Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach

Similar documents
ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

Karen A. Duhring Marine Advisory Scientist Center for Coastal Resources Management Virginia Institute of Marine Science College of William & Mary

FirstLight Power Shoreline Management Manual Sustainable Shoreline Designs: From Long Island to Lake Erie Webinar Series

Lake Nokomis Shoreline Enhancement Project

Biotechnical streambank stabilization

2014 HDR 2014 Architecture, HDR, Inc., all all rights reserved. reserved.

Green or Grey Solutions? Why not both? Lessons from the Mid-Atlantic on Hybrid Living Shorelines

Bio-Engineering Techniques to Revegetate Streambanks

April 11, 2016 Park Board Chair and Commissioners General Manager Vancouver Board of Parks and Recreation New Brighton Salt Marsh - Preferred Concept

WETLAND SOD u Bare Root Wetland Plants u Deep Rooted Willows u Coir Logs u Native Trees & Shrubs u Habitat Islands u Custom Growing

Phase 1 Habitat Replacement & Reconstruction

NATURAL LAKE & STREAMBANK PROTECTION & NATURAL BUFFERS. By Sam Martin, Water Management Specialist, Pine SWCD

Vegetating Disturbed Road & Stream Banks. By Mike Fournier NRCS Resource Conservationist

BASS PONDS, MARSH, & WETLAND HABITAT RESTORATION PROJECT

Stormwater Standards. Clackamas County Service District No. 1. Planting Guide for Buffers

Stop Losing Ground to Erosion. Kimberly Laframboise Ecologist Michalski Nielsen Associates limited

STREAM ALTERATION PRACTICES

Tentatively Selected Plan within Harlem River, East River and Western Long Island Sound Planning Region. First Level Costs. Federal Non-Federal Total

A comparison of Traditional and Prefabricated Encapsulated Soil Lifts

Applied Ecological Services, Inc. Sustainable Solutions for Over 30 Years.

OLD BUSINESS NEW BUSINESS A. JIM CONWAY 2016-WTRA B. KENNETH CALISE 2016-WTRA C. SAGIE DORON 2016-WTRA-00060

Introduction. Integrating Ecological Restoration of Estuarine Shorelines with Urban Community Revitalization Efforts. Ed Morgereth Biohabitats, Inc.

Use of Best Management Practices

Options for Managing Coastal Erosion. Presentation by: Ashley Sprague

McArthur Swamp Planning Unit. Fish, Plant, and Wildlife Habitat MCARTHUR SWAMP PLANNING UNIT

Presentation to Parks and Open Space Advisory. Committee September 22, 2016

Welcome. Tannery and Waterworks Parks Shoreline Improvements Environmental Assessment. Public Information Centre #1 November 27, pm to 8 pm

Natural Shorelines. for Inland Lakes. A Landowner s Guide to using. to STABLIZE SHORELINES, Michigan s inland lakeshore.

Wisconsin Dept. of Transportation November 2017

Bioengineered designs

Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project

Meeting Agenda. City of Guelph. River Systems Advisory Committee. Agenda Items. Item 1, 2 and 3. Item 4 Ward to Downtown Pedestrian Bridge

Monitoring and Maintenance Permit Process

Site Preparation. What to Look for in a Vegetation Implementation Plan. Plant Community Goals (restoration checklist) Plant Community Goals

Information for File MMJ Main Stem Bassett Creek Restoration Project

D RAFT MEMORANDUM CURRENT PLANTING TECHNIQUES. Technique 1: Bioengineered Brush Layering. To: Date: January 20, 2016

Funding, Designing, and (eventually) Building Miles of Shoreline and Acres of Wetlands and Oyster Reefs on an Urbanized River!

Restoration of Riparian Buffer at the Former Smelt Hill Dam Site, Falmouth, Maine

A Landowner s Guide to Creating Woodland Pools for Amphibians and Other Wildlife

PUBLIC SPACE/AMENITY PROJECTS

Wetlands Board Hearing Procedures

Balancing Conservation and Development on the Jordan River

Restoring Water Ecosystems in NYC Parks

PICTURE CANYON Planning Riparian-Wetland Refugia in an Urban Setting

Department of Agriculture. Conservation Service. United States. Natural Resources REVISED 8/26/16

Hunts Point Landing, Bronx, New York

NEIGHBORHOOD WATER RESOURCES ENHANCEMENT GRANT OPPORTUNITIES

Natural Shoreline Landscapes on Michigan Inland Lakes. Introduction. Workshop for Property Owners. Photo by Jane Herbert

Regional Restoration Planning:

Bristol Marsh Heritage Conservancy

North Carolina Coastal Federation

5 TH ANNUAL CAPE COASTAL CONFERENCE

Wisconsin NRCS Direct Volume Method Bank Recession Rate Categorizations

Is a Riparian Restoration Still Viable After 100-year Storm Events Alter the Original Design?

MILL POND OVERLOOK. A project of the Town of Oyster Bay. Prepared by Cameron Engineering & Associates, LLP

Peninsular Florida Landscape Conservation Cooperative. Marine and Estuarine Priority Resources and Conservation Targets

WQ-03 STORMWATER WETLAND

Stream Restoration: Working with Nature?

