Installation Manual BCS2000/3000

Similar documents
Installation Manual BCS 1000/1500

WineZone Ceiling Mount Ductless Split 15

EarthLinked SW Series Compressor Unit R-410A Quik-Start Instructions

Installation Manual for CCS Cased Coils with SC, SD, SW Compressor Units and R-410A Refrigerant

EarthLinked SC Series Compressor Unit R-407C Quik-Start Instructions

INSTALLATION AND COMMISSIONING MANUAL. Neos 100S Integra 20X, 30S, 35X, 40X, 50X

Warm Case Troubleshooting Guide 9/18/2014

To accomplish this, the refrigerant fi tis pumped throughh aclosed looped pipe system.

LK-TSSTB July 2009 FPO HP Two Stage Condensing Units and Systems Technical Guide. with Bitzer Compressors.

60 TON AIR-COOLED CHILLER. Call us today! (800) PA-ACCTR-60 GENERAL DIMENSIONS ELECTRICAL DATA 60 TON AIR-COOLED CHILLER FEATURES

EarthLinked SCW Series Compressor Unit R-410A Quik-Start Instructions

Installation Manual for. Series HWM and Non-ETI HYDRONIC WATER MODULE with SC and SD COMPRESSOR UNITS and R-410 REFRIGERANT

Condensing Unit Installation and Operating Instructions

Electrical Problems. Fuse(s) blow or circuit breaker trips. Does the unit use circuit breakers or fuses? Replace with correct fuse(s)

Contour TM Screw Compressors

EarthLinked HC Series Compressor Unit R-410A Quik-Start Instructions

SEA FROST BAITFREEZER 110-VOLT AIR-WATER Twin Valve

Installation Manual for ETI AVS Series and NON-ETI Air Handlers with SC or SD Compressor Units and R-410A Refrigerant

NO: 9-16 DATE: 2/11/16 EMERSON CLIMATE TECHNOLOGIES WHOLESALERS -EXECUTIVES -PRODUCT MANAGERS -EMERSON TM TECHNICAL SPECIALISTS -BRANCH PERSONNEL

CS/CD/CP AIR COOLED CONDENSING UNITS (P/N E207120C R2)

Read and save these instructions

Owners Manual Refrigerated Air Dryer MHT SERIES

R Series Cooling Modules

EarthLinked CC Series Compressor Unit R-410A Quik-Start Instructions

PLATINUM SPLIT TWIN TECHNICIAN S MANUAL. 24V Thermostat Conversion Kit Option. The Coolest Thing In Wine Storage

RCM Refrigerant Module

Split Floor-Mounted Cooling System Operation Care Installation Manual

100 TON AIR-COOLED SCROLL PACKAGED. Call us today! (800) SPECIFICATIONS GENERAL DIMENSIONS ELECTRICAL DATA ADDITIONAL INFORMATION

F-2000MLF(-C) F-2000MWF(-C) F-2000MRF(-C) F-2000MRF3(-C)

DLCLRA. INSTALLATION INSTRUCTIONS Outdoor Unit Single Zone Ductless System Sizes 36 to 58 TABLE OF CONTENTS

PRELIMINARY INSTALLATION. Operation & Service Manual. Carrier Transicold Europe 03/09/07 Viento - Installation/Rev- #1/56

PARALLEL RACK SYSTEM INSTALLATION & OPERATIONS MANUAL With Master Rack Compressor Sequencer

12 In Row. Installation Manual. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc.

R Series Cooling Modules

Instructors: Contact information. Don Reynolds Doug McGee Factory Tech Support

C13-Series Engineering Guide

INSTALLER'S GUIDE. ALL phases of this installation must comply with NATIONAL, STATE AND LOCAL CODES

Hoshizaki America, Inc.

TECHNICAL GUIDE DESCRIPTION SPLIT-SYSTEM AIR-COOLED CONDENSING UNITS. HA300, HB360, HB480 & HB thru 50 NOMINAL TONS (50 Hz)

1025, BOUL. MARCEL-LAURIN INSTRUCTION MANUAL FOR WATER COOLED ENVIROCHILL CHILLER. Prepared par Claude Gadoury, P. Eng MTL TECHNOLOGIES INC.

VertiCool Aurora Engineering Guide

VariCool VAV Engineering Guide

R Series Cooling Manual

TRI-PLATE B INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS PART NO EFFECTIVE MARCH 1, 1983 REPRINT APRIL 16, 1999

Refrigeration Controller Operator s Manual (HRC) PO Box 6183 Kennewick, WA

RDT Refrigeration Book

DRYMAX DRYMAX DRYMAX DRYMAX

Math. The latent heat of fusion for water is 144 BTU s Per Lb. The latent heat of vaporization for water is 970 Btu s per Lb.

