Brighton Marina Neighbourhood Forum AGM. City Plan Part Two - Draft Plan

Similar documents
Great Easton Neighbourhood Plan Statement of Basic Conditions

Wallingford Neighbourhood Plan

WINCHESTER TOWN 3.1 LOCATION, CHARACTERISTICS & SETTING

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

Local Development Scheme

DUNSFOLD NEIGHBOURHOOD PLAN Site Selection Policies

Rotherhithe Rotherhithe Area Vision Map

Stantonbury Neighbourhood Plan

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

04/07/2016. Contents. The importance of neighbourhood planning. What is a neighbourhood plan? Neighbourhood planning in Leeds

The New Planning System 5 June 2015

Application Guide. Should you have any questions on the Outline Application please contact:

SECTION ONE: INTRODUCTION. introduction

Sustainability Statement. Whitby Business Park Area Action Plan

Official Plan Review

Appendix A: Retail Planning Assessment

Welcome. /The Design Companion 4. /Planning London 7. /Getting Homes Built 8. /Transport & Streets 10. /Tech & The City 12

Planning and Sustainability Statement

Neighbourhood Planning Network 9 th January 2018 Local Plan Review update Issues and Options consultation February April 2018

Hackney A Place for Everyone

Hackbridge & Beddington Corner Neighbourhood Plan. Appendices

STATEMENT OF OBJECTION TO THE PROPOSED DEVELOPMENT OF LAND AT CHURCH CLIFF DRIVE FILEY

1.3 The following table presents a Statement of Compliance demonstrating how the Standish Neighbourhood Plan meets those requirements.

Chapter 3 Core Strategy

Neighbourhood Plan Representation

Briefing Document of CNP. June 2017

Draft Island Development Plan

3. Neighbourhood Plans and Strategic Environmental Assessment

2.0 Strategic Context 4

Newcourt Masterplan. November Exeter Local Development Framework

Local Development Plan for Glasgow

OKEFORD FITZPAINE NEIGHBOURHOOD PLAN

Annex B: SWDP Objectives mapped against Worcestershire SCS Objectives. Annex B: SWDP Objectives mapped against Worcestershire SCS Objectives

Description Details submitted pursuant to discharge of condition 5 (Design Code) attached to planning permission 13/01729/OUT.

Ipswich Issues and Options for the Ipswich Local Plan Review, August 2017, Public Consultation

Neighbourhood Planning Local Green Spaces

Site ref: AS06 Site Name or Address: Murreys Court, Agates Lane

Basic Conditions Statement

Appendix 1 Structure plan guidelines

Vigo Neighbourhood Plan Basic Conditions Statement

Tāhuhu whakaruruhau ā-taone The sheltering ridge pole

Newcastle upon Tyne. Ub Urban development perspectives: Innovative strategies for sustainable planning

Droitwich Spa 6. Reasoned Justification

Suffolk Coastal Local Plan Review Issues and Options, August 2017, Public Consultation

The Gwennap Parish Vision Statement

Stratford Neighbourhood Plan Questionnaire

Reporter: Section 3 Place, Drymen, pp reference: Body or person(s) submitting a representation raising the issue (including reference number):

Site Allocations and Development Management Policies

Tasks and content (under the former Planning Act)

Local Development Framework. Core Strategy. Adopted December 2008

DAREBIN PLANNING SCHEME AMENDMENT C137

WELCOME. Land North of STEVENAGE. We would like to thank you for attending our public exhibition today.

Perth and Kinross Council Development Management Committee 8 June Pre-Application Report by Development Quality Manager

Our City Centre is a vibrant, creative and welcoming destination, with a modern business, cultural, shopping, leisure and residential offer

City Regions Ireland

CITY OF LANGLEY OFFICIAL COMMUNITY PLAN BYLAW, 2005, NO APPENDIX II - REGIONAL CONTEXT MAP

WELCOME GYPSY LANE. Wider Site Location plan. Proposals for the development of LAND OFF FOXLYDIATE LANE WEBHEATH. Proposals for the development of

elbridge Core Strategy

Western City District What we heard

Chapter 03 Planning framework

Plan Modification to Chapter B2 of the Auckland Unitary Plan(AUP) Operative in part (15 November 2016)

