Vacuum-ultraviolet Ozone Systems. Installation & Operation Manual. Model OZ-SPA

Similar documents
PZ2 Series Manual. PROZONE INTERNATIONAL, Inc. Ozone Water Purification Systems. INSTALLATION GUIDE and OPERATION MANUAL. Prozone PZ2 Series

Ozone Generator Systems

Ozone Generator Systems

PZ1, PZ3 & PZ6 Installation Guide

FOR THE RECORD. You should record the model and serial numbers, which can be found on the back of the unit, for future reference.

OZONE SYSTEM FOR IN-GROUND POOLS New and Existing

EcoMaster - Residential Pools up to 40,000 Gallons

OZONE SYSTEM FOR IN-GROUND POOLS UP TO 18,000 GALLONS

READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

Next Generation Corona Discharge Installation & Operation Manual

READ AND FOLLOW ALL INSTRUCTIONS SAVE THESE INSTRUCTIONS

IMPORTANT SAFETY INSTRUCTIONS EC-AG1-25 EC-AG1, EC-AG2 SAVE THESE INSTRUCTIONS.

EcoMaster - Residential Pools up to 40,000 Gallons

1, 2, & 4. Corona Discharge Ozone Generators INSTALLATION & OPERATION MANUAL. DEL Ozone SAN LUIS OBISPO, CA USA Fax:

Important Safety Instructions

A2Z Ozone, Inc. PRODUCT MANUAL

DEL AOP 25 INSTALLATION INSTRUCTIONS & PRODUCT MANUAL

Next Generation Corona Discharge Next Generation Corona Discharge Nueva generación Corona de descarga

BALLAST REPLACEMENT. Contents WARNING INSTALLATION MANUAL

Ultraviolet Systems UV-C 50 INSTALLATION INSTRUCTIONS & PRODUCT MANUAL

WINTERIZATION INDUSTRY BEST PRACTICE

WATER PURIFYING SYSTEM

Ozone + UV Sanitation

CONTENTS CONSIDERATIONS. General Plumbing Component Connection ILLUSTRATION. Control System CONFIGURATION. Voltage Verification CONNECTION

MCD. Corona Discharge Ozone Generators MANUFACTURED BY Bullock Lane San Luis Obispo, CA

Ozone plus UV Sanitation System Installation & Operations Manual

Clear Comfort Residential Pool & Spa Sanitization System Installation, Operations & Maintenance Manual

AllClear G2 Series Pressurized Filters Product Manual

SimplyClear Pressurized Filter Product Manual

OPERATORS MANUAL FOR Mi-T-M CORONA DISCHARGE OZONE GENERATORS

Next Generation Corona Discharge Auto Voltage Sensing Installation Manual

Cascade Premier and Elite Premier Bathing Systems with Aqua-Aire Installation / Assembly Instructions

1-866-PENNERS

OWNER S MANUAL. Vintage Signature Series models: AC750, AC1050, AC1100, AC1250, AC1500, AC1750. Proudly Made in the USA.

2 SPEED PUMP INSTRUCTION MANUAL READ THIS MANUAL CAREFULLY BEFORE USING YOUR 2 SPEED PUMP

Installation and Operation Manual. ACF-18 Automatic Chlorinating Feeder

TIDALWAVE I/G POOL PUMP INSTRUCTION MANUAL

JOHN DEERE GATOR HPX/XUV 2 PASSENGER HEATER INSTALLATION INSTRUCTIONS (p/n: 9PH20S30)

gamma pond Ultraviolet Sterilizers

OWNER S MANUAL. Models: AC110, AC125, AC150 made from 2003 through Proudly Made in the USA

Owner s Manual RD432-0 Chemical Controller

MAXI PUMP INSTRUCTION MANUAL NE6151B /NE6171B READ THIS MANUAL CAREFULLY BEFORE USING YOUR MAXI PUMP

OWNER S MANUAL. Vintage Classic HEAT COOL models. Proudly Made in the USA

Ozone plus UV Sanitation System Installation & Operations Manual

Owner s Manual. Installation, Operation and Maintenance SC-OZ, SC-OZ/2, S2Q-OZ, S2Q-OZ/2, S8Q-OZ, S8Q-OZ/2. Manufactured in Canada by:

INSTALLATION AND OPERATION MANUAL

Sundance Spas SPA EQUIPMENT SYSTEM. Installation Instructions. P/N Rev. A

OUTDOOR DISHWASHER INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Air Preparation System

M770 ph Controller Owner s Manual

HydroRite UVO 3. Troubleshooting Guide Residential. TSG-UVO158a. Copyright 2015 Hayward Industries Inc.

