REGISTRATION EXAMINATION, JUNE 2013 CERTIFYING PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

Similar documents
REGISTRATION EXAMINATION, NOVEMBER 2011 CERTIFYING PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, NOVEMBER 2014 LICENSED PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, JUNE 2015 LICENSED PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

CRAFTSMAN EXAMINATION, NOVEMBER 2009 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

CRAFTSMAN EXAMINATION, JUNE 2007 PLUMBING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, NOVEMBER 2016 LICENSED GASFITTER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

CRAFTSMAN EXAMINATION, NOVEMBER 2009 GASFITTING QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

REGISTRATION EXAMINATION, NOVEMBER 2011 CERTIFYING PLUMBER ANSWER SCHEDULE

REGISTRATION EXAMINATION, NOVEMBER 2017 TRADESMAN PLUMBER ANSWER SCHEDULE

REGISTRATION EXAMINATION, NOVEMBER 2016 CERTIFYING PLUMBER ANSWER SCHEDULE

REGISTRATION EXAMINATION, JUNE 2015 LICENSED PLUMBER ANSWER SCHEDULE

CRAFTSMAN EXAMINATION, JUNE 2007 PLUMBING ANSWER SCHEDULE

REGISTRATION EXAMINATION, NOVEMBER 2014 LICENSED PLUMBER ANSWER SCHEDULE

REGISTRATION EXAMINATION, JUNE 2012 LICENSED GASFITTER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours

Level I Chapter 1 Worksheet

HOME INSPECTION CHECKLIST

AIR ADMITTANCE VALVES FOR DOMESTIC PROPERTIES Guidance Notes

STUDENT NOTES Plan, size and layout sanitary pipe work and fixtures

Self-Containment Of Motor Caravans

Pipe Sizing Table. Hydraulic Load Served (fixture units)

FEATURES. Other Fed-Flush Arrangements

Plumber Level 3 Rev. May 2011

LABOUR RATES FOR PLUMBING CONTRACTORS. A guide to the labour costs of plumbing works LABOUR RATES FOR PLUMBING CONTRACTORS

1 Exam Prep Plumbing State Contractors Practice Exam 2

2. Sanitary Plumbing General Installation Requirements

Level 1 Economics, 2016

CUSTOMIZED TEACHER ASSESSMENT BLUEPRINT PLUMBING. Test Code: 5924 Version: 01

MATERIALS Traps TRAPS. No. IPC IRC Description

INSTALL AN ELECTRIC SHOWER

PLUMBING REQUIREMENTS

Level 1 Physics, 2016

Trade of Plumbing. Module 2: Domestic Hot and Cold Water Service Unit 11: Sanitary Appliances Phase 2

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY. Hanover House 24 Douglas Street GLASGOW G2 7NQ NATIONAL CERTIFICATE MODULE DESCRIPTOR

Test Code: 8117 / Version 1

ICP Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

PLUMBING CURRICULA OUTLINE

CERTIFYING GASFITTER

PLUMBING INSTALLATIONS

INSTALLATION INSTRUCTIONS OWNERS GUIDE & WARRANTY STATEMENT

ESSAY: This will be a written paper of 6 essay questions. Candidates are to answer 5 questions in 2 hours for 60 marks.

UNIT 5 COLD WATER SUPPLY

PHCC Educational Foundation Plumbing Year 4

ADVANCE ECB ELECTRIC COMBINATION BOILER

TABLE OF CONTENTS TECHNICAL DOCUMENTATION 03. Technical Data Electrical Details Connection Details Dimensions Standing Losses

WC2 & WC3 Installation & Maintenance Instructions

AS/NZS :2015. Plumbing and drainage AS/NZS :2015. Part 4: Heated water services. Australian/New Zealand Standard

UNIQ HEAT BATTERIES REFERENCE MANUAL_V2.2. Version: 2018_07_19_v2.2

Plumbing Technology/Plumber CIP Task Grid

CHAPTER 9 VENTS SECTION

Trade of Plumbing. Module 2: Domestic Hot and Cold Water Service Unit 10: Hot Water Supply Phase 2

Water Supply (Water Fittings) Regulations 1999

A student investigated how much energy from the Sun was incident on the Earth s surface at her location.

