CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE BAKER BEACH GREEN STREETS CONTRACT NO. WW-627 ADDENDUM NO.

Similar documents
Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA

DC Clean Rivers Project - Green Infrastructure Program. ACEC What s New at DC Water?

6.1 Bioretention Areas

White Street Area Sewer Separation, Project ID Date Issued: June 8, 2015

Green Infrastructure and Low-Impact Development Technologies

David Clark, P.E. RW Armstrong & Associates, Inc. June 20, 2012

FLEXIBLE DUCTS BY SUBSURFACE INSTALLATION FOR MAGNETIC DETECTORS - Item No. RIGID DUCTS, CONCRETE ENCASED FOR MAGNETIC DETECTORS - Item No.

SPECIAL SPECIFICATION 3687 Impermeable Liner

Flooding Hearing: Long and Short Term Strategies

DESIGN SCENE SUBJECT INDEX

Two Sides of the Green Infrastructure Coin. Jaren Hiller, PE, LEED AP Nathan Guequierre

NYC Green Infrastructure Program

Huntington Stormwater Utility

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Impermeable Liner

leel NG CITY COUNCIL AGENDA REPORT Honorable Mayor and City Council Members

Chapter 6. Green Streets

ROADWAY SECTION PRINCIPAL ARTERIAL 2-01

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015.

Building Green: An Update on Atlanta's Green Infrastructure Approach

City of Ingleside Avenue B Outfall Project

BARD COLLEGE REGIONAL GREEN INFRASTRUCTURE DEMONSTRATION PROJECT A Case Study Addressing Stormwater Management for a Small Watershed

2016 WORKSHOP LVR Field Trip

Project Funder: Seattle Department of Transportation. Project Location: Winona Ave. N. Seattle. Project BMP(s): Roadside bioretention

Single Room Occupancy Hotel Safety & Stabilization Task Force

County of Fairfax, Virginia

Honorable Members: C. D. No. 9

Appendix I. Checklists

Submitted by: Phillip L. Harrington, Director, Department of Public Works. Framework for Green Infrastructure Plan Development

From and

Springpoint Architects, pc SECTION Childcare Center Architect s Project No TABLE OF CONTENTS Monroe County Comm. Sch. Corp.

FROM DUPONT CIRCLE NORTH TO CALIFORNIA STREET, NW. Welcome!

FLEET AVENUE GREEN STREET USES VACANT LOT FOR CSO REDUCTION. Thomas M. Evans, AECOM Cleveland, Ohio

Green Infrastructure Stormwater Management Options in an Ultra-Urban Redevelopment. Sandy Doyle-Ahern

THIS ADDENDUM MUST BE ACKNOWLEDGED.

Case Study. New San Francisco 49ers Stadium Scores Big with BioMod System. Project Overview. The BioMod Method. Design & Construction Team

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

CITY OF MOBILE MOBILE CITY PLANNING COMMISSION LETTER OF DECISION. November 5, 2012

Capillary Action Subsurface Irrigation

Original Contract Amount $ 754, Change Order #1 $ 129, New Contract Amount $ 883, New Contract, Compared to Original 117.

Fall 2017 Construction Update

NAPA COUNTY PUBLIC WORKS Standards & Specifications

Figure 1 SSIP Watersheds (Source: SFPUC) North Shore Watershed

North Street Reconstruction & Integrated Stormwater Management System

Consent Agenda. Meeting of June 14,2018

2008 APWA Public Works Congress

VacCalc. Help and Operating Instructions. Overview

MARINA BAY NEIGHBORHOOD PRESENTATION. City of Richmond Officer Bradley A. Moody Memorial Underpass. April 11, 2012

DRAFT PLANNING GUIDE. System Solutions for Intensive Green Roofs

NOTICE TO CONTRACTORS

CITY OF BONITA SPRINGS PERMITTING FEES 9101 Bonita Beach Road Bonita Springs, FL

ADDENDUM NO. 1 COPPER COMMUNICATIONS CABLE AND VOICE AND DATA EQUIPMENT MONITORING, TESTING, AND REPAIR DEPARTMENT OF WATER RESOURCES

DIVISION 40 PUMP STATION SITE WORK AND LANDSCAPING

GREENVILLE-SPARTANBURG AIRPORT DISTRICT REQUEST FOR PROPOSALS FOR DEVELOPMENT SERVICES FOR GSP AIR CARGO FACILITY PHASE 1

GREEN COLLECTION E C O - F R I E N D LY P E R M E A B L E P A V E R S T R E M R O N. C O M

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3

2 Project Description

MEETING DATE: November 12, 2013 SUBJECT: Accept Borden Road Bridge Improvement (CIP No )

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey

Green Infrastructure Modeling in Cincinnati Ohio. Small Scale Green Infrastructure Design Using Computer Modeling

