Service Instructions for use by heating contractor VITOROND 200 IMPORTANT. Read and save these instructions for future reference.

Similar documents
Operating Instructions and User s Information Manual VITOROND 200 WARNING WARNING IMPORTANT. Read and save these instructions for future reference.

Start-up/Service Instructions for use by heating contractor. VITOCELL r 300-V VITOCELL r 300-B IMPORTANT

Service Instructions for use by heating contractor VITOCROSSAL 200 IMPORTANT. Read and save these instructions for future reference.

Installation Instructions for use by heating contractor. VITOCELL r 300-H CAUTION IMPORTANT. Read and save these instructions for future reference.

Operating Instructions and User s Information Manual for use by engineers and heating contractors VITOTRONIC 100 IMPORTANT

Installation Instructions VITOTRONIC 200

Installation, Operating and Service Instructions for use by heating contractor. VITOCELL r 300-W CAUTION IMPORTANT

Description Model Weil-McLain part number. Vent Termination Kit for 3" Stainless Steel All

Installer's Guide. WARNING: HAZARDOUS VOLTAGE - DISCONNECT POWER and DISCHARGE YCC-IG EB23D1-12

SERVICE FACTS WARNING M801-SF-1C. Gas Furnaces Upflow & Downflow Induced Draft 1 Stage Heat Models: DISCONNECT POWER BEFORE SERVICING M801P040AU24AA

Installation and Service Instructions. VITOROND r 100 IMPORTANT. Read and save these instructions for future reference. for use by heating contractor

HWX GAS BOILERS USER S INFORMATION MANUAL

Installation and Service Instructions. VITOROND r 100 IMPORTANT. Read and save these instructions for future reference. for use by heating contractor

12a. Replacement parts. GOLD CGs Gas-Fired Water Boiler Boiler Manual. Section assembly Base Jacket Trim Controls...

USER'S INFORMATION MANUAL

USER'S INFORMATION MANUAL

Service and Maintenance Instructions. Vitoflex 300-UF WARNING WARNING IMPORTANT. Read and save these instructions for future reference.

Installation and Service Instructions SM1 SOLAR CONTROL MODULE IMPORTANT. Read and save these instructions for future reference.

Installation Instructions for use by heating contractor. VITOCELL r 100-B CAUTION IMPORTANT. Read and save these instructions for future reference.

Installation Instructions for use by heating contractor. VITOCELL r 100-V CAUTION IMPORTANT. Read and save these instructions for future reference.

Installation Instructions for use by heating contractor VITOCROSSAL 300 IMPORTANT. Read and save these instructions for future reference.

USER S INFORMATION MANUAL

Installation and Operating Instruction Supplement Use in conjunction with the original technical literature supplied by Riello. Riello Burner WARNING

Installation Instructions for use by heating contractor. VITODENS r 222-F IMPORTANT. Read and save these instructions for future reference.

GBX GAS BOILERS USER S INFORMATION MANUAL

Installation Instructions VITOTRONIC 300

DOMESTIC WATER HEATER OIL FIRED

Technical Data Manual Model Nos. and pricing: see Price List

Operating Instructions VITOCROSSAL 300 WARNING WARNING IMPORTANT. Read and save these instructions for future reference. for use by heating contractor

Installation, Service and Operating Instructions. Viessmann AirflowPLUS IMPORTANT. Read and save these instructions for future reference.

USER S INFORMATION MANUAL

80% and 95% furnace models feature aluminized steel heat exchangers to conduct heat quickly and increase durability.

Installation Instructions for use by heating contractor. VITODENS r 200-W IMPORTANT. Read and save these instructions for future reference.

WARNING FIRE OR EXPLOSION HAZARD.

CMO32 CMO50 DOMESTIC WATER HEATER OIL-FIRED. Models: CMO32 CMO50

Conversion Instructions Logano G234X. Gas boiler. Please read carefully before installing and servicing. Gas boiler

USER S INFORMATION MANUAL Model: HSE 125 N/P, HSE 145 N/P Gas-fired, Condensing Boiler and Instantaneous Water Heater

FGR. Installation, Operation and Startup Instruction Manual FOR FLUE GAS RECIRCULATION SYSTEM. FGR-8 through FGR-22 (25 HP to 1000 HP)

KGA092 SHOWN READ ALL INSTRUCTIONS IN THIS MANUAL AND RETAIN FOR FUTURE REFERENCE WARNING

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

EL195DFE SERIES GAS FURNACE WARNING

USER S INFORMATION MANUAL

VF/VG700 Jumbo. Construction Heater. Installation and Maintenance Manual

Bosch 80% AFUE Gas Furnace BGS80 Model

EL195UH SERIES GAS FURNACE WARNING

TGA/KGA024, 030, 036, 048, 060, 072, 090 (2, 2 1/2, 3, 4, 5, 6, and 7 1/2 TONS)

