Yonge Street Zoning Amendment Application - Preliminary Report

Similar documents
Queen Street West - Zoning Amendment Application - Preliminary Report

646 Kingston Road - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

4155 Yonge Street Official Plan Amendment and Rezoning Application Preliminary Report

1071 King Street West Zoning Amendment Application - Preliminary Report

393, 395, 397, 399, 401 and 403 Spring Garden Avenue Official Plan and Zoning By-law Amendment Application Preliminary Report

Bloor St. W. Rezoning - Preliminary Report

523, 525 and 525A Adelaide Street West - Zoning Amendment Application - Preliminary Report

5959 Yonge Street Rezoning Application - Preliminary Report

Wellington Street West - Zoning Amendment Application - Preliminary Report

1296 Kennedy Road - Zoning Amendment Application - Preliminary Report

4121 Lawrence Avenue East Rezoning Application Preliminary Report

30 and 44 Zorra Street - Zoning By-law Amendment Application - Preliminary Report

7437, 7439 and 7441 Kingston Road - Zoning By-law Amendment and Site Plan Control Applications - Preliminary Report

and Richmond Street West - Official Plan Amendment Application - Preliminary Report

Yonge Street Zoning Amendment Application Final Report

599 Kennedy Road - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

60-64 Queen Street East and Church Street - Zoning Amendment Application - Preliminary Report

10 Park Lawn Rd - Zoning Amendment Application- Preliminary Report

4780 Eglinton Avenue West - Zoning By-law Amendment and Draft Plan of Subdivision Applications - Preliminary Report

350, 370, and 390 Queens Quay West Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

8 Oak Street - Official Plan and Zoning By-law Amendment Application - Preliminary Report

Director, Community Planning, North York District

280 Manse Road - Official Plan Amendment, Zoning Amendment, Draft Plan of Subdivision Applications - Preliminary Report

Planning and Growth Management Committee. Chief Planner and Executive Director, City Planning Division. Pg12013 (File No NNY 34 OZ)

1-17 Anndale Drive, Bales Avenue and Glendora Avenue Zoning Amendment Application Preliminary Report

49 to 51 Camden St - Zoning Amendment Application - Preliminary Report

1151 Queen Street East - Zoning Amendment Application - Preliminary Report

70 and 80 Wicksteed Avenue, 202, 204 and 206. Parkhurst Boulevard and 99 Vanderhoof Avenue

From: Director, Community Planning, Scarborough District. Ward 40 Scarborough-Agincourt

2494 Danforth Avenue - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

From: Director, Community Planning, Etobicoke York District

112 College Street Zoning Amendment Application Preliminary Report

240 and 242 Finch Avenue West Zoning By-law Amendment Application Preliminary Report

333 College Street and 303 Augusta Avenue - Official Plan Amendment, Zoning Amendment Applications - Preliminary Report

North York Community Council. Director, Community Planning, North York District. Ward No. 26, Don Valley West

11 Charlotte Street - Zoning Amendment and Site Plan Applications- Request for Direction Report

Official Plan Review: Draft Built Form Policies

71 75 Curlew Drive - Zoning Amendment Application - Preliminary Report

8 & 10 Donalda Crescent Official Plan & Rezoning Application Final Report

251 Manitoba Street- Official Plan Amendment and Zoning By-law Amendment Application- Preliminary Report

Bayview Avenue Official Plan Amendment, Zoning Amendment and Site Plan Control Applications Request for Direction Report

Main Street - Zoning Amendment Application - Preliminary Report

1350 Ellesmere Road and 1560 Brimley Road Zoning Amendment Application - Preliminary Report

150 Eighth Street Zoning By-law Amendment Application Preliminary Report

Avenue Road and Pears Avenue - Zoning Amendment Application - Preliminary Report

20 & 50 Ashtonbee Road, 1920 & 1940 Eglinton Avenue East, and 880, 890 & 900 Warden Avenue Zoning Amendment Application Final Report