DRAFT INSTALLATION INSTRUCTIONS. Solid-State Series !! NOTE!! Covers the following models: Refer to INSERT for additional information

PolyMax H2-24 Dutch Bucket System

A2Z Ozone Inc. Clean Water and Pure Air for ALL around the world! Product Catalog 2014/15

PRECISION PRECISION. Installation and Operating Instructions FLOW. AUTOMATIC REGULATOR

SPA BLOWER OWNER'S MANUAL XXXX, XXXX, XXXX, XXXX, XXXX, XXXX fax

Closing procedures for above-ground pools

Genesis Whole House Chlorination System Page 2

Owner s Manual PRINTED IN CANADA 05/2009

INSTALLATION MANUAL. PP1 Ozone System Designed for use within pool skimmer

Mixing Degas Vessel (MDV) EC-1, EC-2, EC-4, Total Eclipse 2 or 4, and TrioPure-25 or TrioPure-50

INSTALLATION MANUAL. PP2 Ozone System (No Filter Cartridge) PP3 Ozone System (With Filter Cartridge) nspdevelopment.com

SB-175 Installation & Operation Manual

Installation Instructions PRO SERIES

HARMSCO INSTALLATION AND OPERATION MANUAL UPFLOW SWIMMING POOL CARTRIDGE FILTER CARTRIDGE CLEANING INSTRUCTIONS HARMSCO CARTRIDGES

SB-MAX Installation & Operation Manual

INSTALLATION INSTRUCTIONS FOR ACCESSORY COMBUSTION AIR INLET FILTER KIT FOR ULTRA HIGH EFFICIENCY WATER HEATERS (PART# ) KIT CONTENTS:

Operation Manual for Eco-Logic Pond & Lake Restoration System

Air Preparation System

UNIVERSAL AIR SERIES SYSTEM OPERATION MANUAL

DEMA SOLID PRODUCT LAUNDRY MASTER TM MODEL: 581L-1W and 581L-2W INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Professional Series. Chemical Feed System Model # US Patent No. 6,752,930 B2

M790 ph/orp Controller. Owner s Manual

register your product at a2zozone.com/pages/warranty SP Series Operating Manual

WL380 QUICK START GUIDE

Arch Feeder: Installation Manual

PolyMax H1-10 Dutch Bucket System

#300 & #302 CHLORINEIBROMINE FEEDERS

Installation Guide. Manufactured for Aero-Spa, LLC Web:

PARTS MANUAL. American Dish Service ADS LOW-WATER DISHWASHER MODELS: L3DW / L3DWC EFFECTIVE: MAY, 2008

Owner s Manual LIMITED WARRANTY INFORMATION OBTAINING WARRANTY SERVICE FURTHER LIMITATIONS AND EXCLUSIONS ARE AS FOLLOWS REGISTRATION

Detailed Cleaning Instructions

American Hydro Systems

Easy Dose Chemical Injection and Dispensing System DEMA Engineering Company

Two Tier Illumifalls Patio Pond

Manual update 2016 MC37/MFC3600

STOP. SAFETY INFORMATION Please read and understand this entire manual before attempting to assemble, operate or install the product.