User s Information Manual

ML180UH SERIES GAS FURNACE WARNING WARNING

READ ALL INSTRUCTIONS IN THIS MANUAL AND RETAIN FOR FUTURE REFERENCE WARNING

Page 1 of 18. Part# /5/2013

VIESMANN. Service instructions VITORONDENS 200-T. for contractors. Vitorondens 200-T Type BR2A, 20.2 to 53.7 kw Oil Unit condensing boiler

KG 092 SHOWN READ ALL INSTRUCTIONS IN THIS MANUAL AND RETAIN FOR FUTURE REFERENCE WARNING

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

WV-DV. Series. Oil. Boilers. Installation, Operation & Maintenance Manual

USER S INFORMATION MANUAL

Elite. User s Information Manual. Elite and Elite VWH* All Models

G61MPV SERIES GAS FURNACE WARNING

Aqua Balance. User s Information Manual. WMB-155C Wall Mount Gas-Fired Combination Boiler Heating and Domestic Hot Water

Operating Instructions. VITODENS r 200 Series With Vitotronic 200 HO1B Controls WARNING WARNING IMPORTANT

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-200 INDIRECT FIRED SPACE HEATERS

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVN/P-400 INDIRECT FIRED SPACE HEATERS

Installation Instructions Part No

WARNING FIRE OR EXPLOSION HAZARD.

USER S INFORMATION MANUAL

USER'S INFORMATION MANUAL

Detailed Cleaning Instructions

Viking Installation Guide

USER S INFORMATION MANUAL SLP98UHV SERIES

Internet Version for Reference Only INDUCED DRAFT COMMERCIAL WATER HEATERS SUPPLEMENT INSTRUCTIONS TO PART #

High Efficiency Oil Fired Hot Water Boiler REPAIR PARTS & OPTIONAL KITS. P/N# , Rev. C [01/09]

OPERATING INSTRUCTIONS MANUAL (Please retain for future reference) FVO-200 INDIRECT FIRED SPACE HEATERS

Installation Instructions for use by heating contractor. Vitodens Common Venting System IMPORTANT

STAR-MAX PROPANE GAS GRIDDLE

User s Information Manual

Industrial - Remote Reservoir Parts Cleaner Operator's Manual. Read and understand all labels, MSDS, and this instruction manual before use.

SLP98UH SERIES VARIABLE CAPACITY GAS FURNACE WARNING WARNING

Service Instructions for use by heating contractor. VITODENS r 200-W IMPORTANT. Read and save these instructions for future reference.

EL195UHE SERIES GAS FURNACE WARNING WARNING

Installation and Service Instructions VITODENS 100-W IMPORTANT. Read and save these instructions for future reference. for use by heating contractor

LATTNER BOILER COMPANY 9.5 HP Low-NOx Installation and Start-Up Checklist for Dry Cleaners

User s Information Manual

SERVICE AND INSTALLATION MANUAL MODELS HDO(H) OIL FOR YOUR SAFETY

ZG Shown READ ALL INSTRUCTIONS IN THIS MANUAL AND RETAIN FOR FUTURE REFERENCE WARNING

User s Information Manual

FWZ Series Oil-Fired Hot Water Boilers INSTALLATION INSTRUCTIONS

Service Instructions for use by heating contractor. VITODENS r 222-F IMPORTANT. Read and save these instructions for future reference.

MC Series Gas-Fired Heating Appliance

Heat Exchanger Block Replacement Instructions

User s Information Manual

EL296UHV SERIES GAS FURNACE WARNING WARNING

Service Instructions. VITODENS r 200-W IMPORTANT. Read and save these instructions for future reference. for use by heating contractors

USER'S INFORMATION MANUAL

APEX CONDENSING HIGH EFFICIENCY GAS-FIRED HOT WATER BOILER

ASSEMBLY INSTRUCTIONS - NXS SERIES. INFRARED RADIANT TUBE HEATER Single and Two Stage Pull Through System (Negative Pressure)

15 20 kw kw kw

Service Instructions for use by heating contractor. VITODENS r 200-W IMPORTANT. Read and save these instructions for future reference.

