2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.

Code Technologies Committee Report Elevator Lobby Group A changes: Elevator Lobby

COMPLIANCE ALTERNATIVES

Is There A Need to ENCLOSE ELEVATOR LOBBIES IN TALL BUILDINGS?

COMPLIANCE ALTERNATIVES

PERFORMANCE COMPLIANCE METHODS

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

PERFORMANCE COMPLIANCE METHODS

PERFORMANCE COMPLIANCE METHODS

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC

ICC CODE CORNER 2012 IFC Code & Commentary

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

Date: February 22, 2005 Kimbalton DUSEL, Pre-S-2 Submittal CNA0402 PRELIMINARY CODE REVIEW. International Plumbing Code Edition

Fire Protection Coffee Break Training May 2016

PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE

For additional information regarding R-3.1 residential care facilities please contact (951)

Building & Fire Code Academy. Building Better With Our Greatest Resource Education. Welcome!

1) Height Limit: About seven stories

SECTION 907 FIRE ALARM AND DETECTION SYSTEMS

Agency for Health Care Administration

9/23/ :47 AM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement

ICC CODE CORNER 2012 IFC Code & Commentary

Edward K. Budnick Hughes Associates, Inc. Wheaton, Maryland, U.S.A SUMMARY. that is entrained or otherwise mixed into the mass.

Agency for Health Care Administration

Report on First Revisions with Statement June 2014 NFPA 101

BUILDING CODE OF THE CITY OF NEW YORK. New York City Department of Buildings 4 June 2007

2007 CBC & CFC Residential Care Facility Requirements (24 hour care only)

Chapter 2: Definitions

Agency for Health Care Administration

MECKLENBURG COUNTY FIRE MARSHAL S OFFICE

Residential Based Care Facility Guidelines

Riverside County Fire Department Office of the Fire Marshal Market St., Ste. 150, Riverside, CA Ph. (951) Fax (951)

Residential Care Facilities Requirements

Code Technologies Committee Report Fire Rated Glazing Group A changes: Fire rated glazing

Defend In Place 2012 IFC Overview of Institutional Occupancies

M E M O R A N D U M. NFPA Technical Committee on Building Services and Fire Protection Equipment

GROUP SR SPECIAL (ASSISTED SELF-PRESERVATION) OCCUPANCIES

ICC CODE TECHNOLOGY COMMITTEE Area of Study Labeling of Fire Rated Glazing

3/6/2018. Design Tips For Fire and Smoke Barriers. Professional Development Hours (PDH) Certificates. Copyright Materials

Report to Adhoc Health Code change proposal regarding locking arrangements From John Woestman, BMHA

Balloting Version First Draft NFPA 101 Life Safety Code Proposed 2015 Edition

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot

NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES

January 1, 2014 Mandatory Effective Date

For the Florida Building Commission And the Fire Code Advisory Council

El Reno Fire Department Fire Alarm Plan Review Worksheet

GROUP SR SPECIAL RESIDENCE (ASSISTED SELF-PRESERVATION) OCCUPANCIES

BCBC 2012 CHANGES TO PART 3

SAF-BCF SECOND REVISIONS WITH STATEMENTS

BCAC Egress Work Group

Residential-based Care Facility R-4 Guideline

SMOKE CONTROL: ISSUES / APPROACHES. Smoke, Not Flame

AHC Meeting #7 July 12-13, Occupancy WG Report

Smoke Management in High-Rise Structures

IBC Committee Responsibility Matrix January 2017

M E M O R A N D U M. Diane Matthews, Administrator, Technical Projects. NFPA 101 First Draft Letter Ballot (A2014)

LABELING OF FIRE-RATED GLAZING STUDY GROUP REPORT TO CTC MEETING CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES

FIRE/SMOKE BARRIER FUNDAMENTALS

ELEVATORS. Integration of Codes between Fire Alarm, Sprinklers, and Elevators 12/5/2017

Report on First Revisions with Statement June 2014 NFPA 101

rpsa FIRE PROTECTION ENGINEERS

Table EXIT ACCESS TRAVEL DISTANCE a OCCUPANCY SYSTEM SYSTEM. A, E, F-1, I-1, M, b,d R, S-1. B c. F-2, S-2, U c

Summary of BBS Proposed Ohio Mechanical Code Rule Changes October 2016

Agency for Health Care Administration

First Revision No NFPA [ Global Input ] Submitter Information Verification. Committee Statement

Open to Below: A Discussion of Allowed Floor Openings. Jay A. Ierardi, Ph.D., P.E., LEED AP. Kevin S. Hastings, P.E., LEED AP

Major Changes to the 2010 National Construction Codes Contractor s Breakfast January 2014

Preview of the MA Building Code (780 CMR) 9 th edition

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

Following are code change proposals submitted through Adhoc Health from General study group and related changes. General. Position.

Balloting Version First Draft NFPA 101 Life Safety Code Proposed 2015 Edition

GROUP SR SPECIAL (ASSISTED SELF-PRESERVATION) OCCUPANCIES

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

1. The provisions of paragraph (D)(1104) of this rule shall apply to all existing buildings.

ICC CODE CORNER 2015 International Fire Code

Changes in NFPA

E25 (D) Automatic controls for general means of egress lighting

Agency for Health Care Administration

Report on First Revision June 2014 NFPA 5000

HIGH-RISE RETROFIT ORDINANCES - NO and NO

2012 International Fire Code Significant Changes. IFC Background. Purpose IBC and 2012 NFPA 101 Significant Means of Egress Changes

2009 International Fire Code Errata. SECOND PRINTING (Posted April 6, 2010)

Hazards Due to Smoke Migration Through Elevator Shafts Volume I: Analysis and Discussion. Final Report

Agency for Health Care Administration

Human Factors - Egress Analysis for High Hazard Occupancies. Presented by: Michael J. Klemenz, PE, SFPE

Agency for Health Care Administration

Fire Alarm System Fundamentals

NFPA 101 Code Update from 2012 Edition to the 2015 Edition

2018 International Fire Code. Add new text as follows:

Life Safety - Means of Egress/Exits NFPA 101

First Aspen Federal Regulation Set: K LSC 2000 Health Existing

2012 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata)

Air Moving Systems. Fire Safety Inspection and Testing of. NBSIR jan «1933. Washington, DC General Services Administration

Recommended Amendments to the 2003 International Fire Code North Central Texas Council of Governments region

PLAN REVIEW SUBMITTAL GUIDE

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

Transcription:

Report to CTC for July 21-22, 2011 CTC Meeting Elevator Lobby Study Group (SG) 7/ 12/2011 The following is a report of the work of the Elevator Lobby Study Group to the CTC. The scope and objectives of the SG are located below for reference. Basically there are 5 Task Groups (TGs) listed as follows which have reports included with this document: TG1 Research. TG2 Need for elevator lobbies. TG3 Means of egress and elevator lobbies. TG4 Design and construction of Elevator lobbies. TG5 Standards. TG1 Research This Task Group took the lead in assembling documents for background and research use by the rest of the task group. A list of references is found under the report of TG1. See Attachment A. TG2 Need for elevator lobbies This task group through extensive discussion has developed a technical analysis with recommendations where elevator lobbies should be required in the I-Codes. The draft technical analysis is attached for review. Once these recommendations are discussed by the CTC it is hoped that the group can move forward with more specific code changes to reflect the recommendations. Note that this group concurrently would also like to pursue a risk analysis. This will be discussed in more detail at the CTC meeting. See Attachment B for a draft of the Technical Analysis. TG3 Means of egress and elevator lobbies. This task group works on the assumption that the various types of elevator lobbies may be present in a buildings and how such enclosed lobbies affect the means of egress. Note for example that FSAE and 1