4569 Kingston Road Zoning Amendment Application - Preliminary Report

1285 Queen Street East - Zoning Amendment Application - Request for Direction Report

1141 Bloor Street West, 980 Dufferin Street, and 90 Croatia Street Combined Official Plan and Zoning Amendment Application - Preliminary Report

Yonge Street and 2-8 Cumberland Street Zoning Amendment Application - Preliminary Report

2161 Yonge Street - Zoning Amendment Application - Preliminary Report

2450 Victoria Park Avenue Official Plan Amendment Application Preliminary Report

2376 Dundas Street West, Zoning Amendment Application - Preliminary Report

Eglinton Avenue East & 50 Thermos Road - Official Plan Amendment Application Preliminary Report

Broadview Avenue Zoning Amendment Application Final Report

St. Lawrence Neighbourhood Focused Area - Official Plan Amendment Status Report

Church Street, and 111 Bond Street - Zoning Amendment Application Final Report

Director, Community Planning, North York District

King Street West - Zoning Amendment Application - Preliminary Report

Director, Community Planning, Etobicoke York District

30 Bay Street and 50 Harbour Street - Zoning Amendment Application - Preliminary Report

844 Don Mills Road & 1150 Eglinton Avenue East - Official Plan Amendment Application - Preliminary Report

2655 Lawrence Ave East - Rezoning Application - Preliminary Report

Director, Community Planning, Toronto and East York District

1050 Sheppard Avenue West - Official Plan Amendment and Zoning By-law Amendment Applications - Request for Direction Report

Church Street and 117 Dundas Street East Zoning By-law Amendment - Request for Direction Report

5 Scrivener Square, 4-10 & 10R Price Street & Yonge Street - Official Plan and Zoning Amendment Applications - Preliminary Report

8 Elm Street - Zoning By-law Amendment Refusal Report

2901 Bayview Avenue and 630 Sheppard Avenue East - Official Plan Amendment and Zoning Amendment Application - Preliminary Report

Sheppard Avenue East Zoning Amendment Application Refusal Report

The application was submitted on March 28, A notice of complete application with regard to the application was issued on April 26, 2018.

Community Consultation Meeting

1891 Eglinton Avenue East Official Plan Amendment Application Preliminary Report

3500 Eglinton Avenue West and 55 Ray Avenue Zoning Amendment - Preliminary Report

158, 164, 181 and 200 Sterling Rd - Official Plan Amendment and Zoning Amendment Applications - Preliminary Report

1407 Military Trail Zoning Amendment Application Final Report

Jarvis Street Zoning Amendment Request For Direction Report

Director, Community Planning, Etobicoke York District

Demolition of a Designated Heritage Property Roncesvalles Avenue

3686 and 3688 St Clair Avene East Zoning Application Final Report

1 Eglinton Avenue East Zoning Amendment Application Final Report

33 Gerrard Street West and 22 Elm Street - Zoning Amendment Application - Request for Direction Report

4800 Yonge Street - Official Plan Amendment, Zoning Amendment and Site Plan Applications - Request for Direction Report

Queen Street East/Ashbridge Precinct Planning Study- City-Initiated Official Plan Amendment and Urban Design Guidelines Final Report

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

Richmond Street West - Zoning Amendment Application - Request for Direction Report

Welcome. Walk Around. Talk to Us. Write Down Your Comments

2301 Brimley Road, Brimley Road, and 175 Commander Boulevard Rezoning Application Request for Direction Report

CP Railway Lands St. Clair Avenue West and Jane Street Official Plan Amendment and Rezoning Applications Final Report

4155 Yonge Street - Official Plan and Zoning Amendment Applications - Preliminary Report

Pearl Street and 15 Duncan Street - Zoning Amendment Application - Request for Direction Report

361 The West Mall and 24 Eva Road - Zoning By-law Amendment Application - Request for Direction Report

South of Eastern Strategic Direction Status Update

Dundas Street East Zoning Amendment Final Report

Lawrence Avenue West Zoning By-law Amendment Application Final Report

178 Carruthers Properties Inc.

Official Plan Amendment to Further Protect Heritage Views of City Hall, Old City Hall and St. James Cathedral - Preliminary Report

