CPU15 CPOS10 - CPOS15

Operating instructions

User s Information Manual

atmocraft VK 654/9-1654/9 DE/AT/GB/CZ/SK/HU/PL/HR/SI/SCG

Great Britain en. Installation, user and service manual. Control panel HMI Gas 310/610 ECO PRO

IDE 20 / IDE 30 / IDE 50 IDE 60 / IDE 80

Installation and maintenance instructions

USERS MANUAL FOR GAS BOILERS

ir-range 8G /03.15 Changes reserved.

Instructions for installation and use English. More documents on: H B /09

arotherm Installation instructions Installation instructions For the competent person VWL../2 A 230 V Publisher/manufacturer Vaillant GmbH

System s30. User Guide FAN POWERED HIGH EFFICIENCY MODULATING DOMESTIC CONDENSING GAS SYSTEM BOILER

VIESMANN. Service instructions VITOLADENS 300-T. for contractors. Vitoladens 300-T Type VW3B Inox-Radial heat exchanger for oil fired condensing Unit

Installation instructions. Pump Group. For wall hung gas-fired condensing boiler GB162-50/65/80/ TD UK/IE (2014/09)

24V dc Terminals X4. 230Vac Terminals X V dc Electrical connections Volt free Room thermostat on/off

Gas Fire Patio Heater Q9

Powerflow Unvented water heater

Gas Fired Residential Combi Boiler Floor and Wall Mount Models

USER'S INFORMATION MANUAL

TopGas Cascade Condensing Gas Boilers Technical Information and Assembly Manual Output range 60 to 720 kw /17 Subject to modification

Light oil / kerosene burner

JANUS 3 CIRCULATOR WATER HEATER INSTALLATION, COMMISSIONING & SERVICING INSTRUCTIONS G.C. No

WHE 2.24 / WHE 2.24 FF

ecotec exclusive GB, IE Installation and maintenance instructions

Operating instructions Page 12

User s Information Manual

GB24 & GB30. User Manual

USERS GUIDE. Esprit eco 24, 30. For installation guide see reverse of book

VIESMANN. Installation and service instructions VITODENS 111-W. for contractors

INSTALLATION, OPERATING AND SERVICING INSTRUCTIONS BG 2000-S (V13) RU PL DE IT ES NL EN 1 662Y0600 A

Installation Manual. For Australian refrigerator models: N304M.3 (93 liter 3-way operation with LP gas, 240 volts AC, or 12 volts DC )

INSTALLATION INSTRUCTIONS POINT OF USE WATER HEATERS EPU - US10 EPU - US15

User s Information Manual

General safety precautions English

VWZ MEH 61. Installation instructions and instructions for use. Installation instructions and instructions for use

SEALED THERMAL STORE

PowerVent. Installation manual (GB) English. Store this document in a safe place UK

Logic+ Combi

User s Information Manual Models: ER152, ER202, ER252, ER302, and ER402

Transcription:

Installation and maintenance instructions For the competent person Installation and maintenance instructions HOME COMI G, IE Publisher/manufacturer Vaillant GmbH erghauser Str. 40 D-4859 Remscheid Tel. +49 9 8 0 Fax +49 9 8 80 info@vaillant.de www.vaillant.de

Contents Contents Safety... 4. ction-related warnings... 4. Risk caused by inadequate qualifications... 4. Intended use... 4.4 General safety information... 4.5 Regulations (directives, laws, standards)... 6 Notes on the documentation... 7. Observing other applicable documents... 7. Storing documents... 7. Validity of the instructions... 7 Product description... 7. Compartment Ventilation... 7. Serial number... 7. Information on the identification plate... 7.4 Functional elements: Combination unit... 8.5 CE label... 8 4 Set-up... 8 4. Transporting the unit... 8 4. Unpacking the product... 8 4. Checking the scope of delivery... 8 4.4 Dimensions... 9 4.5 Minimum clearances... 9 4.6 Clearance from combustible components... 9 4.7 Using the installation template... 9 4.8 Wall-mounting the product... 9 4.9 Removing/installing the front casing... 0 4.0 Removing/installing the side section... 0 5 Installation... 5. Checking the gas meter... 5. Gas and water connections... 5. Connecting the drain line for the expansion relief valve... 5.4 Connecting the condensate drain pipework... 5.5 Connecting the drain cock... 5.6 Electrical installation... 6 Operation... 4 6. Using diagnostics codes... 4 6. Displaying the status codes... 4 6. Using check programmes... 5 7 Start-up... 5 7. Carrying out the initial start-up... 5 7. Checking the factory setting... 5 7. Checking and treating the heating water/filling and supplementary water... 5 7.4 voiding danger arising from insufficient water pressure... 6 7.5 Switching on the product... 7 7.6 Filling and purging the heating installation... 7 7.7 Filling the condensate siphon... 7 7.8 Filling the hot water circuit... 7 7.9 Checking and adjusting the gas ratio setting... 7 7.0 Checking leak-tightness... 9 8 dapting the unit to the heating installation... 0 8. urner anti-cycling time... 0 8. Setting the pump output... 0 8. Setting the bypass... 9 djusting the hot water temperature... 9. Setting the hot water temperature... 0 Handing the product over to the operator... Inspection and maintenance.... Observing inspection and maintenance intervals.... Procuring spare parts.... Checking the CO₂ content....4 Setting the CO₂ content....5 Removing the gas-air mixture unit....6 Cleaning the heat exchanger....7 Checking the burner... 4.8 Checking the ignition electrode... 4.9 Cleaning the condensate tray... 4.0 Cleaning the condensate siphon... 4. Cleaning the filter in the cold water inlet... 5. Cleaning the heating filter... 5. Installing the gas-air mixture unit... 5.4 Draining the product... 5.5 Checking the pre-charge pressure of the expansion vessel... 5.6 Completing inspection and maintenance work... 5 Troubleshooting... 5. Rectifying faults... 5. Calling up the fault memory... 6. Deleting the fault memory... 6.4 Resetting parameters to factory settings... 6.5 Preparing the repair work... 6.6 Replacing defective components... 6.7 Completing repair work... 9 Decommissioning the product... 9 4 Customer service... 9 ppendix... 0 Check programmes Overview... 0 Overview of diagnostics codes... 0 C Status codes Overview... 4 D Overview of fault codes... 5 E Connection diagram: Combination unit... 7 F Connection diagram: Combination unit (5 kw)... 8 G Inspection and maintenance work Overview... 9 H Opening in the air/flue pipe... 40 H. Positioning of the opening of a fan-supported flue gas pipe... 40 H. Horizontal terminal positioning... 4 I Commissioning Checklist... 4 J Combustion chart... 45 K Lengths of the air/flue pipe... 46 Installation and maintenance instructions HOME 000455_0

