Westside Pump Station Reliability Improvements Project Public Art Project Plan For approval at the December 21, 2016 Visual Arts Committee meeting

Similar documents
TREASURE ISLAND PHASE ONE PROJECTS PUBLIC ART PROJECT OUTLINE

Posted by Calgary Public Library on November 1, 2012

Flooding Hearing: Long and Short Term Strategies

SFE Policy Committee Presentation. Rachel Kraai

Hialeah Gardens Library Branch at Westland Gardens Park

PROJECTS AND THE PUBLIC ART MASTER PLAN

REQUEST FOR QUALIFICATIONS Entrance: Entertainment and Sports Center

Holloway Green Street

PCH & GOLDEN LANTERN. CHARLES COMPANY DANA POINT, CALIFORNIA September 8, 2014

REQUEST FOR PROPOSAL (RFP)

Chapter 8. Visualizations

BROADVIEW PARK. Projects Status Update February Estimated Investment. Project Status Update Agency Anticipated Completion

MY BILL OF RIGHTS.ORG COMMISSIONING GUIDELINES & STANDARDS VISION AND PROCESS

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA

Green Infrastructure Projects

City of Thunder Bay Public Art Program Call to Artists. Water Garden Island Feature. Request for Expressions of Interest EOI #11/2010

AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

Islais Creek, Sunnydale and Yosemite Watersheds. Community Workshop Summary Report Urban Watershed Planning Game Results

WELCOME NEIGHBORS! April 11, 2019

SF REC & PARK STANYAN STREET IMPROVEMENT. Supervisor London Breed District 5. Project Manager Dan Mauer Recreation and Parks Department

NO: R166 COUNCIL DATE: July 24, Recommendation for Port Kells Community Hall Public Art Project

Call to Artists Public Art for Los Angeles Metro Stations

DATE: January 19, WCA Governing Board. Johnathan Perisho, Project Manager. Mark Stanley, Executive Officer

Call for Artists Gateway Island Ashland Oregon Requests for Qualifications (RFQ)

Philip A. Ginsburg, General Manager Toks Ajike, Acting Planning and Capital Program Director

Toronto and East York Community Council. Robert Freedman, Director, Urban Design

Request for Proposal: Art Along the Way Sculpture Area Sensory Garden Playground Project Proposal Deadline: April 5, 2015

Design & Access Statement

Clarendon Park Framework Plan. Chicago Park District Department of Planning & Development June 7, 2008

MEMORANDUM OF UNDERSTANDING REGARDING MANAGEMENT OF THE LAKE MERCED TRACT

In March 2012, the County of Yolo was awarded a grant from the California State Department of Parks

The City of Bowie Arts Committee Bowie, Maryland ART IN PUBLIC PLACES PROGRAM Request for Proposals

STAFF REPORT Agenda Item: J.4 To: Mayor and City Council Date:

Town of Yucca Valley Capital Improvement Projects Report July 24, 2014

PUBLIC MEETING NO. 4 OCTOBER 29, 2013

RIVERWALK EAST PUBLIC ART DESIGN PROJECT

Welcome to the Sellwood Bridge Project Pre-Construction Open House

A 2012 Clean and Safe Neighborhood Parks Bond Project. Katy Tang, District Supervisor. Jasmine Kaw, Landscape Architect Will Kwan, Architect

SFMTA PHELAN LOOP AND PUBLIC PLAZA PHELAN OCEAN AVENUE

EASTSIDE REGIONAL PARK MASTER PLAN

People who are members of historically disenfranchised racial, ethnic, cultural, and other identity groups are encouraged to apply.

VIRGINIA KEY CONSENSUS MASTER PLAN

Request for Qualifications For Administration of the 2016 Summer Sprout Program

M E M O R A N D U M CITY PLANNING DIVISION PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT CITY OF SANTA MONICA

SAN FRANCISCO RECREATION + PARKS DEPARTMENT HYDE & TURK MINI PARK COMMUNITY PRESENTATION #2 WEDNESDAY,

Recommendation for the Creative Enhancement of a Concrete Barrier Wall in Bear Creek Area

REPORT TO THE CHIEF ADMINISTRATIVE OFFICER FROM THE DEVELOPMENT AND ENGINEERING SERVICES DEPARTMENT

Chapter 15. Public Art Guidelines 15.2 GENERAL DESIGN OBJECTIVES 15.1 INTRODUCTION AND PURPOSE 15.3 PUBLIC ART GUIDELINES

Coxwell Station Easier Access

a) That prior to the execution of the amending site plan agreement:

