LONGONI ENGINEERING SRL

Similar documents
Installation, Operation and Maintenance LOK-FLANGE Multitube Heat Exchangers

Installation, Operation and Maintenance Manual

Installation, Operation and Maintenance Instructions for Thermax Semi-Storage Calorifier

4 route 147, C.P.33 Coaticook, Qc J1A 2S8

SERVICE MANUAL. For Service & Parts please call APK THERMAL at or SAFETY INSTRUCTION

Instruction Manual. Pharma-line ESE02198-EN Original manual

BoilerSupplies.Com. America's Choice For Boiler Room Supplies. Installation, Operation, & Maintenance Instructions For Shell & Tube Heat Exchangers

OPERATION AND MONTAGE MANUAL ROOF FANS

Operation and Maintenance Manual Sondex All-Welded Heat Exchangers (SAW)

OPERATION AND MONTAGE MANUAL ROOF FANS

Installation, Operation and Maintenance Instructions for Electric Storage Calorifier

INFINITY FLUIDS CORPORATION

SHELL AND TUBE HEAT EXCHANGERS FOR INDUSTRIAL ONCE-THROUGH COOLING SYSTEMS AND THE OCCURRENCE OF LEAKAGE

CRU-S Series Stainless Steel Condensate Recovery Unit

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

Installation of Glass Lined Equipment

Inverted Bucket Steam Traps

Installation, Operation and Maintenance Guide. Steam Coil Installation, Operation and Maintenance. steam coils

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR MODEL RH REMOTE HORIZONTAL AIR COOLED HEAT EXCHANGERS

Instruction and Maintenance Manual. Spiral Heat Exchanger

Daikin Water Cooling, Heating, and High Capacity Booster Coils

INSTALLATION, OPERATING & MAINTENANCE INSTRUCTIONS FOR 350 SERIES CIRCULATION HEATERS

Handling or using the product improperly and in disregard of the instructions with this mark might result in serious bodily injury or death.

WATLOW IND. FIREBAR Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

CELDEK Evaporative Cooler Module Installation, Operation, and Maintenance Manual. CELDEK Evaporative Cooler

TITAN FLOW CONTROL, INC.

Heat Transfer. the new standard in. Heat Exchangers. Storage, Installation, Operation and Maintenance

! The Caution Symbol (exclamation point) alerts you to a "CAUTION", a safety or

Installation, Operation and Maintenance Manual for B&G U Series Heat Exchangers Removable Bundle Design BELL & GOSSETT.

WATLOW IND. WATROD Flange Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2.00

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

Standard and CELDEK Evaporative Cooler Modules Installation, Operation, and Maintenance Manual

Steam Trap BK 45 BK 45-U BK 45-LT BK 46

INSTALLATION, OPERATION AND MAINTENANCE MANUAL FOR COMMERCIAL INDIRECT POWERED WATER HEATER

WATLOW ELECTRIC MFG CO. FIREBAR Screw Plug Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 11/25/2013 Rev: 4.

MODULAR AUTOMATIC GRANULAR ICE FLAKER

ANLAGENBAU HEAT EXCHANGER w w w. a nla g enba u-b oehm er. d e Version 05/2015

WATLOW IND. WATROD Modular Duct Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date:6/11/2008 Rev: 2

WATLOW IND. WATROD Circulation Heater Installation & Maintenance Manual I&M NUMBER: Page: 1 Date: 6/11/2008 Rev: 2.00

ALLEGHENY BRADFORD CORPORATION

Installation and Maintenance Manual Forbes Marshall Tracer Line Trap FMMST63

Installation Operation Maintenance. Ductable water unit FWD FWD-SVX01D-E4

INSTALLATION AND MAINTENANCE INSTRUCTIONS. IM US March RediHeat. Table Of Contents. I. Installation RediHeat Start-Up Procedure 4

VS SERIES NH3 STEAM VAPORIZERS OPERATION MANUAL

Instruction Manual. 1. Introduction

Industrial Flanged Immersion Heaters

AUTOMATIC MODULAR ICE-CUBE MAKER

AUTOMATIC MODULAR ICE FLAKER

Operating Manual. Model: 1400 Model: 1400-N RIFOmat Float-Controlled Condensate Traps, PN Safety instructions. 2 General description and use

EBAC MODEL AD850 INDUSTRIAL DEHUMIDIFIER OWNER S MANUAL

Pressure Switches Precautions 1 Be sure to read this before handling.