OPERATING INSTRUCTIONS AND OWNER S MANUAL

Operating instructions

HX Field Replacement Kit

User s Information Manual

Transcription:

Instructions for use by heating contractor Vitorond 200 VD2 Series Oil-/Gas-fired boiler Heating input: 1255 to 4387 MBH (368 to 1285 kw) VITOROND 200 Product may not be exactly as shown IMPORTANT Read and save these instructions for future reference. 03/2015 Please file in Binder

Safety Safety, Installation and Warranty Requirements Vitorond 200, VD2 Series 320 to 1080 Please ensure that these instructions are read and understood before commencing installation. Failure to comply with the instructions listed below and details printed in this manual can cause product/property damage, severe personal injury, and/or loss of life. Ensure all requirements below are understood and fulfilled (including detailed information found in manual subsections). H Product documentation Read all applicable documentation before commencing installation. Store documentation near boiler in a readily accessible location for reference in the future by service personnel. For a listing of applicable literature, please see section entitled Important Regulatory and Safety Requirements. H Licensed professional heating contractor The installation, adjustment, service and maintenance of this equipment must be performed by a licensed professional heating contractor. Please see section entitled Important Regulatory and Installation Requirements. H Contaminated air Air contaminated by chemicals can cause by-products in the combustion process, which are poisonous to inhabitants and destructive to Viessmann equipment. For a listing of chemicals which cannot be stored in or near the boiler room, please see section entitled Mechanical Room. in this manual. H H Advice to owner Once the installation work is complete, the heating contractor must familiarize the system operator/ ultimate owner with all equipment, as well as safety precautions/requirements, shutdown procedure, and the need for professional service annually before the heating season begins. Warranty Information contained in this and related product documentation must be read and followed. Failure to do so renders the warranty null and void. H Carbon monoxide Improper installation, adjustment, service and/or maintenance can cause flue products to flow into living space. Flue products contain poisonous carbon monoxide gas. For information pertaining to the proper installation, adjustment, service and maintenance of this equipment to avoid formation of carbon monoxide, please see section entitled Combustion air supply and Venting information in this manual. H Fresh air This equipment requires fresh air for safe operation and must be installed ensuring provisions for adequate combustion and ventilation air exist. For information pertaining to the fresh air requirements of this product, please see subsection entitled Mechanical Room in this manual. H Equipment venting Never operate boiler without an installed venting system. An improper venting system can cause carbon monoxide poisoning. For information pertaining to venting and chimney requirements, please see section entitled Venting Information in this manual. All products of combustion must be safely vented to the outdoors. WARNING Installers must follow local regulations with respect to installation of carbon monoxide detectors. Follow the Viessmann maintenance schedule of the boiler in the Instructions manual. 2

Vitorond 200, VD2 Series 320 to 1080 Safety, Installation and Warranty Requirements (continued) Safety Fiberglass wool and ceramic fiber materials WARNING Inhaling of fiberglass wool and/or ceramic fiber materials is a possible cancer hazard. These materials can also cause respiratory, skin and eye irritation. The state of California has listed the airborne fibers of these materials as a possible cancer hazard through inhalation. When handling these materials, special care must be applied. Suppliers of ceramic fiber products recommend the following first aid measures: - Respiratory tract (nose and throat) irritation: If respiratory tract irritation develops, move the person to a dust free location. - Eye irritation: If eyes become irritated, flush immediately with large amounts of lukewarm water for at least 15 minutes. Eyelids should be held away from the eyeball to ensure thorough rinsing. Do not rub eyes. - Skin irritation: If skin becomes irritated, remove soiled clothing. Do not rub or scratch exposed skin. Wash area of contact thoroughly with soap and water. Using a skin cream or lotion after washing may be helpful. - Gastrointestinal irritation: If gastrointestinal tract irritation develops, move the person to a dust free environment. Suppliers of fiberglass wool products recommend the following precautions be taken when handling these materials: Precautionary measures - Avoid breathing fiberglass dust and contact with skin and eyes. - Use NIOSH approved dust/mist respirator. - Wear long-sleeved, loose fitting clothing, gloves and eye protection. - Wash work clothes separately from other clothing. Rinse washer thoroughly. - Operations such as sawing, blowing, tear-out and spraying may generate airborne fiber concentration requiring additional protection. First aid measures - If eye contact occurs, flush eyes with water to remove dust. If symptoms persist, seek medical attention. - If skin contact occurs, wash affected areas gently with soap and warm water after handling. Hazardous materials WARNING Appliance materials of construction, products of combustion and the fuel contain alumina, silica, heavy metals, carbon monoxide, nitrogen oxides, aldehydes and/or other toxic or harmful substances which can cause serious injury or loss of life and which are known to the State of California to cause cancer, birth defects and other reproductive harm. Always use proper safety clothing, respirators and equipment when servicing or working nearby the appliance. 3