UNIQUE SCIENCE ACADEMY

HEATRAE SADIA. Installation and User Instructions for the UTC Undersink Vented Water Heater

Sanitary Drainage Systems

Summary of BBS Proposed Ohio Plumbing Code Rule Changes October 2016

Australian/New Zealand Standard

Sprinkler System Installer Level 2

Mechanical System Description

Contents. Commissioning 6 Operation 6 Routine Preventative Maintenance 6 Fault Finding 7 Spares Parts 8 Technical Support 9

CHAPTER 9 VENTS. run undiminished in size and as directly as possible from the building drain through to the open air above the roof.

Greenleaf 600 Macerator Toilet Waste Pump

Cork Institute of Technology Higher Certificate in Engineering in Building Services Engineering Award

Read Only Document Not For Distribution

COMMERCIAL PERMIT APPLICATION AND CHECKLIST. Depending on the scope of your project, the following submittal requirements will apply:

CUBEflow Thermal Store Tank

AN ORDINANCE TO AMEND CHAPTER 7-BUILDING REGULATIONS, ARTICLE 1-UNIFORM CONSTRUCTION CODE, SECTION 7-2 -FEES TO ESTABLISH A NEW FEE SCHEDULE

Water Heating UK 14 th May 2016

Level 1 Agricultural and Horticultural Science, 2011

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

Multipoint. Unvented point of use hot water

1 WATERMARK CERTIFICATION SCHEME SCHEDULE OF PRODUCTS This document was adopted 1 August 2017 and replaced the WaterMark Schedule of Specifications

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Unit 1: Fire Engineering Science (A/505/6005)

STACKS AND STACK VENTS

2009 IRC. and Fuel gas Provisions

Installing, modifying and maintaining domestic plumbing systems. Water Supply (Water Fittings) Regulations 1999

Read Only Document Not For Distribution

Extreme Domestic Hot Water Loading System TECHNICAL DOCUMENTATION. Issue 11/09

APPENDIX L ALTERNATE PLUMBING SYSTEMS

ELECTRICAL INSTALLER THEORY EXAMINATION. 14 November 2015 QUESTION AND ANSWER BOOKLET

House Drainage System. Building Utility & Services

1 Exam Prep Solar Water and Pool Heating Manual (UCF) Questions and Answers (Plumbing Contractor)

Adelaide Homes Design Guide 4 - Winter warming

PLAN REVIEW SUBMITTAL GUIDE

CHAPTER 10 TRAPS AND INTERCEPTORS

SUBCOURSE EDITION EN US ARMY ENGINEER SCHOOL PLUMBING FIXTURES (PLUMBING IV)

PROPOSED NEW BUILDING

DOMESTIC & COMMERCIAL PLUMBING SYSTEMS FURTHER INFOMATION

Mains Pressure Hot Water from an existing vented copper cylinder... Allows the cold water tank to be removed, freeing loft space.

WALLACE MAXIPUMP 3000, 5000, 6000 and HYDROJET 30P, 30C, 140 AND HJ400 INSTALLATION AND MAINTENANCE INSTRUCTIONS

Technical Certificate in Plumbing Sample Version September Question Paper Pack

INSTALLATION AND CARE INSTRUCTIONS

THERMflow Thermal Store Cylinders

Section 7 F/602/2884 Understand and apply domestic hot water system installation and maintenance techniques

IPC Plumbing Exam. Name: Carefully read each question and then circle the letter of the best answer.