50 Wellesley Street East and Dundonald Street Official Plan Amendment and Zoning Amendment Applications Request for Direction Report

2706, 2708, 2710, 2720, and 2730 Dundas St. W. - Zoning Amendment Application - Request for Directions Report

King-Spadina Secondary Plan Community Consultation Meeting. Michelle Knieriem, City Planner October 11, 2017

Transcription:

STAFF REPORT ACTION REQUIRED 341-355 Yonge Street Zoning Amendment Application - Preliminary Report Date: March 24, 2011 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning, Toronto and East York District Ward 27 Toronto Centre-Rosedale 11 146654 STE 27 OZ and 11 146675 STE 27 SA SUMMARY This application was made on or after January 1, 2007 and is subject to the new provisions of the Planning Act and the City of Toronto Act, 2006. Ryerson University proposes to construct a 9-storey mixed-use institutional building with retail at and below grade at 341-355 Yonge Street. The primary purpose of the development is a new student learning centre for the university. This report provides preliminary information on the above-noted application and seeks Community Council's direction on further processing of the applications and on the community consultation process. Next steps include a community consultation meeting scheduled for May 4, 2011. The applicant is required to submit a detailed transportation study which will address the parking, loading, access and circulation issues of the proposal. A final report is targeted for the third quarter of 2011. Target dates assume that the applicant will provide all required information in a timely manner. Staff report for action Preliminary Report 341-355 Yonge Street 1

RECOMMENDATIONS The City Planning Division recommends that: 1. Staff be directed to schedule a community consultation meeting for the lands at 341-355 Yonge Street together with the Ward Councillor. 2. Notice for the community consultation meeting be given to landowners and residents within 120 metres of the site. 3. Notice for the public meeting under the Planning Act be given according to the regulations under the Planning Act. Financial Impact The recommendations in this report have no financial impact. DECISION HISTORY The subject properties encompass the site of the former Sam the Record Man flagship store as well as the former World of Posters retail outlet. Demolition permits for the existing buildings were issued on December 10, 2008 and February 25, 2010 respectively. Pre-Application Consultation Staff met with Ryerson University and their consultant team on August 12, 2010 for a preliminary review of the Student Learning Centre. Staff had concerns about the height and relationship to the adjacent properties at grade. Staff also expressed concern about the type and format of retail and expressed a desire for a new below grade TTC connection to Dundas Station through the Ryerson Student Learning Centre. A second meeting with Ryerson University was held on September 14, 2010. Staff reiterated their concerns from the previous meeting. A pre-application meeting was held on February 25, 2011 to discuss complete application submission requirements. Modifications made to the proposal included: reducing the height of the proposed building and removing the rooftop amenity space. Due to the fire at the nearby "Lalani building" and its demolition, Staff dropped their concern about the second TTC entrance in the Student Learning Centre as it was agreed that the "Lalani site" would be a more suitable location. Staff continued to express a desire for a knock-out panel in the basement of the student centre for a potential PATH and TTC connection. In addition to Staff outlining all the necessary plans and studies that would have to be submitted in order for the application to be considered complete, Staff acknowledged the need for an expedited review and approval process for this project. Staff report for action Preliminary Report 341-355 Yonge Street 2