Occupant evacuation elevators require direct access to an interior exit stairway. See Attachment C for a report and proposals. TG4 Design and construction of Elevator lobbies This task group focused on the design and construction of enclosed elevator lobbies. There are various subcategories that are discussed in the report and proposals document. See Attachment D for a report and proposals and Attachment E for a discussion on options for pressurization. TG5 Standards No particular report from this group as it has not been necessary at this point. 2

CTC Study Group Elevator lobbies Background At the 2009 Code Development Hearings, a motion was passed by the IBC Fire Safety committee that the issue of elevator lobbies, based on the significant number of code changes that have been submitted over the past cycles (09/10 16; 07/08 15; 06/07-4), be investigated in a forum outside of the code development process. The intent being that such a forum would provide a venue for involvement for governmental members as well as industry representatives to thoroughly review the issues. Scope The scope of the effort will focus on: Review the need for elevator lobbies; with emphasis on building use, building and hoistway height, active and passive fire protection features associated with the aforementioned. Review the differences and specific needs when dealing with elevator lobbies of traditional-use elevators, fire service elevators, and occupant evacuation elevators. Review related code provisions, such as egress from and through elevator lobbies. Review the appropriate use of alternatives including pressurization of hoistways, additional doors, roll-down style barriers, and gasketing systems. Review with members of elevator industry to scope the requirements of applicable elevator reference standards as it deals with elevator lobby design, use and construction. Review design and construction requirements for elevator lobbies, including but not limited to dimensions, location and separation. Review applicable code change history Objective: The objective of this Area of Study is to develop code requirements which are responsive to identified issues noted under Scope and which are technically substantiated, where possible. 3

Work Product: Code changes to be submitted in the 2012/2013 Code Change Cycle for consideration in the 2015 I-Codes. 4

ATTACHMENT A ICC CTC Elevator Lobby Study Group References WEBSITE Beitel. J. J., Wakelin, A.J., Beyler, C. L., Analysis of Smoke Movement in a Building Via Elevator Shafts, Prepared for Smoke Safety Council by Hughes Associates, March 2000. Ahrens, M Reported Fires in High-Rise Structures in Selected Occupancies with and without Automatic Extinguishing Systems by Extent of Smoke Damage, Fire Analysis and Research Division, National Fire Protection Association, December 2010 Budnick, E.K., Klote, J.H., Capabilities of smoke control, PART II--System Performance And Stairwell Pressurization Elevator Lobby CC History staff (06/07 through 09/10) Bukowski, R.W. Is There a Need to Enclose Elevator Lobbies in Tall Buildings?, Building Safety Journal, Vol 3, No 4, 26-31, August 2005 Klote, J. H., NBSIR 80 3757 An Analysis Of The Influence Of Piston Effect On Elevator Smoke Control, US. DEPARTMENT OF COMMERCE National Bureau of Standards National Engineering Laboratory Center for Fire Research Gaithersburg, MD 20899, April 1988 Klote, J. H., NBSIR 83 2715, Smoke Control for Elevators, Prepared for the Veterans Administration by Us. Department Of Commerce, National Bureau of Standards National Engineering Laboratory Center for Fire Research Gaithersburg, MD 20899, June 1983 Chapman, R. E., Butry, D.T., Huang, A.L., and Thomas, D.S. NIST Special Publication 1109 Economics of Egress Alternatives and Life-Safety Costs, U.S. Department of Commerce National Institute of Standards and Technology, Office of Applied Economics Building and Fire Research Laboratory Gaithersburg, Maryland 20899, September 2010 Klote, J. H., NIST GCR 04 864 I Hazards Due to Smoke Migration Through Elevator Shafts Volume I: Analysis and Discussion. Final Report, U.S. Department of Commerce Building and Fire Research Laboratory National Institute of Standards and Technology, Gaithersburg, MD, 20899-8664, June 2004 5

Klote, J. H., NIST GCR 04 864 II Hazards Due to Smoke Migration Through Elevator Shafts Volume II: Results of Tenability Calculations. Final Report, U.S. Department of Commerce Building and Fire Research Laboratory, National Institute of Standards and Technology, Gaithersburg, MD 20899-8664, June 2004 REFERENCES TG2 TECHNICAL ANALYSIS ASHRAE Handbook Fundamentals, Ch 24, Owen, M. ed., ASHRAE, 2009. Bukowski, R.W., Is There a Need to Enclose Elevator Lobbies in Tall Buildings?, Building Safety Journal, Vol 3, No 4, 26-31, August 2005. Bukowski, R.W., Status of the Use of Elevators in Fires, Emerging Trends (online), SFPE, Bethesda, MD, 2008. Hall, J. R., U.S. Experience With Sprinklers And Other Automatic Fire Extinguishing Equipment, NFPA, Quincy, MA 2010. Klote, J.H., Hazards Due to Smoke Migration Through Elevator Shafts Volume I: Analysis and Discussion. Final Report, NIST GCR 04-864-1, Gaithersburg, MD,, 2004. Klote, J.H., Nelson, H.E. and Deal, S., Staging Areas for Persons with Mobility Limitations, NISTIR 4770, NIST, Gaithersburg, MD 1992. Klote, J.H. and Tamura, G.T., Elevator Piston Effect and the Smoke Problem, Fire Safety Journal, Vol. 11, No. 3, pp. 227-233, December 1986. Klote, J.H., An Analysis of the Influence of Piston Effect on Elevator Smoke Control, NISTIR 88-3751, NIST, Gaithersburg, MD 1988. Marryatt, H.W., Fire, Automatic Sprinkler Performance in Australia and New Zealand, 1886-1968, Australian Fire Protection Association (Melbourne), ISBN 0959946101, 1971. Miller, R.S. and Beasley, D., On Elevator Shaft Pressurization for Smoke Control in Tall 6

Buildings, in Society of Fire Protection Engineers Professional Development Conference and Exposition (2008), Charlotte, North Carolina. NIST CONTAM homepage http://www.bfrl.nist.gov/iaqanalysis/contam/index.htm Sutherland, S., What s changed and what hasn t in the 100 years since the Triangle Waist Co. fire, NFPA Journal, NFPA Quincy, MA 02269, March/April 2011 Tamura, G., Stack Effect and Building Design, NRCC CBD-107, Ottawa, Canada, 1968. 7

