SNS Modulator Fire of Friday, March 21, 2008 Fire Marshal Review

Similar documents
Standard Operating Procedure Ottawa Fire Service. Major Case File Management

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 6 Utilities Electrical Emergencies Revised

Fire Department Orientation / Organization

CAMDEN COUNTY FIRE COORDINATOR

TULANE UNIVERSITY EMERGENCY ACTION PLAN

Carbon Monoxide Poisoning

ELEVATOR RESCUE PROCEDURE

[Name/title] is the Alternate Safety Officer/ Alternate Emergency Coordinator.

AMADOR FIRE PROTECTION DISTRICT

PCD/PEM Power Conversion Department - Equipment Lockout Procedure

Rescues individuals in danger from fire, vehicle accidents, industrial accidents and other situation requiring extraction.

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Emergency Planning and Preparedness

Mission. Vision. To set the standard for excellence and innovation in public safety. Department Description

Whitestown Fire Department Standard Operating Procedure

Banff Mineral Springs Hospital EMERGENCY RESPONSE CODE RED Fire

HOLLY HILL FIRE DEPARTMENT

Risk Management Services

Emergency Procedures for Clients

EC 5.10 FIRE PREVENTION MANAGEMENT

NATIONAL COMPETENCY STANDARD

Training Toolbox Series. ICA11v1.0 Information, Digital Media & Technology

INCIPIENT FIRE BRIGADE MEMBER MANIPULATIVE SKILL OBJECTIVES GENERAL

Truro Police Department. Fire Emergencies. Policy Number: OPS-9.02 Effective Date: June 1, 2000 REFERENCE:

Centers for Regional Excellence. Downriver Fire Authority. Organization Committee Objective. Operations Committee Report 2007

REED COLLEGE DEPARTMENT OF COMMUNITY SAFETY DEPARTMENTAL DIRECTIVE CSO FIRE & FIRE ALARM SYSTEM RESPONSE GUIDELINES

I. Scope: II. Environmental Health and Safety Fire Alarm System Impairment Program - Guideline Revision Date: April, 2018

Structural Firefighting Policy

2017 Annual Report. King County Fire District No. 27 Fall City, WA

SUBJECT FIRE OPERATIONS GUIDELINE (F.O.G.) #F510 Issued: 1/2014 Last Revision: 1/2014 Pages: 9 By Order Of: J.S. Thompson, Fire Chief

Performance and Cost Data. fire services

CHAPTER 05 - OFFICE OF STATE FIRE MARSHAL SUBCHAPTER 05A - FIRE AND RESCUE SECTION.0900 PUBLIC PROTECTION CLASSIFICATIONS FOR FIRE DISTRICTS

Course Outline Cover Page

AMADOR FIRE PROTECTION DISTRICT

Services the Agency is Required to Provide Services

FIRE SAFETY AND PREVENTION POLICY

Inspections and Investigations Chapter 10 - Use of Fire/Explosives Investigations Investigator March 2009

Cumru Township Fire Department 4/27/10 Standard Operating Guidelines Page: 1 of 6 Section 15.07

Grossmont Cuyamaca Community College District Fire Report 2014

Emergency Evacuation Plan South Patterson Building (SPB)

EMERGENCY PROCEDURES FOR WCSD SCHOOLS AND SITES

EMERGENCY PREPAREDNESS & RESPONSE PROCEDURE

October 1, Full *2 Sprinkler System

UC Irvine Environmental Health & Safety TITLE: FIRE WATCH AND OUT OF SERVICE NOTIFICATION

Shell Canada Limited Hydrogen Sulphide (H2S) Release September 12, 2006

Based on NFPA 1001: Standard for Fire Fighter Professional Qualifications, 2013 Edition.

4 ESF 4 Firefighting

SECURITY SERVICE LEVEL AGREEMENT

Date Issued: December 14, 2017 Revision: 2.1

GUIDELINES FOR EMERGENCY PLANNING AND PREPAREDNESS. High-Hazard

SCALES NW EMERGENCY ACTION PLAN

2.13 RADIOLOGICAL INCIDENTS and EMERGENCIES RCT STUDY GUIDE Identify in general how an RCT should respond to an emergency.

Dutchess Community College. Emergency Action Plan. Conklin Hall College Residence

Fire Prevention Plan

Austin Independent School District Police Department Policy and Procedure Manual

EASTERN ARIZONA COLLEGE Fire Department Operations II

IIPP. Injury & Illness Prevention Program Hartog Drive San Jose CA Responsibilities. Workplace Hazards. Training. Incident Investigations

Assignment Sheet Apply the NIMS-ICS Model to an Emergency Scene

Outline. Standards of Coverage. ICS Features 2/12/2016 ICS

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

Building Emergency Response Scenario

Harvard University - OEB Glasshouse Emergency Evacuation Plan

Pebble Beach Community Services District Fire Department 3101 Forest Lake Road, Pebble Beach, CA

Chapter 1 Test. Directions: Write the correct letter on the blank before each question.

