Lessons Learned from Katrina and Reducing Vulnerability Fall 2011

Similar documents
Pontchartrain Coastal Lines of Defense Program Figure 1 Figure 2 Figure 1

Inner Harbor Navigation Canal Lock Replacement General Reevaluation Report and Supplemental Environmental Impact Statement

Public Meeting Summary

The Effects of Woody Vegetation on Levees

NEW ORLEANS LAKEVIEW FLOATING STREETS

An Integrated Approach for Water Management Examples from The Netherlands. Addressing Climate Change and Sea Level Rise

Public Meeting Summary

Coastal Planning in Texas. Tony Williams Senior Director of Planning Coastal Resources Division Texas General Land Office

Improvement of the Atlantic Coast of New York City,

Stormwater Management at The University of New Orleans

EROSION & SEDIMENT CONTROL

Claiborne Corridor Cultural Innovation District Green Infrastructure Plan

-AIHL NOISE UNIFIED SOIL CLASSIFICATION SYSTEM. Aqx. R CORPS OF ENGINEERS, U. S. ARMY APPENDIX A

International Levee Handbook (ILH) significance for vegetation management. Jonathan Simm HR Wallingford, United Kingdom

In the Mississippi Delta: Building with Water

LIVING WITH WATER. Waggonner & Ball. David Waggonner OREGON ASSOCIATION OF CLEAN WATER AGENCIES JULY 27, 2016 LOUISIANA COASTAL CONDITION

Lower Meramec Multi-Jurisdictional Floodplain Management Plan Public Involvement (Results of Early Public Engagement) 27 June 2018

Upcoming Changes for EM Design, Construction, and Evaluation of Levees

Subsoil conditions are examined using test borings, provided by soil engineer (geotechnical).

Beneficial Use at Deer Island A Decade of Design and Implementation. Mississippi Water Resources Conference Jackson, Mississippi April 3, 2012

Learning Objectives. Thinking about Tomorrow s Waterfront Parks Lessons from Hurricane Sandy and Beyond. Hurricane Sandy

Pontchartrain Coastal Lines of Defense Program. Lake Pontchartrain Basin Foundation Coastal Sustainability Program

Numerical Analysis of Leakage through Geomembrane Lining Systems for Dams

50 Years of Habitat Change in the Mississippi River Delta

Mitigation + Adaptation Strategies for Historic Structures and Sites

DCBP APPENDIX B Action Plan for Retrofitting Structural BMPs

Coastal Construction Setback Line Review

Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project

Public Meeting Summary

Flood Mitigation Planning Bayou des Allemands St. Charles Parish, Louisiana

.MANAGED RETREAT. Need for managed retreat

NORTH KINGSTOWN PILOT PROJECT May 9, 2016 North Kingstown Town Council

Appendix to Amicus Curiae Brief: Selected Provisions of the South Carolina Beachfront Management Act

The Impact of Woody Vegetation on Levees Research Experiences from Austria

Stormwater Regulations & Considerations Morse Study Area. Pam Fortun, P.E. CFM Senior Stormwater Treatment Engineer Engineering Services Division

Trees and Levees: How and Where Do Tree Roots Grow?

2

Preparing Hudson River Waterfronts for an Era of Rapid Sea Level Rise

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

Erosion Control for Home Builders in the. City of Jacksonville

APPENDIX E: UC Berkeley Laboratory Testing and ILIT In-Situ Field Vane Shear Testing

Sea Level Rise Workshop #4 May 22, 2018 Venice Local Coastal Program SUMMARY

Technical Manual for Dam Owners Impact of Plants on Earthen Dams FEMA 534

Dauphin Island s East End Beach and Barrier Island Restoration Project. April 16, :00 PM Dauphin Island Sea Lab, Shelby Hall

5 TH ANNUAL CAPE COASTAL CONFERENCE COONAMESSETT RIVER RESTORATION PROJECT. Elizabeth H. Gladfelter, Ph.D. Conservation Commission Town of Falmouth

Fact Sheet Regulating Oceanfront Accessory Structures Updated June 10, 2013

Natural Shorelines. for Inland Lakes. A Landowner s Guide to using. to STABLIZE SHORELINES, Michigan s inland lakeshore.

Slope Stability in Harris County

EROSION & SEDIMENT CONTROL

Empowering Local Action for Coastal Resilience in Massachusetts. Bruce K. Carlisle MA Office of Coastal Zone Management

New Orleans East District 9, 10 & 11. St. Martin Brown & Associates

NJ Department of Environmental Protection

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

Lafitte Greenway Sustainable Water Design

Design methods for geosynthetics used for erosion control in channel and river banks

Lake Ogallala Bathometric Project

Coastal safety- case studies in Flanders

BAY AREA PARKS & RECREATION

Bioengineered designs

Rainwater Harvesting: Where does the Rainfall Go?

Russ J. Joffrion, P.E. Whitney Thompson, P.E.