ATTACHMENT B DRAFT TECHNICAL ANALYSIS OF THE NEED FOR ENCLOSED ELEVATOR LOBBIES Prepared for the ICC CTC by the Elevator Lobby Study Group CTC Proposals on Enclosed Lobbies for Elevators Background One of the fundamental objectives of fire safety in buildings is to limit the spread of fire and its effects (heat, smoke, and toxic gasses) to the greatest extent possible. This is usually accomplished by limiting the ignitability and burning rate of materials and by physical barriers (compartmentation). In specific areas where it is most critical to prevent direct exposure of building occupants that might injure or interfere with evacuation, physical barriers may be supplemented by active or passive smoke control. The driving force that moves smoke and fire gasses around a building is differences in temperature (and resulting differences in density) resulting from the fire and from the fact that the environment in buildings is heated or cooled for comfort. Air flows resulting from these temperature differences increase with increasing difference in temperature and in relation to the area of openings (including visible and hidden gaps and cracks) between spaces at different temperature. One of the early lessons learned from fire disasters is the need to protect vertical shafts that can act as chimneys, carrying heat, smoke, and gasses to remote areas of a building. Smoke and fire spread up hoistways and stairways accessed through non-rated doors had been implicated as early as in 1911 in the 146 fatalities at the Triangle Shirtwaist Fire [Sunderland 2011]. Other significant fires that involved smoke and fire spread up stairways and hoistways include the Equitable Building Fire, New York, NY January 9, 1912, and the MGM Grand Hotel, Las Vegas, NV, November 21, 1980. There are also a few examples of properly designed and constructed stairways that were compromised during a fire by doors that were propped open. These include the Prudential Building, Boston, MA, January 1986, and the Cook County Office Building, Chicago, IL., October 17, 2003. Sprinklered Buildings A key observation in each of these major fires is that the buildings (or at least the area where the fire occurred) were unsprinklered. The discharge of water from operating sprinklers not only suppresses or extinguishes the fire, limiting the quantities and dynamics of the smoke, but also cools the air temperatures to near ambient levels. Even in the cases of fires shielded from the sprinkler spray, temperatures are low while smoke and fire gas release rates can be increased due to incomplete combustion. Thus, in sprinklered buildings, there is little driving force to generate and move dangerous quantities of smoke and gasses around the building by way of stairways or hoistways. 8

Sprinkler Reliability The definitive source for data on sprinkler systems reliability is Dr. John Hall at NFPA. According to his latest report [Hall, 2010] on the US experience with sprinklers, Sprinklers (of all types) operated in 91% of all reported structure fires large enough to activate sprinklers, excluding buildings under construction and buildings without sprinklers in the fire area.* When sprinklers operate, they are effective 96% of the time, resulting in a combined performance of operating effectively in 87% of all reported fires where sprinklers were present in the fire area and fire was large enough to activate them. The combined performance for the more widely used wet pipe sprinklers is 88%, Across all structures, wet-pipe sprinklers operate 92% of the time. The top reasons for non-operation are: 43% of failures to operate were attributed to the equipment being shut off, 16% were because manual intervention defeated the equipment, 12% were because water was discharged but did not reach the fire, 8% were because not enough water was discharged, 8% were because of lack of maintenance, 6% were because the equipment was inappropriate for the type of fire, and 6% were because a component was damaged. Many of these failure mechanisms have been mitigated through recent improvements in building code requirements and the applicable design standard, NFPA 13, Standard for the Installation of Sprinkler Systems, effectively designing-out the typical failure mechanisms. Equipment shut off typically refers to water supply valves being closed, either to the entire system or to the portion of the system in the area of origin. Valves can be electronically monitored (requiring a fire alarm system) but securing with a chain and lock is common, and permitted by NFPA 13. Chain not reinstalled is a common failure mode, but electronic monitoring cannot be defeated easily since these systems are required to signal tampering to a constantly-attended location. The International Building Code (IBC) Section 903.4 requires electronic monitoring of all valves with a fire alarm control unit that transmits a distinctive signal to an approved location. Chains and locks permitted to secure valves by NFPA 13 are not permitted by the IBC. In addition, requirements in the IBC for automatically transmitting an alarm upon 9

sprinkler system activation to a constantly-attended location will result in a greater level of reliability than the data set included in the Hall study. Manual intervention is not a failure of importance because the fire was extinguished by hose or fire extinguisher and is no longer producing heat, smoke or gas. Water discharged but did not reach the fire is also not significant because the sprinkler spray cools the environment and, even though smoke and gasses are produced, fires remain relatively small. The low air temperatures minimize the driving forces that push the fire products to and up building shafts. Not enough water discharged usually refers to systems that ran out of water too soon, such as when too many sprinklers open. Recent changes in NFPA 13, requiring hydraulically-designed systems and faster-operating sprinklers have greatly reduced the likelihood of such occurrences when compared to the universe of sprinkler systems installed over the last hundred years. In any case, the effect would be similar to water discharged but did not reach the fire because significant cooling occurs even where it is not sufficient to extinguish the fire. Inappropriate for the type of fire is most common in storage occupancies where the commodity for which the system was designed was replaced with a commodity that required a higher water density, and the system was not upgraded. Such failures are not typical in high-rise residential and office buildings. Based on this analysis, only lack of maintenance and component damaged would be of significance for failure of systems that are electronically monitored, resulting in an estimated reliability of 98.9%. This reliability rate is also consistent with the reliability data published by Marryatt for commercial office and residential occupancies in which he studied electrically-supervised sprinkler systems having flow and tamper signals automatically transmitted off-site. [Marryatt, 1971] Stack Effect Stack effect is defined as air flow in vertical shafts induced by indoor-to-outdoor temperature differences that lead to density differences and flow. By convention, stack effect flows are upwards when outdoor temperatures are colder than indoors, and reverse stack effect is a downward flow observed when outdoor temperatures are warmer than indoors. The upward flow results when air from lower floors is drawn into the shaft and flows out on upper floors. Thus, there exists a height in the building at which there is no flow into or out of the shaft, which is called the neutral plane. 10

Flow rates increase with height above and below the neutral plane. This is illustrated for normal (upward) stack effect in Figure 1. Figure 1 Stack Effect Flows Stack effect flows will be induced in any open shaft in a building, including mechanical, plumbing, and electrical shafts. Stack effect creates the most problems in elevator hoistways because these shafts cannot be closed at intervals as can plumbing and electrical shafts, and the landing doors at every floor at which the elevator stops are leaky because they open laterally, making them difficult to seal. Problems associated with stack effect range from annoying (strong flows blowing from openings) to safety hazards when stack effect moves smoke and gasses from fires or accidental chemical releases vertically within the building. The pressure induced at each floor is a function of the leakage areas, the height of the shaft and the temperature difference. Stack effect pressures across elevator landing doors can range up to 3 in. water (800pa) in an 800 ft building, as shown in Figure 2. [Tamura, G., 1968] Worst case pressures are observed in winter conditions since the indoor to outdoor temperature differences are greatest. Because elevator landing doors open laterally, excessive pressure across the door can cause the door to bind and not open or close properly. If a landing door doesn t open, people cannot get on/off and if it doesn t close fully, the elevator cannot leave the floor. It is reported that in some buildings that experience significant stack effect, elevator mechanics must come to the building to adjust landing doors at least twice a year. In fires, the fire itself can result in shaft flows driven by large temperature differences between fire gasses and ambient air. A paper by Bukowski [Bukowski 2005] based on an analysis by Klote showed that, in a fully sprinklered building (with operational sprinklers), fire temperatures are held low enough Figure 2 Pressures Produced by Stack Effect Across Landing Doors that significant shaft flows are never observed and the generation of smoke/toxic gasses that might present a hazard to occupants is limited because of the greatly reduced burning rates. Since stack effect is present whether there is a fire or not, shaft flows during fires still occur, but there is much less smoke/toxic gases if there are operating sprinklers. Enclosed Elevator Lobbies Enclosed elevator lobbies are intended to address one or more of the following issues: 11