REVIEW AND APPROVAL OF FINAL ART PLAN FOR THE SIERRA MADRE VILLA CORRIDOR PUBLIC ART PROJECT

Final Report: Appendix F. LID Driveway Retrofit at Ocean Spray Processing Facility, Middleboro Supporting Information

Maple Leaf Square 15 York Street Public Art Plan

Transportation Committee

Southern Gateway Project and Public Green

REQUEST FOR PROPOSALS. The BIG Back Yard. A garden exhibition/summer outdoor installation on view at Powell Gardens May 12-October 22, 2018

Civic Design Review - Phase 1 Presentation August 15, Building Design & Construction

REPORT FOR ACTION. 88 Queen Street East Public Art Plan SUMMARY

Dallas CBD Second Light Rail Alignment (D2)

RPD GEORGE CHRISTOPHER PLAYGROUND COMMUNITY MEETING 1 SEPTEMBER 24, Duncan St

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Task Force on Kai Tak Harbourfront Development

The Land of Oak & Iron - Sculpture Commission

Figure 1 SSIP Watersheds (Source: SFPUC) North Shore Watershed

Building Exterior Lighting Grant Program. Applications will be reviewed April 1, July 1 and October 1, 2019

Montana Rail Link Park

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

I-70/71 Innerbelt Project

4/8/2015 Item #10D Page 1

CITY OF BOYNTON BEACH SE 1 ST STREET COMPLETE STREETS IMPROVEMENTS

East Midtown Greenway East 53 rd 61 st Street. Community Board 8 Project Introduction November 16, 2017

Ashbridges Bay Erosion and Sediment Control Project

Queens Quay East & Lake Shore Boulevard East & 26 Richardson Street Public Art Plan

CALL TO ARTISTS Expression of Interest (EOI)

LELAND & VISITACION PARK COMMUNITY MEETING

Streets for People, Place-Making and Prosperity. #TOcompletestreets

April 22, 2011 PART I

Landscaping Conceptual Design of 94 Northcliffe Boulevard, Toronto

What will the flow of the water be and where will the flood storage capacity be?

MISSISSIPPI GORGE REGIONAL PARK MASTER PLAN

National Museum of Marine Science and Technology 2015 International Marine Environment Art Project in Keelung, Taiwan Paradise: Sustainable Oceans

Public input has been an important part of the plan development process.

Policies and Procedures for the Missouri Master Gardener Program

CITY OF NAPA PARKS AND RECREATION SERVICES DEPARTMENT AGENDA SUMMARY REPORT

Chesterfield County Project Update

City of North Vancouver

Alameda County Castro Valley Boulevard Streetscape Improvement Project Artwork Proposal Masayuki Nagase

Call for Artists/Request for Qualifications Public Art at new Red Sandstone Elementary Parking Garage

CALL TO ARTISTS, DESIGNERS, AND LANDSCAPE ARCHITECTS ROUNDABOUT SITE DESIGN FOR NAIADS SCULPTURES

2 January 14, 2015 Public Hearing

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT.

South th E ast Communit ity Centre (SECC)

Open House Wellesley Station Second Exit Construction Update and Public Art Concept

CND Committee Meeting April 10, 2018

PC RESOLUTION NO ARCHITECTURAL CONTROL (AC)

8 October 14, 2015 Public Hearing

SBCAG STAFF REPORT. MEETING DATE: March 17, 2016 AGENDA ITEM: 5I

Though functionally a part of the Ocean Avenue Neighborhood Commercial

GUIDELINES REGARDING PERMANENT ARTWORK IN PUBLIC SPACES

Project phasing plan (if applicable) 12 copies of site plan

Transcription:

Westside Pump Station Reliability Improvements Project Public Art Project Plan For approval at the December 21, 2016 Visual Arts Committee meeting BACKGROUND The San Francisco Public Utilities Commission (SFPUC) is making improvements to the Westside Pump Station, located at the corner of the Great Highway and Sloat Boulevard. The Westside Pump Station is the SFPUC s main wastewater pump station servicing the west side of the City of San Francisco. The public art plan for this improvement project includes both the relocation of existing artwork as well as the commissioning of new artwork. RELOCATION OF EXISTING ARTWORK The existing artwork Earth Air Sea, by Mary Fuller, commissioned in 1986, will be removed from its current location at the corner of the Great Highway and Sloat Blvd., and relocated to a planting area in front of the building facing Sloat Blvd. The new location is adjacent to the San Francisco Zoo, and visible from residences across the street. The funds for the removal and relocation of the sculptures will be paid for from the capital improvement budget, and not from art enrichment funds. Below is an image of the concrete sculptures in their current location (on the left), and an image of the proposed location of the three sculptures (on the right). Existing Sculptures Proposed new building with relocated artwork facing Sloat Blvd. [1]