Stream Restoration: Working with Nature? Greg Jennings, PhD, PE

The Reedville Living Shoreline

Landscaping for Wildlife

Ecological Restoration of Seneca Lake State Park

STREAM BANK STABILIZATION THORPS MORTIMER RECREATION AREA Grandfather Ranger District SITE LOCATION & DRAINAGE AREA

BEST MANAGEMENT PRACTICES Spurge Laurel(Daphne laureola) (Family Thymelaeaceae Daphne Family)

Kootenai River Habitat Restoration Program June 18, 2018 Kootenai Valley Resource Initiative Update

Banking on Natural Fibers Products made from coir and jute play a key role in stabilizing a restored stream for a commercial stream mitigation bank.

Healthy Living Strategy: Shorelines

Pike River Restoration Adaptive Design: Restoring Structure and Function in an Urban Floodplain - from cabbages to cordgrass

HOW TO CONTROL STREAMBANK EROSION

ROLE OF LANDSCAPE CONSERVATION COOPERATIVES IN EVERGLADES RESTORATION

Reconnecting to a Forgotten River St. Cloud MN. Aaron Hanson Design Design Thesis LA 572, Thesis, Spring 2012

RIVER TRAINING STRUCTURES

Pontchartrain Coastal Lines of Defense Program Figure 1 Figure 2 Figure 1

July 22, 2013 REQUEST FOR PROPOSALS TO PROVIDE ENGINEERING DESIGN SERVICES FOR A PROJECT ALONG THE WESTERN SHORE OF MOBILE BAY

Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall

Juneau Watershed Partnership

Applications of Coir Fibre Products in Environmental Erosion & Sediment Control and Restoration

Guidelines for Designing Wildlife Friendly Ponds

Hiawatha Drain County Drain or Habitat Restoration?

Template for Restoration in a Lake Superior Area of Concern. Template for Restoration in a Lake Superior Area of Concern

Once Upon a Gravel Pit: Reconnecting Floodplain through Aggregate Extraction

FISH RESTORATION PROGRAM AGREEMENT Implementing Habitat Restoration Requirements Of The Biological Opinions

Sconset Geotextile Tube Update Sconset Bluff, Nantucket. Maria Hartnett, Associate

Property. Line. Fence. Plantings. Vegetated Buttress. With Sun Tolerant. Vegetated Terrace. Tolerant Plantings Existing

A Cooperative Effort Between:

North Branch of Cypress Creek Ecological Restoration: A Comprehensive Approach to Stream Restoration

Coquitlam River Riparian Planting

Moses Lake Shoreline Landscape Design

CHAPTER 5. Soil Bioengineering Techniques

319 Grant: Baker Creek & Centenary Creek Restoration Initiative

Planning for Staten. Habitat Restoration and Green Infrastructure. Island s North Shore

The scope of the plan will focus on the Prospect Heights Slough and Hillcrest Lake as one entity.

Plants for Rain Gardens and Pond Edges

Baylands Segment J. Bay between the Golden Gate and Segment J. Coyote Point. of For managed ponds. included habitat enhancement.

Stream Bank Erosion: Soil Bioengineering Solutions

Stormwater Management for Homeowners Fact Sheet 6: Buffers

Soil bioengineering and ecological

Beneficial Use at Deer Island A Decade of Design and Implementation. Mississippi Water Resources Conference Jackson, Mississippi April 3, 2012

Guiding Landowners in Stream Restoration. The Science, Practice & Art of Restoring Native Ecosystems 2015

2017 Summer Projects

Transcription:

Habitat Improvements to the Motor Island Shoreline in the Upper Niagara River, NY: A Collaborative Approach Edward Alkiewicz 1, Stephen Schoenwiesner 1, Jeff Gerlach 1, Morris Perot 2, Scott Ault 2, Mark Bowen 2, and Alan Haberstock 2 New York Power Authority 1 and Kleinschmidt Associates 2 August 1, 2011 NCER 11 Baltimore, MD 8/1/2011 - NCER'11 1

Motor Island Outline Background Impetus and collaborative approach Project objective Island history Collaborative design process Design considerations Basis for design 3-Part design approach Proposed habitat improvements Project status Take home 8/1/2011 - NCER'11 2

Impetus for the Project In 2005, the Niagara Power Project applied for a new FERC license (received 2007) Collaborative stakeholder process developed Settlement Agreement; calls for series of habitat improvement projects Ecological Standing Committee NYPA, USFWS, NYSDEC, NYSDOS Seneca Nation of Indians, Tuscarora Nation, Tonawanda Seneca Nation New York Rivers United, Niagara Relicensing Environmental Coalition 8/1/2011 - NCER'11 3

Collaborative Design Approach Continued collaborative stakeholder involvement ESC assigned advisory and design review role Working meetings Consultation Consensus approval ESC/Agency involvement throughout the project Establish and refine objectives Local knowledge and expertise Landowner and resource consultation historic, RTE, etc. Design review 10%, 50%, 90% stages Permitting 8/1/2011 - NCER'11 4