Contents L Technical data... 46 Index... 49 000455_0 HOME Installation and maintenance instructions

Safety Safety. ction-related warnings Classification of action-related warnings The action-related warnings are classified in accordance with the severity of the possible danger using the following warning signs and signal words: Warning symbols and signal words Danger! Imminent danger to life or risk of severe personal injury Danger! Risk of death from electric shock Warning. Risk of minor personal injury Caution. Risk of material or environmental damage. Risk caused by inadequate qualifications The following work must only be carried out by competent persons who are sufficiently qualified to do so: Installation Disassembly Installation Start-up Maintenance Repair Decommissioning Observe all instructions that are included with the product. Proceed in accordance with the current state of technology. Observe all applicable directives, standards, laws and other regulations.. Intended use There is a risk of injury or death to the user or others, or of damage to the product and other property in the event of improper use or use for which it is not intended. The product is intended as a heat generator for closed heating installations and for hot water generation. Depending on the gas-fired boiler type, the products referred to in these instructions must only be installed and operated in conjunction with the air/flue pipe accessories listed in the other applicable documents. Intended use includes the following: observance of accompanying operating, installation and servicing instructions for the product and any other system components installing and fitting the product in accordance with the product and system approval compliance with all inspection and maintenance conditions listed in the instructions. Intended use also covers installation in accordance with the IP class. ny other use that is not specified in these instructions, or use beyond that specified in this document shall be considered improper use. ny direct commercial or industrial use is also deemed to be improper. Caution. Improper use of any kind is prohibited..4 General safety information.4. Risk of death from escaping gas What to do if you smell gas in the building: void rooms that smell of gas. If possible, open doors and windows fully and ensure adequate ventilation. Do not use naked flames (e.g. lighters, matches). Do not smoke. Do not use any electrical switches, mains plugs, doorbells, telephones or other communication systems in the building. If it is safe to do so, close the emergency control valve or the main isolator. 4 Installation and maintenance instructions HOME 000455_0

Safety If possible, close the gas isolator cock on the product. Warn other occupants in the building by yelling or banging on doors or walls. Leave the building immediately and ensure that others do not enter the building. Notify the gas supply company or the National Grid +44 (0) 800 999 by telephone once you are outside of the building..4. Risk of death from escaping flue gas If you operate the product with an empty condensate siphon, flue gas may escape into the room air. In order to operate the product, ensure that the condensate siphon is always full..4. Risk of death due to blocked or leaking flue gas routes Installation errors, damage, tampering, unauthorised installation sites or similar can cause flue gas to escape and result in a risk of poisoning. What to do if you smell flue gas in the property: Open all accessible doors and windows fully to provide ventilation. Switch off the product. Check the flue gas routes in the product and the flue gas diversions..4.4 Risk of death due to explosive and flammable materials Do not use or store explosive or flammable materials (e.g. petrol, paper, paint) in the installation room of the product..4.5 Risk of death from electric shock There is a risk of death from electric shock if you touch live components. efore commencing work on the product: Unplug the mains plug. Or disconnect the product from the power supply by switching off all power supplies (electrical partition with a contact opening of at least mm, e.g. fuse or line protection switch). Secure against being switched back on again. Wait for at least minutes until the condensers have discharged..4.6 Risk of death due to lack of safety devices The schematic drawings included in this document do not show all safety devices required for correct installation. Install the necessary safety devices in the system. Observe the applicable national and international laws, standards and guidelines..4.7 Risk of poisoning and burns caused by escaping hot flue gases Only operate the product if the air/flue pipe has been completely installed. With the exception of short periods for testing purposes, only operate the product when the front casing is installed and closed..4.8 Risk of being burned or scalded by hot components Only carry out work on these components once they have cooled down..4.9 Risk of injury due to the heavy weight of the product Make sure that the product is transported by at least two people..4.0 Risk of corrosion damage due to unsuitable combustion and room air Sprays, solvents, chlorinated cleaning agents, paint, adhesives, ammonia compounds, dust or similar substances may lead to corrosion on the product and in the flue gas guiding. Ensure that the supply of combustion air is always free of fluorine, chlorine, sulphur, dust, etc. Ensure that no chemical substances are stored at the installation site. If you are installing the product in hairdressing salons, painter's or joiner's workshops, cleaning businesses or similar 000455_0 HOME Installation and maintenance instructions 5