COMMISSION OF NEW ARTWORK ART OPPORTUNITY The art opportunity is the facility s West side concrete façade facing the Great Highway, distinct from the new location of the Mary Fuller sculptures along the facility s North façade facing Sloat Blvd. The preferred location for the new work is the three sides of the upper portion of the tower structure that sits just south of the signage wall. The west facing side of the upper portion of the tower is approximately 15 feet high by 20 feet wide. Due to the harsh marine environment, the material for the artwork should be of the most durable materials, for example, stone or mosaic. PROJECT GOAL The goal of this new project is to create an artwork that will beautify and complement the architecture of the building; enhance the building s connection to the site by reflecting SFPUC s mission of providing high quality, efficient and reliable water, wastewater and power services to the City in a manner inclusive of environmental and community interests; and have visibility and presence from a distance. PROJECT BUDGET Administration Fee $46,308 Artist selection, signage and documentation $9,520 Artwork Budget $136,000 Contingency $16,559 Conservation $23,154 Total Budget $231,542 ARTIST RECRUITMENT APPROACH AND ELIGIBILITY The Arts Commission will select a short list of artists from the 2015/16 Prequalified Pool. ARTIST SELECTION PROCESS The list of qualified artists will be presented to the Westside Pump Station Reliability Improvements Public Art Selection Panel consisting of one representative of the client agency (PUC), one Arts Commissioner, two arts professionals, and one community member. The panel will identify three finalists who will be invited to develop conceptual site specific proposals after attending an orientation session with the project team and key stakeholders. These finalists will be paid an honorarium of $1,250 plus travel reimbursement for development of a proposal. The Westside Pump Station Reliability Improvements Public Art Selection Panel will reconvene to consider the finalists proposals in an interview format and will select one artist and an alternate for the project for recommendation to the Art Commission. COMMUNITY INVOLVEMENT A community representative will serve on the Selection Panel and will participate in the Artist Orientation. The finalists proposals will be on display for public comment near the project site and on the SFAC website for two weeks prior to the final selection panel meeting. All selection panels, Visual Arts Committee (VAC) and Commission meetings are open to the public. [2]

TIMELINE (Subject to change) Project Outline Approval (VAC) Wednesday, December 21, 2016 First Selection Panel week of January 30, 2017 VAC approval of finalists Wednesday, February 15, 2017 Artist Finalist Orientation week of February 20, 2017 Final Proposal Due week of April 18, 2017 Public Display end of April - beginning of May 2017 Final Selection Panel mid-may 2017 VAC Approval of Finalist Wednesday, May 17, 2017 Arts Commission Approval Monday, June 05, 2017 Artist under Contract end of June 2017 FURTHER INFORMATION Contact Mary Chou, Public Art Project Manager at (415) 252-2233 or by email at mary.chou@sfgov.org. [3]

WESTSIDE PUMP STATION RELIABILITY IMPROVEMENTS CIVIC DESIGN REVIEW - PHASE 1 - OCTOBER 17, 2016 CITY & COUNTY OF SAN FRANCISCO PUBLIC UTILITIES COMMISSION

WESTSIDE T/S PROJECT BACKGROUND AND OBJECTIVE RICHMOND TRANSPORT TUNNEL RICHMOND WATERSHED The Westside Pump Station has been in service for over 30 years since 1985. It is the SFPUC s main wastewater pump station servicing the west side of the City of San Francisco therefore its continued service and reliability is critical. The objective of the Westside Pump Station Reliability Improvements Project is to increase reliability of its operations to comply with the current maximum permitted level of Combined Sewage Discharges. SCOPE OF WORK LINCOLN OUTFALL LINCOLN WAY Construction of a below-grade channel and a vertical shaft with connection to existing facility Renovation/reconstruction of a portion of the existing pump station to accommodate construction of new channel/shaft and installation of new mechanical equipment Construction of a new electrical building to provide a redundant power feed and increase the power capacity Providing a new driveway for improved access and other site improvements PACIFIC OCEAN SUNSET WATERSHED VICENTE OUTFALL VICENTE STREET WESTSIDE PUMP STATION PUMP STATION SWOO OSP LAKE MERCED TRANSPORT TUNNEL COMBINED SEWER DISCHARGE (CSD) WATERSHED INPUT FORCE MAIN / PRESSURIZED FLOW LAKE MERCED OUTFALL LAKE MERCED WATERSHED SWOO TUNNEL TRANSPORT / STORAGE STRUCTURE OCEANSIDE WATER POLLUTION CONTROL PLANT SOUTHWEST OCEAN OUTFALL Project Background and Objective Civic Design Review - Phase 1 10.17.2016 Page 2