CONDENSING UNITS-AIR SUBMITTED BY : Poppy Hudson PROJECT : Brooks Landing REV DATE : 07 Dec 2017 ORDER # : A00

Call us today! (800)

TABLE OF CONTENTS. NOTE: Read the entire instruction manual before starting the installation. TROUBLESHOOTING... 13

R.A.S.E.R.S System. Installation Guide

INSTRUCTIONS! DO NOT DISCARD!

Read and save these instructions

CoolSpot Engineering Guide

Eclipse Technical Training CME686 CME810 CP686 CP886 CP1086

Kramersaver Air Cooled Condensing Units

HEAT PUMP INSTALLATION MANUAL

KTL Two-Way Low Profile Evaporators

INSTRUCTIONS! DO NOT DISCARD!

Air Conditioning Operation and Troubleshooting Matt Dunham

an ISO 9001:2008 Registered Company GOLL ST. - SAN ANTONIO, TX ph fax MINI SPACE SAVER HEAT /COOL

Condensing Unit and Refrigeration System Installation & Operations Manual R448A/R449A

XSTREAM Valve System With A.R.M.E.D. Technology Service & Installation Instructions Page 1

Installation, Start-Up and Service Instructions

MYSTICOOL Max Valve System with Xstream and A.R.M.E.D. Technology Service & Installation Instructions Page 1

NO. F ISSUED: JUN. 15, 2009 REVISED: HOSHIZAKI MODULAR CRESCENT CUBER KMD-201AA KMD-201AWA MODEL SERVICE MANUAL

Water-Cooled Dual Compressor Screw Chiller

Hoshizaki America, Inc.

INSTRUCTIONS! DO NOT DISCARD!

Welcome to the Ice-O-Matic on-line training modules. Ice. Pure and Simple

Sporlan Valve Division Parker Hannifan/CIC Group

Dixell Installing and Operating Instructions release 7.0

WKS 2200 SERIES (USA only) --INSTALLATION INSTRUCTIONS--

SECTION REFRIGERATION EQUIPMENT. A. Section Includes: Refrigeration equipment for insulated cold storage rooms including necessary accessories.

Read and save these instructions

Class 1: Basic Refrigera0on Cycle. October 7 & 9, 2014

Table of Contents. Service Procedures. Service Procedures. Measuring Superheat (4) Measuring Subcooling (5) Airflow Calculation (6-8)

IMPORTANT. HOSHIZAKI provides this manual primarily to assist qualified service technicians in the service and maintenance of the icemaker.

DESIGN STANDARDS SECTION 15600

Calhoon MEBA Engineering School. Study Guide for Proficiency Testing Refrigeration

INSTALLATION INSTRUCTIONS R 410A

Call us today! (800)

Air-Cooled Condensing Units with Screw Compressors. Technical Bulletin Low Temperature Models SSV DSV

ENGINEERING SPECIFICATIONS

ENGINEERING SPECIFICATIONS

Scotsman Technical Training. CU50 Cube Ice Machine

INSTALLATION MODULE XARIOS RANGE. UTC Climate, Controls & Security PROPRIETARY Rev B 29th mai 2013

R4H4. Product Specifications

Operation Manual SCT14B and SCT18B. Inspection. 3 General Description. 3 General Requirements. 3 Standard Features.

MAGNUM SERIES OWNER S MANUAL. Magnum SS9000 Magnum SS12000 QS

QUANTUM SERIES VERSION 4 TECHNICIAN S MANUAL. 24V Thermostat Conversion Kit Option. Quantum SS9000 Quantum SS The Coolest Thing In Wine Storage

AIR CONDITIONING. Carrier Corporation 2002 Cat. No

Read and save these instructions

Installation Instructions

PLATINUM SPLIT TECHNICIAN S MANUAL PS The Coolest Thing In Wine Storage

CEILING MOUNT. VERSION 2 TECHNICIAN'S MANUAL 24V Thermostat Conversion Kit Option. The Coolest Thing In Wine Storage

MASS. MARITIME ACADEMY

Installation, Operation, and Maintenance Information

horizontal air discharge outdoor discus condensing unit

Transcription:

Installation Manual BCS2000/3000 Supplies Needed for Installation 1. 3/8 and 5/8 copper tubing. 2. 1/4 copper water supply 3. 1/4 condensate vinyl drain tube/tube clamps 4. Provide 120v 15A circuit for indoor evaporator, and 120v/230v 30A, single or three phase (dependent upon your condensing unit) for outdoor condensing unit. Check local codes. 5. 18-2 stat wire; to be used to extend temperature sensor, humidity sensor cable, keyboard, and master to slave control jumper. 6. Condensing unit pad Condensing Unit Set Up 1. Place a (suggested model) on a firm level location (pad) for outdoor applications, or add 4 anti-vibration pads to each corner of the condensing unit for indoor use. Place in an area with adequate air flow. 2. Braze in suction and liquid lines to condensing unit. 3. Bring 3/8 copper tubing from the liquid line of the condensing unit to a spot equidistant to both evaporators and solder that line into the run side of a 3/8 x 3/8 x 3/8 tee. 4. Braze both the 3/8 line to the liquid line of each evaporator from the run and branch of the tee. 1