Safety locations, choose a separate installation room in which the room air is technically free of chemical substances..4. Risk of corrosion damage due to unsuitable combustion and room air Sprays, solvents, chlorinated cleaning agents, paint, adhesives, ammonia compounds, dust or similar substances may lead to corrosion on the product and in the air/flue pipe. Ensure that the supply of combustion air is always free of fluorine, chlorine, sulphur, dust, etc. Ensure that no chemical substances are stored at the installation site. If you are installing the product in hairdressing salons, painter's or joiner's workshops, cleaning businesses or similar locations, choose a separate installation room in which the room air is technically free of chemical substances..4. Risk of material damage caused by frost Do not install the product in rooms prone to frost..4. Risk of material damage caused by using an unsuitable tool Use the correct tool to tighten or loosen screw connections..5 Regulations (directives, laws, standards) Observe the national regulations, standards, guidelines and laws. 6 Installation and maintenance instructions HOME 000455_0

Notes on the documentation Notes on the documentation. Observing other applicable documents You must observe all the operating and installation instructions included with the system components.. Information on the identification plate The identification plate is mounted on the underside of the product in the factory. The identification plate keeps record of the country in which the product is to be installed.. Storing documents Pass these instructions and all other applicable documents on to the system operator.. Validity of the instructions These instructions apply only to: Product article number HOME COMI 5 - (H-G) HOME COMI 0 - (H-G) HOME COMI 5 - (H-G) rticle number Gas Council Number 0000990 47-044-6 000099 47-044-6 000099 47-044-64 These products are only designed for natural gas systems. Product description. Compartment Ventilation The boilers are very high efficiency appliances. s a consequence the heat loss from the appliance casing during operation is very low. Compartment ventilation is not required as the products are only certified, and can only be fitted with a concentric flue system.. Serial number The serial number can be found on the identification plate () ( Page 7). Stickers showing the serial number are on the back of the electronics box (). Information on the identification plate Serial number HOME COMI XX, Gxx xx mbar (x kpa) Cat. Condensing technology Type: Xx(x) PMS PMW V/Hz W IP Pn Pnc P Qn Qnw T max. NOx Code (DSN) GC no. Meaning arcode with serial number For quality control purposes; rd and 4th digits = year of production For quality control purposes; 5th and 6th digits = week of production For identification purposes; 7th to 6th digits = product article number For quality control purposes; 7th to 0th digits = place of manufacture Product designation Gas group and gas connection pressure as set at the factory pproved gas category Efficiency class of the boiler in accordance with EC Directive 9/4/EEC Permissible flue gas connections Maximum water pressure in heating mode Maximum water pressure in hot water handling mode Electric connection Max. electrical power consumption Level of protection Heating mode Hot water generation Nominal heat output range in heating mode Nominal heat output range in heating mode (condensing technology) Nominal heat output range in hot water handling mode Nominal heating load range in heating mode Nominal heating load range in hot water handling mode Max. flow temperature NOx class for the product Specific product code Gas council number 000455_0 HOME Installation and maintenance instructions 7

4 Set-up.4 Functional elements: Combination unit 4 Set-up 0 9 4. Transporting the unit Important: With regard to the regulations of 99 concerning the manual handling of loads, the unit exceeds the weight that can be lifted by a single person. 8 7 6 5 4 4 5 4.. General Hold the load as close as possible to your body. void rotational movements. Instead, reposition your feet. If the unit is being lifted by two persons, ensure your movements are coordinated during lifting. void bending your upper body do not lean forwards or to the side. Wear suitable non-slip protective gloves in order to protect your hands against sharp edges. Ensure that you are carrying the load securely. If required, get somebody to assist you in this. 4.. Unloading the box from the delivery van It is recommended that two people lift the unit together. Lift the box using the straps provided. Use safe lifting techniques keep your back straight and bend your legs at the knee. Hold the load as close as possible to your body. If the unit is being lifted by two persons, ensure your movements are coordinated during lifting. If required, get somebody to assist you in this. 8 7 6 4. Unpacking the product Electronics box Heating circuit expansion relief valve Plate heat exchanger 4 Condensate siphon 5 Flue gas pipe 6 Pressure sensor 7 Flue gas measuring stub pipe 8 Ignition transformer 9 Gas valve.5 CE label 0 ir intake pipe Ignition electrode Fan Primary heat exchanger 4 Heating expansion vessel 5 Flow rate sensor 6 Heating pump 7 ypass 8 Diverter valve. Remove the product from its box.. Remove the protective film from all of the product's components. 4. Checking the scope of delivery Check that the scope of delivery is complete. Quantity Description Heat generator ag with accessories ag with seals Condensate drain hose Drain spigot of the expansion relief valve Hanging bracket ag containing the hydraulic connections Enclosed documentation The CE label shows that the products comply with the basic requirements of the applicable directives as stated on the identification plate. The declaration of conformity can be viewed at the manufacturer's site. 8 Installation and maintenance instructions HOME 000455_0

Set-up 4 4.4 Dimensions 4.5 Minimum clearances C C D Minimum clearances C D 50 mm 50 mm 0 mm Note 600 mm Note C 50 mm (required clearance for removing the side section) 5 mm (for cabinet-type casing) 4.6 Clearance from combustible components D Dimensions C D 740 mm 0 mm 00 mm 48 mm It is not necessary to maintain a specified clearance between the product and components made of combustible materials. 4.7 Using the installation template Use the installation template to ascertain the locations at which you need to drill holes and make breakthroughs. 4.8 Wall-mounting the product. Check whether the wall has sufficient load-bearing capacity to bear the operational weight of the product.. Wall-mount the product as described using the adapted fixing material provided on-site. 000455_0 HOME Installation and maintenance instructions 9

