State Water Board s Post Construction Stormwater Calculator. Instructions for El Centro

Similar documents
12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

Stormwater Control Plan: Small (Tier 1) Land Development Project

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Green Infrastructure & Low Impact Development

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

J. Paul Guyer, P.E., R.A.

A P P E N D I X D. Project Stormwater Plan Worksheets

Standards Manual. RIDOT Workshop. Design Strategies: How to Meet Minimum Standard No. 1 July 13, 2011

Homeowners Guide to Stormwater BMP Maintenance

Rhode Island Stormwater Design and Installation Standards Manual

SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS

West Virginia Stormwater Management Manual: Methods.

Preparing a Stormwater Control Plan for a Small Land Development Project

Going Green with the NYS Stormwater Design Standards

Green Infrastructure and Low-Impact Development Technologies

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Appendix D - Technical Design Criteria for BMPs

DRAFT DESIGN CRITERIA STORMWATER TREATMENT STANDARDS CITY OF OVERLAND PARK

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

Small Project Guidance Document

NON-PRIORITY PROJECT WATER QUALITY PLAN (NPP)

Site design measures. Chapter. This Chapter explains how site design measures can reduce the size of your project s stormwater treatment measures.

POST- CONSTRUCTION STANDARDS PLAN

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

APPENDIX A. Proposed Guidance and LID checklists for UConn and Town of Mansfield

Huntington Stormwater Utility

Low Impact Development Site Design

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

New Tools/Resources for

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

West Norriton Township

Keep the Rain, not the runoff! Residential Best Management Practice (BMP) Incentive Program Criteria

Impervious Cover Reduction Action Plan for Hampton Township, Sussex County, New Jersey

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

Site Design Measures. Chapter

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey

Charles County, MD Low Impact Development (LID)/ Environmental Site Design (ESD) Ordinance & Design Manual

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey

SMALL PROJECTS SIMPLIFIED APPROACH

LOUISIANA STATE UNIVERSITY COMPREHENSIVE & STRATEGIC CAMPUS MASTER PLAN. APPENDIX G - Stormwater Study Findings & Stormwater Solutions

Introduction Post-Construction Stormwater Management Performance Requirements

Westside Stormwater Retrofits

LID Permit Requirements. Lisa Austin. Geosyntec Consultants

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey

CHAPTER 9 STORM DRAINAGE. Minimum Requirements for New Development and Redevelopment

Green Infrastructure Overview

ATTACHMENT A STORMWATER MANAGEMENT TECHNIQUES Cahill Associates Environmental Consultants

Community LID Workgroup Issue Paper #6

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

APPENDIX G: TOWN ORDINANCE REVIEW

STORM WATER CONTROL PLAN FOR A REGULATED PROJECT

Municipal Stormwater Management: Does Your Town Need More than the Minimum?

Structural Stormwater Best Management Practices

Introduction Post Construction Stormwater Management Performance Requirements

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey

Non-Residential&Multi-Family PropertyCreditManual

How to Update a Storm Water Management Program (SWMP) to Incorporate Total Maximum Daily Load (TMDL) BMPs

Appendix E: Illustrative Green Infrastructure Examples

Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater. Laura Prickett, EOA, Inc.

Attachment 2: Permeable Pavement Design Guidelines

Planning, Design, and Construction of Green Infrastructure.

HIGHLAND LAKES WATERSHED ORDINANCE WATER QUALITY MANAGEMENT TECHNICAL MANUAL

RESIDENTIAL STORM WATER PERMIT & CREDIT APPLICATION WORKSHEET AND CHECKLIST

Harvesting the Rain: Green Infrastructure for a Healthier Rahway River Watershed

ROOFTOP DISCONNECTION VERSION 1.5

State of Rhode Island Stormwater Management Guidance for Individual Single-Family Residential Lot Development

WATER QUALITY IMPACT ASSESSMENT (WQIA) FORM

Types and Basic Design of Post-Construction BMPs

2.1.4 Roof Downspout Rain Gardens

FFL Home Landscape Recognition Checklist

Draft. Impervious Cover Reduction Action Plan for Dunellen Borough, Middlesex County, New Jersey

Guide to Our Webcasts For Technical Support click the Help button

Zoning Regulation Amendments Adopted December 19, 2018 effective date January 7, 2019

Draft. Impervious Cover Reduction Action Plan for Fair Haven, Monmouth County, New Jersey