IMPORTANT INSTRUCTIONS READ & SAVE

FLCH4R Garage and Utility Electric Heater

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

6000 AIR SERIES SYSTEM OPERATION MANUAL A-AZ Rev.0 5/07

Manual for MC37/MFC3600

Installation Electric Dryers Instructions 01

IMPORTANT WARNINGS IMPORTANT SAFETY INSTRUCTIONS

Heat Exchanger Block Replacement Instructions

OWNER S MANUAL. Models SCU-H11, SCU-H9, SCU-H7, SCU-H5, SCU-H3

Viking Installation Guide

Ozone Systems. Installation & Operation Manual CD15nx CD30nx. Corona Discharge Ozone Generators. ClearWater Tech, LLC. Integrated Ozone Systems

Transcription:

OzoneAX 3 T Vacuum-ultraviolet Ozone Systems Installation & Operation anual odel OZ-SPA

A. Important Safety Instructions IPORTANT SAFETY INSTRUCTIONS When using this electrical equipment, basic safety precautions should always be followed, including the following: READ AND FOLLOW ALL INSTRUCTIONS in this manual before attempting installation. A wire connector is provided on this unit to connect a minimum 12 AWG solid copper conductor between this unit and any metal equipment, metal enclosures of electrical equipment, metal water pipe, or conduit within five (5) feet (1.5m) of the unit. Follow all applicable electric codes. All permanent electrical connections should be performed by a qualified electrician. For cord and plug connected units: Risk of electric shock. Connect only to properly grounded, grounding type receptacle. For cord and plug connected units: Do not bury cord. For cord and plug connected units: Warning To reduce the risk of electric shock, replace damaged cord immediately. If electrically connecting this unit directly to pool controls, ensure the controls are protected by a (G.F.C.I.) Ground Fault Circuit Interrupter. Install at least five (5) feet from wall of pool water using nonmetallic plumbing. Install ozone generator no less than one (1) foot above the maximum water level to prevent water from contacting electrical equipment. Install in accordance with the installation instructions. ount the unit so that it is not accessible by anyone in the pool. Electric Shock Hazard. Disconnect unit from power source before attempting service. WARNING: Short term inhalation of high concentrations of ozone and long term inhalation of low concentrations of ozone can cause serious harmful physiological effects. Do not inhale ozone gas produced by this device. WARNING: UV Light is harmful to eyes and exposed skin. Do not look directly at the Ozone producing bulb used in this device. B. Identifying OzoneAX components OZ-SPA Power Box OZ-VIK Venturi Injection Kit Owners anual Warranty Card Indicator Light Output Connector 4 Piece olly Set with #10 Screws 2

C. Tools & aterials Required Bullet Level Hacksaw or Pipe Cutter PVC Cleaner/Primer Screwdrivers, Flat & Phillips Drill & Drill Bits PVC Cement Utility Knife Screws & Anchors D. Site Survey Power Source/ TimerBox OZ-SPA Unit Venturi Injector within 6 feet within 6 feet The OZ-SPA system is comprised of a power box and a venturi injection kit, which needs to be installed at the very end of the return line (after the filter, ionizer electrode chamber, heater, etc.). The ozone unit will need to be installed to a post or wall within six (6) feet of a 115 or 220VAC timer, electrical box or a 115V receptacle. This location will need to be within six (6) feet of location of the venturi injector. This location should be mounted at least one (1) foot above maximum water level and preferably out of direct sunlight. The ozone unit should be no closer than five (5) feet from a body of water. E. Installing the Power Box ount the OZ-SPA unit to a post or wall using the four mounting screw holes in the enclosure base. The unit may be mounted horizontally or vertically, however it is recommended that the vent holes not face upward and be directly exposed to rainfall. The location of the box must be within six (6) feet of the location of the venturi, which is plumbed on the return line. The unit should be mounted at least one (1) foot above maximum water level and preferably out of direct sunlight. The power box should also be located no closer than five (5) feet from a body of water. 3

F. Electrical Any electrical connections should be performed by a certified electrician in accordance with all electrical codes. OZ-SPA systems are universal voltage, meaning the unit will work on 115 or 230VAC without any internal switching. When locating the power source, make sure that when the pump and motor shuts off, the OZ-SPA will too. The ideal source is the timer box. If no timer box exists, the unit can use the pump motor as its power source. In other words, the electrical connection should be such that the OZ-SPA is supplied power only when the power is supplied to the pool filter/circulation pump. A permanent ground bonding connector is provided on this unit and should be used to connect a minimum 12 AWG solid copper wire conductor to any metal equipment, metal enclosures of electrical equipment, metal water pipe, or conduit within five (5) feet of the unit. G. Installing the Venturi Injector Power Source/ Pump Timer N N N Kynar check valve ¼ reinforced vinyl hose Venturi Injector ¾ mpt to ¾ barbed adapter ¾ ID vinyl tubing water flow water flow SPA Pump N = Nylon Hose Clamps = etal Hose Clamps Filter 2 slip x ¾ fpt x 2 slip tee Heater Using the above drawing, install the venturi injector kit (OZ-VIK) as seen on page 6 4 Continue on next page >>>