4 Set-up Conditions: The load-bearing capacity of the wall is sufficient, The fixing material may be used for the wall. Pull the front casing forwards at the bottom edge. 4. Lift the front casing upwards from the bracket. 4.9. Fitting the front panel Refit the components in the reverse order. 4.0 Removing/installing the side section 4.0. Removing the side section Caution. Risk of material damage caused by mechanical deformation. Wall-mount the product as described. Conditions: The load-bearing capacity of the wall is not sufficient Ensure that wall-mounting apparatus on-site has a sufficient load-bearing capacity. Use individual stands or primary walling, for example. Do not wall-mount the product if you cannot provide wall-mounting apparatus with a sufficient load-bearing capacity. Removing both side sections may cause mechanical distortion in the product, which may cause damage to the piping, for example, and potentially result in leaks. lways remove only one side section never both side sections at the same time. Note If there is sufficient lateral clearance (at least 50 mm), you can remove the side section to facilitate maintenance or repair work. 4.9 Removing/installing the front casing 4.9. Removing the front casing C C x D. Tilt the electronics box forward.. Hold on to the side section so that it cannot fall and unscrew both screws (), one from the top and one from the bottom.. Tilt the side section to the outside and move it downwards and out.. Undo the two screws ().. Gently press the front casing backwards in the centre so that the latching lug is released. 0 Installation and maintenance instructions HOME 000455_0

Installation 5 4.0. Installing the side section Refit the components in the reverse order. Only solder connection pieces if the connection pieces are not yet screwed to the service valves. 5 Installation Danger! Risk of explosion or scalding caused by incorrect installation. Stresses in the connection cable can cause leaks. Make sure there is no stress in the connection cables when they are installed. Caution. Risk of material damage caused by residues in the pipelines. Welding remnants, sealing residues, dirt or other residues in the pipelines may damage the product. Flush the heating installation thoroughly before installing the product. 5. Checking the gas meter Make sure that the existing gas meter is capable of passing the rate of gas supply required. Note pply thermal insulation to the water pipes to the boiler outlet and to the system. Preliminary work. Check that the system volume and the volumetric capacity of the expansion vessel are compatible. If the volume of the expansion vessel is insufficient for the system. Install an additional expansion vessel in the heating return, as close to the product as possible. Install a non-return flap at the product's outlet (heating flow).. Ensure that the system has the following components: cold water stop cock for the unit gas stopcock for the unit filling and draining device in the heating installation 4 5 5. Gas and water connections Caution. Risk of damage caused by incorrect gas connection installation. Excess test pressure or operating pressure may cause damage to the gas valve. Check the leak-tightness of the gas valve using a maximum pressure of kpa (0 mbar). Caution. Risk of material damage caused by corrosion Due to non-diffusion-tight plastic pipes in the heating installation, air gets into the heating water. ir in the heating water causes corrosion in the heat generator circuit and in the product. If you use non-diffusion-tight plastic pipes in the heating installation, ensure that no air gets into the heat generator circuit. Caution. Risk of material damage due to heat transfer during soldering. Heating flow connection, G/4 Hot water connection, G/4 Gas connection, G/ 4 Connection for the cold water supply line, G/4 5 Heating return connection, G/4. Connect the water and gas connections in accordance with the applicable standards.. Purge the gas line before start-up.. Check whether the connections ( Page 9) are leaktight. 000455_0 HOME Installation and maintenance instructions

5 Installation 5. Connecting the drain line for the expansion relief valve s with other pipe work insulate the condensate discharge pipe to minimise any risk of freezing and beware when crossing cavities that the fall is maintained and the pipe sleeved. You can find further information in specification "S 6798" for installing and maintaining gas-fired boilers with a nominal heat loading under 70 kw. 5.5 Connecting the drain cock Ensure that the pipeline is visible. The pipe must have a continuous fall and be routed to a position so that any discharge of water, possibly boiling, or steam cannot create any danger to persons, damage to property or external electrical components and wiring. The components must be set up in such a way that you can see the water flowing out. 5.4 Connecting the condensate drain pipework Connect a hose to the drain cock () and guide the free end of the hose to a suitable outflow location. 5.6 Electrical installation Danger! Risk of death from electric shock! The power supply terminals L and N remain live even if the product is switched off: Switch off the power supply. Secure the power supply against being switched on again. Follow the instructions listed here and observe directives and local regulations on condensed water discharge. Use PVC or another material that is suitable for draining the non-neutralised condensed water. If you cannot guarantee that the materials from which the drain lines are made are suitable, install a system for neutralising the condensate. 5.6. Opening and closing the electronics box Note The condensate drain pipework must have a continuous fall (45 mm per metre) and should whenever possible terminate at a suitable drain point within the heated envelope of the building that will remain frost free under long periods of low external temperatures. Connect the condensate siphon (). Use the supplied drain hose () for this. Connect a condensate discharge pipe (.5 mm, not included in the scope of delivery) to the drain hose (). During installation remove all burs from inside of cut pipe work and avoid excessive adhesive which may trap small pockets of water close to the pipe wall which can freeze and build into a larger ice plug.. To open the electronics box, follow the instructions in the specified sequence.. To close the electronics box, follow the instructions in reverse order. Installation and maintenance instructions HOME 000455_0

Installation 5 5.6. Cable route 0V 4V / eus The applicable regulations state that the connection must be made via an electrical partition with a contact opening of at least mm at each pole.. Make sure that the rated voltage of the mains is 0 V.. Provide one common electricity supply for the boiler and for the corresponding controller: Power supply: Single-phase, 0 V, 50 Hz Cover plate: 4. Open the electronics box. 5. Observe the routing of the power supply cable () in the electronics box in order to guarantee that there is no strain. 4-V eus cable route 0-V eus cable route 0 mm 5.6. Carrying out the wiring L N RT X 0V~ 0 mm max.. Shorten the connection cables to the appropriate lengths to prevent them from causing damage inside the electronics box.. Screw the plug to the connection cable.. Plug the plug into the slot provided on the PC. 5.6.4 Establishing the power supply 6. Carry out the wiring. ( Page ) 7. Screw the supplied plug to a three-core mains connection cable that complies with the relevant standards. 8. Connect the plug for the mains connection cable. 9. Make sure that access to the mains connection is always available and is not covered or blocked. 0. Close the electronics box.. Observe all valid regulations. 000455_0 HOME Installation and maintenance instructions