Qualification Guide. BPEC 601/2514/7 - Level 1 Diploma in Plumbing Foundation. BPEC 600/9432/1 - Level 2 Diploma in Plumbing Foundation

Unvented Hot Water Criteria

Methods of Venting Plumbing Fixtures and Traps in the 2018 IPC

Transcription:

ffix label with andidate ode Number here. If no label, enter candidate Number if known No. 9195 RGISTRTION XMINTION, JN 2013 RTIFYING PLMR INSTRTIONS QSTION N NSWR OOKLT Time allowed THR hours heck that the andidate ode Number on your admission slip is the same as the number on the label at the top of this page. o not start writing until you are told to do so by the Supervisor. Total marks for this examination: 100. The pass mark for this examination is 60 marks. Write your answers and draw your sketches in this booklet. If you need more paper, use pages 22 25 at the back of this booklet. learly write the question number(s) if any of these pages are used. ll working in calculations must be shown. andidates are permitted to use the following in this examination: rawing instruments, approved calculators, document(s) provided. Publications, cts, Regulations, odes of Practice, or Standards other than the ones provided are NOT permitted in the examination room. heck that this booklet has all of 25 pages in the correct order and that none of these pages is blank. YO MST HN THIS OOKLT TO TH SPRVISOR T TH N OF TH XMINTION Plumbers, Gasfitters and rainlayers oard, 2013. ll rights reserved. No part of this publication may be reproduced by any means without the prior permission of the Plumbers, Gasfitters and rainlayers oard.

andidates that sat this examination in June 2013 were provided with the following documents: S/NZS 3500 Part 1: Water services S/NZS 3500 Part 2: Sanitary plumbing and drainage S/NZS 3500 Part 4: Heated water services

STION QSTION 1 (a) State the length of time within which a plumber is required to notify the Plumbers, Gasfitters and rainlayers oard of a change of address. (1 mark) (b) State the penalty that may be imposed if the requirement in (a) is not met. (1 mark) Total 2 marks ertifying Plumber 9195, June 2013 1

QSTION 2 The diagram below shows a plan view of a proposed dormitory with 10 single occupancy rooms. The diagram includes the sanitary fixtures layout and laundry facilities. Hot water for fixtures is to be supplied via a ring main fed from two identical storage water heaters installed in the ceiling space, shown as and on the plan. LNRY (a) omplete the drawing to show the pipework and components required to convey hot water from the cylinders to the fixtures. (4 marks) ertifying Plumber 9195, June 2013 2

QSTION 2 (cont d) (b) It is expected there will be one peak load period per day, where 80% of the showers will be in use. The incoming cold water temperature is 15º. The average shower temperature is expected to be 40º. The estimated average shower time is 9.5 minutes. The thermostat on the cylinder is set to maintain a temperature of 70º. sing the typical flow rates for hot water demand stated in S/NZS 3500 Part 4 Heated water services, calculate the required capacity for each of the hot water cylinders. Formula: Total storage required = where Time (seconds) Flow rate (l/s) Number of showers T1 T2 Peak load T1 = Temperature increase from cold to average shower temperature. T2 = Temperature increase from cold to hot stored temperature. (5 marks) ertifying Plumber 9195, June 2013 3

QSTION 2 (cont d) (c) The hot water storage cylinders and are to be connected in parallel. (i) omplete the starter drawing below to show the pipework and valves required for the installation of the hot water cylinders. Outlet TPR Outlet TPR Inlet Inlet old supply (2 marks) (ii) Give THR advantages of installing the cylinders in parallel. 1 2 3 (3 marks) (iii) Give THR requirements that must be met relating to the support of the cylinders in the ceiling space. 1 2 3 (3 marks) ertifying Plumber 9195, June 2013 4

QSTION 2 (cont d) (d) escribe a method that can be used to prevent legionella bacteria growing within the ring main. (1 mark) Total 18 marks ertifying Plumber 9195, June 2013 5

QSTION 3 hot water storage system with a capacity of 750 litres has been installed. The 1 hour peak load of the system is 600 litres, at the end of this time the cylinder temperature has dropped to 40. The cylinder is fitted with a 3.0 kw element that has an efficiency rating of 94%. The thermostat is set to 70. 3.6 MJ = 1 KWh alculate the recovery time required for the hot water cylinder to reach the thermostat setting. Formula: Time = mass of water (kg) 4.2 (T2 T1) Heat energy input per hour (kj) (efficiency % 100) Total 4 marks ertifying Plumber 9195, June 2013 6