G. Installing the Venturi Injector (continued) OZ-VIK - Venturi Injection Kit O L I J H G K H N G. (1) azzei venturi injector H. (2) 2 slip x ¾ fpt x 2 slip tee I. (4) ¼ nylon hose clamps J. (4) 1 ¼ metal hose clamps K. (1) ¼ x ¼ Kynar check valve L. (1) 8' of ¾ ID vinyl tubing. (2) ¾ mpt to ¾ barbed adapter N. (9) ¼ x 14 long zip ties O. (1) 8' of ¼ reinforced vinyl hose AKE SURE THE WATER FLOWS IN THE DIRECTION OF THE ARROW ON THE VENTURI INJECTOR AND TO INSTALL IT IN THE CORRECT DIRECTION OF THE WATER FLOW. The installation of the Kynar check valve is a precautionary one we require during installation in case of the unlikely failure of the venturi that is built in the manifold. This would prevent water from entering the OzoneAX unit. To make sure this is properly installed, cut a few inches of the reinforced hose and insert one end on the outlet coming out of the OzoneAX unit. Install the check valve, then connect the other end of the remaining piece of hose to the check valve and then to the venturi injector which is located on the manifold. It is important that you install the Kynar check valve where air flow is allowed toward the injector. Air direction can be tested by blowing into the ¼ I.D. polybraid tubing. If correctly installed, you will see air bubbles enter the ¾ I.D. clear vinyl tubing. DO NOT SUCK ON THE ¼ I.D. TUBING WHEN CONNECTED TO THE OZONE SYSTE. After installation and turning on all the equipment, you will see a frothing (very tiny milk-like bubbles) action immediately after the venturi injector. This is located on the ¼ clear vinyl hose. These tiny bubbles should also appear at the nearest return line and possibly other return lines. This means ozone is getting injected into the pool s water. 5

H. Starting the System Once everything has been connected, turn on the power to the OZ-SPA unit. ake sure all the connections are complete and tight. After installation and turning on all the equipment, you will see a frothing (very tiny milk-like bubbles) action immediately after the venturi injector. This is located on the ¼ clear vinyl hose. These tiny bubbles should also appear at the nearest return line and possibly other return lines. This means ozone is getting injected into the pool s water. water flow water flow I. Balancing the Spas Water ¼ reinforced vinyl hose Venturi Injector ¾ ID vinyl tubing (this side should be showing very small bubbles) Frothing Effect (small bubbles) Spa Water Chemistry To achieve optimal performance from the OZ-SPA system, it is recommended the following be performed prior to initial start-up: BACKWASH or clean filter Test and adjust water chemical balance to recommendations in the chart below ph............................. 7.2-7.6 Total Alkalinity (TA)............... 80-120 ppm Calcium Hardness (CH)............ 150-350 ppm Total Dissolved Solids (TDS)........ 300-2000 ppm Copper Ion Levels................ 0.15-0.2 ppm J. Periodic Inspection The amazing thing you will notice about the OZ-SPA system is the clarity of the water, especially if you are using the ineralpure ionization system in conjunction with it. You might initially notice the water getting cloudy the first couple of days. DO NOT BE ALARED. THIS IS NORAL! You will want to clean or backwash your filter after the first week. Visual Inspection You will want to periodically inspect the power box in the evening to ensure the unit is functioned correctly. Turn the system on temporarily, if needed. The indicator light, located next to the output connector will glow a nice blue color. The ozone unit should only be on when the pump is running. To insure that the venturi injector and bypass are working correctly, simply observe to see if small bubbles are entering the pool and the frothing effect is taking place in the clear window of the venturi manifold window. Continue on next page >>> 6