ISSUE BACKGROUND Proposal The proposal is for a 9-storey student learning centre located at the property known municipally as 341-355 Yonge Street. The proposal will also have retail at and below grade. The total proposed gross floor area (GFA) is 12,784.26 m 2, of that, 1,730.31 m 2 is proposed to be retail. The proposed floor space index (FSI) is 6.68. No vehicular parking is proposed for the new building. The applicant has indicated that the total aggregate parking for Ryerson University is still sufficient to accommodate the parking needs of the proposed new building. A total of 53 bicycle parking spaces are proposed (26 occupant and 27 visitor). The main pedestrian access for the Ryerson Student Learning Centre would be on Gould Street, although the main entrance effectively opens onto to both Yonge Street and Gould Street. Servicing would take place on O' Keefe Lane, accessed via Gould Street, reversing the flow of the one-way vehicular traffic on O'Keefe lane from southbound to northbound. The current proposal indicates a "possible knock-out panel" in the basement of the Student Learning Centre and the construction of an above grade connection over O'Keefe Lane into the second floor of the Ryerson Student Library. Site and Surrounding Area Yonge Street between Gould Street and Gerrard Street is primarily characterized by lowrise (3 storey) retail buildings. The current site is vacant, having been the site of the former Sam the Record Man flagship store and World of Posters outlet (341 Yonge Street and 355 Yonge Street, respectively). There are listed heritage buildings in the vicinity at 340, 362, 363, 364 and 365 Yonge Street. North: to the north of the subject property are 2 to 3-storey retail and food stores and adult entertainment establishments. South: to the south of the subject property is Gould Street and beyond that is the now demolished heritage building referred to as the Lalani building (335 Yonge Street); the same retail building fabric continues to the south until the Toronto Life Square building at Yonge and Dundas Square. East: to the east of the subject property is O'Keefe Lane, the Ryerson Student Library, and the greater Ryerson University campus. West: to the immediate west of the property is Yonge Street and the same retail building fabric described above. Staff report for action Preliminary Report 341-355 Yonge Street 3

Provincial Policy Statement and Provincial Plans The Provincial Policy Statement (PPS) provides policy direction on matters of provincial interest related to land use planning and development. The PPS sets the policy foundation for regulating the development and use of land. The key objectives include: building strong communities; wise use and management of resources; and, protecting public health and safety. City Council s planning decisions are required to be consistent with the PPS. The Growth Plan for the Greater Golden Horseshoe provides a framework for managing growth in the Greater Golden Horseshoe including: directions for where and how to grow; the provision of infrastructure to support growth; and protecting natural systems and cultivating a culture of conservation. City Council s planning decisions are required to conform, or not conflict, with the Growth Plan for the Greater Golden Horseshoe. Staff will review the proposed development for consistency with the PPS and for conformity with the Growth Plan for the Greater Golden Horseshoe. Official Plan The current Official Plan designation is Mixed-Use Area, and the property is also subject to Site Specific Official Plan policy 174. Mixed-Use Areas in the Official Plan are designed to accommodate a broad range of retail, residential and institutional uses. New development in Mixed-Use Areas should provide an appropriate transition between diverse built forms and provide high quality employment opportunities wherever possible. Site Specific Policy 174 of the Official Plan states that Yonge Street is to be promoted as a place for street related retail and entertainment uses. Reinvestment in the Yonge Street corridor is to be encouraged. Any large changes from the existing built form are to be directed to the Yonge and Dundas area. The downtown Yonge redevelopment project should encourage and explore high quality architecture, and landmark buildings that could act as tourist destinations. Appropriate linkages should be created between Ryerson University, Yonge Street, the redevelopment lands and major mixed-use developments. Generally, redevelopment should respect and reinforce the existing built form fabric of Yonge Street. Heritage buildings should be the target of adaptive reuse where possible, and the streetscape shall be treated in accordance with the Downtown Yonge Business Improvement Association's streetscape guidelines. Tall Building Guidelines Toronto City Council approved the use of the document, Design Criteria for Review of Tall Building Proposals in June, 2006 and in April, 2010 extended authorization of its use. A tall building is generally defined as a building that is taller than the road right-ofway adjacent to the site. Yonge Street has a right of way of 20 metres in this part of the City, therefore, this building is considered a tall building. Staff report for action Preliminary Report 341-355 Yonge Street 4