To who it may concerns. I-Ravenna, March 11 th, 2016 HEAT EXCHANGER MAINTENANCE

Technical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT

Niles Steel Tank Hot Water Generator Installation and Operation Manual

User Manual GV25 GV35 GV702. Company information: Original instructions GV12066 (1)

MPA Modular Plenum Array Installation, Operation, and Maintenance Manual

HYDRAULIC OIL COOLER. Installation, Operation & Maintenance Guide

TYPE FSD KYOWA EXHAUST GAS SCRUBBER OPERATION MANUAL

CRU 200 and 500 Series Condensate Recovery Unit Installation and Maintenance Instructions

Nuova Saimar srl. Ravenna - Italy. Over twenty years experience in the Oil & Gas Field

AUTOMATIC MODULAR ICE-CUBE MAKER WITH VERTICAL EVAPORATOR SYSTEM

AXPR Wall Mounted Axial Panel Fans

Panel Fan Series Operators Manual (Galvanized and Polymer)

Quartzone. Infrared Quartz Tube & Metal Sheathed Electric Heaters. Owner s Manual. File E COMFORT HEATERS for INDOOR* and OUTDOOR** USE

FUN I / FUN U FUN I MCP / FUN U MCP FUN V / FUN V MCP

OPERATING AND MAINTENANCE MANUAL FOR BOILER WATER OR HIGH TEMPERATURE HOT WATER (HTHW) POWERED WATER HEATER

COOLING / HEATING COILS

Titanium Plate Heat Exchanger. Installation & Operating Manual

Installation, Operation and Maintenance Instructions for ThermaFlex Gasketed Plate Heat Exchangers

Series 1140 and 1141 Temperature Regulators

INSTALLATION AND MANINTENANCE INSTRUCTIONS

VADA - V80-H PRODUCT OVERVIEW CONSTRUCTION USAGE LIMITATIONS MOTOR WARRANTY

V80-H Multistage Pump Instruction Manual

This label warns for risk of electrical shock when failing to observe.

INSTALLATION, COMMISSIONING AND OPERATING MANUAL

IMPORTANT INSTRUCTIONS

AUTOMATIC ICE-CUBE MAKER - INSTRUCTIONS AND WARNINGS

Carry Out Maintenance Procedures

SuperKlean Washdown Products

SECTION 1D ENGINE COOLING

Installation Operation Maintenance

Installation, Operation and Maintenance Instructions Electric Flow Heater OM009

ISOLATED DIRECT DRIVE PLENUM FAN (IDDP)

VERTICAL GLANDLESS PUMP

GLEB Kitchen exhaust fan

Circulation heaters for ATEX/IECEx hazardous areas or in non-atex version

Thermostatic mixing valves with interchangeable cartridges

p Permanent magnet water cooled motors Additional manual

WINDOW YORK TECHNICAL GUIDE. Single package Cooling only and Heat pump. Models YO-YM R407C YO V6 G YO V7 G

K Tronic Series Installation and Start Up Checkout Procedure.

Daikin Direct Expansion (DX) Cooling Coils

IEC- Direct-driven radial fans with IEC-Standardmotor

T-Series Air Conditioner T15 Model

Climate Control System

T-Series Air Conditioner T53 Model

1 ESMA, Inc. P. O. BOX 734 * SOUTH HOLLAND, IL * (800) * FAX (708)

INSTALLATION & MAINTENANCE MANUAL FOR QuickDraw

ENERVEX VHX VORTEX HEAT RECOVERY CENTER

We are helping power generation facilities advance toward the future.

PANEL FAN SERIES OPERATORS MANUAL (Galvanized and Polymer)

Transcription:

INDEX 1.1 Classification of heat exchanger and components 1.1.2 Type of heat exchanger and components 1.2 Purpose and scope of the manual 1.3 General instruction 1.4 Warning installation 1.5 Notes for operations 1.6 Maintenance notes 2.1 Purpose and scope 2.2 General precautions 2.3 Additional information 3.1 Methods for removing and cleaning operate 3.2 Instruction forremoving heat exchanger 3.3 Instructions for cleaning heat exchanger 3.4 Notes for electrical beam In the following pages you will find all the information necessary for the proper use and proper maintenance of your heat exchanger 1-7

1.1 CLASSIFICATION OF HEAT EXCHANGERS AND COMPONENTS The following figure shows the nomenclature used to identify the main components of finned tube heat exchangers. 1.1.2 Type of heat exchangers and components 1 Finned tube 9 Wiring block 2 180 Curve 10 Fan Group 3 Flange In/Out Fluid 11 Lifting eyebolts 4 Shell 12 Saddle support 5 Primary collector 13 Fillet In/Out fluid 6 Secondary collector 14 7 Support tubes 15 8 Electrical resistance 16 2-7

