Junction of Bispham Road and Bristol Avenue, north of Blackpool town centre, Lancashire, next to the former TVR car factory.

Similar documents
Forest Way School Coalville, Leicestershire

Melton, School SuDS scheme, Mowbray

Victoria Park Health Centre, Leicester

Renfrew Close, London

Manor Ponds, Sheffield

Wessex Water Operations Centre, Claverton Down

Priors Farm Estate SuDS Retrofitting Project, Cheltenham

Springhill Cohousing Development, Springfield Road, Stroud, Gloucestershire

St Andrews Park, Uxbridge

Springhill Cohousing Development, Springfield Road, Stroud, Gloucestershire

Blythe Valley Park, Solihull, West Midlands

Hopwood Motorway Service Area, Worcestershire

Green Streets and Water

Queen Caroline Estate, London

paving case study GREAT WESTERN PARK DIDCOT OXFORDSHIRE

Opportunistic approaches to incorporating multi-functioning SuDS into housing redevelopments

An Introduction to Sustainable Drainage

Cambrian North Basin, Llanelli

DEALING WITH STORM WATER MANAGEMENT

Fellgate Estate, Jarrow Surface Water Management Plan 2015

Stebonheath Primary School, Llanelli

rainwise Working with communities to manage rainwater

Appendix D - Technical Design Criteria for BMPs

LANDSCAPE PLANNING ECKLAND LODGE REDDITCH ROAD CRIBBS CAUSEWAY YEW TREE HILL LUBENHAM TENBURY WELLS

Olympic Park, London. SuDS used. 1. Location. 2. Description. Case study

4.6. Low Impact and Retentive Grading

Welcome to our public consultation

Howard Street, Salford, Manchester

Sustainable Urban Drainage Systems. Diederik Rousseau Tineke Hooijmans

A: Downtown Diversion Pipe

Play areas overlooking climbing hill. School & playgrounds overlooking pond bottom ballfields. Project experience while at Loris and Associates, Inc.

Greening streets, retrofit rain gardens, Nottingham

Water Cycle ARC-452 DESIGN VI: INTEGRATION A5 ENVIRONMENTAL SYSTEM BURGENER SIMON YANGCHUAN SUN

The Development of Urban Planning and Landscaping for Sustainable Drainage Systems

Lead Local Flood Authority SuDS Policy Statement

Alma Road Rain Gardens, London

Delivering SuDS in Leicestershire Early Experiences. Wednesday 23 rd July Introduction

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

Uniclass L534:L217. December permeable. paving CASE STUDY ADOPTION IN OXFORDSHIRE.

STORMWATER MANAGEMENT PLAN: ERAND GARDENS X70

Heron Court Rain Garden, London

Sewer Flooding Alleviation in the Counters Creek Catchment

Sewer Flooding Alleviation in the Counters Creek Catchment

Ruislip green roof retrofit on a tube depot, London

MASTERPLANNING MILTON KEYNES WESTERN EXPANSION AREA ELLESMERE WITNEY LITTLECOMBE CRIBBS CAUSEWAY

Defra s Water Availability and Quality Evidence Programme. Comparative Costings for Surface Water Sewers and SuDS.

Northumbrian Water is required to provide investment to reduce spills at Whitburn and St Peter s, Sunderland in

Table 4.7.1: Swales Potential Application and Storm Water Regulation

Moon Brook FRP BMP Summary Sheet. Ownership of Land where BMP is Located

SuDS The business case. Steve Wilson

Hollickwood Primary School, London

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

PLANNING AND DESIGN OF PUTRAJAYA STORMWATER MANAGEMENT SYSTEM

Green Infrastructure and Low-Impact Development Technologies

Blenheim Lane. Nottingham Energy Park. Informal Planning Guidance January Approved By: Portfolio Holder for Planning & Transportation

Welcome to our public exhibition

Green Roofs and Stormwater Management Virginia Stovin

Rainwise. Sustainable Drainage Solutions. Working with communities to manage rainwater. Wuppertal Court, Jarrow

BIO-ECOLOGICAL DRAINAGE SYSTEM(BIOECODS):CONCEPTS, DESIGN AND CONSTRUCTION

OP Council Resolution June 16, Planning and Development Services

Why we need the Counters Creek storm relief sewer

6.1. INTRODUCTION 6.2. EXISTING CONDITIONS

Dear High Meadows Community,

Leduc Industrial Outline Plan SE W4

Homeowners Guide to Stormwater BMP Maintenance

Structural Stormwater Best Management Practices

Rainwise. Sustainable Drainage Solutions. Working with communities to manage rainwater. SuDS For Schools and Communities

Section 4 - Public Realm & Landscape proposals Landscape Masterplan. Section 4 52

Retrofitting SuDS. Virginia Stovin. Department of Civil and Structural Engineering Pennine Water Group University of Sheffield.