NEW REGIONAL OFFICIAL PLAN HIGH LEVEL PROCESS & FRAMEWORK

Welcome to the Oakridge Centre Open House

Cottenham Civil Parish. Neighbourhood Development Plan to 2031

Effingham Neighbourhood Plan 1. Basic Conditions Statement

Neighbourhood Planning Guidance Local Green Spaces

Rochford District Council Allocations Development Plan Document: Discussion and Consultation Document Sustainability Appraisal

Scottish Natural Heritage. Better places for people and nature

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

Darlington Healthy New Town Hilary Hall Project Manager, HNT

A Growing Community Rural Settlement Areas

MOUNT AVENUE MASTERPLAN WORKING DRAFT NOVEMBER 2006

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Evesham 7. Reasoned Justification

Paignton Neighbourhood Plan (Submission version 2017)

Kibworth Harcourt. Introduction. Introduction

LAVANT NEIGHBOURHOOD DEVELOPMENT PLAN

Development Brief Ursuline Convent, Blackrock, Cork

Copyright Nigel Deeley and licensed for reuse under this Creative Commons Licence

Durham City Neighbourhood Plan Summary of Consultation Draft Prepared by the Durham City Neighbourhood Forum

EXTRACT FROM THE CUDDINGTON NEIGHBOURHOOD PLAN The Policies

ROCHFORD LOCAL DEVELOPMENT FRAMEWORK: Sustainability Appraisal/ Strategic Environmental Assessment. Rochford Core Strategy Preferred Options Document

Schedule of Planning Applications Committee Date: 23 May Reference: 06/17/0726/F Parish: Hemsby Officer: Mr J Beck Expiry Date:

WHITELEY TOWN COUNCIL NORTH WHITELEY DEVELOPMENT SEPTEMBER 2014

Amy Burbidge North Northants Joint Planning and Delivery Unit Tresham Garden Village

9 Pershore. Introduction. Pershore Abbey

INTRODUCTION NORTH HEYBRIDGE GARDEN SUBURB

North Finchley Town Centre Framework

Rochford District Council. Adopted 16 December Local Development Framework. Development Management Plan LDF.

Town and Country Planning (Local Planning) (England) Regulations 2012, Regulation 22 Submission of Legacy Corporation Local Plan

Appendix C. Members Pre-Consultation Briefing. Local Plan - Gypsy and Traveller Sites. January 2018

Carterton Construction Ltd is bringing forward plans for up to 85 new family homes and extra care facilities on land east of Burford.

COMMUNITY GROWN FOOD IN WALES

Strategic Growth Options Consultation

Plano Tomorrow Vision and Policies

Auckland City Council

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT

South District What we heard

The Charter of European Planning BARCELONA 2013

Welford-on-Avon Neighbourhood Plan Consultation Event Sunday, 6 April Your name Your address

Transcription:

Brighton Marina Neighbourhood Forum AGM City Plan Part Two - Draft Plan 16 May 2018 Sandra Rogers Planning Manager Carly Dockerill & Robert Davidson Principal Planning Officers

Presentation outline: Context City Plan Part One Role of City Plan Part Two What s happened so far Draft Plan - overview Next stages public consultation Summer 2018

Context: City Plan Part One 2016 adopted City Plan Part One Sets citywide strategic housing target, retail and employment land requirements to 2030 Identifies Development Areas and Strategic Site Allocations to deliver regeneration and infrastructure Strategic city wide policies

Challenges: Demographic drivers for growth growing population; high working age population; High demand for housing of all types; Constrained land supply; High housing costs / relatively low wages Acute affordability issues; Regional centre for employment/ culture/ tourism; Under supply of high quality Grade A office space Competition for sites between residential uses and from other uses Significant Heritage assets

City Plan Part One: 8 Development Areas e.g. DA2 Brighton Marina, Gas Works & Black Rock Area 22 strategic site allocations e.g. Inner Harbour, Gas Works, and Black Rock 6 Special Areas e.g. SA2 The Seafront 22 Citywide policies

Strategy for growth in the City Plan? 6 key strands: focus most development within the built up area; make the best use of brownfield sites; Direct development to accessible locations Higher density development in appropriate locations; focus employment in right places mixed uses release some greenfield sites