ORDINANCE NO WHEREAS, the City provided the proposed code amendments to the Washington State Department of Commerce on September 20, 2017; and

4. Contractor (and subcontractors if applicable) certification statement(s)

Please make the following changes in your copy of the bid proposal for the captioned project:

J. Paul Guyer, P.E., R.A.

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

Appendix E: Illustrative Green Infrastructure Examples

STORMWATER REPORT FOR WALMART SUPERCENTER STORE # SIOUX FALLS, LINCOLN COUNTY, SOUTH DAKOTA BFA PROJECT NO

Ted Turner Drive Resilience Corridor Challenge

National Wildlife University Reston, Virginia Habitat Restoration George Mason University Grounds Shop Fairfax, Virginia 22030

DANE COUNTY DEPARTMENT of PUBLIC

Preparing a Stormwater Control Plan for a Small Land Development Project

City of Petersburg, Virginia Stormwater Utility Program Residential Fee Credit Manual (Revised March 2014)

Reducing Runoff with Green Infrastructure. Lake George, NY May 5, 2011

BIDDER: KONE INC Business Address: ONE KONE COURT MOLINE, IL Class B, C-8, A License No. DIR Registration No.

City of Grande Prairie Development Services Department

Burton Station Village Community Meeting February 26, 2014

Local Stormwater Retrofit Case Studies. Westmoreland County Conservation District Updated 11/2011

Residential Stormwater Credit Application

Green Streets. Sustainable Stormwater Solutions for Greener Communities and a Cleaner Bay

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey

BID PROPOSAL-REVISED

Construction Engineering & Inspection Services Transit Bus Stop Infrastructure for the Broward County Transit Division (BCT)

Residential Stormwater Credit Application

[TEMPLATE FOR] STORMWATER FACILITIES OPERATION AND MAINTENANCE PLAN. [date] [revision date]

Baumgarten MPUD. Exhibit 3 Evaluation Criteria

Planning, Design, and Construction of Green Infrastructure.

ASPEN GROVE PROJECT NO. 53B2390 D-1 DETAIL STANDARD NOTES CITY OF MADISON

Technical Assistance Permeable Interlocking Concrete Pavement PICP

Third Ave CSO Integrated Green Infrastructure

CIVIC CENTER PUBLIC REALM PLAN OVERVIEW

MPRD s Keith Mione (Community) Park Midlothian Road Entrance Traffic Signals

SOUTH AFRICAN NATIONAL STANDARD

Replacement of Fire Pump and Generator Upgrade, H Building, Sexton Campus

Fire Sprinkler System Design and Installation Requirements

INVITATION TO BID. Allendale Elementary School 3670 Penniman Avenue, Oakland, CA 94619

Authority. any changes required as a result of the approved CHMP.

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

Butchers Hill. Greening Feasibility FINAL REPORT MAY 2009 N PORT ST N WOLFE ST S MADEIRA ST. Submitted To: Submitted By:

Example Stormwater Control Plan For a Commercial Project 123 Main Street Anytown, USA

Transcription:

San Francisco Water Power Sewer CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION WASTEWATER ENTERPRISE BAKER BEACH GREEN STREETS CONTRACT NO. ADDENDUM NO. 1 Signatures: ~ Date: April 20, 2018 Contract Standards Engineer I CITY AND COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION S ignature~ ~ jj ~ HANNA WON~ ANAGER ENGINEERING MANAGEMENT BUREAU NOTICE TO PARTIES HOLDING SPECIFICATIONS AND CONTRACT PROPOSAL: The Contract Documents of the contract named above are hereby amended as fo llows: Specifications Section 00 0 I l 0 - Table of Contents Section 00 0 I 10, Page 4: Under 03 20 00- Finish Carpentry DELETE the fo llowing: "DIVISION 12 - FURNISHINGS 12 93 00 - Site Furnishings'' Under DIVIS ION 31 - EARTHWORK ADD the following: "31 0519.16 - Geomembrane" Template Version 3 31-2017 Page I of6

Section 00 01 15 - List of Drawing Sheets Section 00 01 15, page 7: Under 109,217, U-1.7, UTILITY OCCUPANCY PLAN - SEACLIFF A VENUE AND 27TH A VENUE ADD the following: "-, USWP-1(Rev.1), AT&T Utility Support and Work Around Plan -, USWP-2 (Rev. 1 ), Comcast Utility Support and Work Around Plan -, CDM-01(Dated2/12&14/16), Richmond Green infrastructure - El -, CDM-02 (4/1/2014), Riclunond Green infrastructure - El -, CDM-03 (Dated 2/12&14/ 16), Richmond Green Infrastructure - El -, CDM-04 (Dated 2/12&14/16), Richmond Green lnfrastructure - El -, CDM-05 (Dated 2/12&14/ 16), Richmond Green infrastructure - El -, CDM-06 (Dated 2/12&14/16), Richmond Green Infrastructure - El -, BT-01 (Dated 4/ 17/2014), Baker Beach Green Street-Beach Terrace -, BT-02 (Dated 4/17/2014), Baker Beach Green Street - Beach Terrace -, BT-03 (Dated 4/ 17/2014), Baker Beach Green Street - Beach Terrace -, BT-04 (Dated 4/ 17/2014), Baker Beach Green Street - Beach Terrace" Page 2 of6