Table of Contents Vitorond 200, VD2 Series 320 to 1080 Safety General Information Inspection and Maintenance Page Safety, Installation and Warranty Requirements...2 Product documentation...2 Licensed professional heating contractor...2 Contaminated air...2 Advice to owner...2 Warranty...2 Carbon monoxide...2 Fresh air...2 Equipment venting...2 Fiberglass wool and ceramic fiber materials...3 Suppliers of ceramic fiber products recommend the following first aid measures...3 Precautionary measures...3 First aid measures...3 Hazardous materials...3 Important Regulatory and Safety Requirements...6 Instructing the system user...6 Initial start-up...6 Working on the equipment...6 Technical literature...6 About these Installation Instructions...7 Necessary Tools...8 Tools...8 Cleaning supplies...8 Testing/Analysis equipment...8 Technical information...8 Replacement parts...8 Customer Site Information...8 Boiler...8 Burner...8 Shut Down the Heating System...9 Open Combustion Chamber Door and Clean-out Opening Covers...9 Remove and Clean Turbulators...9 Clean heat exchanger, flue gas collar and chimney...10 Check all Gaskets and Sealant Ropes...10 Check Insulation of Combustion Chamber Door...10 Reinstall Turbulators, Clean-out Covers and Close Combustion Chamber Door...11 Check Proper Operation of Safety Header...11 Check Proper Operation of Expansion Tank, Low Water Cut-offs and Pumps...11 Check Proper Expansion Tank and System Pressures...12 4

Vitorond 200, VD2 Series 320 to 1080 Table of Contents Page Inspection and Maintenance Additional Information Clean Sight Glass of Combustion Chamber Door...12 Check Water Hardness...12 Ensure Proper Fit of Insulation Blanket...12 Ensure Proper Operation of Heating System Control...12 Ensure Proper Operation of Low Temperature Protection Package...13 Check Combustion Air Supply...13 Check Vent System...13 Check Proper Operation of Door Safety Switch (oil burners only)...13 Calibrate Burner...14 Two-stage burner...14 Model...14 Flue gas resistance...14 Fully modulating burner...14 Weishaupt / Riello burners...14 Gas-fired...14 Oil-fired...14 Vitorond 200 with Viessmann Vitotronic controls...14 Model...14 Input...14 Min.1-stage input...14 Maintenance Schedule...15 Maintenance...15 Frequency...15 Performed by...15...15 Parts List...16 When ordering replacement parts...16 Parts...16 Parts not shown...16 Maintenance Record...20 5

Safety Important Regulatory and Safety Requirements Vitorond 200, VD2 Series 320 to 1080 Instructing the system user The installer of the system is responsible to ensure the system operator/ultimate owner is made familiar with the functioning of the system, its activation, and its shut-down. Note: The following topics must be covered: Proper system operation sequence. Explain the equipment as well as the need for combustion air. Demonstrate an emergency shut-down, what to do and what not. Explain that there is no substitute for proper maintenance to help ensure safe operation. Initial start-up Initial start-up must be performed by a qualified heating contractor. Completion of the Maintenance Record by the heating contractor is also required. Note: The Maintenance Record is located on page 20 of this manual. Technical literature Literature for the Vitocrossal 200 VD2 boiler: - Technical Data Manual - Installation Instructions - Instructions - Operating Instructions and User s Information Manual - Instructions of other Viessmann products utilized with this installation - Installation codes mentioned in this manual Additional applicable literature: - Viessmann boiler controls manuals Note: Leave all literature at the installation site and advise the system operator/ultimate owner where the literature can be found. Contact Viessmann for additional copies. Working on the equipment The installation, adjustment, service, and maintenance of this boiler must be performed by a licensed professional heating contractor who is qualified and experienced in the installation, service, and maintenance of hot water boilers. There are no user serviceable parts on the boiler, burners, or control. Note: Please carefully read this manual prior to attempting installation. Any warranty is null and void if these instructions are not followed. For information regarding other Viessmann System Technology componentry, please reference documentation of the respective product. Viessmann offers frequent installation and service seminars to familiarize our partners with our products. Please inquire. Ensure main power supply to equipment, the heating system, and all external controls has been deactivated. Close main gas supply valve. Take precautions in all instances to avoid accidental activation of power during service work. Note: The completeness and functionality of field supplied electrical controls and components must be verified by the heating contractor. This includes low water cut-offs, flow switches (if used), staging controls, pumps, motorized valves, air vents, thermostats, etc. 6