1. Protecting hoistways as vertical openings that could spread smoke/toxic gasses For this to be an issue, one needs to have a hazard (smoke) present and pressure differences to drive it to and up (down) the hoistway. Smoke is only present in a fire. Pressure differences that drive flows can come from fire temperatures, stack effect, mechanical systems, or elevator piston effect. Sprinklers maintain fire temperatures only slightly elevated, so there is no significant driving force. Sprinklered fires produce small quantities of smoke/toxic gasses. [Klote 2004; Klote 1992] Stack effect derives from building (shaft) height, leakage areas between the shaft and the inside/outside, and indoor/outdoor temperature differences. Elevator piston effect is not significant in other than single-car hoistways [Klote and Tamura 1986, Klote 1988]. Absent a fire, stack effect flows can be a nuisance but are rarely a health or safety hazard. In a fire it is possible for stack effect forces to carry smoke up or down vertical shafts where elevator hoistways would see the largest flows because landing doors have the largest leakage areas. However, the quantity of smoke and gas produced in a sprinkler controlled fire is small and when distributed into the building volume the concentration, and thus the potential effect on occupants is small. Further, in a sprinkler controlled fire temperatures are held only slightly above ambient, so the only force available to move smoke and gas up shafts is stack effect, and stack effect flows are low. Using the accepted equation from the 2009 ASHRAE Fundamentals Handbook, estimates of volumetric flows due to stack effect in a 500 ft (152 m) hoistway range from just over 1000 CFM to just over 4000 CFM over a range of outdoor temperatures between -40 and 40 F (-40 to 4.4 C). Nuisance problems associated with stack effect are being addressed by designers of very tall buildings by breaking the shafts about every 40 stories but this is not possible on elevators (especially shuttle and service cars) that need to serve every floor. A secondary effect of addressing the nuisance problems is that many shafts are no longer tall enough to yield significant stack effect. From this it can be concluded that elevator lobbies are not generally necessary to prevent smoke migration via hoistways in fires for sprinklered buildings except possibly in very tall buildings with large occupant loads that would require significant time to evacuate from height. 2. Protecting occupants during a fire (safe place) Since elevators are not to be used in fires except those designated explicitly for Fire Service [3007] and Occupant Egress [3008] and both these sections require lobbies, then lobbies for general use elevators should not be needed to protect occupants during a fire. Exit stairwells are provided explicitly to provide a protected means of egress in fires. One conclusion of the refuge area study for GSA [Klote 1992] was that, in a fully sprinklered building, the entire building is an area of refuge. With respect to protecting occupants in elevators, ASME A17.1 Firefighter Recall Operation (FEO) will take the elevators out of service to the level of exit discharge before smoke can enter the hoistway, regardless of whether 12

an enclosed lobby is provided. In 3007- and 3008-type elevators, the required lobbies are provided to delay recall as long as possible to permit safe use, along with providing a protected space for occupants to wait or for fire fighters to stage below the fire and to operate a forward command post. Hoistway pressurization instead of Lobbies Elevator lobbies are permitted to be eliminated where additional doors [3002.6] or pressurized hoistways [708.14.2] are provided. Pressures are required by the IBC to be between 0.1 and 0.25 in. of water, with the lower limit representing the minimum necessary to prevent flow into the hoistway and the upper limit representing the value above which the landing doors might jam. In the course of this study the group discovered that common practice for mechanical designers is to utilize unconditioned outside air to pressurize the hoistway and to pressurize stairways. Filling vertical shafts with air near the outside temperature reduces stack effect since these flows are driven by differences in temperature between the shaft air and outside air. According to one mechanical engineer, even where only the stairways are pressurized with unconditioned air, the temperature in the hoistways will be driven toward the outside temperature because air moving into the stair will leak into the building and flow into other shafts, including hoistways However, the question has been raised as to the effect of outside air of extreme temperatures (extreme hot or extreme cold) on the safe operation of the elevators, particularly machine-room-less elevators, where elevator machinery is located within the hoistway. Typically, elevator manufacturers publish temperature limits in their operating instructions, and 95 F (35 C) non-condensing is a common limit. More study may be required to determine how long the equipment can be exposed to extreme temperatures before performance is degraded below safe levels. Note that the IBC smoke control provisions state that such systems must perform for 20 minutes or 1.5 times the evacuation time, whichever is less. While 1.5 times the evacuation time is reasonable, the 20 minute maximum may not be appropriate for very tall buildings as the time to egress even with elevators may be much longer (depending on the number of floors evacuating or relocating). Occupant self-evacuation elevator systems utilizing all public-use cars (as required in 3008 of the IBC) are capable of evacuating 100% of the occupants of any building in 1 hour or less [Bukowski 2008]. Also, the 20 minute maximum would certainly not be appropriate for Fire Service Access Elevators which are intended to be operational for the duration of a fire not just during building evacuation. Standby power is required to be available for both types of elevators for two hours which may indicate the intended duration of operation. Smoke Control Systems Design 13

In any building, there exist complex flow paths that include construction cracks and hidden spaces not normally apparent. The larger the building, the more complex these flow paths can become. In addition, there can be strong interaction between stair and hoistway pressurization systems in buildings that have both [Miller 2008]. Section 909.4 of the IBC requires a rational analysis to be performed and submitted with the construction documents, accounting for a number of factors including stack effect, fire temperatures, wind, HVAC, climate and duration of operation. The scope of the required analysis for many buildings results in a complexity that can only adequately be addressed through the utilization of computer (network) models such as CONTAM, developed and distributed by NIST [NIST 2011]. Due to the existence of multiple, complex flow paths, all of which interact in complex ways, and especially where some are mechanically pressurized, it is crucial that the required rational analysis utilize these network models for high-rise buildings and that have one or more of the following characteristics: Buildings in which there is more than a 40% difference in floor area between any two floors, Buildings that contain a parking garage, whether open or enclosed, Buildings that contain both pressurized stairways and pressurized hoistways, and Buildings that contain stacked atria. Buildings containing atria with mechanical smoke control Buildings containing shafts taller than 420 Stairway pressurization Stairway pressurization generally is outside the scope of this Study Group but there are many elements of stairway pressurization systems that impact how the elevator hoistways will perform during a fire. One of the most important issues is how stair pressurization affects the performance of the hoistway when the option of pressurizing the hoistway is chosen. Recommendations for IBC regarding elevator lobbies Based on the forgoing, the following recommendations are suggested for consideration by the entire CTC: 14

1. Unsprinklered low- and mid-rise buildings (buildings with an occupied floor less than 55 feet above the lowest level fire department vehicle access or less than 75 feet above the lowest level of fire department access with an occupant load less than 30 on each floor) No enclosed elevator lobbies required for traditional elevators. Rationale: While fire temperatures can be high, driving smoke and gasses around the building, occupants traveling at the typical rate of about 150 ft/min over the maximum permitted travel distance of 200 ft can reach the safety of an egress stairway in about 1.3 minutes and can descend to the level of exit discharge in less than five minutes. This is merely an approximation but provides an indication of the amount of time necessary for egress in low and mid rise buildings. Also, some code officials participating in the study group stated that lobbies have traditionally not been required in these type buildings in their jurisdictions and their experience has been good. Sprinklers are required in any building containing Fire service access (3007) and occupant evacuation (3008) elevators so these would not be found in buildings in this category. 2. Sprinklered buildings with occupied floors less than 75 feet to the lowest level of fire department vehicle access : No enclosed elevator lobbies required for traditional elevators o Rationale: In sprinklered buildings fire temperatures are kept low and such buildings have little stack effect. Traditional elevators are not to be used by occupants in fires, so any small infiltration into the hoistway is not significant. Shafts shorter than 75 feet have limited stack effect flows. Enclosed lobbies required for fire service access (3007) and occupant evacuation (3008) elevators o Rationale: Fire service access and occupant egress elevators need to continue in operation during a fire. Lobbies provide a protected space to stage and to await the elevator and further provide a physical barrier to smoke that might activate a lobby smoke detector and trigger Phase I recall. 3. Sprinklered buildings with an occupied floor more than 75 feet to the lowest level of fire department vehicle access but less than 420 feet in building height No enclosed elevator lobbies required for traditional elevators. o Rationale: In sprinklered buildings fire temperatures are kept low and such buildings have little stack effect. Traditional elevators are not to be used by occupants in fires, so any small infiltration into the hoistway is not significant. Enclosed elevator lobbies required for fire service access (3007) and occupant evacuation (3008) elevators o Rationale: Fire service access and occupant egress elevators need to continue in operation during a fire. Lobbies provide a protected space to stage and to await the elevator and further provide a physical barrier to smoke that might activate a lobby smoke detector and trigger Phase I recall. 4. Sprinklered buildings more than 420 feet in building height Enclosed elevator lobbies or pressurization of the hoistways required for traditional elevators. o Rationale: While traditional elevators are not permitted to be used in fires, the shaft height might result in more inadvertent smoke infiltration due to stack effect and spread to remote areas. Enclosed lobbies with smoke tight 15