6 Operation 5.6.5 Connecting controllers to the electronic system.off urner off 4 V US 6 Operation 6. Using diagnostics codes You can use the parameters marked as in the table of diagnostics codes to adapt the product to the system and customer requirements. Overview of diagnostics codes ( Page 0) RT US RT US 4V = - + X06 urner off 4V= RT + US 6.. ctivating diagnostics codes. Press and hold the button for 7 seconds. is shown in the display.. Press the or button to set the value. X X X4 The access code (96) is reserved for the competent person. The access code (5) is reserved for the customer service.. Press the button to confirm. 4 is shown in the display. Safety thermostat for floor-standing heating 4 V controller eus controller or radio receiver unit 4 Outside temperature sensor, wired. Open the electronics box.. Carry out the wiring. ( Page ). Connect the individual components depending on the type of installation. Conditions: If installing a multi-circuit controller. Change the pump operating mode (d.8) from Eco (intermittent pump operating mode) to Comfort (continuous pump operating mode). Conditions: If you are connecting a controller (0 V). 6.. Setting a diagnostics code. Press the or button to select the diagnostics code.. Press the button to confirm. The value and/or status of the diagnostics code is shown in the display.. Press the or button to set the value. 4. If you allow the value to flash for three seconds, the setting is automatically confirmed. is shown in the display for second. Note You can manually confirm the setting at any time by pressing and holding the button for less than seconds. L N 0 mm RT X 0V~ 5. Proceed accordingly for all parameters that need to be changed. 6. Press and hold the button for seconds to finish configuring the diagnostics codes. The display switches to the basic display. Connect the controller to the main plug. Remove the bridge from the plug 4V=RT. 4. Close the electronics box. 6. Displaying the status codes The status codes display the product's current operating status. Status codes Overview ( Page 4) 6.. ctivating the status codes display. Hold the button down for more than 7 seconds. S.XX is shown on the display, followed by the heating flow temperature, the internal system pressure and the cylinder temperature (depending on the version).. Press the button to exit this menu. 4 Installation and maintenance instructions HOME 000455_0

Start-up 7 The display switches to the basic display. 6. Using check programmes y activating various check programmes, you can trigger various special functions on the product. Check programmes Overview ( Page 0) 6.. Calling up the check programmes. Hold the button down for more than 5 seconds. ll symbols are shown in the display. is shown in the display.. Press and hold the button for five seconds. is shown in the display.. Press the or button to select the check programme. 4. Press the button to confirm. on is shown in the display and the programme starts. 5. Press the and buttons at the same time whilst running a check programme. The heating water temperature and the filling pressure for the heating installation are shown alternately in the display. 6. Press the button to return to the check programme. The display shows the check programme. 7. Press the button to finish the check programme. OFF is shown in the display. 8. Press and hold the button for seconds to finish the check programmes. End is shown in the display. The display switches to the basic display. Note If you do not press any button for 5 minutes, the current programme is automatically cancelled and the basic display is shown. 7 Start-up 7. Carrying out the initial start-up Initial start-up must be carried out by a customer service technician or an authorised competent person using the firstcommissioning-checklist. The first-commissioning-checklist in the appendix ( Page 4) of the installation instructions must be filled in and stored carefully along with the unit's documentation. Carry out the initial start-up using the first-commissioning-checklist in the appendix. Fill out and sign the first-commissioning-checklist. 7. Checking the factory setting Caution. Risk of material damage caused by making unauthorised settings. Never modify the factory setting of the gas pressure regulator of the gas valve. The product combustion is checked on-site and pre-set to the type of gas specified on the identification plate. Check the information about the type of gas indicated on the identification plate and compare this with the type of gas available at the installation location. Conditions: The product model is not compatible with the local gas type. Do not start up the product. Conditions: The product model is compatible with the local gas type. Proceed as described below. 7. Checking and treating the heating water/filling and supplementary water Caution. Risk of material damage due to poor-quality heating water Ensure that the heating water is of sufficient quality. 6.. Displaying the pressure and temperature of the heating during a check programme. Press the buttons simultaneously. Display the filling pressure in the heating installation. Display the heating flow temperature.. Press the button to display the check programme currently running. efore filling or topping up the system, check the quality of the heating water. Checking the quality of the heating water Remove a little water from the heating circuit. Check the appearance of the heating water. If you ascertain that it contains sedimentary materials, you must desludge the system. Use a magnetic rod to check whether it contains magnetite (iron oxide). If you ascertain that it contains magnetite, clean the system and apply suitable corrosion-protection measures, or fit a magnet filter. Check the ph value of the removed water at 5 C. If the value is below 6.5 or above 8.5, clean the system and treat the heating water. Ensure that oxygen cannot get into the heating water. 000455_0 HOME Installation and maintenance instructions 5