K. Scheduled aintenance & Replacing the UV Bulb There is very little maintenance required with the OZ-SPA unit, however we do recommend you replace the ozone hoses and check valves once a year. Replace ozone hose once a year Order replacement part OZ-HOSEKIT from your dealer. This complete package includes 8 feet of hose, two check valves, 6 hose clamps, and 5 zip ties. Replacing the UV Bulb J. Periodic Inspection (continued) Periodically check the unit intake vent holes for the unlikely event of debris accumulation. It is important these vent holes are open for air to enter the ozone unit. Do not look directly into the vent holes when the UV bulb is operating. Plumbing Issues inor adjustment of the ball valve (when installing the manifold) may be required to divert water through the injector. This may be true with two speed or variable speed pumps. Older versions of these adjustable speed pumps do not adjust well and you will need to adjust the ball valve to accommodate flow through the venturi on low speed. There is an internal check valve in the venturi injector. In the unlikely event this area becomes clogged, it may be cleaned by removing the nut/barb and a retaining rubber seal. Care should be used not to lose the internal ball and spring while taking the rubber seal off. Clean and reinstall. Order replacement part OZ-10L Replacement Aqua Elite 10 bulb from your dealer. Replace the UV bulb after approximately 9,000 hours of use. This is approximately 12 years of running the ozone unit 2 hours a day, 365 days a year. We recommend the bulb gets changed at about 70% of its life for optimum performance, or the 9,000 hours. To determine the actual number of hours the ozone system has been running, simply calculate the number of days your spa is open a year by the number of hours per day the equipment is running. When the bulb does lose its power, you will notice the water getting cloudier quicker or having to use more chlorine than usual. You can also check the clear connector on the output tube of the power box. It should be a glowing blue in color if the bulb is on. Note: It is much easier to view this indicator feature in the evening hours when there is no bright sunlight. When replacing the UV bulb, we strongly recommend you remove the unit from the wall. This is to insure you carefully remove the delicate equipment from the metal enclosure properly, and seal back up tightly. etal plate with the bulb ballast attached to it Bottom of unit with bottom panel off Zip tie holding in bulb Cut zip tie holding in bulb Carefully remove bulb from metal bracket & white connector Carefully replace bulb in white connector and metal bracket Replacing the bulb in the OZ-SPA unit. 1. Disconnect power from the OZ-SPA unit. Coming into contact of the exposed ozone bulb can cause serious damage to your health. 2. Remove the six (6) screws on the bottom of the unit. Continue on next page >>> 7

K. Scheduled aintenance & Replacing the UV Bulb (continued) 3. Carefully pull off the bottom panel and slide out the metal plate with the UV bulb and ballast attached to it as far as it will go approximately 4 inches. There is a tether holding it in place so it will not completely disconnect from the ozone box. Be careful NOT to pull out any wires. 4. Cut the zip tie holding the bulb in the bulb clamp. Be careful NOT to break the bulb. 5. Carefully pull the bulb from the white connectors and the bulb clamp from holding them in place and remove. Be careful NOT to break the bulb. Dispose of bulb properly after removal. 6. Snap new bulb in place. Secure with the metal brackets. 7. Push metal plate back into its place inside the unit. There is no need to add another zip tie as this was used for shipping purposes. 8. Replace the bottom plate, making sure the gasket is seated in the groves properly. 9. Tighten the 6 screws back into place, securing the bottom plate tightly. 10. Reconnect power. ake sure the bulb indicator (the clear connector on the output tube of the power box) glows in a blue color. Again, you may want to check this in the evening hours out of direct sunlight. L. Warranty Information This unit comes with a 1-year warranty to be free from defects in material and workmanship under normal use from the date of purchase. See warranty card (blue card) included. OzoneAX 3 Vacuum-ultraviolet Ozone System T anufactured by Sustainable solutions for our future Designed, engineered & assembled in the USA. The Healthy Alternative to Chlorine Phone: 727-562-5186 Toll Free: 800-756-SWI (7946) ClearwaterPoolSystems.com 3/17