construction or pressurization of the hoistways will limit infiltration. Further consideration and discussion is needed regarding the threshold of 420 feet. Enclosed elevator lobbies required for fire service access (3007) and occupant evacuation (3008) elevators o Rationale: Fire service access and occupant egress elevators need to continue in operation during a fire. Lobbies provide a protected space to stage and to await the elevator and further provide a physical barrier to smoke that might activate a lobby smoke detector and trigger Phase I recall. EXCEPTION: Hoistways for traditional elevators separated into vertical sections not exceeding 420 feet in height with no communication of the shaft environment between sections shall not require enclosed lobbies or pressurization as long as the following condition is met. o Where connection of elevator banks is by a transfer corridor, it shall be necessary to pass through at least 2 swinging doors or a revolving door that maintains a separation of the environments to pass from one section to another. o Rationale: By breaking shafts into shorter sections and limiting communication of different shaft environments, both stack effect and smoke migration will be limited to the extent that pressurization of the hoistways is not required. 5. The design of pressurization systems for elevator hoistways shall be based on a rational analysis in accordance with Section 909.4 that utilizes a network model approved by the AHJ and which includes an analysis of possible interactions between building shafts pressurized by different systems, and between pressurized and unpressurized shafts that exceed 420 feet in height. Add guidance to commentary for 909.4 that the rational analysis should show that the pressurization design will maintain the estimated Fractional Effective Dose (FED) below 0.5 and the estimated visibility distance above 25 feet within the stairway for 1.5 times the estimated evacuation time for each of the design fires selected. o Rationale: Taller buildings with more complex flow paths require analysis utilizing a network model that can account for these interacting flow paths. The criteria suggested for commentary represents the standard of practice for a fire hazard analysis preformed as the required rational analysis. References ASHRAE Handbook Fundamentals, Ch 24, Owen, M. ed., ASHRAE, 2009. Bukowski, R.W., Is There a Need to Enclose Elevator Lobbies in Tall Buildings?, Building Safety Journal, Vol 3, No 4, 26-31, August 2005. Bukowski, R.W., Status of the Use of Elevators in Fires, Emerging Trends (online), SFPE, Bethesda, MD, 2008. 16

Hall, J. R., U.S. EXPERIENCE WITH SPRINKLERS AND OTHER AUTOMATIC FIRE EXTINGUISHING EQUIPMENT, NFPA, Quincy, MA 2010. Klote, J.H., Hazards Due to Smoke Migration Through Elevator Shafts Volume I: Analysis and Discussion. Final Report, NIST GCR 04-864-1, Gaithersburg, MD,, 2004. Klote, J.H., Nelson, H.E. and Deal, S., Staging Areas for Persons with Mobility Limitations, NISTIR 4770, NIST, Gaithersburg, MD 1992. Klote, J.H. and Tamura, G.T., Elevator Piston Effect and the Smoke Problem, Fire Safety Journal, Vol. 11, No. 3, pp. 227-233, December 1986. Klote, J.H., An Analysis of the Influence of Piston Effect on Elevator Smoke Control, NISTIR 88-3751, NIST, Gaithersburg, MD 1988. Marryatt, H.W., Fire, Automatic Sprinkler Performance in Australia and New Zealand, 1886-1968, Australian Fire Protection Association (Melbourne), ISBN 0959946101, 1971. Miller, R.S. and Beasley, D., On Elevator Shaft Pressurization for Smoke Control in Tall Buildings, in Proc Society of Fire Protection Engineers Professional Development Conference and Exposition (2008), Charlotte, North Carolina. NIST CONTAM homepage http://www.bfrl.nist.gov/iaqanalysis/contam/index.htm Sutherland, S., What s changed and what hasn t in the 100 years since the Triangle Waist Co. fire, NFPA Journal, NFPA Quincy, MA 02269, March/April 2011 17

Tamura, G., Stack Effect and Building Design, NRCC CBD-107, Ottawa, Canada, 1968. 18

ATTACHMENT C TG3 REPORT AND PROPOSALS The following are proposals and discussions related to enclosed elevator lobbies and egress. These proposals were developed based upon the fact that an elevator lobby whether traditional, FSAE or Occupant evacuation elevator lobbies were required. The following were topics discussed by TG3. 1. Exit access through lobbies. 2. Direct access. 3. Dead end corridors 4. Conflicting Door swings 1. Exit Access Through Lobbies. Access to egress paths addressed the issue of whether restrictions on the number of paths of egress through the elevator lobby should be implemented. Based upon the intent of the code it was felt that exit access through elevator lobbies should be limited only for occupant evacuation elevators and traditional elevators. Occupant evacuation elevators are specifically drawing occupants to the lobby. It would not be appropriate to allow a tenant space with all egress paths having to go through the enclosed lobby to get to a stair since they will be working against the traffic flow of egress. Traditional enclosed elevator lobbies if required are mandated with a concern for smoke migration in the elevator hoistway. Therefore it would not be prudent to allow both paths of egress to pass through the enclosed lobby. FSAE cause less concern as the occupants will likely not interfere with FS operations and are not specifically pulling occupants to those areas as they elevators are not for egress. This proposal addresses traditional, occupant evacuation and fire service access elevator with regard to the allowances for egress and also provides a proposed pointer within the rated corridor section. See draft proposal as follows: Revise as follows: 19

713.14.1 Elevator lobby. An enclosed elevator lobby shall be provided at each floor where an elevator shaft enclosure connects more than three stories. The lobby enclosure shall separate the elevator shaft enclosure doors from each floor by fire partitions. In addition to the requirements in Section 708 for fire partitions, doors protecting openings in the elevator lobby enclosure walls shall also comply with Section 716.5.3 as required for corridor walls and penetrations of the elevator lobby enclosure by ducts and air transfer openings shall be protected as required for corridors in accordance with Section 717.5.4.1. Elevator lobbies shall have at least one means of egress complying with Chapter 10 and other provisions within this code. Egress through an elevator lobby shall be permitted in accordance with Section 1014.2 item 5 3007.7 Fire service access elevator lobby. The fire service access elevator shall open into a fire service access elevator lobby in accordance with Sections 3007.7.1 through 3007.7.5. Egress is permitted through the elevator lobby in accordance with Section 1014.2 item 5. Exception: Where a fire service access elevator has two entrances onto a floor, the second entrance shall be permitted to open into an elevator lobby in accordance with Section 708.14.1. 3008.7 Occupant evacuation elevator lobby. The occupant evacuation elevators shall open into an elevator lobby in accordance with Sections 3008.7.1 through 3008.7.7. Egress is permitted through the elevator lobby in accordance with Section 1014.2 item 5. Add a new item 5 to section 1014.2 5. Exit access through an enclosed elevator lobby, not required by Section 3007, is permitted. Access to at least one of the required exits shall be accomplished without travel through the enclosed elevator lobbies required by Section 713.14.1 and Section 3008. Access through fire service access elevator lobbies is not restricted. 20

