Land Readjustment Projects

Similar documents
projects may be executed without being set forth as Category 1 Urban Redevelopment Projects in the Plan. The relationship between city plans and proje

Community Earthquake Risk Assessment(Combined Risk Ratings in Light of Emergency Response Difficulty

Landscape planning for a safe city

Plan for City Planning Areas) and on this basis provide for detailed individual city plans(see Section 1-1 of Chapter 3 at page 33). Master Plan for C

Urban Development for Inclusive Growth

Issues in Tama New Town, the largest new town in Japan

Handout Material. Invitation to Developers for Second Zone, Umekita Area

And More. Aviation Fire Services

1 5 t h I N T E R N A T I O N A L P L A N N I N G H I S T O R Y S O C I E T Y C O N F E R E N C E

Safe, Secure and Enjoyable KOSHIGAYA LAKE-TOWN. Location of the Project

Landscape Act. (Act No. 110 of June 18, 2004)

The Master Plan for City Planning Areas made by prefectures. This plan defines the future vision of the city from a long-term perspective and the path

Case Study of Integrated Housing and Railway Development (Kohoku New Town and Yokohama City Metro Development)

Transit and Land Use Integration in Tokyo Metropolitan Area

Central Government Road They are the roads planned to improve the central administrative district in Kasumigaseki, and 8 roads, with a length of appro

Urban Development in Tokyo

Urban Land Use Planning System in Japan

1. The EIA System in Japan

Urban D evelopment and Expressways in Tokyo

Lesson from Japanese TOD System

SMALL URBAN GREENERY: MAPPING AND VISUAL ANALYSIS IN KYŌJIMA-SANCHŌME

Masaki YOSHIDA. Assistant Director, Saitama Regional Branch. Urban Development Corporation. Saitama, Japan

7th International Conference on Operations Research July 17-23, 1975 Tokyo - Kyoto, Japan. Valeri Sokolov

2. Tokyo s Urban Growth, Urban Form and Sustainability

Use and Area Management of Railway Under-Viaduct Spaces and Underground Spaces near Stations

Commencement of the Makuhari Bay Towers Project (Tentative Name) Developing a Life Innovation Town with 10,000 Residents

TOD Project Practices in Japan

Integration of Transport and Land-use Planning in Japan: Relevant Findings from Europe

Field trip report. Field trip transport planning, , 2 ECTS, 2017S

CITY CLERK. Parkland Acquisition Strategic Directions Report (All Wards)

Copyright 2007 Bureau of Waterworks, Tokyo Metropolitan Government. All Rights Reserved 8-1 Nishi-Shinjuku 2-chome, Shinjuku-ku, Tokyo, Japan

Tohru Yoshikawa. 1. Introduction

Contribution of Railways for the Sustainable Urban Development in Japan

Unprecedented CBD sustainably built upon Public-Private Partnerships

Tohru Yoshikawa. 1. Introduction

Postdisaster Urban Recovery: 20 Years of Recovery of Kobe

Presentation of Financial Results for the Second Quarter of the Year Ending March 2017 PC DEPOT CORPORATION

Fire Service System in Japan

Profile Photonic Sensing Consortium for Safety and Security

Local Growth Planning in North Central Green Line Communities

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

City Planning based on Green Space Development in Major Asian Cities

Lifting of evacuation orders and subsequent efforts in Japan

FIRE DEPARTMENT FIRE CHIEF. Deputy Fire Chief Operations Section. Assistant Fire Chief Planning & Budget Section

Kashiwa-no-ha Smart City A New Vision for the Cities of Tomorrow

SCARBOROUGH SUBWAY EXTENSION. Scarborough Subway Extension. Final Terms of Reference

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

SOCIALIST REPUBLIC OF VIET NAM CONSTRUCTION. Independence - Freedom - Happiness

CITY OF TARPON SPRINGS DCA#11-1AR

Subcentres and Satellite Cities: Tokyo s 20th Century Experience of Planned Polycentrism

WATERFORD Plan of Preservation, Conservation and Development Supplement Part 1 - Policy Element

EIA process in Malaysia. Approaches and Strategies. Way Forward

CapitaLand in joint venture with Mitsubishi Estate for a new residential condominium in Tokyo, Japan

Edward R. Sajecki Commissioner of Planning and Building

Mill Woods Town Centre Proposed Rezoning LDA

NO: R035 COUNCIL DATE: FEBRUARY 24, 2014

Appendix A. Planning Processes. Introduction

8implementation. strategies

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

Request for Proposals

On the choice between the international and China spatial planning. system patterns

10 Principles for a Sustainable Development of Urban Waterfront Areas

ORIENTATION ANMC21 STUDY COURSE 3 ~ 7 FEBRUARY, 2014 IN TOKYO ON 3RS AND WASTE MANAGEMENT

South of Eastern Strategic Direction Status Update

5. Examples of Developing Parks and Green Spaces

Streets for People, Place-Making and Prosperity. #TOcompletestreets

III To Protect Citizens from Disasters

CITY OF LAKEWOOD 2012 THREE-MILE PLAN

150 Eighth Street Zoning By-law Amendment Application Preliminary Report

Report to/rapport au : Transportation Committee Comité des transports. November 26, novembre 2012