2017 Eastside Fire & Rescue Response Coverage Report

CENTRAL YORK FIRE SERVICES 2009 Annual Report PROUDLY PROTECTING THE COMMUNITIES OF AURORA AND NEWMARKET

FROM: CITY MANAGER DEPARTMENT: POLICE FIRE SUMMARY OF REDWOOD CITY FIRE/COMMUNITY ALERTING SYSTEM (TELEMINDER) FAILURE

WHAT IS FIRE DISASTER? Fire Disaster is an occurrence or an incident of such magnitude which creates a situation in which the normal life is suddenly

I. It shall be the responsibility of the department officers to implement this operating guideline.

FIRE PROTECTION AND EMERGENCY SERVICES BYLAW

Summary. Introduction

Emergency Evacuation Plan. Kettering Labs. School of Engineering

REQUIREMENTS. For FIRE DEPARTMENTS. State of West Virginia. Bob Wise Governor THE DEPARTMENT OF MILITARY AFFAIRS AND PUBLIC SAFETY

REPORT TO COUNCIL. DATE: August 1, 2006 REPORT NO.: FD SUBMITTED BY: Gordon (Shorty) Smith FILE NO.: Fire Chief

BUILDING SECURITY and EVACUATION RELATED POLICIES: REVIEWED: AS NEEDED

Property Name & Address [ Property Name ] - [ Property Address ]

POLICY. Code Announcement means an announcement (e.g. page or strobe light, verbal notification) to commence a Fire Drill without an audible alarm.

Safety Manual Section 7 Fire/Life Safety

5.0 CONTINGENCY PLAN. It is necessary to amend the plan if:

Review of Recent Laser Incidents at DOE facilities. Joanna Casson Los Alamos National Laboratory

OPWDD Fire Safety Level One Post Test

TABLE OF CONTENTS Part 6 Legal Basis for Fire Safety Planning... 2

NY Fire Safety Institute Coordinator of Fire Safety & Alarm Systems F-80

Service Business Plan

HAZARDOUS MATERIALS/WASTE EMERGENCY CONTINGENCY PLAN University of Southern Maine Portland Campus

RAMBLER PARK FIRE SAFETY INFORMATION

Guidelines for Fire Safety Plans at Construction or Demolition Sites

ESCONDIDO FIRE DEPT TRAINING MANUAL Section Truck Module Page 1 of 5 High Rise On Scene Revised

Standard Operating Procedure Ottawa Fire Services. Fire Operations- Structural Fire Incidents SUBJECT. Fire Alarm Systems (Silence/Reset) - Revised

Emergency Action Plan for Sycamore House 3818 Winding Way

A.U.C. 150 March 31, 2004 IROQUOIS NATURAL GAS PIPELINE AT CON EDISON HUNTS POINT FACILITY 1. DESCRIPTION

EMERGENCY PREPAREDNESS: EVACUATIONS

Table of Contents. EMERGENCY PROCEDURES Policy 190

INDEX CALL CENTRES. AIR CONDITIONING, see HEATING, VENTILATION AND AIR CONDITIONING ALARM SYSTEMS ARSON, 30 ASSAULTS, 24 BREAK AND ENTER, 23

Fire Prevention and Emergency Preparedness Plan for Black Oak Wind Farm

INSTRUCTOR GUIDE COURSE: FIREFIGHTER PRE-BASIC SESSION REFERENCE: 1 TOPIC: ORIENTATION AND FIRE BEHAVIOR LEVEL OF INSTRUCTION:

2012 SunTrust Center ERT Annual Review. 919 East Main St. Richmond, VA

MATRIX TO DETERMINE YOUR PRESENT POSITION IN MEETING N.F.P.A. 1720

Contingency/Emergency Plan for all Hazards Page 1 of 9

San Ramon Valley Fire Protection District GREEN SHEET

Transcription:

SNS Modulator Fire of Friday, March 21, 2008 Fire Marshal Review The SNS modulator located at SLAC is one of 15 units, with the other 14 units located and operated at the SNS project in Oakridge. All 15 units were fabricated under contract at Los Alamos National Laboratory. This SLAC unit generates RF power used to test and develop RF components for use with the next generation linear collider. The modulator is loaned to SLAC as part of a collaboration with SNS. It is located in End Station B. At approximately 10:15 am on Friday, 3/21/08, a very loud noise was heard in and around End Station B. The Safety Officer, Keith Jobe, and others promptly investigated the incident and determined that an electrical explosion had occurred inside the SNS modulator, an experimental device that had been recently recomissioned following extensive servicing. The incident resulted only in localized damage within the modulator and was initially classified as non-orps reportable. The event was later recategorized as ORPS. This internal report was provided by the, Ralph Kerwin. Appendix A of this report addresses Keith Jobe s review of the technical aspects of the SNS modulator internal explosion. During a discussion on March 21 st, Keith stated that the electrical explosion was initiated by an electrical component failure resulting in a short and complete discharge of the modulator s capacitor bank through a pair of IGBT semiconductor switches, resulting in the destruction of both switches. Keith stated that this failure mode was anticipated by the SNS modulator designers at Los Alamos, who specifically designed the modulator and its enclosure to withstand such an occurrence. This failure did not result in any significant additional damage to the modulator beyond the switch. However, Keith states that in past occurrences with other modulators located at SNS, this failure mode has led to the destruction and ignition of oil-filled capacitors also located in the modulators. At the time of this event, Keith was actively pursuing a contract to provide a carbon dioxide suppression system for the modulator that would minimize fire damage should such a fire involving the capacitor oil occur in the future. The contractual documents were reviewed by the SLAC fire marshal prior to issuance. The SNS modulator typically has a VESDA system to detect fire conditions inside the unit. The VESDA system sampling port had been disconnected from the modulator for the renovation and recommissioning operations. The disconnection of the VESDA port did not impede the response to this specific incident. However, the full recommissioning of the unit without reconnection of the VESDA port illustrates a weakness in the SLAC fire suppression system impairment tracking system (see Lessons Learned, Item 1). The sequence of events from the run report relative to Engine 7 is as follows: Alarm received 10:18:37 Engine 7 Dispatch 10:18:43 Engine 7 En Route 10:21:02 Engine 7 Arrival 10:25:49 Engine Clear 10:33:04 Engine 7 had a response time of 04:47 (arrival time minus en route time). Other responding apparatus included Truck 6, Rescue Unit 2, ALS Unit 1, Engine 6 and Engine 4. Response times were listed for Engine 6 as 04:35 and for Engine 4 as 05:58. An Engine 7 response time of under 4 minutes would normally be expected for this portion of the site. As of the time of this writing, the Fire Marshal has not interviewed the responding Engine 7 firefighters. PAFD Captain Rocky Hull Ralph Kerwin 1 April 4, 2008

(not on shift that day) pointed out that most other vehicles were shown receiving roll call for departure at 10:22:03, and he stated that the PAFD dispatch logging system is subject to occasional error when multi-unit dispatches occur, because the times are entered manually by a single dispatcher. The SLAC Emergency Management Coordinator and CGS Department Head arrived at the scene at the same time as PAFD Engine 7. The incident commander was able to determine very quickly after arrival that there were no life safety threats presented by the occurrence and relinquished incident command to SLAC. However, there was no organized effort on the part of SLAC personnel to control the movement of people into the building or around the SNS modulator. This points to an opportunity to improve scene management arrangements in future events, for which conditions may not be benign. (See Lessons Learned, Item 2.) In addition, the EMC stated that a portion of the event notification communication chain appeared incomplete. Beyond the initial calls given to the DFM, Fire Marshal and the 911 call to the fire department, there was no specific protocol for contacting interested parties such as the ORPS program manager and the EMC. (See Lessons Learned, Item 3). ORPS CLASSIFICATION Based on further evaluation, the Deputy Facility Manager on duty has determined that this will be an ORPS, classified as Group 10, Management Concern/Issue; Sequence # (2): an event that does not meet any of the other reporting criteria, but is determined by the Facility Manager or line management to be of safety significance or of concern to other facilities or activities in the DOE complex. A significance category (SC) of 4 has been assigned (an occurrence that is not an Operational Emergency and has some impact on safe facility operations). Lessons Learned/Opportunities for Improvement Item 1. Fire Protection System Configuration Control Include VESDA port detachment and reattachment in scope of fire protection system impairment program. Provide a means for tracking and ensuring recommissioning of these ports through cautionary labels, a tracking system, or other means. [Responsibility: Fire Marshal] Item 2. Emergency Scene Management by SLAC Personnel Develop a program for providing on-scene management of emergency scenes, both in support of the fire department (or sheriff s office) and for situations in which the first responder has relinquished incident command of the scene. [Responsibility: Emergency Management Coordinator] Item 3. Emergency Event Notification Protocols Work with Security to expand list of emergency contacts following emergency situations or provide other means to ensure prompt notification of ORPS program manager and others. [Responsibility: Fire Marshal] These items will be entered into CATS for tracking. Ralph Kerwin 2 April 4, 2008