1.2 PURPOSE AND SCOPE OF THE MANUAL This manual is designed as a support and guidance for staff use and maintenance of heat exchangers with finned tubes This manual should be read carefully before beginning installation of any heat exchanger in order to ensure proper implementation and better operation. Please note that In this manual are given general guidelines. Customer care will be the responsibility of implementing the instructions, taking into account: - the system in which the equipment will be installed - the specific process - The specific maintenance procedures 1.3 GENERAL INSTRUCTION So how come our products are to be assembled with other machines to form a group in a single plant whose commissioning is forbidden until the complete system has been declared in conformity with the rules established in the State in which the 'plant is in service. The performance efficiency of operation of heat transfer equipment, operating life and the absence of problems during the operation, depend in general on the following factors: - Adequate thermal design and mechanical - Adequate arrangements for installation, including plans for the supports and the piping connection - Method of operation - Accuracy of cleaning and maintenance Performance problems can be attributed to one or more of the following factors: - exchanger fouling - Operating conditions different from those of project - stagnation of air, gases or liquids - Wrong connection of pipes - Corrosion of internal components - Application of incorrect or faulty storage before installation. 1.4 WARNINGS INSTALLATION Upon receipt of the exchanger, check the integrity of same in order to verify that no damage occurred during transit, waiting for the installation to store the heat exchanger in an appropriate manner, preferably in a covered and heated area. If the heat exchanger remains stored for a period exceeding 30 days, you should take precautions to avoid oxidation, dirt and contamination by foreign bodies both internally and externally. Do not expose to the atmosphere the interior passages of the heat exchanger, as humidity and pollutants can penetrate into the heat exchanger and possible damage and / or failures. The battery operated electric fans and electric motors are more sensitive to moisture and liquids. 3-7

After a long period of storage in the warehouse, an inspection is needed before installation of the heat exchanger in order to verify its integrity. During the installation, set up in the heat exchanger in order to allow the connection of pipes without force. Before connecting the pipes, remove the protection of openings, carefully check all access openings to remove any debris. In order to allow the isolation of the heat exchanger in order to permit cleaning and maintenance, install the valves and by-pass on the pipes. In order to prevent and / or remove any trapped air or gas, both to cloak the side pipes, you should install air release valves. Connect the supply pipes, if not otherwise provided for special needs, so that the flow of two fluids appears to be upstream. - The flow of dry heat comes from the output side of the heating fluid inlet side and exit from the heating fluid - The flow of dry cool to come from the output side of the coolant and exits the input side of the coolant - If the fluid in the tubes can generate steam is recommended to connect it so that the flow goes from bottom to top - The steam coils the steam flow must always go from top to bottom regardless of airflow. - Achieving adequate support for mounting the heat exchanger to prevent sagging and deformations that may affect the mechanical efficiency of the heat exchanger. Fix the heat exchanger so that it has freedom of movement due to the lengthening of expansion. Install the appropriate control devices, control and related devices and / or security alarms for under or over temperature, over pressure, etc.. In the heat exchangers and steam condensation usually occur the perfect drainage of condensate. Exchangers heating with electric heaters, the first electrical connection, check that the power supply is compliant and that the type and cable size is adequate to operating temperature and current absorption. Place a circuit breaker on the power line. If there was the presence of electric fans, adequate space for the intake and expulsion of air, put the device in a position which can not be extracted from the fan, small objects, check that the direction of rotation is correct. Because of the high temperature at which they can work some heat exchangers are recommended in the insulation of the same in order to prevent accidental contact with hot surfaces. Connect the equipment to the ground. 4-7