Risk Assessment of Cultural Heritages Using Local Hazard Maps and Risk Filters

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF JUNE 7, 2016

Figure 1- Site Plan Concept

Green Square Town Centre

Subject: City of Richfield Cedar Avenue Corridor Plan Comprehensive Plan Amendment, Review File No

Stafford County Strategic Plans

Growth Area Reviews Preliminary Directions for Midtown Oakville, the Uptown Core and Palermo Village

5th and Division. Crabill, Daren

Corporate Profile. Fujita Engineering Co., Ltd.

CHAPTER 12 IMPLEMENTATION

PILLAR FOUR INTEGRATE LAND USE & TRANSPORTATION

Land Use Amendment in Southwood (Ward 11) at and Elbow Drive SW, LOC

Downtown Dubuque...it s a great time.

ctbuh.org/papers Micro Urban Voids in Tokyo Title:

Route 110 Alternatives Analysis

... on the draft Arden Vision & Framework

A Study on the Characteristics of Planning within Analyzing of Exterior Space in Mixed-use Development 1

NATIONAL HALON MANAGEMENT STRATEGY

MIAMI 21 CODE MAY This document is amended as of May 26, 2011.

1 Outline of the plan

NORTH CLAYMONT AREA MASTER PLAN COMMUNITY WORKSHOP #1 FEBRUARY 3, 2016

TRANSIT ORIENTED DEVELOPMENT

Memorials, Plaques & Interpretive Signs Policy

Presented at the FIG Congress 2018, May 6-11, 2018 in Istanbul, Turkey

Research Project on the Urban Landscape in Shinjuku, Tokyo

PEOPLE S COMMITTEE OF HO CHI MINH CITY DEVELOPMENT STRATEGY FOR HO CHI MINH CITY S INFRASTRUCTURE

1.4 TRANSIT VISION 2040 FROM VISION TO ACTION THEME 1: PUTTING TRANSIT AT THE CENTRE OF COMMUNITIES. Fully integrate transit with community design

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

Appendix. Statement Outlining Compliance with Ministerial Guidelines

Edward R. Sajecki Commissioner of Planning and Building

Transcription:

Land Readjustment Projects Outline of Land Readjustment Projects Land readjustment projects are plane-oriented development projects to change the form or nature of land in order to improve public facilities (roads, parks, etc.) and to promote housing land use on land within city planning areas, in accordance with the Land Readjustment Act. Projects in this category are utilized as a typical method for urban development, which enables comprehensive development of public facilities and housing land, and town development corresponding to many purposes depending on local characteristics. The executors of land readjustment projects are as follows: individuals, land readjustment associations, land readjustment companies, prefectures and municipalities (local governments), the Minister of MLIT, the Urban Renaissance Agency and regional public housing corporations. Land readjustment projects by local governments, the Minister of MLIT, the Urban Renaissance Agency and regional public housing corporations shall be executed within the areas set forth in city plans in terms of the land readjustment projects because these projects are to be executed as city planning projects. On the other hand, land readjustment projects by individuals, and land readjustment associations and companies may be executed without city planning decisions except in cases where these projects are governmentally subsidized. In land readjustment projects, locations and areas of each housing lot are to be changed and relocated (i.e. replotted) in order to newly develop or expand public facilities such as roads and parks, and in this regard, the replotting plan will be designated, in principle, in a way that corresponds to the original location, area, environment and usage situation of the original housing lots (i.e. the principle of correspondence). Also, parts of individual building lots within the area may be reduced and consolidated as a contribution (land reduction) to creating land that is necessary for developing public facilities and reserved land that is to be sold to cover the project costs. The land reduction ratio differs depending on project purposes, local characteristics (e.g. levels of public facility development before and after the execution of projects) and promotion of the use of each building lot. After completion of relocation or construction of a building, the original registration are changed (i.e. new address and area) and in principle all the rights are transferred to the new land. In this regard, since land readjustment projects are closely related to area alteration, and to rights and lives of relevant people, the Land Readjustment Act therefore provides that the

project plan and the land replotting plan, except in the case of individual executors, be subject to public inspection for the period of two weeks in the process of their formulation, and that stakeholders may submit their written opinions. An illustration of land readjustment Implementation Status of Land Readjustment Projects Land readjustment projects in Tokyo have been utilized in order to respond to various purposes in many areas as a method of comprehensive town development, from recoveries from the Great Kanto earthquake and the Second World War to development of urban hub areas that form the cores of housing supply and regional development corresponding to the postwar rapid concentration of population into urban areas. As of the end of 2012, land readjustment projects have been completed in 593 areas (approximately 21,312 ha) and ongoing in 23 areas (approx. 520 ha) in the ward area and in 36 areas (approx. 1,055 ha) in the Tama area. TMG has acted as an executor in nine of the 23 areas in the ward area. In addition, TMG made city planning decisions on about 9,000 ha in the nine peripheral wards (Ota, Setagaya, Nakano, Suginami, Itabashi, Nerima, Adachi, Katsushika and Edogawa) as the area where land readjustment projects should be executed, along with the abolishment of the former scheme of green space in the late 1960s. Many of them,