Motor Island Location 6-acre island in the Upper Niagara River (above Niagara Falls) Part of State- Designated Significant Coastal Fish and Wildlife Habitat area 8/1/2011 - NCER'11 5

Motor Island State-owned; managed by NYSDEC for wildlife habitat Used as boat club in early 1900s Tennis courts Boat slips Chimney Sidewalks Building May 5, 2011 8/1/2011 - NCER'11 6

Erosional Forces Wind Fetch = 1.25 miles from SW Winds >50 mph every year Waves Ice >2 ft trough to crest Storm surge ~4 ft above normal water levels Large vessel wakes 2 3 ft thick 8/1/2011 - NCER'11 7

Motor Island Shoreline Stabilization History Early 1900 s crib wall built Vertical timber face backfilled with riprap 1980s Concrete blocks placed along top of crib wall 8/1/2011 - NCER'11 8

Motor Island Existing Conditions Protected habitat for colonial nesting birds (egret, heron) Wild celery beds valuable for water birds, muskellunge, smallmouth bass Managed wildlife habitat Limited public use 8/1/2011 - NCER'11 9

Motor Island Existing Conditions Concrete sidewalk Wetland Concrete tennis courts SAV Wetland Pilings and docks No SAV in nearshore areas Concrete blocks on cribwall

Project Objective Original objective maintain shoreline protection and avoid SAV and fish impacts Sheet pile design concept Since 2007 ESC and NYSDEC broadened focus to include gradual shoreline transitions to increase ecological diversity 8/1/2011 - NCER'11 11

Design Considerations Shoreline Protection Dissipate wave energy Prevent ice damage Habitat Goals (Collaborative) Increase topographic variability Greater habitat diversity and complexity in aquatic, wetland and riparian areas Control invasive plants Construction Limitations Limit environmental impact Ice and severe winter weather Biological exclusion period (April to July 15) Benefit/cost 8/1/2011 - NCER'11 12

Basis for Design Ice damage is largest threat to the design Field surveys to identify Reference conditions Existing conditions o Wetlands and SAV o Invasives o RTE species o Soils/geotechnical survey o Archaeological Phase 1B survey Appropriate armor size Small shoreline scallops for protected transitional habitat ESC and NYSDEC input to refine design Expertise and local knowledge 8/1/2011 - NCER'11 13

Reference Vegetation Survey 8/1/2011 - NCER'11 14

3-Part Design Approach Location Specific Enhancements 1. Grade shoreline to dissipate wave energy, create habitat pools and transitional slopes Low-profile berms, scallops, wave runup zone, riparian pockets 2. Bioengineering to protect soils Stone, coconut fiber coir logs and matting, live stakes and posts, ice protection boulders 3. Habitat features Willow logs, rootwads, protected pools Native plantings seed, herbaceous plugs, shrubs, and trees based on localized observations of species and elevation ranges 8/1/2011 - NCER'11 15

Habitat Enhancement Zones Location Specific Enhancements 0 UPLAND 1 RIPARIAN 2 SHORELINE ZONE HABITAT REPRESENTATIVE SPECIES 3 SHALLOW EMERGENT 4 DEEP EMERGENT Upland trees and grasses over spoils/tennis court Native riparian trees, shrubs, herbs Wetland shrub vegetation in cobble substrate along shoreline and in breakwaters Shallow emergent marsh and cobble beach. Deep emergent marsh and cobble beach. Staghorn sumac, box elder, red oak Red and silver maple, chokeberry, bayberry Willows and red-osier dogwood Hardstem & softstem bulrush, giant bur-reed Pickerel weed, arrowhead, hardstem bulrush 5 DEEP POOL Deep pool Natural colonization 6 LOW-PROFILE BERM Unvegetated low-profile berm Natural colonization 8/1/2011 - NCER'11 16

Proposed Habitat Improvements Proposed wetland Invasive species control Protected pools New upland forest habitat Remove concrete blocks; protect toe of existing cribwall Protected pools behind cribwall Invasive species control Pilings to remain; Piers to be removed Rounded Ice protection rocks

Motor Island Proposed Design 11 habitat features (2.52 acres) deep pool, emergent, wetland, riparian, meadow and reforestation

Motor Island Feature B Protected pool with emergent habitat Root wads, coir fiber logs, live stakes

Motor Island Feature G Protected pool with deep pool and emergent habitat Wetland and riparian habitat Root wads, coir fiber logs, live stakes

Project Status Project will benefit 2.52 acres of open water, existing and created wetland, riparian reforestation, and upland shrub meadow habitat Submitted Joint Permit Application May 2011 USACE, Buffalo District NYSDEC NYSDOS Preparing specifications and RFP package Target construction dates Excavation late-july to October 2012 Planting mid-march to mid-july 2013 8/1/2011 - NCER'11 21

Take Home Collaborative design process: Takes longer o Coordination and manage focus Leads to much better projects (greater ecological benefits) o Vast resource of local knowledge, history, and experiences o Extensive expertise contributed by resource managers Fosters greater stakeholder buy-in 8/1/2011 - NCER'11 22