Vitorond 200, VD2 Series 320 to 1080 About these Installation Instructions General Information Take note of all symbols and notations intended to draw attention to potential hazards or important product information. These include WARNING, CAUTION, and IMPORTANT. See below. WARNING Indicates an imminently hazardous situation which, if not avoided, could result in loss of life, serious injury or substantial product/property damage. Note: Warnings draw your attention to the presence of potential hazards or important product information. CAUTION Indicates an imminently hazardous situation which, if not avoided, may result in minor injury or product/ property damage. Note: Cautions draw your attention to the presence of potential hazards or important product information. IMPORTANT Note: Helpful hints for installation, operation or maintenance which pertain to the product. Note: Note: This symbol indicates that additional, pertinent information is to be found. This symbol indicates that other instructions must be referenced. 7

General Information Necessary Tools Vitorond 200, VD2 Series 320 to 1080 Tools H Assortment of flathead and Phillips screwdrivers H Pipe wrenches H Open-ended wrenches H Pipe sealant H Assortment of Allen keys H Flashlight H Approved leak detection fluid for natural gas and propane gas Cleaning supplies H Hand brush H Cleaning/service brush (supplied) H Vacuum cleaner H Rags Testing/Analysis equipment (use only calibrated equipment) H Flue gas analyzer to measure % CO 2 or O 2 (i.e. Bacharach fluid samplers or a suitable electronic analyzer) H Multimeter to measure 0-120 VAC, 0-12 AAC, and 0-20 microamps DC H Smoke test gun (Bacharach) H Oil pump pressure gage H Oil pump vacuum gage H Pressure gage to measure gas pressure 0-7 w.c. (accurately) and up to 28 w.c. gas pressure (or a nonelectric Magnehelicr pressure gage may also be utilized) H Carbon monoxide measuring equipment (0-400 ppm) H Bacharach calculator or suitable tables to calculate efficiency H Stack thermometer 0 to 500 F (0 to 260 C) H d in. NPT male to ¼ in. barb adaptor fitting, as well as tubing for pressure measurement Technical information The following is a list of literature applicable to the Vitorond 200, VD2 boiler: H Installation Instructions H Instructions H Operating Instructions and User s Information Manual For installation of the heating system, please refer also to the technical literature of other System Technology devices: H Installation Instructions for Viessmann boiler control H Installation Instructions for Viessmann indirect-fired hot water storage tank(s) H Installation Instructions for burner and accessories Replacement parts The materials listed below are recommended to be on hand for all service calls. For a complete listing of replacement components, please see Parts List starting on page 16 of these instructions. Order replacement components from your Viessmann distributor. H O-rings for mixing valve(s) H Sealant rope for combustion chamber door H Refractory for combustion chamber door H Sealant rope for clean-out opening cover H Glue for sealant rope CAUTION Use only original Viessmann components when replacing defective parts. Installation of incorrect replacement parts can cause hazardous operation and will void warranty. Customer Site Information Boiler Mfr.: Series: Heating Input: Serial No.: Viessmann MBH 8 Burner Mfr.: Series: Heating Input: Serial No.: MBH

Vitorond 200, VD2 Series 320 to 1080 Shut Down the Heating System Inspection and Maintenance 1. Shut down heating system 1. Deactivate main power supply to heating system and secure against accidental reactivation. 2. Disconnect plug fa from burner. 3. Close main oil or gas supply valve. Open Combustion Chamber Door and Clean-out Opening Covers 1. When using a gas power burner: Disconnect gas train. 2. Loosen four M 12 bolts on combustion chamber door A and open. 3. Remove clean-out opening covers B. Remove and Clean Turbulators 1. On models VD2-320 to VD2-860 only: Remove turbulators A and clean. 9

Inspection and Maintenance Clean Heat Exchanger, Flue Gas Collar and Chimney Vitorond 200, VD2 Series 320 to 1080 1. Clean flue gas passageways A and combustion chamber B with the supplied cleaning brush. Clean tight areas between ribs with the smaller cleaning brush. Remove combustion residues with a vacuum cleaner. 2. Remove combustion residues of chimney connection and flue gas collar via the clean-out openings C at rear of boiler. Check all Gaskets and Sealant Ropes Replace worn items. Check Insulation of Combustion Chamber Door Replace if worn. 10