BARD COLLEGE REGIONAL GREEN INFRASTRUCTURE DEMONSTRATION PROJECT A Case Study Addressing Stormwater Management for a Small Watershed

Sustainable Urban Drainage Systems (SuDs)

SECONDARY BENEFITS OF STORMWATER BMPS. Growing Sustainable Communities, October 2017

Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St.

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

Small Town Sustainable Stormwater Solutions

THE ECO-CITY AUGUSTENBORG. - A walk along the path of storm water

RAIN GARDEN ILLINOIS URBAN MANUAL PRACTICE STANDARD. (feet) CODE 897 DEFINITION

City of Hume Planning Scheme Amendment C207. Statement of Expert Evidence Provided to Planning Panels Victoria

CENTRAL BEDFORDSHIRE COMMITTED TO WORKING TOGETHER WITH LOCAL COMMUNITIES

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Rain Gardens. A Welcome Addition to Your Landscape

Rainwater Management

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Map Reading 201: Where Does the Water Go?? Map Reading Map Reading 201. Interconnected Systems

Promoting Sustainable Drainage Systems

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

Post Construction BMPs

Welcome to our exhibition

Introduction. Welcome to this consultation regarding the draft redevelopment proposals for the former CeramTec factory on Sidmouth Road, Colyton.

Low Impact Development (LID) Techniques. Associate BD Presentation, October 7, 2014

Environment Agency Flood Risk Map for the Village of Bridge

Bristol University Auditorium, Bristol

building with nature - a new benchmark for green infrastructure

Welcome to our exhibition

LOW IMPACT DEVELOPMENT (LID) SAMPLER

Promoting SuDS & Green Infrastructure


Construction of BIOECODS for a Government Complex: A Case Study

WELCOME. North East Haverhill. The Planning Process

3.1 The hybrid planning application proposes the following description of development:

Transcription:

Moor Park, Blackpool SuDS used Swales Basins Benefits Control of runoff to greenfield runoff rate. Wetland features manage runoff to ensure clean water enters the natural drainage system. Significantly lower cost of installation over a conventional piped or underground drainage. Massive biodiversity potential. Engagement with school staff and students. Anticipated involvement of local people and potentially Moor Park Friends Group. 1. Location Junction of Bispham Road and Bristol Avenue, north of Blackpool town centre, Lancashire, next to the former TVR car factory. 2. Description The Moor Park development is a large healthcare building, incorporating leisure and library uses as well as new play areas and a multi-use games area. It is set in the north-west corner of an existing park, Moor Park, in the residential neighbourhood of Bispham. The building is served by a large (200 space) car parking area. It lies at roughly 10m AOD and is broadly flat, falling to the south. The development site is around 3.4ha, including the surrounding earthworks and soft play areas. Surface water drainage is to a combined sewer running underneath the site (pre-existing drainage). Soils are mixed, but incorporate a high proportion of sands. 1

Figure 1 Moor Park masterplan (David Singleton) 2

Figure 2 Building layout (David Singleton) 3

3. Main SuDS used From the very early stages of the project, the proposed location of such a large development in a designated green space demanded a high level of sensitivity and a landscape led approach. This is reflected in the form and arrangement of buildings and spaces. The concept of a SuDS treatment train to deal with stormwater was developed between the client and the design team. The building location was adjusted to enable an innovative and almost totally above-ground solution. Car parks and swale system were designed together, to form a series of arcs, centred on the building. Very little underground drainage is used, with kerbs omitted and rainwater pipes discharging directly into swales. The Environment Agency requested the use of SuDS. Figure 3 Schematic of water sensitive urban design for Moor Park 4. How it works Most water is taken from the building roof and hard areas above ground into concentric rings of swales, which carry it around the east and south of the development to a large attenuation basin. The basin and swales contain an extensive area for natural play, within which are a series of designated play spaces for different ages of children. 4