Where the path of exit access travel passes through an enclosed elevator lobby the level of protection required for the enclosed elevator lobby is not required to be extended to the exit unless direct access to an exit is required by other sections of this code. 1018.6 Corridor continuity. Fire-resistance-rated corridors shall be continuous from the point of entry to an exit, and shall not be interrupted by intervening rooms. Where the path of egress travel within a fire-resistance-rated corridor to the exit includes travel along unenclosed exit access stairways or ramps, the fire resistance-rating shall be continuous for the length of the stairway or ramp and for the length of the connecting corridor on the adjacent floor leading to the exit. Exceptions: 1. Foyers, lobbies or reception rooms constructed as required for corridors shall not be construed as Intervening rooms. 2. Enclosed elevator lobbies as permitted by Section 1014.2 item 5 shall not be construed as intervening rooms. Reason: First the purpose of elevator lobbies is first discussed. The code itself does not state what the purpose of a traditional elevator lobby is but historically and to a certain extent from the code commentary there are several purposes that could be concluded. Prevent smoke from spreading from the floor of fire origin through the elevator hoistway. Protect occupied areas from smoke spread from the elevator hoistway In the case of FSAEs and Occupant Evacuation elevators there are additional purposes such as providing a staging area for fire fighters, a protected area for occupants awaiting egress and also to delay the automatic activation of phase 1 recall. Note that Both FSAE and Occupant evacuation elevators require direct access to an exit within the lobby. 21

Based upon the intent of the code it was felt that exit access through elevator lobbies should be limited only for occupant evacuation elevators and traditional elevators. Occupant evacuation elevators are specifically drawing occupants to the lobby. It would not be appropriate to allow a tenant space with all egress paths having to go through the enclosed lobby to get to a stair since they will be working against the traffic flow of egress. Traditional enclosed elevator lobbies if required are required with a concern for smoke migration in the elevator hoistway. Therefore it would not be prudent to allow both paths of egress to pass through the enclosed lobby. The last sentence of the proposed item 5 also clarifies that if an egress path passes through a lobby with more restrictive construction that the level of construction does not need to be continued to the exit. The new exception to Section 1018.1 clarifies also that travel is permitted through an enclosed elevator lobby if the enclosed elevator lobby is located in a rated corridor. 2. Direct Access. The second issue addressed by this committee was direct access to an interior exit stairway as required for occupant evacuation elevators and fire service access elevators. Both FSAE and Occupant Evacuation elevators lobbies call for direct access to the stairway. The term direct access is not necessarily clear in its meaning and can provide logistic problems with building design. The intent originally is believed to be a stair within the lobby itself. The debate has been whether an alternative is needed to locating the interior exit stairway next to the elevator. The debate has been whether such an option should extend the interior exit stairway protection or if the lobby requirements should be extended. The following proposal allows the extension of construction similar to the lobby via corridor construction. A door is being required at the entrance of the lobby space with smoke and draft protection. Revise as follows: 22

3007.7.1 Interior exit stairway access. The fire service access elevator lobby shall have direct access from the enclosed elevator lobby to an enclosure for an interior exit stairway. Exception: Access to an interior exit stairway shall be permitted to be through a protected path of travel that has a level of fire protection not less than the elevator lobby enclosure. The protected path shall be separated from the enclosed elevator lobby through an opening protected by a smoke and draft control assembly in accordance Section 716.5.3. 3008.7.1 Interior exit stairway access. The occupant evacuation elevator lobby shall have direct access from the enclosed elevator lobby to an interior exit stairway or ramp. Exception: Access to an interior exit stairway shall be permitted to be through a protected path of travel that has a level of fire protection not less than the elevator lobby enclosure. The protected path shall be separated from the enclosed elevator lobby through an opening protected by a smoke and draft control assembly in accordance Section 716.5.3. Direct Access. A path of travel from a space to an immediately adjacent space through an opening in the common wall between the two spaces. Reason: Both FSAE and Occupant Evacuation elevators lobbies call for direct access to the stairway. The term direct access is not necessarily clear in its meaning and could if applied as intended place severe design limitations on some buildings. The intent of this proposal is to set out a viable option for the stairs to be more remotely located from the lobby. A package of requirements that provides fire resistance rated construction and smoke and draft protection is provided. A definition is also provided for discussion. It is not clear whether the proposed language itself is self explanatory or if a definition is also necessary. Background sections for the separation requirements are as follows: 23

708.1 General. The following wall assemblies shall comply with this section. 1. Walls separating dwelling units in the same building as required by Section 420.2. 2. Walls separating sleeping units in the same building as required by Section 420.2. 3. Walls separating tenant spaces in covered and open mall buildings as required by Section 402.4.2.1. 4. Corridor walls as required by Section 1018.1. 5. Elevator lobby separation as required by Section 713.14.1. 708.2 Materials. The walls shall be of materials permitted by the building type of construction. 708.3 Fire-resistance rating. Fire partitions shall have a fire resistance rating of not less than 1 hour. Exceptions: 1. Corridor walls permitted to have a 1/2 hour fire-resistance rating by Table 1018.1. 2. Dwelling unit and sleeping unit separations in buildings of Type IIB, IIIB and VB construction shall have fire-resistance ratings of not less than 1/2 hour in buildings equipped throughout with an automatic sprinkler system in accordance with Section 903.3.1.1. 716.5.3 Door assemblies in corridors and smoke barriers. Fire door assemblies required to have a minimum fire protection rating of 20 minutes where located in corridor walls or smoke barrier walls having a fireresistance rating in accordance with Table 716.5 shall be tested in accordance with NFPA 252 or UL 10C without the hose stream test. Exceptions: 1. Viewports that require a hole not larger than inch (25 mm) in diameter through the door, have at least a 0.25-inch-thick (6.4 mm) glass disc and the holder is of metal that will not melt out where subject to temperatures of 1,700 F (927 C). 2. Corridor door assemblies in occupancies of Group I-2 shall be in accordance with Section 407.3.1. 24

3. Unprotected openings shall be permitted for corridors in multitheater complexes where each motion picture auditorium has at least one-half of its required exit or exit access doorways opening directly to the exterior or into an exit passageway. 4. Horizontal sliding doors in smoke barriers that comply with Sections 408.3 and 408.8.4 in occupancies in Group I-3. 716.5.3.1 Smoke and draft control. Fire door assemblies shall also meet the requirements for a smoke and draft control door assembly tested in accordance with UL 1784. The air leakage rate of the door assembly shall not exceed 3.0 cubic feet per minute per square foot (0.01524 m3/s m2) of door opening at 0.10 inch (24.9 Pa) of water for both the ambient temperature and elevated temperature tests. Louvers shall be prohibited. Installation of smoke doors shall be in accordance with NFPA 105. 716.5.3.2 Glazing in door assemblies. In a 20-minute fire door assembly, the glazing material in the door itself shall have a minimum fire-protection-rated glazing of 20 minutes and shall be exempt from the hose stream test. Glazing material in any other part of the door assembly, including transom lights and sidelights, shall be tested in accordance with NFPA 257 or UL 9, including the hose stream test, in accordance with Section 716.6. Background information on the term direct access is as follows: ANCHOR BUILDING. An exterior perimeter building of a group other than H having direct access to a covered or open mall building but having required means of egress independent of the mall. 405.4.3 Elevators. Where elevators are provided, each compartment shall have direct access to an elevator. Where an elevator serves more than one compartment, an elevator lobby shall be provided and shall be separated from each compartment by a smoke barrier in accordance with Section 709. Doors shall be gasketed, have a drop sill and be automatic-closing by smoke detection in accordance with Section 716.5.9.3. 407.4.1 Direct access to a corridor. Habitable rooms in Group I-2 occupancies shall have an exit access door leading directly to a corridor. 505.2.3 Openness. A mezzanine shall be open and unobstructed to the room in which such mezzanine is located except for walls not more than 42 inches (1067 mm) in height, columns and posts. Exceptions: 25