5. Repeat the same procedure from the 5/8 suction line of the condensing unit. Solder to a 5/8 run of a 5/8 x ½ x ½ tee. Run ½ copper to the suction line connections in each evaporator. 6. Power from disconnect (recommended) 12-2/with ground to the condensing unit. 7. Check low pressure control for the correct 25 psi setting, with a 15 psi differential. Diagram 1 Evaporator Set Up 1. Locate a suitable ceiling mount location, and space both evaporators equally across the ceiling. Allow for at least 24 inches from the back of the evaporator (coil side) to the back wall for adequate air distribution. 2. Run the 1/4 drain line from the pump in the evaporator through the ceiling cap and out to a suitable location. Heat tape any portion susceptible to freezing.. 3. Attach template to the ceiling. Remove the stainless steel outer enclosure from the base of the unit. Attempt to locate any mounting holes below ceiling joists for secure attachment with (#8) wood screws. Use moly bolts for all other mounting locations. Attach base securely to the ceiling. (diagram 1) Minimum 7 mounts. 4. Below is the BCS electronic control package used in both the BCS2000 and BCS3000 System. The main control module below must be mounted equidistantly between both evaporators in a serviceable location. Master Control Module 2

5. The first port on the left includes two pieces of 18-2 that should be connected to each slave module in both evaporators at #1 and #2 terminals. These connections will shut down the system if there is ever a high water condition in either evaporator. They are connected parallel to each safety float. Also in the first port there is a piece of 18-6 that is color coded per our standard operating instructions to be affixed to the VH620 Keyboard Display, the temp sensor, and the humidity sensor (see Page 6 in Power To the Evaporator ). Second port from the left is power, 14-2 with ground, 115V. Lastly the third and fourth outlets hold each 14-6 jumper cable, that is also color-coded. These run to each evaporator slave module inside of each stainless steel enclosure. 6. Make sure that the unit is covered tightly with each cover. Slave Control Module 7. From left to right. The first two terminals should be connector to the 18-2 leads from port one in the master control module. Terminals 3, 4/5 (one white lead), 7,8.9 and 10 will be connected to each color coded lead from the 14-6 cable that you run from the Master Control Module. Replace the cover firmly. Evaporator Set Up, continued 8. Wrap the TXV and refrigeration solenoid with ESP Heat block (#HB34) or comparable product. Braze the refrigerant solenoid to the liquid line. Remove the txv bulb and braze in the suction line to the line exiting the condenser. Re-attach the bulb when cool. 3

9. Locate the nearest water supply. Shut off water supply to the line and braze in the CPS water supply compression adapter. Connect the water filter to the fitting and run ¼ copper from the filter thru the evaporator ceiling opening and cap, and attach to the water solenoid inlet in each evaporator. 10. Attach the 1/4 vinyl hose drain tube to the outlet of the green condensate pump in each evaporator. 11. For indoor applications, run 1/4 vinyl condensate drain tube from the evaporator to a suitable location 12. Do not replace cover until unit test is complete. Controller Display Set Up 1. Install double gang box and cut out the blank plate to accept the Bacchus Temp/Humidity Keyboard (VH620). The keyboard can be mounted inside or outside of the room. Run 18-2 stat wire from the monitor back to the evaporator above the ceiling opening, and attach to the yellow and green lead wires indicated. The keyboard 4

can be mounted up to 75 feet from the microprocessor inside the evaporator. 2. Mount the humidity sensor (XH10P) to a discreet side wall location @ 6ft. from the floor. Bring the two lead wires from the sensor, and attach to the + and lead wires indicated. White lead to the #2 terminal, and Red lead to the #1 terminal on the sensor. Do not mount in the air discharge (coil side) of the evaporator. 3. Mount the temp sensor adjacent to the humidity sensor, and run the lead wires back to the wire harness. It is best to place both sensors in a location where they cannot be touched by the end user, and are not in the air discharge of the evaporator. 4. Check supply voltage before connecting to the controller/power board. 5. Do not expose to water or moisture: use the controller only Within the operating limits avoiding sudden temperature changes with high atmospheric humidity to prevent formation of condensation. 6. Warning: disconnect all electrical connections before any kind of maintenance 7. Ensure that the wires for probes leads and the power supply are separated and are not intertwined or crossed. 8. The microprocessor has been preprogrammed for 55F and 50% RH. To change either setting: XH10P Humidity Sensor E. Depress the up ^ and down v keys together for more than three seconds to unlock the keyboard F. Push the Temp or Humidity Set Key and immediately Release G. Use the up^ and down v keys to change the value H. Push the appropriate set key again, and wait 10 seconds I. Depress the up^ and down v keys to lock the keyboard. 18NB1 9. There is no reason to change any besides temperature or humidity set point depending upon the end users preference. 10. Alarm Signaling Message Cause Outputs P1 Thermostat probe failure compressor and heating outputs off (on dehumidification system only) P3 Humidity probe failure humidity regulation off HA High temp alarm outputs unchanged LA Low temperature alarm outputs unchanged HHA High humidity alarm outputs unchanged HLA Low humidity alarm outputs unchanged In the instance of any of these alarms, call Bacchus Tech Services, or your installation contractor Power to the Evaporator 1. Bring in 14-2 conductor wire with ground to the evaporator, and connect to the 14-2 with ground wire harness exiting the evaporator. Make sure the line has adequate amp rating for the circuit. 5