Sustainable Stormwater Retrofit Best Practices

STORMWATER GREEN INFRASTRUCTURE AND PLANNING/ZONING BOARDS

Landscape Design. earth-wise guide to. earth-wise guide to

Draft Impervious Cover Reduction Action Plan for Newark, Essex County, New Jersey Volume 2

Draft Rhode Island Stormwater Design and Installation Standards Manual

COMMUNITY DEVELOPMENT DEPARTMENT POLICY DRAINAGE FOR RESIDENTIAL PROJECTS WITH ONE OR TWO UNITS REVISED JANUARY 4, 2018

New Development Stormwater Guidelines

BMP Suitability Matrix

Contents. Adapted/abbreviated from GSWMM Coastal Stormwater Supplement, August

Low Impact Development. Charlene LeBleu Auburn University Landscape Architecture (334)

Appendix A.2 Simplified Approach to Stormwater Management for Small Projects - Handbook

Standard Specifications for Lot-Scale Measures for Small Projects

Selecting Appropriate Stormwater Control Measures for Your Development Project

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi

SEATTLE PUBLIC UTILITIES Drainage Design Options for street right of ways.

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2007 SESSION LAW SENATE BILL 1967

Homeowners Guide to Stormwater BMP Maintenance

Proposed Credit Program

Example Stormwater Control Plan For a Residential Subdivision Project. Whispering Pines Lane Anytown, USA

PLANNING & DEVELOPMENT SERVICES 1800 Continental Place Mount Vernon, WA Inspections Office Fax

Stormwater Prevention and Control

Introduction to Low Impact Development. Dr Kathy Chaston Coral & Coastal Management Specialist NOAA Office of Ocean & Coastal Resource Management

Urban Watershed Mentors

ORDINANCE APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. Appendix A

Transcription:

State Water Board s Post Construction Stormwater Calculator Instructions for El Centro Important: This workbook must be completed for each Drainage Management Area (DMA) in the project site. For example, if your project has four DMAs, you will need to complete this workbook four times. The following instructions are separated for each worksheet in the workbook. Volume Calculator. Applies to all project DMAs. The steps are labeled on the worksheet. Project Information. Include the project name, Waste Discharge Identification (WDID) if the project is subject to State Construction General Permit, the date, and the DMA. Please be sure that the DMA ID matches exactly with what is shown on the map. Step 1a) The 85th percentile storm event for El Centro is 0.41 inches. Step b) El Centro is located in Imperial County. Imperial should be selected. Step 1c) El Centro 2 SSW should be selected. Step 2) Please select the soil type at the project site (A, B, C, or D). This can be found using USDA NRCS maps or a site geotechnical investigation report. Step 3) Select the most appropriate option that describes the existing land at the project site that has not been developed. Many new development projects in El Centro will use natural desert for this selection. Redevelopment projects must take into account any agricultural land or landscaping onsite. Step 4) Select the most appropriate option that describes the proposed land at the project site that will not be developed. Projects that propose typical Southern California landscaping that requires irrigation (i.e. palm trees and lawns) for most of the pervious areas in the developed condition will select the option A mix of lawn, grass, pasture and tress covering more than 75% of the open space. Drought tolerant landscaping that requires less frequent irrigation can be considered A mix of lawn, grass, pasture and tress covering less than 50% of the open space. If the remaining pervious area in the proposed condition is to be kept as is (no soil amendments, non native plants, or irrigation), the selection Natural Desert Landscape is appropriate for most new development projects in El Centro.

Step 5) Enter the total project area. Step 6) Enter the DMA area for the DMA that is being analyzed. Step 7) Enter the impervious area in the existing and proposed conditions for the DMA (NOT the project area). Please separate rooftop areas from other impervious areas like streets, sidewalks, parking lots, courtyards, etc. within the DMA. Step 8) Do not fill this section out. It will be filled out automatically later on based on information in other sections. Step 9) Do not fill this section out. It will be filled out automatically later on based on information in other sections. Porous Pavement. Only applies if porous pavement is proposed in the DMA being analyzed (includes brick without grout, cobbles, reinforced grass pavement, porous gravel pavement, and poured porous concrete and asphalt pavement). Please enter the footprint of each type of porous pavement option in the proposed condition for the DMA being analyzed. Enter the values in the appropriate blue cells. The value of equivalent areas will be automatically generated. For brick without grout, cobbles, reinforced grass pavement, and porous gravel pavement, please note that if the base is less than 12 inches, it must be considered separately that if the base is 12 inches or more. For poured porous concrete and asphalt pavement, four different base depths are addressed separately. The pavement area must be addressed separately if the base is less than 4 inches, between 4 and 8 inches, between 8 and 12 inches, or 12 inches or more. Tree Planting. Only applies if existing trees are to be protected or new trees are to be planted on the DMA being analyzed. Enter the number of proposed trees in the DMA being analyzed. Differentiate between evergreen trees (i.e. palms, pines) and deciduous trees (i.e. Crape Myrtle). Enter the values in the appropriate blue cells. The value for area credit will be automatically generated. For each existing tree that is to be protected in place in the DMA being analyzed, measure and record the thickness (diameter) of the trunk of the tree 4.5 feet above the grounds surface.