Section 00 31 00 - Available Project lnfonnation Section 00 41 00, Page 1: Under Subsection 1.028.3 ADD as follows: Section 00 41 10 - Schedule of Bid Prices "4. 'Baker Beach Green Streets Project Memorandum,' dated April 12, 2019 by San Francisco Public Works." Section 00 41 I 0, Page 3: DELETE Bid ftem No. GI-23, Infiltration Gallery lmpenneable Membrane and REPLACE as follows: "Bid Item No. GI-23, Impermeable Membrane, 4200, SF,, $ " Section 0 I 20 00 - Price and Payment Procedures Section 0 I 20 00, Page 18: DELETE description for Bid Item No. Gl-23, Infiltration Gallery Impermeable Membrane, in its entirety, and REPLACE as follows: "BID ITEM NO. GI-23 IMPERMEABLE MEMBRANE A. Impermeable Membrane will be measured and paid based on unit bid per square foot satisfactorily installed, which shall constitute fu ll compensation for preparation of area and sub grade, watertight liner attachment to walls and structures, and liner penetrations.., Section 02 81 00 - Environmental Management of Excavated Materials Section 03 I 0 00 - Concrete Forming and Accessories Section 03 20 00 - Concrete Reinforcing Section 03 30 00 - Cast-In-Place Concrete Section 31 05 19.16 - Geomembrane Section 3 l 22 13 - Landscape Grading Operations ADD Section 02 8 1 00 (Rev. 1 ), attached ADD Section 03 10 00 (Rev. 1 ), attached ADD Section 03 20 00 (Rev. 1), attached ADD Section 03 30 00 (Rev. 1), attached DELETE Section 31 05 19.16 in its entirety, and REPLACE with Section 31 05 19.16 (Rev. I), attached ADD Section 31 22 13 (Rev. 1), attached Page 3 of6

Plans G-0.2 - Plan and Drawing Index G-0.3 - Plan and Drawing Index R-1.8 - Roadway - Pavement Plan - GGNRA 25th Avenue North GI-4.1 - El - Node 4 - Lined Infiltration Gallery and Drainage Plan GI-4.2 - El - Node 4 - Lined Infiltration Gallery Profiles GI-4.2A - El - Node 4 - Lined Bioretention Drainage Profiles Gl-4.3 - El - Node 4 - Lined Bioretention Plan and Profile GT-4.4 - El - Node 4 - Lined Bioretention Plan and Profile GI-6.9 - Green Infrastructure Details GI-6.10 - Green Infrastructure Details GI-6.11 - Green Infrastructure Details L-2.1 - Planting Plan - El - Node 1 L-2.2 - Planting Plan - El - Node 2 L-2.1 - Planting Plan - El - Node 3 L-2. I - Planting Plan - El - Node 4 L-2.1 - Planting Plan - Seacliff - 26th Ave and 25th Ave USWP-1 - AT&TUtility Support and Work Around Plan USWP-2 - Comcast Utility Support and Work Around Plan CDM-01 - Richmond Green Infrastructure - El CDM-02 - Richmond Green Infrastructure - El CDM-03 - Richmond Green Infrastructure - El DELETE Drawing G-0.2 and REPLACE with Drawing G-0.2 (Rev. 1 ), attached DELETE Drawing G-0.3 and REPLACE with Drawing G-0.3 (Rev. 1), attached herewith.. ADD Drawing R-1.8 (Rev. 1 ), attached DELETE Drawing GI-4.1 and REPLACE with Drawing GI-4.1 (Rev. I), attached DELETE Drawing GI-4.2 and REPLACE with Drawing GI-4.2 (Rev. l), attached DELETE Drawing GI-4.2A and REPLACE with Drawing GI-4.2A (Rev. 1), attached DELETE Drawing GI-4.3 and REPLACE with Drawing GI-4.3 (Rev. 1), attached DELETE Drawing GI-4.4 and REPLACE with Drawing GI-4.4 (Rev. 1 ), attached DELETE Drawing GI-6.9 and REPLACE with Drawing GI-6.9 (Rev. I), attached DELETE Drawing Gl-6.10 and REPLACE with Drawing GI-6.10 (Rev. 1 ), attached DELETE Drawing GI-6.11 and REPLACE with Drawing Gl-6. 11 (Rev. 1), attached DELETE Drawing L-2. l and REPLACE with Drawing L-2.l (Rev. 1), attached DELETE Drawing L-2.2 and REPLACE with Drawing L-2.2 (Rev. 1), attached DELETE Drawing L-2.3 and REPLACE with Drawing L-2.3 (Rev. l ), attached DELETE Drawing L-2.4 and REPLACE with Drawing L-2.4 (Rev. l ), attached DELETE Drawing L-2.5 and REPLACE with Drawing L-2.5 (Rev. 1 ), attached ADD Drawing USWP-1 (Rev. 1 ), attached ADD Drawing USWP-2 (Rev. 1), attached ADD Drawing CDM-01(Dated2/12&14116), attached ADD Drawing CDM-02 (Dated 4/1 /2014), attached ADD Drawing CDM-03 (Dated 2/12& 14/ 16), attached Page 4 of6