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

Wisconsin Contractors Institute Continuing Education

QUESTIONS AND ANSWERS Windsor Woods, Princess Anne Plaza & The Lakes Combined Drainage Project

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

APPLICATIONS IN FILTRATION AND DRAINAGE & EROSION CONTROL

RFP DRAINAGE OUTFALL DESIGN AND PERMITTING. Mandatory Meeting for Proposers August 15, 2015

CHAPTER 8 SLOPE STABILITY ANALYSIS

Design Considerations for Open Channel and Detention Pond Design. Howard Redfearn, City of Mansfield

CHAPTER Committee Substitute for Senate Bill No. 1472

Libby Zemaitis October 18, 2017 Climate Outreach Specialist, NYS DEC Hudson River Estuary Program

DRAFT ONONDAGA LAKE CAPPING AND DREDGE AREA AND DEPTH INITIAL DESIGN SUBMITTAL H.3 STATIC SLOPE STABILITY ANALYSES

Poisoned Park? How Exide s Lead Contamination Risks Frisco s Grand Park

City of Stoughton Erosion Control Permit Application (effective 2/6/2018)

Building Ecological Solutions to Coastal Community Hazards: Guidance and NJ Coastal Community Assistance

EMERGENCY ACTION PLAN

1 Introduction. 2 General Pile Analysis Features. 2.1 Pile Internal Forces and Displacements

Billing Code: DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-6072-N-01]

Geomembranes and Geosynthetic Clay Liners (GCLs)

HAZARD MITIGATION GOALS AND OBJECTIVES

Natural Resource Adaptation Action Area Addressing Sea Level Rise in Estuarine Ecosystems TO: TOWN OF YANKEETOWN MAY

Sierra Club Comments on ACOE Public Notice NAE Re: Proposed Town Neck Beach Project at Sandwich, Massachusetts

MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

BASS PONDS, MARSH, & WETLAND HABITAT RESTORATION PROJECT

UNIVERSITY OF CINCINNATI

Floodplain Management Plan 2016 Progress Report

North Carolina Coastal Federation

OYSTER LAKE RESTORATION PROJECT

STREAM ALTERATION PRACTICES

SEAMING OF GEOSYNTHETICS

POND Construction. Perry L. Oakes, PE State Conservation Engineer Natural Resources Conservation Service

Urban Conservation Practice Physical Effects ESTABLISHMENT, GROWTH, AND HARVEST NUTRIENT MANAGEMENT

HYDRAULIC DESIGN involves several basic

Coastal hazard assessments in Victoria

Ghent Neighborhood League Briefing Living at Sea Level & Flooding Risks

Harlem Avenue Corridor Plan: Corridor Planning Across Municipal Boundaries

Coastal Bluff Protection JANUARY 11, 2017 CAPO CARES

FRI B04 ASLA 2014 DENVER Dredge Landscapes Dredge Landscapes: Sediment Flows, Earth Moving, and Dredge as Designed Landscape

SURREY COASTAL FLOOD ADAPTATION STRATEGY (CFAS) Phase 1 Open House

CHAPTER 1: INTRODUCTION. Road transport is an only means of transport that offers itself to the whole community

Transcription:

Page 1 of 9 TIDE-1220 Tulane University New Orleans & Hurricanes Prof. Stephen A. Nelson Lessons Learned from Katrina and Reducing Vulnerability Fall 2011 This document last updated on 21-Sep-2011. Why did the Levees/Floodwalls Fail During Katrina? Contributing Factors. 1. Katrina Storm Surge - increased pressure on bottom of canals & on levees & floodwalls 2. Weak Materials in the foundations of the levees and floodwalls, such as Permeable Sands, Peat, and Weak Clay 3. Trees uprooted by hurricane force winds 4. No armoring of tops of levees to prevent erosion after overtopping 5. Poor design of levees & floodwalls - did not consider all of the above! (I walls instead of T-walls, Low Factor of Safety, Short sheet pilings, not enough consideration of complex and variable geological environment) What could have prevented the failures? - Mitigation of Contributing Factors 1. Storm Surge - Keep the Storm Surge Out of the Canals - Gates at the mouth of Canals on Lake Pontchartrain Pumps at Lake to pump water over Lakefront levees 2. Weak Materials - Drive sheet pilings deep enough to cut off possible seepage to outboard side of canals Use T-walls instead of I-walls 3. Trees uprooted by hurricane force winds - Don t allow trees with roots that may penetrate levees - remove existing trees 4. No armoring of levees to prevent erosion after overtopping - Armor tops of levees to prevent erosion 5. Poor design of levees & floodwalls - did not consider all of the above! Better oversight of design & construction of protection systems

Page 2 of 9 Examples of Problems Levee overtopping, while it does allow water in to the protected area, is not as serious as levee/floodwall breaching (Figure 1) Figure 1 During Katrina, Mississippi River - Gulf Outlet (MR_GO) levees were overtopped resulting in breaching. This resulted in severe flooding in St. Bernard Parish. The levees were made of easily erodable spoil dredged from the shipping channel. The levees were not armored to prevent erosion (Figure 2). Figure 2