however, remained untouched; there emerged a problem that urbanization proceeded without being followed by development of roads and parks. Thus, TMG formulated the Guidelines for Urban Development in s Where Land Readjustment Projects Should Be Executed in the Peripheral Wards in 2002, in which changes were made to the district-planning-based development in terms where the level of development meets certain standards. In the Tama area, there is currently no project area executed by TMG; projects in 21 out of 36 areas where projects are ongoing are all executed by municipalities, and those in 16 areas are outsourcing businesses to the Tokyo Urban Planning and Development Corporation. Before readjustment After readjustment Land readjustment project in Hamura Ozakudai area Current status of TMG s land readjustment projects Executor Whole Tokyo (ward and Tama areas) In operation Completed (Unit: ha) (As of March 31, 2013) Ward area Tama area In operation Completed In operation Completed Land Readjustment 8 26.4 47 217.6169 6 25.0 33 101.0 2 1.4 14 116.6 Individual Old City Act Planning 0 0.0 27 196.0 0 0.0 17 132.5 0 0.0 10 63.5 Subtotal 8 26.4 74 413.6 6 25.0 50 233.5 2 1.4 24 180.1 Land Readjustment 12 275.5 184 4,073.5 0 0.0 84 2,658.1 12 275.5 100 1,415.4 Old City Planning 0 0.0 131 5,767.2 0 0.0 121 5,321.8 0 0.0 10 445.4 Association War-damage reconstruction 0 0.0 6 158.5 0 0.0 6 158.5 0 0.0 0 0.0 Subtotal 12 275.5 321 9,999.2 0 0.0 211 8,138.4 12 275.5 110 1,860.8 TMG 9 410.6 19 1,435.3 9 410.6 11 785.0 0 0.0 8 650.3 Public body Municipalities 27 781.3 55 3,113.9 6 69.3 9 79.5 21 712.0 46 3,034.4 Subtotal 36 1,191.9 74 4,549.2 15 479.9 20 864.5 21 712.0 54 3,684.7 Land Readjustment 0 0.0 13 176.0 0 0.0 11 125.4 0 0.0 2 50.6 War-damage Administrati reconstruction 0 0.0 32 1,233.2 0 0.0 29 1,074.6 0 0.0 3 158.6 ve agency Earthquake disaster reconstruction 0 0.0 65 3,116.6 0 0.0 65 3,116.6 0 0.0 0 0.0 Subtotal 0 0.0 110 4,525.8 0 0.0 105 4,316.6 0 0.0 5 209.2 UR Agency 3 81.0 13 1,804.0 2 14.9 2 432.4 1 66.1 11 1,371.6 Public JKK Tokyo 0 0.0 1 19.8 0 0.0 0 0.0 0 0.0 1 19.8 corporations Subtotal 3 81.0 14 1,823.8 2 14.9 2 432.4 1 66.1 12 1,391.4 Total 59 1,574.8 593 21,311.6 23 519.8 388 13,985.4 36 1,055.0 205 7,326.2 Notes This table refers to projects under the old City Planning Act (those to which the

Readjustment of Arable Land Act was applied), those for war-damage reconstruction, and those for Earthquake disaster reconstruction, as well as those under the Land Readjustment Act. The distinction between projects in operation and those completed is based on public notices on land replotting disposition. The land readjustment projects executed by administrative agencies, which have been completed in Tama area, include the Oshima disaster reconstruction project (15.9 ha) The areas where projects have been completed by TMG include an area of 41.2 ha for the project for war-damage reconstruction (Tabata) that was taken over from the executing association. Land Readjustment Projects to Develop Large Vacated Sites Integrated development of the urban infrastructure is underway in the Shiodome district and the surrounding areas, centering around the former site of a Japan National Railways freight terminal, to advance mixed-use development with business, commercial, cultural, and residential facilities (project period: FY1994 through FY2015). Land Readjustment Projects in Redevelopment of Built-up s In the Mizue Station West, Shinozaki Station East, Rokucho, Hanahata North, and Tabata districts, the TMG will work to develop a quality living environment in the areas along the Toei Shinjuku Line and the Tsukuba Express Line.

Land Readjustment Projects in Tokyo s Waterfront In the Harumi 4-chome and 5-chome districts, as well as the Toyosu district and the Ariake-kita district, regional arterial roads linking central Tokyo to the waterfront sub-center area are being constructed and mixed-use development combining business, commercial, cultural, and residential facilities is underway.