Vitorond 200, VD2 Series 320 to 1080 Inspection and Maintenance Reinstall Turbulators, Clean-out Covers and Close Combustion Chamber Door 1. On models VD2-320 to VD2-860 only: Completely insert turbulators A into the third flue gas passageway. In doing so, push first turbulator element approximately two thirds of the way into the flue gas passageway, hook in the second and third element and push in. 2. Tighten bolts B of combustion chamber door in a cross-wise fashion. When using a gas power burner: Connect gas train and perform necessary leak detection tests. 3. Install clean-out opening covers C. Check Proper Operation of Safety Header Check pressure gage, air vent and pressure relief valve. Ensure pressure relief valve does not leak. Also ensure pressure relief valve operates in accordance with information provided by the manufacturer. Check Proper Operation of Expansion Tank, Low Water Cut-offs and Pumps Ensure proper system water pressure in diaphragm expansion tanks, low water cut-offs, pumps, and pressure relief valve. Note: Observe the instructions by the expansion tank manufacturer. Perform all tests on a cold system. Flush float water type low water cut-offs (if used). The usual water fill pressure is between 12 and 15 psig with the system cold. A lower pressure gage reading usually indicates loss of water due to leakage. All leaks must be corrected. Note: Refer to instructions packaged with automatic fill valve. Follow local regulations with respect to backflow preventers. If oil-lubricated pumps are used, ensure proper lubrication. If motorized zone valves are used, refer to maintenance instructions provided with zone valves. If an older non-diaphragm expansion tank is used, ensure the correct water level is present (approx. h full). 11

Inspection and Maintenance Check Proper Expansion Tank and System Pressures Vitorond 200, VD2 Series 320 to 1080 1. Drain system or close cap valve on the diaphragm expansion tank and reduce the pressure until the pressure gage indicates 0. 2. If the inlet pressure of the diaphragm expansion tank is lower than the static system pressure, top up with enough nitrogen to raise the inlet pressure higher than the static system pressure 1.5 to 3 psig (0.1 to 0.2 bar). The static pressure corresponds to the static height. 3. Top up with water until the filling pressure of a cool system is higher than the inlet pressure of the diaphragm expansion tank 1.5 to 3 psig (0.1 to 0.2 bar). Max. operating pressure is 75 psig (5 bar) [58 psig (3.9 bar) in some Canadian provinces]. Clean Sight Glass of Combustion Chamber Door Ensure gasket A and hose B to sight glass are air-tight. IMPORTANT Do not over tighten to avoid leaks and potential damage. Check Water Hardness Water treatment should be considered in areas where it is known that boiler feed water contains a high mineral content and hardness. Test and establish proper chemical make-up of system water. Note: Contact a local water treatment company for advice. Ensure Proper Fit of Insulation Blanket Ensure proper fit of the insulation blanket. Ensure Proper Operation of Heating System Control Remove motorized arm from mixing valve and check the motor for ease of movement. If mixing valve is not water-tight, replace O-ring seals and snap the motorized arm back into place. 12

Inspection and Maintenance Ensure Proper Operation of Low Temperature Protection Package Vitorond 200, VD2 Series 320 to 1080 Ensure proper operation of the low temperature protection package. Check Combustion Air Supply Check Vent System Ensure an adequate supply of combustion and ventilation air is available. If an outside air duct is required, ensure it is installed. Note: See subsection entitled Combustion air supply in the Installation Instructions. Ensure that nothing is obstructing the flow of combustion and ventilation air and no chemicals, garbage, gasoline, combustible materials, flammable vapors and liquids are stored (not even temporarily) in the vicinity of the boiler. Ensure proper operation of the barometric draft regulator (barometric damper). See Installation Instruction Supplement for Barometric Draft Regulator. Check Proper Operation of Door Safety Switch (oil burners only) Installation Instructions Oil Door Safety Switch 13

Inspection and Maintenance Calibrate Burner See separate instructions supplied with the burner. The maximum input published for each boiler size must not be exceeded. Two-stage burner With a two-stage burner, when the boiler water temperature falls below the minimum (140º F (60º C), the burner automatically switches to the second stage (full input) to protect the boiler from the effects of dew-point condensation, i.e. condensation/corrosion. In order to provide this protection, the burner must not be limited to first stage operation during the summer months. Model Flue gas resistance mbar w.c. VD2-320 0.5 0.20 VD2-380 0.9 0.35 VD2-440 1.3 0.51 VD2-500 1.7 0.67 VD2-560 1.9 0.75 VD2-630 2.1 0.83 VD2-700 2.8 1.10 VD2-780 3.9 1.54 VD2-860 4.9 1.93 VD2-950 4.5 1.77 VD2-1080 6.7 2.70 Fully modulating burner When the Vitorond 200, VD2 is operated with a fully modulating burner, the minimum boiler water temperature is as follows: Oil-fired burner................... 140 F (60 C) Gas-fired burner.................. 149 F (65 C) Return water temperature elevation must be adjusted to a minimum temperature of 129 F (54 C). Weishaupt / Riello burners A Vitorond 200, VD2 boiler with a high-performance gas burner can achieve a combustion efficiency of up to 85%, and up to 88% if equipped with a #2 oil burner. Vitorond 200, VD2 Series 320 to 1080 Gas-fired 10% volume CO 2, 280 F (138 C) net stack temperature, CO in ppm < 50 temperature Oil-fired 13% volume CO 2, 300 F (149 C) net stack temperature, smoke spot 0-1 (on the Bacharach Scale) See separate instructions supplied with burner The maximum input published for each boiler size cannot be exceeded. Vitorond 200 with Viessmann Vitotronic controls To further protect the Vitorond 200, VD2 from dew-point corrosion, the following minimum inputs on a 2-stage burner must be adjusted for the first stage when the boiler is used in conjunction with a Viessmann Vitotronic controls, and when operating with modulating boiler water temperatures. Model Input Input Min.1-stage input Oil MBH Gas MBH Oil MBH Min.1-stage input Gas MBH VD2-320 1255 1300 753 780 VD2-380 1490 1544 895 926 VD2-440 1726 1787 1036 1072 VD2-500 1961 2031 1177 1219 VD2-560 2196 2275 1318 1365 VD2-630 2471 2559 1483 1535 VD2-700 1745 2843 1647 1706 VD2-780 3059 3168 1835 1901 VD2-850 3373 3493 2024 2096 VD2-950 3727 3860 2236 2316 VD2-1080 4236 4387 2542 2632 Under partial load conditions, a minimum flue gas temperature must be met. How high that minimum flue gas temperature must be depends largely on the configuration of the chimney insulation and height of the chimney; however, it should be a minimum of 248 F (120 C). 14