Among other goals, the Tall Building guidelines seek to reduce the impacts of tall building proposals on adjacent development, while encouraging design excellence. Assessment using these guidelines is based on issues such as height transition, building placement and orientation, entrances, heritage conservation, massing of base buildings, tower floorplates, separation distances, pedestrian realm consideration, sustainable design, servicing, amenity space, massing, light and privacy, landscaping, weather protection and shadow impacts. This document will be used to evaluate the proposed building. The City s Design Criteria for Review of Tall Building Proposals study is available on the City s website at: http://www.toronto.ca/planning/studies.htm#guidelines Zoning Within the old City of Toronto Zoning By-law (438-86) and the new comprehensive Zoning By-law (1156-2010, under appeal), the subject lands are zoned CR, or commercial residential. CR zoning permits a wide variety uses including residential, retail, commercial and institutional uses. The site has a height limit of 20 metres and a density restriction of 4 times coverage. The property is also subject to a 20 m height limit and a 44 angular plane which begins from a base height of 16 m established from the lot line abutting Yonge Street, measured from grade. The property is also within the flight path of the Hospital for Sick Children and subject to the height restrictions associated with it. Site Plan Control Site Plan Control is applicable to this site and an application for Site Plan Control has been submitted (11 146675 STE 27 SA). The application will be reviewed concurrently with the rezoning application. Tree Preservation As part of this application, two City owned trees on Gould Street will have to be removed. Reasons for the Application The application requires relief from the in force Zoning By-law (438-86). The application in its current form exceeds height restrictions of the by-law (20 metres) by approximately 24 metres on Yonge Street. Furthermore, the built form proposed does not meet the 44 angular plane restrictions or the FSI restrictions of 4 times the lot area for the property. The proposed building, does not, however, penetrate the flight path for the Hospital for Sick Children. COMMENTS Staff report for action Preliminary Report 341-355 Yonge Street 5

Application Submission The following reports/studies were submitted with the application: 1. Planning Rationale Report; 2. Shadow Study; 3. Arborist Report; and 4. Functional Servicing Report. City staff are reviewing the application for completeness, and anticipate that the applicant will have to submit a comprehensive Traffic Impact Study, and pedestrian level wind study. Issues to be Resolved City Staff have identified some issues to be resolved: 1. consistency with the Provincial Policy Statement and the Growth Plan for the Greater Golden Horseshoe; 2. conformity with Official Plan policies, particularly with respect to the sections on public realm, heritage, built form and built form for tall buildings and Official Plan Policy 174; 3. assessment of the proposed public realm, landscaped open space and conformity with the Downtown Yonge BIA's Streetscape Guidelines; 4. conformity with the Design Criteria for Review of Tall Building Proposals, namely the sections on transition in scale, prominent sites, open space, heritage resources, spatial separation, and pedestrian realm; 5. built form and massing issues including, but not limited to: height, density, setbacks, stepbacks, views, sky view, light penetration, privacy, wind mitigation and pedestrian realm weather protection on Yonge Street and Gould Street; 6. the built form transition from this site into all surrounding neighbourhoods, including Ryerson University and the Yonge Street Strip, and shadow impacts on surrounding properties, open space and the public realm; 7. sustainability approach including TGS Tier Two targets as well as the type, location and supply of bike parking facilities; 8. suitability of the size, format and location of the retail space; 9. traffic and neighbourhood parking impacts, access issues from O'Keefe Lane, including the proposed reversal of vehicular traffic flow and access issues from Gould Street. Should the City contemplate a permanent closure of Gould Street, Staff report for action Preliminary Report 341-355 Yonge Street 6

some kind of restricted access or gate system would have to be implemented to retain accessibility to O'Keefe Lane; 10. appropriateness of building a pedestrian bridge over O'Keefe lane and the encroachment that would result; 11. provision of knock-out panels for future PATH and TTC Dundas Station subway connections; Toronto Green Standard The Toronto Green Standard (TGS) is a tool to implement the broader environmental policies of the Official Plan. Several of the natural environment policies of the Official Plan encourage green development. These policies are geared to reduce the negative impacts of development on the natural environment through practices such as improved stormwater management, water and energy efficiency, and waste reduction and recycling. These policies also promote development that enhances the natural environment and support green industry. The TGS Checklist has been submitted by the applicant and is currently under review by City staff for compliance with the Tier 1 performance measures. Additional issues may be identified through the review of the application, agency comments and the community consultation process. CONTACT Giulio Cescato, Planner Tel. No. (416) 392-0459 Fax No. (416) 396-0113 E-mail: gcescat@toronto.ca SIGNATURE Gregg Lintern, MCIP RPP Director, Community Planning, Toronto and East York District (p:\2011\cluster B\pln\teycc9889468099.doc) - es Staff report for action Preliminary Report 341-355 Yonge Street 7