Measure the tree canopy extent (the outermost leaves) and calculate the square feet under the canopy as accurately as possible. Enter the values into the appropriate cells. Provide a detailed explanation of how the trees will be maintained. Include information on who is responsible for maintenance, the irrigation demand, the type of irrigation system that will be in place in the proposed condition, and guidelines for pest control and vegetation management (pruning). Downspout Disconnection. Only applies if proposed downspout disconnections are in the DMA being analyzed. A downspout disconnection is when the downspout fully directs the rooftop runoff to a landscaped area to promote infiltration. Make a selection (Yes or No) for the four questions. Required information to answer these questions includes measurements at the downspout(s) in the DMA, a grading plan of the existing and/or proposed rooftop surface(s) in the DMA, and the runoff volume(s) from the downspout(s). If there is existing rooftop in the DMA being analyzed, enter the percentage of rooftop that drains to a disconnected downspout. Enter the value in the appropriate blue cell. If there is proposed rooftop in the DMA being analyzed, enter the percentage of rooftop that drains to a disconnected downspout. Enter the value in the appropriate blue cell. Impervious Area Disconnection. Only applies if all flow path lengths in the proposed condition in the DMA are less than 75 feet. Make a selection (Yes or No) for the three questions. A flow path of 75 feet or more can be intercepted by a French drain, bioretention area, gravel trench, or equivalent to break the flow path into multiple segments that are all less than 75 feet to meet this criterion. If this criterion is met, select Yes for the first question. If the impervious area in the DMA is less than 5,000 square feet, select Yes for the second question. Enter the percentage of the existing and proposed disconnected impervious area in the appropriate blue cells.

GreenRoofs. Only applies if the DMA being analyzed includes proposed green roofs. Make a selection (Yes or No) for the three questions. For the existing and proposed conditions, enter the percentage of rooftop in the DMA that is green roof. Enter the values in the appropriate blue cells. Stream Buffer. Only applies if the DMA being analyzed produces runoff that is to be conveyed to a flood prone area in the proposed condition and meets the criteria in the four questions. Make a selection (Yes or No) for the four questions. For the existing and proposed conditions, subtract the impervious are that has been addressed using the Downspout and/or Impervious Area Disconnection credits from the impervious surface area within the DMA that drains to a stream buffer. Add these values to the appropriate blue cells. Vegetated Swale. Only applies if the DMA being analyzed has proposed vegetated swales designed in accordance with Treatment Control BMP 30 (TC 30 Vegetated Swale) from the California Stormwater BMP Handbook, New Development and Redevelopment. Make a selection (Yes or No) for the two questions. For the existing and proposed conditions, subtract the impervious are that has been addressed using the Downspout and/or Impervious Area Disconnection credits from the impervious surface area within the DMA that drains to a vegetated swale. Add these values to the appropriate blue cells. Rain Barrels & Cisterns. Only applies if the DMA being analyzed includes a rain barrel or cistern in the proposed condition. Enter the total number of rain barrels/cisterns in the first blue cell. Enter the average capacity of the rain barrels/cisterns in the second blue cell. The third value (capacity) will be automatically generated. If there are two or more units that have very different capacities (it is hard to determine an average capacity), you can use this worksheet for each unit, and the sum the capacities to get the whole capacity for the DMA. The third value will be automatically generated.

Soil Quality. Applies to DMAs with proposed landscaping. The bulk densities of the soils used for landscaping within the DMA being analyzed must be known. Compare the bulk densities of the soils with the values provided in Table 1 on the worksheet. Make a selection (Yes or No) to the first question. Answer the second or third questions based on the available information for the landscaping soils in the DMA. Answer the fourth and fifth question. The credit volume should be automatically generated. Last step: Go back to the Volume Calculator worksheet. Ensure that the value for Project Related Volume Increase with Credits (cu ft) is 0. If it is not zero, additional measures must be implemented to reduce the post project runoff volume for the DMA. Readjust the necessary worksheets within the workbook and check the value again until it reaches 0. Once the value reads 0, the DMA satisfies the requirements.