Page 3 of 9 In the New Orleans Hurricane Protection System, no armoring was present at the base of floodwalls to prevent erosion if the floodwall was overtopped. This resulted in erosion of the levees at the base of overtopped floodwalls (Figure 3). Figure 3 Trench at base of floodwall on Lakefront levee in New Orleans East. This also contributed to failures along the Industrial Canal (See Figures, 14, 15, 16, 17, & 18 in the Katrina Field Trip Guide - http://www.tulane.edu/~sanelson/katrina The other contributing factor in the case of the Industrial Canal levee floodwall failures was a mechanism of I-wall failure discovered after these floodwalls were built. In 1985 Army Corps of Engineers research branch conducted tests on sheet pile flood walls with the same design that they were using for New Orleans hurricane protection system. Found that they would likely fail! (Figure 4) Reference: Jackson, R.B., E99 Sheet Pile Wall Field Load Test Report, Technical Report No. 1, U.S. Army Engineer Division, Lower Mississippi Valley, June 1988, Vicksburg, MS, 83 pp. Figure 4 The combination of erosion due to the waterfall that resulted from overtopping and the force of the water acting to push the floodwall over, appears to have been largely responsible for the failure of the floodwalls on the east side of the Industrial Canal bordering the Lower 9th Ward (Figure 5)

Page 4 of 9 Figure 5 Failure of the levee on Floodwall on the east side of the London Avenue Canal was due to failure to drive sheet pilings deep enough to cut off underseepage through the sand underlying the canal and levee. Figure 6

Page 5 of 9 This failure could also have been initiated by uprooting of a tree by hurricane force winds to initiate the breach (Figure 7). In either case, the sheet piles were not driven deep enough to prevent the underseepage through the sand. Figure 7 On the west side of the London Avenue Canal, a similar problem occurred. But, in this case, the pressure from the rising water seeping under the levee provided enough force to uplift the land in a process called heaving (Figure 8) Figure 8 At the 17th St. Canal, (see Figures 41 and 42 in the field trip guide - http://www.tulane.edu/~sanelson/katrina) a sliding mechanism, similar to the failure mechanism discovered by the Corps of Engineers experiments in 1985 (Figure 4) appears to have been the cause of the failure (Figure 9)

Page 6 of 9 Figure 9 In this case the sheet piles were not even driven as deep as the bottom of the canal, but it is also seen that the design failed to take into account the low soil strengths below the levee (Figure 10).

Page 7 of 9 Figure 10 Shear strength and wet density versus depth along an 1800 foot section of the 17th St. Canal which includes the area of the breach (from U.S. Army Corps of Engineers, 1990, the Design documents for the 17th St. Canal floodwall). The author has added the red lines and red labeling showing the depth to the tip of the sheet piles in the breach zone and the characteristic strength values as a function of depth that the Corps used to determine the stability of the floodwall system. What Has Been Done or Is Being Done to Fix the Problems? Along the MR-GO levees have been raised to 20 Feet above sea-level and a Standard has been adopted for clay used in levees to ensure that they will not be easily eroded by future storm surge. The MR-GO has been closed to shipping at the Bayou La Loutre Ridge, but this is not a surge barrier!

Page 8 of 9 Along the Industrial Canal, the failed I- Wall has been replaced with T-Wall, but only adjacent to the Lower Ninth Ward (Figure 11). Figure 11 Along the rest of the Industrial Canal, concrete splash pads have been placed on top to the levee at the base of the floodwalls to prevent erosion that would be caused by overtopping of the floodwall. All areas along the Industrial Canal remain vulnerable until the 100-year barrier system has been installed (by 2011). Construction started about 6 months ago (Figure 12) Figure 12 (From U.S. Army Corps of Engineers) A gate structure will also be constructed where the Industrial Canal meets Lake Pontchartrain at Seabrook (Figure 13).

Page 9 of 9 Figure 13 (From U.S. Army Corps of Engineers) For the drainage canals, - if water is kept off of the floodwalls, it is unlikely that failures will occur. To accomplish this, closable gates and pumps have been installed near where each drainage canal intersects Lake Pontchartrain. These gates and pumps underwent tests before and during Hurricanes Gustav and Ike in 2008 - all systems worked! To prevent the possibility of tree blow down tree causing a levee failure, the Army Corps of Engineers has removed all trees within 6 feet of the toe of levees on all drainage canals, despite landowners protests. What's Next? The U.S. Army Corps of Engineers has been authorized and funded by Congress to construct a Hurricane Protection System to protect the New Orleans area from the so-called 100 year flood. To do so, they needed to determine exactly what the 100 year storm might be. So the first thing we need to do is explore what is meant by the 100 year storm/flood. and how the effects were determined. The IPET task force was charged with determining what the effects of the 100 year flood or storm would be and then to determine the risk to the New Orleans area from future storms. Next time we will also examine the methodology and results of the IPET risk analysis. Return to TIDE 1220 Homepage