Vitorond 200, VD2 Series 320 to 1080 Maintenance Schedule Maintenance The boiler must be cleaned at least once a year by a qualified heating contractor or service agency. The following is an overview of scheduled service steps. Where indicated have a qualified heating contractor or service agency perform the service work at the frequency shown. Regular service work ensures reliable, energy-efficient, and environmentally friendly operation. IMPORTANT Inspection and Maintenance Keep boiler and boiler room clear and free from combustible materials, gasoline and other flammable vapors and liquids. Do not obstruct the flow of combustion and ventilation air. All inspection, maintenance, and service must be performed by a qualified heating contractor. Frequency Performed by Monthly Owner / Operator Check the system pressure frequently (min. 20 psig). Ensure proper operation of the boiler control. Inspect all seals; retighten or replace as necessary. Ensure an adequate supply of combustion air and ventilation air into and out of the mechanical room is being maintained. Annually Owner / Operator Mechanical Contractor Ensure service work/test is conducted at least annually by qualified personnel, and that any deficiencies are corrected immediately. Test functionality of safety high limits. Test burner with burner accessories according to their corresponding maintenance checklist. Test and establish proper chemical makeup of system water. Check flue pipe condition, chimney connection and chimney itself. Check pressure relief valve and system pressure, and verify proper operation of automatic feed if installed. Check heating pipe joints, valves, air vents, etc. System leaks must be corrected immediately to avoid further defects. The cause of defect must also be determined in order to avoid further problems. Check for proper combustion air supply and ventilation to boiler / mechanical room. Check for combustible materials or chemicals stored too close to the boiler. Test high limits by dialing lower settings, switching burner on/off to verify functioning of same. Test low water cut-off, check and verify proper function according to manufacturer s instructions. When circulating pump is field-installed or existing, check requirements for maintenance or lubrication according to manufacturer s specifications. Check for oil-tight fuel lines; clean or exchange fuel oil filters annually. Check and inspect oil tank. Check for gas-tight connection of gas piping, unions, gas valve and manifold. Check proper ignition on oil or gas burner operation. Combustion test must be performed by a qualified service technician. Ensure proper operation of door safety switch. Ensure functionality of low water cut-offs, including flushing of float types (if used) during operation, based on supplier s instructions. Inspect low- and/or high pressure gas switch (if used). Inspect main burner flame and follow burner manufacturer s instruction manual for detailed service and maintenance guidelines. Manual shipped with burner. All boilers and the boiler room must be kept free of high dust levels, high humidity, aggressive vapors and/or chemicals containing chlorine. Ensure proper boiler room ventilation and combustion air is maintained. Valves, fittings and pipes not pressure tight must be repaired. Combustion chamber door, clean-out opening covers, glass fiber rope seals and flanges may need to be retightened and resealed. 15