BAKER BEACH GREE STREETS CDM-04 - Richmond Green Infrastructure - El CDM-05 - Richmond Green Infrastructure - El CDM-06 - Richmond Green Infrastructure - El BT-01 - Baker Beach Green Street - Beach Terrace BT-02 - Baker Beach Green Street - Beach Terrace BT-03 - Baker Beach Green Street - Beach Terrace BT-04 - Baker Beach Green Street - Beach Terrace ADD Drawing CDM-04 (Dated 2/12&14/ 16), attached ADD Drawing CDM-05 (Dated 2/12&14/16), attached ADD Drawing CDM-06 (Dated 2/ 12&14/ 16), attached ADD Drawing BT-01 (Dated 4/ 17/2014 ), attached ADD Drawing BT-02 (Dated 4/17 /20 l 4 ), attached ADD Drawing BT-03 (Dated 4117/2014), attached ADD Drawing BT-04 (Dated 4/17/2014), attached Attachments: Specifications Section 02 81 00 (Rev. 1) - Environmental Management of Excavated Materials Section 03 10 00 (Rev. I) - Concrete Forming and Accessories Section 03 20 00 (Rev. 1) - Concrete Reinforcing Section 03 30 00 (Rev. 1) - Cast-In-Place Concrete Section 31 05 19.16 (Rev. I) - Geomembrane Section 31 22 13 (Rev. 1) - Landscape Grading Operations Plans G-0.2, Plan and Drawing Index G-0.3 (Rev. 1 ), Plan and Drawing Index R-1.8 (Rev. I), Roadway- Pavement Plan - GGNRA 25th Avenue North GI-4.1 (Rev. 1 ), El - Node 4 - Lined Infiltration Gallery and Drainage Plan GI-4.2 (Rev. 1 ), El - Node 4 - Lined Infiltration Gallery Profiles GI-4.2A (Rev. 1 ), El - Node 4 - Lined Bioretention Drainage Profiles GI-4.3 (Rev. 1 ), El - Node 4 - Lined Bioretention Plan and Profile GI-4.4 (Rev. I), El - Node 4 - Lined Bioretention Plan and Profile GI-6.9 (Rev. 1 ), Green Infrastructure Details GJ-6. l 0 (Rev. 1 ), Green Infrastructure Details GI-6.11 (Rev. 1), Green Infrastructure Details L-2.1 (Rev. I), Planting Plan - El - Node 1 L-2.2 (Rev. l ), Planting Plan - El - Node 2 L-2.1 (Rev. 1 ), Planting Plan - El - Node 3 L-2.1 (Rev. l ), Planting Plan - El - Node 4 L-2.1 (Rev. 1 ), Planting Plan - Seacliff - 26th Ave and 25th Ave Page5of6

USWP-1 (Rev. I), AT&T Utility Support and Work Around Plan USWP-2 (Rev. 1), Comcast Utility Support and Work Around Plan CDM-01 (Dated 2/12&14/ 16), Richmond Green Infrastructure - El CDM-02 (Dated 4/1 /2014), Richmond Green lnfrastructure - El CDM-03 (Dated 2/12& 14/16), Richmond Green lnfrastructure - El CDM-04 (Dated 2/ 12&14/ 16), Richmond Green Infrastructure - El CDM-05 (Dated 2/12&14/16), Richmond Green Infrastructure - El CDM-06 (Dated 2/12& 14/ 16), Richmond Green Infrastructure - El BT-01 (Dated 4/ 17/2014), Baker Beach Green Street - Beach Terrace BT-02 (Dated 4/17/2014), Baker Beach Green Street - Beach Terrace BT-03 (Dated 4/17/2014), Baker Beach Green Street - Beach Terrace BT-04 (Dated 4/1 7/2014), Baker Beach Green Street - Beach Terrace END OF ADD ENDUM NO. 1 Page 6 of6