1. Mezzanines or portions thereof are not required to be open to the room in which the mezzanines are located, provided that the occupant load of the aggregate area of the enclosed space is not greater than 10. 2. A mezzanine having two or more means of egress is not required to be open to the room in which the mezzanine is located if at least one of the means of egress provides direct access to an exit from the mezzanine level. 3. 1007.6 Areas of refuge. Every required area of refuge shall be accessible from the space it serves by an accessible means of egress. The maximum travel distance from any accessible space to an area of refuge shall not exceed the travel distance permitted for the occupancy in accordance with Section 1016.1. Every required area of refuge shall have direct access to a stairway complying with Sections 1007.3 or an elevator complying with Section 1007.4. Where an elevator lobby is used as an area of refuge, the shaft and lobby shall comply with Section 1022.10 for smokeproof enclosures except where the elevators are in an area of refuge formed by a horizontal exit or smoke barrier. 1007.7.2 Outdoor facilities. Where exit access from the area serving outdoor facilities is essentially open to the outside, an exterior area of assisted rescue is permitted as an alternative to an area of refuge. Every required exterior area of assisted recue shall have direct access to an interior exit stairway, exterior stairway, or elevator serving as an accessible means of egress component. The exterior area of assisted rescue shall comply with Sections 1007.7.3 through 1007.7.6 and shall be provided with a two-way communication system complying with Sections 1007.8.1 and 1007.8.2. 1027.1 General. Exits shall discharge directly to the exterior of the building. The exit discharge shall be at grade or shall provide direct access to grade. The exit discharge shall not reenter a building. The combined use of Exceptions 1 and 2 shall not exceed 50 percent of the number and capacity of the required exits. 1105.1.1 Parking garage entrances. Where provided, direct access for pedestrians from parking structures to buildings or facility entrances shall be accessible. 1105.1.2 Entrances from tunnels or elevated walkways. Where direct access is provided for pedestrians from a pedestrian tunnel or elevated walkway to a building or facility, at least one entrance to the building or facility from each tunnel or walkway shall be accessible. TABLE 2902.1 26

c. A single-occupant toilet room with one water closet and one lavatory serving not more than two adjacent patient sleeping units shall be permitted where such room is provided with direct access from each patient sleeping unit and with provisions for privacy. 3007.7.1 Access. The fire service access elevator lobby shall have direct access to an enclosure for an interior exit stairway. 3008.7.1 Access. The occupant evacuation elevator lobby shall have direct access to an interior exit stairway or ramp. 3109.4.1.8 Dwelling wall as a barrier. Where a wall of a dwelling serves as part of the barrier, one of the following shall apply: 1. Doors with direct access to the pool through that wall shall be equipped with an alarm that produces an audible warning when the door and/or its screen, if present, are opened. The alarm shall be listed and labeled in accordance with UL 2017. In dwellings not required to be Accessible units, Type A units or Type B units, the deactivation switch shall be located 54 inches (1372 mm) or more above the threshold of the door. In dwellings required to be Accessible units, Type A units or Type B units, the deactivation switch shall be located not higher than 54 inches (1372 mm) and not less than 48 inches (1219 mm) above the threshold of the door. 3. Dead end corridors due to stair shifts. There is a concern specific to occupant evacuation elevators and FSAEs related to dead end corridors that may be created as a result. More specifically, since direct access to a stair must be provided from the lobby the location of the stairs may shift and possibly cause issues with dead end corridors and travel distance. There will likely be an avoidance of a third stair to address this so it may create some awkward layouts. In buildings with a core design it may not be as difficult to address. The proposals drafted addressing direct access will allow more flexibility which will reduce this problem. In addition, at least one path of egress can pass through the enclosed elevator lobby (as currently proposed) which provides some level of flexibility in design. 4. Conflicting doors/door swing. This issue is more specific to FSAE and the many doors required. The code currently requires direct access from the lobby to a stairway and 27

additionally an entrance to the same stairway from the corridor based upon standpipe access issues. Depending upon how the stairway is laid out issues with conflicting doors may arise. Also there is concern that this particular requirement for essentially 2 doors on each story may cause difficulty in design and also some confusion for occupants and Fire fighters as to where to go. A proposal has not been assembled at this time but will likely involve signage to avoid conflict. Note that depending upon how the concept of direct access is addressed this may affect this issue. More specifically if the interior exit stairway is accessed down a protected path it may already satisfy the requirements of Section 3007.10.1 for access directly to the floor without passing through the enclosed elevator lobby. 28

ATTACHMENT D TG4 REPORT AND PROPOSALS Task Group 4 was charged with addressing the design and construction of enclosed elevator lobbies. Note that there were basically three types of elevators and associated enclosed elevator lobbies of interest which included the following. Traditional (Section 713.14.1) FSAE (Section 3007) Occupant Evacuation Elevators (Section 3008) There were several subcategories of topics with regard to the design and construction of enclosed elevator lobbies that were to be reviewed. These subcategories were as follows: 1. Dimensions of Elevator Lobbies 2. Location of Elevator Lobbies 3. Separation of Elevator Lobbies 4. Pressurization of Hoistways and Elevator Lobbies. 5. Roll Down Type Barriers, Sliding Doors & Additional Doors 6. Gasket Systems 7. Additional Issues 1. Dimensions of Elevator Lobbies. The issue of whether or not the lobby sizes mandated in Section 3007 and 3008 were appropriate was discussed at some length. The main focus was on the FSAE lobbies and whether they would work with fire fighting operational needs. Also a question based upon some interpretation of this section as to whether each FSAE would require an increase in lobby size. Proposals such as G197-07/08 were reviewed for intent. The conclusion was Current lobby size requirements for both FSAE and Occupant evacuation elevator were appropriate Size requirements for FSAE were only intended to apply one time. In other words the area did not need to increase by 150 square feet for each addition FSAE. This is important as the 2012 IBC now requires 2 FSAEs. See Proposal 3 for clarification of the size requirements. 2. Location of Elevator Lobbies. This issue was focused more upon where lobbies were required though TG2 was charged with determining if an enclosed elevator lobby was necessary. No changes were proposed for this topic except to clarify the difference between enclosed elevator lobbies and 29