Charging the System 1. Evacuate and pressure test the system. This can be accomplished by charging with nitrogen to 75 lbs and checking your gauges for any sign of a leak. Evacuate the system to 500 microns. 2. Charge the system with R134A until the sight glass goes clear. Initial charge will be 6.3 pounds of 134A; the pumpdown capacity of the receiver. It is very important not to over charge this system. As soon as the bubbles in the sight glass disappear, discontinue charging. Over-charge will result in an ice block in the evaporator. 3. Adjust the TXV to 12-14 degree s of superheat. Take your suction pressure and temperature reading at the condenser, and add two pounds to it for the pressure drop. Take the difference between actual temperature and your reading from a PT chart to calculate. 4. System Start up. Before replacing stainless steel enclosure cover, power up the system to make sure water solenoid is opening correctly. The misting nozzle will be open. Remove power and replace the cover. Power up the evaporator, and let the system pull down. At temp set point the refrigerant solenoid will close and the system will pump down and shut off the condensing unit. 5. Check level of safety float. Breakers. We recommend a 30a fused disconnect. Maintenance and Troubleshooting Have your system checked each year by a certified refrigeration technician. He should: 1. Clean the indoor and outdoor coils 2. Change the water filter on the Humidification models, and change out the humidification mister head 3. Drain the Stainless steel sump (diagram #3), and clean it if necessary. 6

This will prevent any possible mold build up. 4. Check the operation of the condensate pump, and make sure the water misting fitting is acting properly, by allowing water to flow thru it. Clean with vinegar if clogged and change the water filter. 5. Check the electronic controller for any alarm conditions 6. Check the refrigerant level and system operating pressures. 7. Clean the water solenoid on a yearly basis, and change it out every two years. Warning: If the water solenoid sticks open, overflow can result. Troubleshooting Alarm conditions on the electronic controller, Call BCS Tech Services at 937-665-0424 Unit will not reach temperature Unit has shut off Call your installation contractor to Determine proper refrigerant charge. Dirty condenser? Call BSC tech services or field Service; could be bad Compressor, fans, controller or Pump Alarm Signaling Message Cause Outputs P1 Thermostat probe failure compressor and heating outputs off (on dehumidification system only) P3 Humidity probe failure humidity regulation off HA High temp alarm outputs unchanged LA Low temperature alarm outputs unchanged HHA High humidity alarm outputs unchanged HLA Low humidity alarm outputs unchanged In the instance of any of these alarms, call Bacchus Tech Services, or your local service contractor Dimensional /Electrical BCS1000 BCS1000 BCS1500 BCS1500 BCS2000 BCS3000 Cond. Unit Evap. Con. Unit Evaporator Con. Unit Con. Unit Dims. 17 D x 13.3 W 18 D x 29.25 W 19 D x 16.2 W 18 D x 29.25 W 19 D x 21 W 25 D x 20 W x 11.8 H x 6.5 H x 14 H x 6.5 H x 16.5 H x 16 H Weight 51 lbs. 49 lbs. 62 lbs. 51 lbs. 81 lbs. 135 lbs. Refrigerant 3/8 suc. 3/8 sw 3/8 suc 3/8 sw x 3/8 suc ½ suc Connection 1/4 dis. ¼ dis ½ sw 5/16 dis 3/8 dis Water Supply ¼ ¼ Connection compression compression Condensate ¼ mpt ¼ mpt Connection 7

Compressor 1/2 hp 115v.65 hp 115v 1 hp 115v 1 ½ Hp HP/voltage 208/230-1v Electrical compressor rla 10A 11A 8A 12.1A compressor lra 53A 51A 43A 49A cond. Unit MFS 20A 30A 15A 17.6A cond. Unit mca 13.4A 13.4A 11.3A 12.1A BTU capacity 40F 4857 6250 10200 (100 amb) 12,185 suc, 110 amb. Phone: 937-665-0424 Fax: 937-890-6664 8