ATTACHMENTS Attachment 1: Site Plan Attachment 2: North Elevation Attachment 3: South Elevation Attachment 4: East Elevation Attachment 5: West Elevation Attachment 6: Zoning (438-86) Attachment 7: Zoning (1156-2010) Attachment 8: Application Data Sheet Staff report for action Preliminary Report 341-355 Yonge Street 8

Attachment 1: Site Plan Staff report for action Preliminary Report 341-355 Yonge Street 9

Attachment 2: North Elevation Staff report for action Preliminary Report 341-355 Yonge Street 10

Attachment 3: South Elevation Staff report for action Preliminary Report 341-355 Yonge Street 11

Attachment 4: East Elevation Staff report for action Preliminary Report 341-355 Yonge Street 12

Attachment 5: West Elevation Staff report for action Preliminary Report 341-355 Yonge Street 13

Attachment 6: Zoning By-law 438-86 Staff report for action Preliminary Report 341-355 Yonge Street 14

Attachment 7: Zoning By-law 1156-2010 Staff report for action Preliminary Report 341-355 Yonge Street 15

Attachment 8: Application Data Sheet Application Type Rezoning Application Number: 11 146654 STE 27 OZ Details Rezoning, Standard Application Date: March 16, 2011 Municipal Address: Location Description: Project Description: 341-355 YONGE ST PLAN 22A PT LOT 26 **GRID S2712 This is a Gold Star Rezoning application for a new 9 storey (plus mechanical) Student Centre for Ryerson University, with retail at and below grade, no parking. Library and Study space. Applicant is also seeking an above grade encroachment of a City-owned laneway and a reversal of direction for the same City-owned laneway. Applicant: Agent: Architect: Owner: RYERSON UNIVERSITY 350 Victoria Street, Toronto, ON, M5B 2K3 Bousfields Inc. 3 Church St. unit 300 Toronto, ON M5E 1M2 Zeidler Partnership 315 Queen St. W Toronto, ON M5V 2X2 RYERSON UNIVERSITY 350 Victoria Street, Toronto, ON, M5B 2K3 PLANNING CONTROLS Official Plan Designation: Mixed-use Areas Site Specific Provision: Y, OP Policy 174 Zoning: CR T4.0 C4.0 R1.5 Historical Status: N Height Limit (m): 20 Site Plan Control Area: Y PROJECT INFORMATION Site Area (sq. m): 1920 Height: Storeys: 9 Frontage (m): 39.04 Metres: 44.245 Depth (m): 49.025 Total Ground Floor Area (sq. m): 744.81 Total Total Residential GFA (sq. m): 0 Parking Spaces: 0 Total Non-Residential GFA (sq. m): 12784.255 Loading Docks 2 Total GFA (sq. m): 12784.255 Lot Coverage Ratio (%): 38.8 Floor Space Index: 6.68 DWELLING UNITS FLOOR AREA BREAKDOWN (upon project completion) Tenure Type: N/A Above Grade Below Grade Rooms: 0 Residential GFA (sq. m): 0 0 Bachelor: 0 Retail GFA (sq. m): 499.964 1230.345 1 Bedroom: 0 Office GFA (sq. m): 0 0 2 Bedroom: 0 Industrial GFA (sq. m): 0 0 3 + Bedroom: 0 Institutional/Other GFA (sq. m): 10800.617 253.329 Total Units: 0 CONTACT: PLANNER NAME: Giulio Cescato, Planner, gcescat@toronto.ca TELEPHONE: 416-392-0459 Staff report for action Preliminary Report 341-355 Yonge Street 16