Appendix A Report of Keith Jobe, 3/28/2008 At 10:15 an explosion was reported at End Station B, involving electrical equipment. The source was the SNS Modulator, which appears to have had a significant electrical discharge of one of the 3 main circuit boards within its enclosure (system operates at 2.5 kvdc and 250 kj). The discharge was contained in the enclosure as designed. The enclosure was designed to provide containment protection in such an event and functioned as it was designed. No personnel were injured. The discharge was heard as far away as building 128 (the NLCTA Control Room). The control room is outside the concrete end-station and all end station doors were closed. The Power Conversions Department engineer (Tony Beukers) responsible for recommissioning and testing the equipment appeared in the control room shortly following the discharge. The NLCTA Safety Officer (myself) and others immediately entered into the end station and the emergency response was initiated. End Station B personnel responded immediately, notified 911, shut down the unit s power, discharged a CO2 extinguisher into the enclosure (a preemptive measure), and initiated the manual discharge of the capacitor banks per the protocols in the approved ELP (Equipment lockout procedure). Initial indications did not suggest any initiation of fire. There was dust or smoke visible within the enclosure as viewed through the enclosure's high-strength windows. A slight "smoke-smell" was present. The call to 911 was initiated to provide fire coverage in the case an undetected fire had been initiated within the equipment. The modulator is the spare unit for the identical modulators in the Spallation Neutron Source (SNS) at Oak Ridge, Tennessee. SNS has had similar experiences with component failures - sometimes these failures included the ignition of oil-filled (non-pcb) capacitors in the immediate vicinity of the likely source of the explosion. The likely failure is a fault in the high-current transistor-switch (an IGBT) on the power board immediately upstream of the pulse transformers. Both SNS and SLAC are pursuing the acquisition of a fire protection system which provides carbon-dioxide flooding for the electronics enclosure. This equipment was being recommissioned following a removal of the high-voltage electrical connections and the disassembly of the oil-filled tank for a capacitor replacement. The oil-tank and its components is completely separate from the equipment failure discussed above and was not involved in the incident. As part of the disassembly, the connection to the High Sensitivity Smoke Detector (HSSD) was removed by the fire technicians. The normal reassembly and recommissioning of the device (which has not been completed) has the HSSD's sample port reattached as part of the reassembly. The HSSD would have automatically signaled the fire department and sounded evacuation alarms in the building, had it been connected. This port was not reconnected at the time of the discharge. The 911 call was correctly initiated by the Safety Officer and the communication was clear and complete. Security, Main Control Center (MCC), Fire Department, SLAC Medical, ES&H, Facilities, Public Affairs, SLAC Facility Manager, and the High Voltage Electricians all responded immediately and appropriately. There were no medical injuries and all damage appears to be confined to the source. The system is currently shutdown, de-energized, and locked-out. The Power Conversion engineers have been authorized to remove the power board and any other affected systems, and evaluate (and repair) the failure. Based on the information currently available, this does not appear to meet the threshold criteria for an ORPS reportable incident.* (Evaluation by Brian Sherin, SLAC Facilities Manager Deputy) Ralph Kerwin 3 April 4, 2008

Keith Jobe will be conducting a preliminary investigation and will provide an update next week. Pictures of the modulator and the explosion from several photographers are available at - http://www.keithjobe.com/pictures/?album=2008-03-21. For those interested, additional photographs of - the internals of the oil tank (at SLAC) can be found at http://www.keithjobe.com/pictures/?album=2008-03-18 and - the installation at SNS at http://www.keithjobe.com/pictures/?album=2005-07-21 Regards Keith Jobe NLCTA Safety Officer -------------------------------------------------------- note: Credit to Brian Sherin for the initial version of this report * ORPS Subgroup B: Fires/Explosions 1) Any unplanned fire or explosion nuclear or hazardous material within a facility 2) Any unplanned fire or explosion in a nuclear facility 3) Any unplanned fire or explosion in a non-nuclear facility that a) activates a fire suppression system b) takes longer than 10 minutes to extinguish following the arrival of fire protection personnel, or c) disrupts normal operations in a high hazard facility 4) Any wild land fire Ralph Kerwin 4 April 4, 2008

APPENDIX B PHOTOS Photo 1 SNS Modulator in ESB Photo 2 Photo 3 Center Module (note fragments) Face of SNS Modulator With Side Panel Open (Center Module has the blown switches; damage not visible in this photo) Ralph Kerwin 5 April 4, 2008