1.5 NOTES FOR OPERATIONS Before the operation to ensure the cleanliness of the interior of the system to avoid clogging the pipes or the shell side. We recommend the use of settling tanks or filters installed on the supply pipes to remove debris. Open the vents before starting, begin gradually put into operation in accordance with the procedures of starting and stopping that will be specified later. Once the system completely filled with process fluids close the vents. All the bolts with the seal of the joints, should be further tightened once the heat exchanger has reached operating temperature to avoid any losses from the seals. Do not operate the heat exchanger at temperatures and pressures other than those listed on the nameplate or on the declaration of conformity. Do not use fluids other than those indicated, since the use of fluids other than those for which the equipment was designed and built could trigger corrosion or erosion that could affect the mechanical efficiency of the device. In heat exchangers that work in the condensation of hot fluids, to prevent water hammer, is starting down that the condensation must be drained completely by the heat exchangers. Avoid fluctuations in fluids in the exchangers, since these fluctuations could cause vibrations that could compromise the functionality of the device and the mechanical strength. At the time of the stop, drain all fluids, to avoid stagnation of fluids that may freeze in the cold or trigger corrosion. With heat exchanger with electric fan running, do not approach with objects or loose clothing which could be drawn from the same fan in the presence of a safety net. Use common sense and make any reference to procedures for commissioning of the plant where the device is inserted. 1.6 MAINTENANCE NOTES To keep in perfect condition and ensure the best operating conditions of a heat exchanger is a good idea to carry out maintenance and cleaning. Trip times vary depending on the type of fluid, impurities or deposits present, the operating temperature, the user will have to adjust according to our experience and based on a few easily identifiable parameters, the yield of heat exchanger, which decreases or the pressure drop of the fluid increases are symptoms that indicate that the heat exchanger needs cleaning. Increasing the thickness of the deposits also increases the difficulty of pulizia.la not cleaning the tubes, and the resulting scale deposits can cause a different heat output of the tubes, also adjacent, and this can lead to different thermal expansion between tubes with a possible consequent breaking. Never remove the flanges without first stopping the system, pressure device and completely removed without having emptied. For all maintenance and cleaning, use appropriate personal protective equipment based on the fluid contained in the heat exchanger and, if necessary ventilation. In case of removal of the heat exchanger at the time of replacement, consider replacing old gaskets with new gaskets, seals during assembly and are crushed and deformed during use tend to become brittle. E 'recommended the use of bolts and nuts to match the new specifications of existing ones. 5-7

2 PROCEDURE FOR STARTING AND STOPPING HEAT EXCHANGER 2.1 PURPOSE AND SCOPE These procedures reflect the operating procedures necessary for starting up and stopping of the finned tube heat exchangers. 2.2 GENERAL PRECAUTIONS All start-up and shutdown should be conducted, taking care to avoid exposing the heat exchanger and the system to the risk of: - sudden and uncontrolled thermal excursions - Day of sudden and uncontrolled pressure - Water hammer These conditions could exert stress on the heat exchanger, fittings or plant that could compromise the mechanical strength and thus cause serious damage. 2.3 ADDITIONAL INFORMATION In all operations starting and stopping the flow of fluids should be adjusted so as to avoid sudden changes in temperature of the heat exchanger. You should not use ON-OFF valves but modular valves. You can start before the hot fluid and then the cold but avoiding the cold fluid in contact with hot surfaces tends to evaporate. 3.1 METHODS FOR REMOVAL AND CLEANING OPERATIVE Dismantling and cleaning of heat exchangers is a simple task to be performed by qualified personnel using appropriate personal protective equipment and apply appropriate protection systems also based on the fluid in the heat exchanger. 3.2 INSTRUCTIONS FOR REMOVING HEAT EXCHANGER These operations must be performed by qualified personnel equipped with the personal protective equipment and safely, you must use appropriate tools and lifting equipment are adequate to carry the weight of the heat exchanger. It 'a good idea to have before dismantling any parts to replace (gaskets, bolts, nuts, cables...). Intervene with individual protective measures and another based on the fluid Before carrying out any operation, check that: - The system is stationary - That the valves feeding and discharge are closed - Whether the unit is empty - That the surfaces are cool 6-7

- What the fans are not working - That there is no voltage - Do not handle the 'unit with hooks or other tools that could damage the tubes or finned surfaces - Balance the weight during handling - Do not bend the tubes 3.3 INSTRUCTIONS FOR CLEANING HEAT EXCHANGER The statements herein may be adopted for cleaning the shell side to tube side of heat exchangers. The soft deposits, depending on the type, can be removed with hot water, air, detergents, taking care of specific use according to the manufacturer's specifications, use only products which do not affect the material used to build the heat exchanger. Do not use cleaning fluids, electrical appliances. Where the action of detergents is not sufficient for the removal of scale, may be adopted mechanical cleaning methods. In the case of mechanical cleaning, avoid: - Tap the tubes with metal objects that could damage - Make uncontrolled maneuvers - Do not damage the surface of the heat exchanger Always use your common sense. 3.4 NOTES FOR ELECTRICAL BEAM The deposit residue on the tubes can affect the operation of the same as reducing the thermal resistance and may overheat and burn. Before carrying out any operation it is recommended to remove the power supply and disconnect the electrical wires. Avoid wetting the head of the resistance in order to avoid possible short circuits to the reintegration of the voltage. 7-7