unenclosed elevator lobby. This makes application of the provisions clear as the term elevator lobby is used whether or not the lobby is enclosed such as the first floor lobby in a high rise building. See Proposal 7. 3.Separation of Elevator Lobbies. This issue related specifically to what types of separations were required of enclosed elevator lobbies in the I-Codes. There are three types of lobbies the group has discussed including what has been termed a traditional elevator lobby, FSAE lobby and Occupant Evacuation Elevator lobby. The basic construction requirements are as follows: Traditional Elevator lobby. 1 Hour fire partitions but note that Section 713.14.1 sets out several exceptions which would allow alternate methods of protection such as a smoke partition with sprinkler protection. FSAE Lobby. Smoke barrier construction. Occupant evacuation elevators. Smoke barrier construction. Generally the types of separations were not questioned but instead clarity in application of some of the code requirements was addressed. The following of some of the specific issues addressed. Smoke barrier continuity. There was concern that the code does not currently allow termination of a smoke barrier at the shaft enclosure and that smoke and draft assemblies would then be required at the opening into the hoistway. Proposal 4 addresses this issue. Area of refuge consistency. Section 1007.6 currently requires the protection afforded for an enclosed elevator lobby through the use of a smoke proof enclosure. More clarity on construction was necessary as smokeproof enclosures are intended for an interior exit stairway and not an elevator lobby. See Proposal 5. Note that there are some suggested revisions still under review for this proposal. One of the key issues is whether the intent of smokeproof enclosures should be taken as a whole or just the construction requirements. In other words, in addition to separation was there also an intent to provide pressurization of the hoistway and lobby? Note that a smokeproof enclosure would be separated with fire barriers versus smoke barriers. Corridor continuity. An area of confusion pointed out to the TG was that it is often interpreted that if a corridor is required to be rated in accordance with Section 1008 that when an elevator opened onto that corridor that smoke and draft protection would still be required even if the elevator lobby requirements were not applicable. The concern with this approach is that this would then essentially be another elevator lobby requirement indirectly applied through the corridor requirements. The logic of the proposal provided was to clarify that if an enclosed elevator lobby was not required by Section 713.14.1 then protection for the corridor would not be necessary. See Proposal 6. 4. Pressurization of Hoistways and Elevator Lobbies. TG4 spent extensive time discussing the viability of hoistway pressurization as an alternative to the main traditional elevator lobby requirements in Section 713.14.1. The concern was whether such a system would be effective. As part of this analysis various types of pressurization strategies were summarized. Also, the affect of stack effect within buildings was 30

discussed and reviewed at length. Initially the conclusion was that there were hoistway height limitations on the use of this options but with more information provided on the use of outside air for pressurization systems the affect of stack effect on such systems is minimized. More discussion of this concept is found in the report presented by TG2. There may be extreme conditions where limitations should be placed upon systems but generally the concept as written in the code currently is satisfactory. It should be noted that the discussion of this topic also did raise questions with regard to what should occur when a rational analysis is undertaken. Future discussions of this group and TG2 may lead to a proposal to strengthen the requirements for a rational analysis in Section 909. 5. Roll Down Type Barriers, Sliding Doors & Additional Doors. The Additional door allowance in the elevator lobby requirements existed in the Uniform Building Code (ICBO) since 1991 (three editions), and then was carried over to the IBC 2000 and each successive IBC edition since them (four editions). It is believed that the rationale for these doors was that they were meant to be a design option used primarily to allow the designer the ability to avoid the additional space required by a fully enclosed lobby while still meeting the elevator lobby requirements. It is generally accepted that the requirements in the IBC for 707.14.1 (IBC 2000 IBC 2006), 708.14.1 (IBC 2009) and 713.14.1 (IBC 2012) are part of the shaft protection requirements, and the sole function of the elevator lobby requirement in Chapter 7 is to serve as a barrier against smoke infiltration into the hoistway from a fire on the floor of origin, or alternately if smoke has made it into the elevator shaft, to prevent smoke from escaping onto other floors remote from the fire. The fire service does not typically stage in the elevator lobby nor when they use the elevators do they even approach any closer than 1 2 floors below the lowest known fire location. The elevator lobby requirements in Chapter 7 also have never been intended to meet the requirements for areas of refuge which are in Chapter 10 and are more extensive. The lobby requirements for the newly created fire service access elevators and the occupant evacuation elevators are found in Chapter 30 and clearly are intended to provide safety areas during fire events for those particular designs. In the UBC legacy code and in the IBC Chapter 7 requirements for elevator lobbies, there has never been a minimum space requirement. The most common instance for the additional door design to be used is when the elevator hoistway door opens directly into the corridor. Instead of offsetting the hoistway away from the corridor to provide space for a small enclosed vestibule, typically a 20 minute fire rated door and frame, which also carries an S rating, is mounted directly in front of the hoistway opening. The door frame is attached to the corridor wall in such a way that the hoistway door frame fire rating is not compromised. Typically the additional doors are restrained (open) by magnetic hold opens and released upon some alarm signal which can range from a general alarm to only releasing when the elevator system enters Phase 1. Note that this particular issue is somewhat controversial as to whether the corridor requirements would drive the need for an elevator lobby. Please see Proposal 6 for more discussion on this issue. There are three areas of supplemental requirements when the additional door option is chosen. The first is found in Exception 3 which requires that the S rating be achieved without taping the undercut; taping of the undercut is normally a common practice when testing to UL 1784. The second area is found in Chapter 30 which states that 3002.6 Prohibited doors. Doors, other than hoistway doors and the elevator car door, shall be prohibited at the point of access to an elevator car unless such doors are readily openable from the car side without a key, tool, special knowledge or effort. 31

The third area is in meeting the minimum corridor widths. The path of the additional door swing through the corridor shall not encroach on more than 50% of the minimum corridor width. The presence of an additional door is also recognized and permitted in the Elevator Code, however there are a few more performance requirements in the Elevator Code when this design option is chosen than are found in the Building Code. Section 2.11.6.3 of the elevator Code addresses this issue. Also note that this section requires the fire department to be able to visually observe the elevator landing (lobby). Below is the commentary for the 2009 IBC 708.14.1 exception 3. Exception 3 eliminates the need for a lobby area, but still requires the additional layer of fire resistance and smoke control. Doors, in addition to the normal hoistway door, are provided in front of the hoistway opening. These doors or door must meet the following two requirements: 1. They must be easily opened in accordance with Section 3002.6. This ensures that if the door or doors do close that they can be opened by someone who arrives at that level on the elevator, such as fire department personnel. This is particularly important if the doors are horizontal power-operated doors, such as those in Section 1008.1.4.3. Section 3002.6 states that the doors shall be readily openable from the car side without a key, tool, special knowledge or effort. 2. Additional door or doors must be tested in accordance with UL 1784. This test is titled "Air Leakage Tests of Door Assemblies." This test does not provide a fire-resistance rating for the door. This test has no failure criteria as it only measures the leakage rate. The leakage rate for smoke and draft control doors in Section 715.4.3.1 is a maximum of 3 cubic feet per minute per square foot (0.0014 m 3 /s) of door opening at 0.10 inch of water column pressure (0.02 kpa). It is assumed that they must meet the leakage rate requirements in Section 715.4.3.1, and they must be identified as smoke and draft control doors in accordance with Section 715.4.6.3. Commentary for Section 3002.6 is as follows: Where a door is installed in front of the hoistway door to meet the hoistway opening protection requirements in Section 708.14.1 (Exception 3) or for security purposes this section requires that occupants be able to open the door. Inappropriate installation of these doors could lead to occupants becoming trapped in the area between the elevator doors and the additional set of doors. See Figure 3002.6 for a picture of an additional door located at the hoistway opening. 32

Figure 3002.6 ADDITIONAL DOOR IN FRONT OF HOISTWAY At this time there are no proposals to revise the requirements in the IBC with regard to this issue. 6. Gasket Systems. This topic was researched by the TG and based upon such research was determined that the use of gasketing systems was not appropriate. More specifically through discussion with those in the elevator community the use of gasketing is not preferred due to the practical difficulties of such gasketing. One such issue is related to concerns with the ability of hoistway door closure. Section 2.11.19 of ASME A17.1 addresses the gasketing of hoistway entrances. This section requires testing of the gasketing material to one of the following fire door testing standards: 33