GREAT HIGHWAY OCEAN BEACH VICENTE STREET ULLOA ELEMENTARY SCHOOL SOUTH SUNSET PLAYGROUND SUNSET BOULEVARD WAWONA STREET SLOAT BOULEVARD PROJECT SITE SAN FRANCISCO ZOO SKYLINE BOULEVARD PROJECT LOCATION O 150 300 600 n Project Location Civic Design Review - Phase 1 10.17.2016 Page 3

SLOAT BOULEVARD LOOKING WEST SLOAT BOULEVARD LOOKING EAST Street Views Civic Design Review - Phase 1 10.17.2016 Page 4

GREAT HIGHWAY LOOKING NORTH GREAT HIGHWAY LOOKING SOUTH Street Views Civic Design Review - Phase 1 10.17.2016 Page 5

SFPUC FACILITY SAN FRANCISCO ZOO PARKING LOT SFPUC FACILITY FENCE SLOAT BOULEVARD FENCE NORTH YARD WESTSIDE PUMP STATION MAIN BUILDING SOUTH YARD ACCESS DRIVE CONCRETE RETAINING WALL PLANTER, TYP. SCULPTURES GREAT HIGHWAY OCEAN BEACH O 20 40 80 n Existing Site Plan Civic Design Review - Phase 1 10.17.2016 Page 6

Photos of Existing Site Civic Design Review - Phase 1 10.17.2016 Page 7

SFPUC FACILITY SAN FRANCISCO ZOO PARKING LOT SFPUC FACILITY SLOAT BOULEVARD SCULPTURES (P) ELECTRICAL BUILDING (E) NORTH YARD (E) PUMP STATION (E) SOUTH YARD (E) DRIVEWAY (P) BAR SCREEN SHAFT (P) LOW PLANTING GREAT HIGHWAY OCEAN BEACH O 20 40 80 n Proposed Site Plan Civic Design Review - Phase 1 10.17.2016 Page 8

VARIABLE FREQUENCY DRIVE ROOM ELECTRICAL ROOM W/ AIR HANDLING UNIT ABOVE 8 MIN. 10 MIN. 10 MIN. 5 MIN. 8 MIN. 8 MIN. NORTH YARD (E) PUMP STATION SOUTH YARD SWITCHGEAR ROOM BATTERY ROOM OPENING ABOVE FOR DISCHARGE POINT BAR SCREEN SHAFT EXISTING TO REMAIN EXISTING TO BE MODIFIED / RECONSTRUCTED PROPOSED ADDITIONS O 8 16 32 Program Area / Equipment Layout n Civic Design Review - Phase 1 10.17.2016 Page 9

NEW ELECTRICAL BUILDING NEW BAR SCREEN SHAFT NEW REDUNDANT CHANNEL WEST PUMP CHAMBER EXPANSION EXISTING TO REMAIN EXISTING TO BE MODIFIED / RECONSTRUCTED* PROPOSED ADDITIONS * RECONSTRUCTION NECESSITATED MAINLY BY EXCAVATION FOR WORK BELOW GRADE Proposed Program Civic Design Review - Phase 1 10.17.2016 Page 10

ELECTRICAL ROOM W/ AIR HANDLING UNIT ABOVE VARIABLE FREQUENCY DRIVE ROOM SWITCHGEAR ROOM NEW OPENING IN (E) WALL FOR DISCHARGE POINT (E) STAIR TO REMAIN NEW BAR SCREEN SHAFT AND HYDRAULIC POWER UNIT BATTERY ROOM NEW REDUNDANT CHANNEL WEST PUMP CHAMBER EXPANSION EXISTING TO REMAIN EXISTING TO BE MODIFIED / RECONSTRUCTED PROPOSED ADDITIONS Program Location and Form Civic Design Review - Phase 1 10.17.2016 Page 11