QSTION 4 (a) The Health and Safety in mployment ct defines classes of injuries that constitute serious harm. Give THR of these classes. 1 2 3 (3 marks) (b) Name the government agency that must be notified when a serious harm accident occurs on a work site. (1 mark) (c) State the maximum amount of time within which written notification for a serious harm accident must be provided to the agency named in (b). (1 mark) (d) Give THR instances in which it is acceptable to disturb the scene of a serious harm accident. 1 2 3 (3 marks) Total 8 marks ertifying Plumber 9195, June 2013 7

QSTION 5 The drawing opposite shows a range of sanitary fixtures, connected to an offset discharge stack. The fixtures include showers, urinals, hand basins and cistern flushing pans. ach floor level has a height of 2.7 metres. The stack is to be a fully vented modified system installed to comply with S/NZS 3500 Part 2: Sanitary plumbing and drainage. (a) omplete the drawing to show the ventilation requirements for a fully vented modified stack, show the diameter of each section of vent pipework. (7 marks) (b) omplete the table below to show the measurements listed for the installation of the stack. Total discharge loading for the stack The maximum discharge loading allowable for any one floor level Minimum diameter at point Minimum diameter at point Minimum diameter at point Minimum height of section Minimum length of section Minimum length of section F Minimum height of section G Minimum diameter at point H Minimum diameter at point I Minimum diameter at point J (12 marks) (c) n air admittance valve is to be installed at the top of the discharge stack vent. State the minimum determined airflow capacity allowable for the air admittance valve. (1 mark) Total 20 marks ertifying Plumber 9195, June 2013 8

QSTION 5 (cont d) ROOF SHWR SHWR WH WH I J FWG WH H SHWR G F SHWR WH FWG WH WH WH SHWR SHWR WH FWG GRON LVL ertifying Plumber 9195, June 2013 9

QSTION 6 (a) Give THR characteristics of a work site that determine that the site will be considered to be a confined space. 1 2 3 (3 marks) (b) State who is responsible for ensuring that all workers entering a confined space are suitably trained. (1 mark) Total 4 marks ertifying Plumber 9195, June 2013 10

QSTION 7 raw and label a cross-sectional view of a pipe penetration through a hollow construction wall fitted with fire collars. Total 4 marks ertifying Plumber 9195, June 2013 11

QSTION 8 reduced pressure zone backflow prevention device is to be installed to protect a potable water supply from contamination. (a) Give THR specific installation requirements that must be met for this device. 1 2 3 (3 marks) (b) Name THR backflow prevention devices that must have isolating valves installed on the inlet and the outlet of the device. 1 2 3 (3 marks) Total 6 marks ertifying Plumber 9195, June 2013 12

QSTION 9 Give THR locations where a thrust block would need to be placed when installing water services underground and that include elastomeric (rubber) ring joints to comply with S/NZS 3500 Part 1: Water services. 1 2 3 Total 3 marks ertifying Plumber 9195, June 2013 13

QSTION 10 The schematic diagram opposite shows a series of fixtures fitted with flushing valves supplied by a break tank. The available head to the upper level is 4 metres. nswer the following so that the system complies with the minimum requirements of S/NZS 3500 Part 1: Water services. (a) omplete the following table to show the diameter of the pipe supplying the flushing valves in each labelled section of the diagram. Section iameter F G H (6 marks) (b) alculate the minimum capacity permitted for the break tank supplying water to the flushing valves. (4 marks) Total 10 marks ertifying Plumber 9195, June 2013 14