Policy DA2 - Brighton Marina, Gas Works & Black Rock Area Aim of policy to facilitate high quality building design, improve connectivity between strategic allocations, enhance transport infrastructure e.g. cycle, pedestrian and bus routes protect and enhance ecological environment, balanced mix of retail, deliver new housing and new development opportunities for District heat and power Policy Allocates 1,940 residential units (including those with planning permission already) Retail, employment and leisure floorspace A community building and health facility A primary school or increase in the number of school places within or in the vicinity of the Marina. Three Strategic Allocations Brighton Marina Inner Harbour, Gas Works Site, and Black Rock Site

What is the role of City Plan Part Two? Delivers Part One City Plan spatial objectives and amounts of development proposed; Updates / replaces retained 2005 Local Plan policies) Additional site allocations Need to streamline policy Covers same geographical area Covers same time period 2030 Needs to conform with NPPF At Draft Plan stage for public consultation June Aug 18

Scoping Consultation (June Sept 2016) Sought views on issues / content for CPP2 Attended meetings and planned events 197 formal responses (2,901 representations) Key issues included: Optimise site delivery - to achieve housing target; Strong support for the inclusion of space and higher access standards for new housing; Better management of HMOs required; Support for purpose built student accommodation (PBSA) Address transport and air quality issues; Support protection of allotments and designation Local Green Spaces; Support for further policy on low and zero carbon energy Impact of unregulated growth of Airbnb

City Plan Part Two Draft Plan 46 DM Policies topic based for assessing planning applications; Around 50 site allocations for housing 7 new strategic sites mixed use/comprehensive development 10 Evidence Base Studies Supporting Documents, e.g. SA, HEQIA, AA

Housing & Accommodation CPP1 Priorities: deliver at least 13,200 new homes by 2030; identifies the broad locations and sources for housing sites; citywide housing density and affordable housing policies CPP2 policies: site allocations full and effective use of sites housing mix, quality and choice housing for different groups space, access and amenity standards supports a range of housing formats

Retail and Tourism CPP1 priorities: Maintaining attractive town centres and growth of sustainable tourism, supporting cultural facilities CPP2 Policies: Updated and streamlined retail centre protection policies Special Retail area policies for Brighton Marina and the Seafront Important Local Parades identified Markets policy Opportunity Areas for new hotels identified Strategic site allocations for Madeira Terrace and Drive regeneration and former Peter Pan site.

CPP2 Draft Policy Brighton Marina Special Retail area Scoping consultation supported the need for a special policy for the Marina since its District Centre status was de-designated in the retail hierarchy by the CPP1 Planning Inspector. Policy aims to broaden and strengthen choice and performance of retail activity in the Marina, encouraging mixed retail activity. Change of use from retail to other uses will be supported where the criteria of the policy are met. E.g. retains or complements existing mix of Marina uses and encourages combined trips and attracts pedestrians. Community uses primarily serving local residents in Use Class D1 community uses (e.g. clinics, health centres, crèches, day nurseries doctors, dentists) may also be permitted provided criteria met.

Community Facilities Priorities of CPP1: Ensure new /enlarged community facilities are provided by working with partners to identify appropriate sites and through developer contributions CPP2 policies: Criteria policy for safeguarding existing facilities and for new or improved community facilities. Protection of Public Houses Strategic site allocations identify specific or general requirements. CIL will also address community facilities / infrastructure

Economy and Employment Priority of CPP1: Create new space for business with strategic sites identified and amounts to be delivered by 2030; identified and safeguarded industrial estates. CPP2 policies: Best use of business sites and premises through flexible design/ adaptability; Securing a mix of uses in new strategic allocations Communications Infrastructure policy digital connectivity in advance of Building Regulations

Transport & Travel Priorities in CPP1: promote and provide an integrated safe and sustainable transport system promote and improve access and secure a better public realm CPP2 policies: Design of new development to promote safe, active and accessible travel More guidance for applicants e.g TA including the need for air quality issues to be addressed in TA Support for transport interchanges New developments should include infrastructure to support the use of low emission vehicles. Includes 2016 adopted parking standards

Other policy areas. Design and Heritage Biodiversity and Open Space Pollution, Water and Energy Resources

Moving Forward Draft Plan - public consultation Summer 2018 Submission Plan Autumn 2019 Examination Spring/Summer 2020 Adoption early 2021