7 Start-up Checking the filling and supplementary water efore filling the system, measure the hardness of the filling and supplementary water. Treating the filling and supplementary water Observe all applicable national regulations and technical standards when treating the filling and supplementary water. Provided the national regulations and technical standards do not stipulate more stringent requirements, the following applies: You must treat the heating water in the following cases: If the entire filling and supplementary water quantity during the operating life of the system exceeds three times the nominal volume of the heating installation, or If the guideline values listed in the following table are not met, or if the ph value of the heating water is less than 6.5 or more than 8.5. Total heating output kw Water hardness at specific system volume ) 0 l/kw ppm CaCO₃ mol/ m³ > 0 l/kw 50 l/kw ppm CaCO₃ mol/ m³ > 50 l/kw ppm CaCO₃ < 50 < 00 < 00 0.0 > 50 to 00 > 00 to 600 mol/ m³ 00 50.5 0.0 50.5 0.0 0.0 > 600 0.0 0.0 0.0 ) Nominal capacity in litres/heating output; in the case of multiboiler systems, the smallest single heating output is to be used. Caution. The use of unsuitable heating water may cause aluminium corrosion and a resulting lack of leak-tightness. In contrast to steel, grey cast iron or copper, for example, aluminium reacts with alkaline heating water (ph value > 8.5) to produce substantial corrosion. When using aluminium, make sure that the ph value of the heating water is between 6.5 and a maximum of 8.5. Caution. Risk of material damage if the heating water is treated with unsuitable additives. Unsuitable additives may cause changes in the components, noises in heating mode and possibly subsequent damage. Do not use any unsuitable frost and corrosion protection agents, biocides or sealants. No incompatibility with our products has been detected to date with proper use of the following additives. When using additives, follow the manufacturer's instructions without exception. We accept no liability for the compatibility of any additive or its effectiveness in the rest of the heating system. dditives for cleaning measures (subsequent flushing required) dey MC+ dey MC5 Fernox F Sentinel X 00 Sentinel X 400 dditives intended to remain permanently in the system dey MC+ Fernox F Fernox F Sentinel X 00 Sentinel X 00 dditives for frost protection intended to remain permanently in the system dey MC ZERO Fernox ntifreeze lphi Sentinel X 500 If you have used the above-mentioned additives, inform the operator about the measures that are required. Inform the operator about the measures required for frost protection. 7.4 voiding danger arising from insufficient water pressure The filling pressure must be between 0.0 and 0.5 MPa (.0 and.5 bar). Note If the heating flow temperature is shown in the display, press and hold the and buttons at the same time for longer than five seconds, or temporarily deactivate heating mode in order to display the pressure. If the heating installation extends over several storeys, higher filling pressures may be required to avoid air entering the heating installation. If the water pressure falls below 0.05 MPa (0.5 bar), the value flashes in the display. If the water pressure falls below 0.0 MPa (0. bar), the product switches off. The display shows 0.0 MPa (0.0 bar). Fault F will be stored in the fault list. Top up the water in the heating installation to start up the product again. The pressure value flashes in the display until a pressure of 0.05 MPa (0.5 bar) or higher has been reached. 6 Installation and maintenance instructions HOME 000455_0

Start-up 7 7.5 Switching on the product 7.7 Filling the condensate siphon Switch on the product via the main switch installed onsite. 7.6 Filling and purging the heating installation Preliminary work Flush the heating installation through. C. Check the silicone hose connection () between the pump's automatic air vent and the hydraulic console.. Fill with water until the required filling pressure is reached. Recommended filling pressure:.5 bar The heating and hot water functions cannot be activated. The pressure value flashes in the display until a pressure of 0.05 MPa (0.5 bar) or higher has been reached. n automatic air vent function is activated if the pressure exceeds 0.05 MPa (0.5 bar) for longer than 5 seconds.. Purge each radiator until the water escapes normally, and then retighten the system's purging valves. 4. Check whether all connections are leak-tight. Conditions: If the noise persists in the boiler Purge the product again by activating check programme (P.07) and then (P.06). Check programmes Overview ( Page 0). Unclip the lower section of the siphon () from the upper section of the siphon ().. Remove the float ().. Fill the lower section of the siphon with water up to 0 mm below the upper edge of the condensate drain pipework. 4. Re-insert the float (). Note Check that the float is present in the condensate siphon. 5. Clip the lower section of the siphon () into the upper section of the siphon (). 7.8 Filling the hot water circuit. Open the water tap to fill the hot water circuit.. Close the water tap once the appropriate volume of water has flowed out. The hot water circuit is filled.. Check all connections and the entire system for leaktightness. 7.9 Checking and adjusting the gas ratio setting Only a qualified competent person is authorised to implement the settings on the gas valve. Each destroyed seal must be restored. The CO adjusting screw must be sealed. Never modify the factory setting of the gas pressure regulator of the gas valve. 7.9. Checking the gas flow rate The gas flow rate has been set during production and does not require adjustment. With the front casing fitted check the gas flow rate of the boiler as follows: Start up the product with the check programme P.0. 000455_0 HOME Installation and maintenance instructions 7