Additional Information Parts List When ordering replacement parts Please provide boiler Model and Serial Number from rating plate when ordering replacement parts. Order replacement parts from your Viessmann distributor. Parts 001 Door hinge 002 Tie rod, length 24 in. (610 mm) 003 Tie rod, length 19 in. (480 mm) 004 Push nipple 005 Fiber rope seal, 7 ½ in. (12 mm) 006 Door hinge, stop 007 Intermediate section *1 008 Front section *1 009 Combustion chamber door 010 Insulation blanket, 18½ x 18½ in. (467 x 467 mm) 011 Insulation blanket (three part) 34 x 38 in. (868 x 968 mm) 012 Combustion chamber door insulation block 013 Fiber rope seal, g x g in. (16 x 16 mm) 014 Hose nipple,¼ in. (6 mm) 015 Plastic hose, 31½ in. (800 mm) 016 Sight glass c/w gasket 017 Sight glass cover 018 Burner plate 019 Turbulator insert *2 020 Gasket, 1½ 1¾ 1 /10 in. (35 45 2 mm) 021 Gasket, 7 ¼ in (8 mm) 022 Plug, 2 in. (51 mm) 023 Insulation blanket, 7 16 in. (408 mm) 024 Fiber rope seal, 7 ½ in. (10 mm) Vitorond 200, VD2 Series 320 to 1080 Parts not shown 300 Accessory pack (insulation) 301 Decorative stripe [1 roll = 33 ft. (10 m)] 302 Touch-up spray paint, Vitosilver 303 Touch-up paint stick, Vitosilver 304 Glue, 150 ml (for Position No. 005) 306 Split kit (for Position Nos. 007, 008 and 025) 307 Installation Instructions 308 Instructions 309 Operating Instructions and User s Information Manual *1 Order item 306 for every section joint. *2 Number of turbulators for every third flue for VD2-320 to VD2-440 kw: 3 pieces for VD2-500 to VD2-560 kw: 2 pieces for VD2-630 to VD2-860 kw: 1 piece 16

Vitorond 200, VD2 Series 320 to 1080 Parts List (continued) Additional Information Parts 025 Rear section *1 026 Refractory insert 027 Clean-out opening cover 028 4-point sensor well 031 Flue outlet (with Position Nos. 027 and 042) 032 Blind plate 033 Cleaning brush handle 034 Extension rod, length 14 in. (355 mm *2 ) 035 Extension rod, length 39 in. (1000 mm *3 ) 036 Extension rod, length 43¼ in. (1100 mm *4 ) 037 Flange, water distribution pipe 038 Water distribution pipe, triple element *5 039 Water distribution pipe, quadruple element *6 040 Water distribution pipe, double end element *7 041 Water distribution pipe, quadruple end element *8 042 Fiber rope seal, 7 g in. (8 mm) 043 Fiber rope seal, 7 g in. (8 mm) 044 Support bracket 045 Gasket, DN 100 Maintenance parts 310 Cleaning brush head *1 Order item 306 for every section joint. *2 Only for VD2-380 to 630, 950 and 1080. *3 Only for VD2-380, 500, 560, 700, 780, 950 and 1080. *4 Only for VD2-320, 440, 630, 780, 860 and 1080. *5 Only for VD2-380, 500, 630, 700, 780, 950 and 1080. *6 Only for VD2-440, 560, 630,780, 860 and 1080. *7 Only for VD2-380, 440 and 630. *8 Only for VD2-320, 500, 560, 700, 780, 860, 950 and 1080. 17

Additional Information Parts List (continued) Vitorond 200, VD2 Series 320 to 1080 Parts 200 Front panel 201 Bracket 202 Cover strip 203 Front left cover (included with item 224) 204 Front right cover (with Position No. 224) 205 Rear mounting bracket 206 Rear panel - right (with Position No. 226) 207 Rear panel - left (with Position No. 226) 208 Top panel - front 209 Top panel - middle 210 Top panel - rear 211 Connecting panel 212 Spacer 213 Side panel, 19¾ in. (502 mm) 214 Side panel, 24¾ in. (628 mm) 215 Side panel, 29¾ in. (755 mm) 216 Tie bar 217 Insulation blanket front 218 Insulation blanket front 219 Insulation blanket rear, width 18¼ in. (466 mm) 220 Insulation blanket rear, width 24 in. (612 mm) 221 Insulation blanket rear, width 27¾ in. (706 mm) 222 Insulation blanket rear 223 Insulation blanket - bottom 224 Strain relief (2-channel) 225 Nameplate Vitorond 200 226 Cover, edgemolding A Rating plate *1 B Boiler control (see Parts List of control) C Arrangement of panels and insulation blankets (VD2-320 to VD2-1080) D Burner cable (see Parts List of control) *1 May be located at a different location. 18

Vitorond 200, VD2 Series 320 to 1080 Parts List (continued) Additional Information 19

Maintenance Record Vitorond 200, VD2 Series 320 to 1080 on: by: on: by: on: by: on: by: on: by: on: by: Technical information subject to change without notice. Printed on environmentally friendly (recycled and recyclable) paper.