Figure 4 The innovative SuDS design takes advantage of the nature of the site and the ecological quality has significantly improved A second bio-swale system to the western side envelopes the Multi Use Games Area (MUGA) and brings water into the attenuation basin. The total surface water areas drained from car parking areas and the new building is 1.14ha. The bio-swales are very shallow and have been carefully graded to fit into the new landscape and enable mowing. Longitudinal sections were adjusted in fine detail on site to enable wetter areas to pond water and allow intermediate development of taller marginal species. It is envisaged that much of the time the basins and swales would not hold standing water. Basins and swales contain two-stage treatment with separation by both gabion baskets and earth forms to increase water residence times. Rocks, excavated from the site, are re-used to improve the natural appeal of the system. Swales are approximately 595m in total with connecting linear drainage keeping surface water just below the surface level. 5

Figure 5 Courtyard with SuDS components (David Singleton) Figure 6 Disconnected downpipe (David Singleton) 5. Specific project details Moor Park was formerly a rubbish tip, used as a public park since around 1950. Surveys revealed that its overall biodiversity was low, relative to other sites in the area and no wetland was present. Soils on site are very mixed and have evidently been heavily re-worked. Made ground was found between 1.9-3.6m in depth. Underlying the made ground the natural strata was found to be peaty clay to a depth of between 3.8-5.7m below ground level. Below the peaty clay the natural strata was found to be boulder clay. The scheme was designed to meet a 1in 100 year plus 20% for climate change return period storm. The discharge rate from the pond into the existing combined sewer is 74.5 litres per second. The pond will store a volume of 276 m³ of water in the 100 year plus 20% storm at a maximum depth of 622mm. 6

Figure 7 Most water is taken from hard areas above ground into concentric rings of swales Water exits the site via a 225mm diameter pipe which connects to the existing 600mm diameter combined sewer crossing the site. Gabions have been constructed with invisible pipes to improve aesthetic appearance and safety. Planting was modified to cope with actual conditions on the ground. It was observed that ponding occurred, due to considerable variations in soil structure, in places along the system that could not be anticipated at design stage. A novel feature of the scheme has been the engagement of the local community in the project. The opportunity was presented to show children at two of the local schools what was happening and to work with them in the design of some of the art features, signage and play areas. This enabled the idea of SuDS as a learning and teaching resource to be explained. 7

Figure 8 Children were able to get involved with the planting and have some fun Figure 9 The children have benefitted from immediate access to the broad and diverse landscape surrounding the school 8

Figure 10 Low-flow swale (David Singleton) Figure 11 Disconnected downpipe to the sports hall channel (David Singleton) 9

6. Benefits & achievements Control of runoff to greenfield runoff rate; Wetland features manage runoff to ensure clean water enters the natural drainage system; No oil interceptors. Instead water is treated biologically through the system; Significantly lower cost of installation over a conventional piped or underground drainage; Massive biodiversity potential; Powerful and exciting visual features making sustainable design obvious; Engagement with school staff and students; On-going work potential data on performance; Monitoring of performance through Blackpool Council staff and rangers; Anticipated involvement of local people and potentially Moor Park Friends Group. 7. Challenges & lessons learned The following challenges were overcome during the project: Client uncertainty of suitability of above-ground SuDS solution; Safety and maintenance concerns. Reassurance provided by carrying out visits to previously installed SuDS schemes including Blythe Valley Park and seeing these work well. Figure 12 SuDS under construction (David Singleton) Figure 13 The main detention basin is downstream of this, which shows the care taken to grade swale sides (David Singleton) 10

8. Interaction with local authority Support from Blackpool Council Planning, Parks and Urban Design officers Support from Environment Agency Officer contact: Planning Case Officer. Blackpool Council Mark Shaw, Ian Ward 9. Project Team Funder: Assura Properties Developer: LSP Developments/Blackpool Council Engineer: BSP Consulting, Derby Landscape Architect: DSA Environment + Design, Nottingham Architect: West Hart Partnership, Tamworth Main contractor: Pochin Construction, Middlewich 11