7 Start-up In addition, ensure that maximum heat can be dissipated into the heating system by turning up the room thermostat. Wait at least 5 minutes until the boiler has reached its operating temperature. Ensure that all other gas appliances in the property are turned off. Measure the gas flow rate at the gas meter. Compare the measured values with the corresponding values in the table. Qnw from the data plate H gas in m³/h Nom. +5% 0% 5..6.70.46 8.4.95.05.76 4.7.6.74.5 5.7.7.86.45 8.6.0.8.7 0.6.4.40.9 5.7.78.97.40 Conditions: Gas flow rate not in the permissible range Check all of the piping and ensure that the gas flow rates are correct. Only put the product into operation once the gas flow rates have been corrected. Conditions: Gas flow rate in the permissible range End the check programme P.0. llow the boiler to cool down by allowing pump overrun to operate for a minimum of minutes. Record the boiler maximum gas flow rate onto the enchmark gas boiler commissioning checklist. 7.9. Checking the gas connection pressure (gas flow pressure). Ensure that the gas inlet working pressure can be obtained with all other gas appliances in the property working.. Close the gas isolator cock ().. Undo the sealing screw on the measuring nipple (). 4. Connect a pressure gauge to the measuring nipple (). 5. Open the gas isolator cock (). 6. Start up the product with check programme P.0 (system with eus controller) or P.0 (system without eus controller). 7. In addition, ensure that maximum heat can be dissipated into the heating system by turning up the room thermostat. Permissible connection pressure Great ritain Natural gas G0.7 kpa (7.0 0 mbar) 9. Should the pressure recorded at the reference test point in the boiler be lower than indicated check if there is any blockage in the pipework or if the pipework is undersized. Conditions: Gas flow pressure not in the permissible range Caution. Risk of material damage and operating faults caused by incorrect gas connection pressure. If the gas connection pressure lies outside the permissible range, this can cause operating faults in and damage to the product. Do not make any adjustments to the product. Do not start up the product. If you cannot correct the failure, notify the gas supply company and proceed as follows: End check programme P.0. llow the boiler to cool down by allowing pump overrun to operate for a minimum of two minutes. Close the gas isolator cock. Remove the pressure gauge and retighten the sealing screw () for the measuring nipple. Open the gas isolator cock (). Check the measuring nipple for gas tightness. Close the gas isolator cock (). Fit the front panel. ( Page 0) Disconnect the product from the power mains. You must not start up the boiler. Conditions: Gas flow pressure in the permissible range End the check programme P.0. llow the boiler to cool down allowing pump overrun to operate for a minimum of two minutes. Close the gas isolator cock (). Remove the pressure gauge and retighten the sealing screw () for the measuring nipple. Open the gas isolator cock (). Check the measuring nipple for gas tightness. Fit the front panel. ( Page 0) Reset boiler controls for normal operation. Record the appliance gas inlet working pressure (kpa resp. mbar) in the enchmark gas boiler commissioning checklist. 8. With the boiler operating at full load check that the gas inlet working pressure at the reference test point () complies with the requirements. 8 Installation and maintenance instructions HOME 000455_0

Start-up 7 7.9. Checking the leak-tightness of the flue gas installation and flue gas recirculation. Check the flue gas installation is intact in accordance with the latest gas safe technical bulletin and information supplied in the installation instructions.. For extended flue gas installations check for flue gas recirculation using the air analysis point.. Use a flue gas analyser. 4. If you discover CO or CO in the supply air, search for the leak in the flue gas installation or for signs of flue gas recirculation. 5. Eliminate the damage properly. 6. Check again whether the supply air contains any CO or CO. 7. If you cannot eliminate the damage, do not start up the product. 7.9.4 Thoroughly flushing the heating installation ("hot"). Operate the appliance until the boiler and the heating system are up to temperature.. Check the heating system for leaks.. Connect a hose to the drain valve located at the lowest position of the heating system. 4. Shut off the boiler, open the drain valve and all purge valves on the radiators and allow the water to flow out of the heating system and the boiler quickly and fully. 5. Close the drain valve. 6. Fill and purge the heating installation. ( Page 7) 7. Re-fill the system until the system design pressure of 0, MPa (,0 bar) is attained. Note The actual reading on the digital pressure gauge should ideally be 0,05 MPa (0,5 bar) plus an additional pressure corresponding to the highest point of the system above the base of the boiler 0 m head equals an additional bar reading on the pressure gauge. The minimum pressure should not be less than 0, MPa ( bar) in any installation. If the system is to be treated with an inhibitor it should be applied at this stage in accordance with the manufacturer s instructions. Further information can be obtained from Sentinel, etz Dearborn Ltd., Tel: 05 40 9595, or Fernox, lpha Fry technologies. Tel: 0870 87006. 8. Fit the front panel. ( Page 0) 7.9.5 Checking the CO₂ content. Start up the product with the check programme (P.0) and set the value. Setting value for the programme P.0: 00 Check programmes Overview ( Page 0). Wait until the value that is read is stable. Waiting period for reading a stable value: 5 min. Unscrew the cover from the flue gas analysis point (). 4. Measure the CO₂ content at the flue gas analysis point (). 5. Compare the measured value with the corresponding value in the table. Checking the CO₂ content Great ritain Removed front casing/installed front casing Natural gas G0 9. ± % The value is OK. The value is not OK; you cannot start up the product. Inform Customer Service. 7.0 Checking leak-tightness Check the gas pipe, the heating circuit and the hot water circuit for leak-tightness. Check that the air/flue pipe has been installed correctly. Conditions: Room-sealed operation Check whether the vacuum chamber has been sealed so that it is leak-tight. 7.0. Checking the heating mode. ctivate the heating mode on the user interface.. Turn all thermostatic radiator valves on the radiators until they are fully open.. llow the product to operate for at least 5 minutes. 4. Purge the heating installation. 5. ctivate the display for the current operating status. ( Page 4) Status codes Overview ( Page 4) If the product is working correctly, the display shows S.04. 000455_0 HOME Installation and maintenance instructions 9