Concept Site Plan - Planting Civic Design Review - Phase 1 10.17.2016 Page 12

WEST PLANTING taller (above 2ft) new zealand flax Phormium margaret Jones infrequent mid (1 to 2ft) blue oat grass helictotrichon sempervirens summer NORTH PLANTING taller (above 2ft) lion s ear blue oat grass Leonotis Leonurus helictotrichon sempervirens spring-fall summer mid (1 to 2ft) blue chalk sticks senecio mandraliscae sea lavender Limonium californicum coral aloe aloe striata rock purslane calindrinia grandiflora summer late summer-early winter winter-spring summer low (BelOw 1ft) low (BelOw 1ft) angelina stonecrop sedum rupestre angelina summer angelina stonecrop sedum rupestre angelina summer little sur manzanita arctostaphylos edmundsii winter-spring Planting Palette Civic Design Review - Phase 1 10.17.2016 Page 13

A SCULPTURES B V.F.D. ROOM B ELECTRICAL ROOM SLOAT BOULEVARD SWITCHGEAR ROOM NORTH YARD (E) PUMP STATION SOUTH YARD BATTERY ROOM A BAR SCREEN / HPU ROOM CONTROL ROOM A A GREAT HIGHWAY O 10 20 40 n Floor Plan Civic Design Review - Phase 1 10.17.2016 Page 14

Scheme A - Imagery Civic Design Review - Phase 1 10.17.2016 Page 15

Scheme A - Great Highway - Southbound Civic Design Review - Phase 1 10.17.2016 Page 16

Scheme A - Great Highway - Northbound Civic Design Review - Phase 1 10.17.2016 Page 17

Scheme A - Sloat Boulevard - Eastbound Civic Design Review - Phase 1 10.17.2016 Page 18

Scheme A - Sloat Boulevard - Westbound Civic Design Review - Phase 1 10.17.2016 Page 19

Scheme A - Overall Perspectival Elevation Civic Design Review - Phase 1 10.17.2016 Page 20

ROOF 20-2 +10-6 SOUTH ELEVATION LEVEL 1 0-0 WEST ELEVATION EAST ELEVATION NORTH ELEVATION O 8 16 32 Scheme A - Electrical Building Elevations Civic Design Review - Phase 1 10.17.2016 Page 21

SOUTH ELEVATION NORTH ELEVATION +31-0 +18-6 +10-6 +12-0 +12-0 +10-6 +9-0 WEST ELEVATION LEVEL 1 0-0 O 8 16 32 Scheme A - Main Building Elevations Civic Design Review - Phase 1 10.17.2016 Page 22

VFD ROOM AIR HANDLING UNIT ELECTRICAL ROOM AIR HANDLING UNIT ELECTRICAL ROOM SWITCHGEAR ROOM BATTERY ROOM ELECTRICAL BUILDING SECTION B-B ELECTRICAL BUILDING SECTION A-A STORAGE BAR SCREEN / HPU ROOM CORRIDOR CONTROL ROOM STORAGE MAIN BUILDING SECTION A-A O 8 16 32 Scheme A - Building Sections Civic Design Review - Phase 1 10.17.2016 Page 23

Scheme B - Imagery Civic Design Review - Phase 1 10.17.2016 Page 24

Scheme B - Great Highway - Southbound Civic Design Review - Phase 1 10.17.2016 Page 25

Scheme B - Great Highway - Northbound Civic Design Review - Phase 1 10.17.2016 Page 26

Scheme B - Sloat Boulevard - Eastbound Civic Design Review - Phase 1 10.17.2016 Page 27

Scheme B - Sloat Boulevard - Westbound Civic Design Review - Phase 1 10.17.2016 Page 28

Scheme B - Overall Perspectival Elevation Civic Design Review - Phase 1 10.17.2016 Page 29

ROOF 20-2 +10-6 SOUTH ELEVATION LEVEL 1 0-0 WEST ELEVATION EAST ELEVATION NORTH ELEVATION O 8 16 32 Scheme B - Exterior Elevations Civic Design Review - Phase 1 10.17.2016 Page 30

SOUTH ELEVATION NORTH ELEVATION +31-0 +18-6 +10-6 +12-0 +12-0 +10-6 +9-0 WEST ELEVATION LEVEL 1 0-0 O 8 16 32 Scheme B - Exterior Elevations Civic Design Review - Phase 1 10.17.2016 Page 31

VFD ROOM AIR HANDLING UNIT ELECTRICAL ROOM AIR HANDLING UNIT ELECTRICAL ROOM SWITCHGEAR ROOM BATTERY ROOM ELECTRICAL BUILDING SECTION B-B ELECTRICAL BUILDING SECTION A-A STORAGE BAR SCREEN / HPU ROOM CORRIDOR CONTROL ROOM STORAGE MAIN BUILDING SECTION A-A O 8 16 32 Scheme B - Building Sections Civic Design Review - Phase 1 10.17.2016 Page 32