QSTION 10 (cont d) G H F ertifying Plumber 9195, June 2013 15

QSTION 11 n underslab pipe-out has been completed for a dwelling, including discharge pipes and hot and cold water feeds to an island bench, to comply with S/NZS 3500. (a) Give the requirements that must be met for hydrostatically testing the discharge pipework before backfilling. (2 marks) (b) State the minimum clearance that must be provided between the water supply pipes and the concrete slab. (1 mark) (c) State three actions that should be taken regarding the pipe work before the concrete slab is poured. 1 2 3 (3 marks) Total 6 marks ertifying Plumber 9195, June 2013 16

STION nswer the following multiple-choice questions by writing your answer (,,, or ) in the box provided after each one of the questions. ach correct answer in this section of the examination is worth 1 mark. Note that should your choice of answer be unclear in this section of the examination no marks will be awarded for that question. 1. t which pipe diameter does fitting a soaker flashing under a flexible boot flashing become required to comply New Zealand ode lause 2/S1 xternal moisture? 41 mm 52 mm 66 mm 86 mm 105 mm 2. Which of the following determines the overhang required each side of a penetration when a soaker flashing is being designed? The expected rainfall in the area. The diameter of the penetration. The expected wind speed in the area. The pitch of the roof. The roof sheet length. 3 When flashing a square penetration through a roof, what is the minimum height required for the upstand on the flashing? 75 mm. 90 mm. 100 mm. 110 mm. 150 mm. ertifying Plumber 9195, June 2013 17

4. What is the minimum allowable distance between 20 mm holes drilled through a 100 mm timber stud? 75 mm. 100 mm. 250 mm. 300 mm. 500 mm. 5. What is the maximum allowable diameter hole permitted to be drilled down through the bottom plate of a timber frame wall? 20 mm. 25 mm. 35 mm. 45 mm. 50 mm. 6. Which of the following can be discharged into a copper waste pipe without risk of affecting the system? ndiluted urinal waste. Photographic equipment. ooling towers. Grease arrestors. Slop hoppers. ertifying Plumber 9195, June 2013 18

7. Which of the following components would you NOT expect to find in a thermo-siphon solar water heating system? non-return valve. n element. pump. thermostat. n air eliminator/vent. 8. Which of the following statements best describes convection heat transfer? Heat that is transferred molecule to molecule by direct contact. Heat that is obtained from a non-potable liquid and transferred to potable water. Heat that transferred with the assistance of a fan. Heat that can travel through a vacuum. Heat that is circulated through air or liquid due to differing densities. 9. Which of the following statements best describes radiation heat transfer? Heat that is transferred molecule to molecule by direct contact. Heat that is obtained from a non-potable liquid and transferred to potable water. Heat that transferred with the assistance of a fan. Heat that can travel through a vacuum. Heat that is circulated through air or liquid due to differing densities. ertifying Plumber 9195, June 2013 19

10. Which of the following statements best describes conduction heat transfer? Heat that is transferred molecule to molecule by direct contact. Heat that is obtained from a non-potable liquid and transferred to potable water. Heat that transferred with the assistance of a fan. Heat that can travel through a vacuum. Heat that is circulated through air or liquid due to differing densities. 11. water service carrying non-potable water is to be installed. Which colour pipe or marking should be used to enable future identification of the pipe? Purple. Red. Yellow. Orange. Pink. 12. When installed underground what is the minimum separation distance between parallel potable and non-potable water supplies? 200 mm. 300 mm. 500 mm. 600 mm. 1000 mm. ertifying Plumber 9195, June 2013 20

13. What is the minimum height above a lawn sprinkler head at which an atmospheric vacuum breaker must be installed? 150 mm. 200 mm. 250 mm. 300 mm. 350 mm. 14. What is the minimum diameter for the overflow pipe fitted to a safe tray under a water supply tank? 25 mm. 32 mm. 40 mm. 50 mm. 65 mm. 15. n access ladder must be installed to permit entry into a water storage tank exceeding what depth? 1000 mm. 1200 mm. 1500 mm. 1800 mm. 2000 mm. Total 15 marks ertifying Plumber 9195, June 2013 21

For xaminer s use only Question number Marks Marks 1 2 3 4 5 6 7 8 9 10 11 Section Total