8 dapting the unit to the heating installation 7.0. Checking the hot water generation. ctivate the hot water handling mode on the user interface.. Open a hot water valve completely.. ctivate the display for the current operating status. ( Page 4) Status codes Overview ( Page 4) If the product is working correctly, the display shows S.4. 8 dapting the unit to the heating installation You can reset/change the system parameters (section "Using diagnostics codes"). Overview of diagnostics codes ( Page 0) 8. urner anti-cycling time To prevent frequent switching on and off of the burner and thus prevent energy losses, an electronic restart lockout is activated for a specific period each time the burner is switched off. The burner anti-cycling time is only active for the heating mode. Hot water handling mode during a burner anti-cycling time does not affect the time function element. 8.. Setting the maximum burner anti-cycling time. Set the diagnostics code. ( Page 4) Overview of diagnostics codes ( Page 0). If required, adjust the maximum burner anti-cycling time using the diagnostics code d.0. 8.. Resetting the remaining burner anti-cycling time Hold the button down for more than seconds. is shown in the display. 8. Setting the pump output Conditions: Modulating pump The product is equipped with a speed-regulated high-efficiency pump, which adjusts independently to the hydraulic conditions of the heating installation. If a low loss header is installed in the heating installation, we recommend switching off the speed regulation and setting the pump output to a fixed value. If required, use diagnostics code d.4 to adjust the setting for the operating-mode-dependent pump speed. Set the diagnostics code. ( Page 4) Overview of diagnostics codes ( Page 0) Flow rate-pressure curves for 5 kw (pressure measured downstream of the valves) 70 60 50 40 0 0 0 4 0 500 000 500 Maximum speed (bypass closed) Maximum speed (default setting for the bypass) Minimum speed (default setting for the bypass) 4 Flow rate at maximum output (ΔT = 0K) Throughput in circuit (l/h) vailable pressure (kpa) Flow rate-pressure curves for 0 kw (pressure measured downstream of the valves) 70 60 50 40 0 0 0 4 0 500 000 500 Maximum speed (bypass closed) Maximum speed (default setting for the bypass) Minimum speed (default setting for the bypass) 4 Flow rate at maximum output (ΔT = 0K) Throughput in circuit (l/h) vailable pressure (kpa) Flow rate-pressure curves for 5 kw (pressure measured downstream of the valves) 70 60 50 40 0 0 0 4 0 500 000 500 Maximum speed (bypass closed) Maximum speed (default setting for the bypass) Minimum speed (default setting for the bypass) 0 Installation and maintenance instructions HOME 000455_0

djusting the hot water temperature 9 4 Flow rate at maximum output (ΔT = 0K) Throughput in circuit (l/h) 8. Setting the bypass Conditions: Modulating pump vailable pressure (kpa) If the pump operating parameter d.4 is set to uto ( p limit), the default setting must not be changed. Caution. Risk of material damage caused by incorrect setting of the high-efficiency pump When the pressure at the bypass valve is increased (turning clockwise), malfunctions may occur if the pump output is set below 00%. In this case, set the pump output to 5 = 00% using diagnostics parameter d.4. 9. Setting the hot water temperature Danger! Risk of death from Legionella. Legionella multiply at temperatures below 60 C. Ensure that the operator is familiar with all of the nti-legionella measures in order to comply with the applicable regulations regarding legionella prevention. Set the hot water temperature. Conditions: Water hardness: >.57 mol/m³ Hot water temperature: 50 0 Handing the product over to the operator When you have finished the installation, attach the sticker supplied (in the operator's language) to the product cover. Explain to the operator how the safety devices work and where they are located. Inform the operator how to handle the product. In particular, draw attention to the safety information which the operator must follow. Inform the operator of the necessity to have the product maintained on a regular basis. Instruct the operator about measures taken to ensure the supply of combustion air and flue gas pipe. Regulate the pressure using the adjusting screw (). Fit the front panel. ( Page 0) Position of the adjusting screw Right-hand stop (screwed all the way in) Mid-position (six anticlockwise rotations) Five further anti-clockwise rotations starting from the mid-position Notes/application If the radiators do not heat up sufficiently at the default setting. In this case, you must set the pump to the maximum speed. Default setting If noises are produced in the radiators or radiator valves. 9 djusting the hot water temperature Inspection and maintenance. Observing inspection and maintenance intervals Note When replacing components, use only original seals supplied, no additional sealants are necessary dhere to the minimum inspection and maintenance intervals. The inspection may require maintenance to be carried out earlier, depending on the results. Inspection and maintenance work Overview ( Page 9) You can reset/change the system parameters ( section "Using diagnostics codes"). Overview of diagnostics codes ( Page 0) 000455_0 HOME Installation and maintenance instructions

Inspection and maintenance. Procuring spare parts The original components of the product were also certified by the manufacturer as part of the declaration of conformity. If you use other, non-certified or unauthorised parts during maintenance or repair work, this may void the conformity of the product and it will therefore no longer comply with the applicable standards..4 Setting the CO₂ content Conditions: The CO₂ content must be adjusted We strongly recommend that you use original spare parts from the manufacturer as this guarantees fault-free and safe operation of the product. To receive information about the available original spare parts, contact the contact address provided on the reverse of these instructions. If you require spare parts for maintenance or repair work, use only the spare parts that are permitted for the product.. Checking the CO₂ content. Start up the product with the check programme (P.0) and set the value. Setting value for the programme P.0: 00 Check programmes Overview ( Page 0). Wait until the value that is read is stable. Waiting period for reading a stable value: 5 min Remove the sticker. Turn the screw () to set the CO₂ content (value with front casing removed). To increase the CO₂ content: Turn anti-clockwise To decrease the CO₂ content: Turn clockwise Only carry out the adjustment in increments of /8 turn and wait approximately minute after each adjustment until the value has stabilised. Compare the measured value with the corresponding value in the table. Setting the CO₂ value Great ritain. Unscrew the cover from the flue gas analysis point (). 4. Measure the CO₂ content at the flue gas analysis point (). 5. Compare the measured value with the corresponding value in the table. Checking the CO₂ content Great ritain Removed front casing/installed front casing Natural gas G0 9. ± % The value is OK. The value is not OK; you cannot start up the product. Set the CO₂ content. ( Page ) CO₂ at full load Set for Wobbe index W₀ O₂ at full load CO at full load Removed front casing/installed front casing Natural gas G0 9. ±0. % 4.09 kw h/m³ 4.5 ±.8 vol. % 50 ppm CO/CO₂ 0.007 If the setting is not in the specified adjustment range, you must not start up the product. Inform Customer Service. Check whether the air-quality requirements with regard to carbon monoxide are fulfilled. Fit the front panel. Installation and maintenance instructions HOME 000455_0