NOTICE TO ALL FIRMS. Bid RFI Questions and Answers

Similar documents
CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505)

Arlington Public Schools Purchasing Office

Memphis Housing Authority High Rise Fire Alarm Upgrades. Questions from Contractors (Through Addendum #2) Communications Systems, Inc.

Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017

PROJECT NO. CWA SEPTEMBER 24, 2014 ADDENDUM NO. 6 BESSEMER RECREATION & WELLNESS CENTER

DONALD H. BERG, ARCHITECT

HMC ARCHITECTS 2495 Natomas Park Drive, Studio 100 Sacramento, California ADDENDUM NO. 3

Florida Department of Transportation 1000 NW 111 th Avenue, Room 6203 Miami, Florida

Air Handler Unit (AHU) Equipment Purchase and Delivery Invitation to Bid

BID INFORMATION LIST Crossroads East N. Scottsdale Road, #105 Scottsdale, AZ Rev

Subject: Addendum #3 IFB No CNG Gas Detection Repair and Maintenance

STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY)

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU FIRE ALARM / ELECTRICAL FIRE PLAN REVIEW CHECKLIST

Tenant Heat Pump Bulletin Temperature Controls Buildings A1, C1, and H1

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan

FIRE AND SAFETY PROJECT REVIEW REPORT

ARCHITECT S PRE-BID ADDENDUM

FIRE ALARM: BY OTHERS, IF REQUIRED.

AMENDMENT NO.: III INVITATION FOR BID NO.: GPA FOR

Pinky Lewis Recreation Centre Interior Renovations in the City of Hamilton

BULLETIN. Temperature Controls (Chilled Water) Phase III only (3/11/2010)

ADDENDUM 1. Southeast High School Auditorium & Gymnasium HVAC Improvements

ADDENDUM NO. 2 COOK LIBRARY BATHROOM RENOVATIONS PROJECT NUMBER TU-1874-SBR

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

BULLETIN. Temperature Controls (10/2013)

FIRE ALARM: BY OTHERS, IF REQUIRED.

CLEVELAND HEIGHTS UNIVERSITY HEIGHTS CITY SCHOOL DISTRICT MONTICELLO & ROXBORO MIDDLE SCHOOLS INTERIOR DESIGN

Library stacks and records storage 150 LB/SF live load

Title: Fire Sprinkler System Permit Requirements

Exhibit J. Subcontract Agreement No.

McMAHON FP200 OUTAGAMIE COUNTY ADMINISTRATION CENTER S. WALNUT & W. 8TH, APPLETON, WI ALTERATION / ADDITION

9 E. Scarborough Park Concession Stand and Restroom And / Or Lake Kirby Park Softball Fields Restroom Addition

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

SECTION WET PIPE FIRE PROTECTION SPRINKLER SYSTEM

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

Cherokee Nation

DESIGN & CONSTRUCTION GUIDELINES

SPACE TYPE: JUDICIAL CHAMBER

ADDENDUM NO. 1. for. MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140. Marquette, Michigan.

Full Service Central Station Fire Alarm Listing Evaluation

Montgomery County Government Building and Codes Department 350 Pageant Lane, Suite 309 Clarksville, TN 37040

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

CONSTRUCTION DOCUMENTS U OF U BUILDING 72 REMODEL FOR EAE GSBS PROJECT NO

DOCUMENT T CAWTHRA SHELTER RENOVATIONS, 2500 CAWTHRA ROAD, CITY OF MISSISSAUGA, PROJECT E ADDENDUM 2

1. Delete BID FORM in its entirety and replace with the BID FORM attached to this Addendum.

Commercial Rules and Regulations

MEDIA CENTER September 30, 2010

Commercial Remodel/ Add On Rules and Regulations

BULLETIN. Temperature Controls (Chilled / Hot Water)

Brighton Area Fire Authority

ESTIMATE SET-UP PACKAGE BID SCHEDULE ENTRY AND MAINTENANCE

Electronic Safety and Security

A. Shop Drawing submittals shall include, but not be limited to, the following:

CLARIFICATION, QUESTIONS AND RESPONSES Clarification

A. Product Data: Include rated capacities, furnished specialties and accessories.

The following information shall become and form part of the contract documents.

TAB C-6 KEYLESS ACCESS AND SECURITY SYSTEM GUIDELINE

Community Development Department Commercial Permit Application

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

CCDC EXPANSION PROJECT

Advanced Fire Alarm Systems Training Program Outline (5 Day)

SANTA CLARA COUNTY Winchester Blvd., Los Gatos, CA (408) (408) (fax)

FIRE & LIFE SAFTEY STANDARD

Additions & Alterations to Ascension Parish Library Galvez Prairieville, Louisiana Project No. 1401

THE DESIGN FIRM ADDENDUM #1 PINE GROVE BAPTIST FELLOWSHIP HALL RENOVATION 759 PINE GROVE RD. HARVEST, AL MAY 10, 2017

September 25, Re: Solicitation # Interpretive Exhibit Fabrication and Installation for the Pinelands Visitor Center.

PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

FIRE SPRINKLER SYSTEMS POLICY

Sidney, Ohio 1204 FORMAL ISSUANCE OF CERTIFICATE OF SUBSTANTIAL COMPLETION... ON OR BEFORE JULY 30, 2015.

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

Requirements for the protection of High-Piled Combustible Storage (HPCS) Effective Date: January 2011

TECHNICAL CRITERIA THE PLACE TO SHOP SCOTTSDALE FASHION SQUARE

Building & Safety PERMIT APPLICATION

SANTA FE COUNTY IFB# PW/KE CONSTRUCTION FOR THE SANTA FE MOUNTAIN CENTER KITCHENETTE AND OFFICE SPACE ADDENDUM #2

Town of Cicero Local Code Amendments

Element D Services Electrical

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

DeCA DESIGN CRITERIA HANDBOOK PRODUCT REFRIGERATION SYSTEM

TOM BURNS, PLANNING DIRECTOR

CITY OF PORTSMOUTH Department of Public Works MUNICIPAL COMPLEX FIRE ALARM. Bid # Addendum #1

FIRE SPRINKLER SYSTEMS POLICY

Subcontract Agreement No.

ADDENDUM No. 3 BID NO TRANSMISSION WAREHOUSE OFFICE REMODEL

1.1 Refer to Section for General Mechanical Requirements. 1.3 Refer to Section for Pipe and Equipment Identification Requirements.

ADDENDUM NO. 1 BID-CONTRACT DOCUMENTS FOR. RFP No Professional Design Services for CCC Le-Jao Student Resource Center

Related Sections: TBD. Effective Date: January 1, 2016

SECTION LIGHTING

SECTION : MEPS IDENTIFICATION & LABELING

Plot # R019A ± 74' ± 74' ± 65' Plot # R019A LEASE OUTLINE DRAWING GROSS LEASABLE AREA ± 4,631 S.F. DEMISING FRONT WIDTH DEPTH ± 13' ± 32' Lease Line

Electrical Design Guidelines Table of Contents

White Street Area Sewer Separation, Project ID Date Issued: June 8, 2015

HOLUM EDUCATION CENTER. Architectural. January 13, 2014 DeForest Area School District

CHATHAM AREA TRANSIT AUTHORITY IFB , ADDENDUM NO.2

AREA LIGHTING TABLE OF CONTENTS PUD SERVICE TERRITORY & CONTACTS FOR YOUR PROPERTY OVERHEAD FEED UNDERGROUND FEED. Electrical Service Requirements

900 N. Via Piemonte Ontario, CA

Tualatin Valley Fire & Rescue Finance Department SW 70 th Ave., Tigard, OR Phone: , Fax:

MLA Architects Pierz Public Schools ISD #484 Healy High School Multi-Purpose & Choir Additions Pioneer Elementary School Class Room Addition Pierz, MN

Item No. Description 1. BID PROPOSAL FORM Make the following revisions: a. Replace the BID PROPOSAL FORM with the attached BID PROPOSAL FORM.

Newport City Council Bettws High School Fire Fighting Performance Specification CONTRACT C1

Transcription:

Purchasing Department 227 West 27 th Street New York, NY 10001 Purchasing Dept. Tel. 212-217-3630 Purchasing Dept. Fax 212-217-3631 Purchasing@fitnyc.edu NOTICE TO ALL FIRMS Date: March 8, 2018 To: From: All Prospective Bidders Walter Winter Director for Purchasing Re: Addendum Number 1 IFB # C1340 MFA Fashion Design Tenant Improvements Bid RFI Questions and Answers Bid RFI 001 Question(s): 1. Who are the building BMS and FA vendors? Please provide contact info 2. Are we furnishing and installing cabling and devices for AV, Security and Tel/Data 3. All emergency lighting fixtures are shown to be connected to an inverter circuit. Is the inverter new or existing? If it is new, please provide specifications. 4. Who is furnishing and installing ceiling mounted reels? If it is part of GC scope, please provide manufacturer and model numbers 5. Is there a new time clock in the project? There is symbol marked as TC in mechanical room #409. Is it a time clock? 6. How are the conduits on the floor to be mounted? Surface or in the floor trenched? Bid RFI 001 Response: 1. There is no BMS System in the Building. FA Vendor is: Christopher Cummaro ARLINGTON LLC 307 West 38th Street. Suite 907 New York, NY 10018 Office : (212) 947.1010 Fax: (212) 947-1133 Cell: (917) 418-4152 Email: Chris@arlingtonnyc.com 2. No. To be provided by Owner s vendors. GC is responsible to coordinate and schedule work of Owner s vendors. 3. New lighting inverter. MYERS POWER PRODUCTS EM-2-1-EM-2-S-BA2008-2YW 4. GC scope to furnish and install, electrical show ceiling mounted QUAD for cord reel + task lighting. cord reel model is CRA-B515-T16G-3 10 Amp rated by KH Industries.

5. No time clock. 6. Surface mounted (between the legs of tables). Bid RFI 002 Question(s): 1. Who is responsible for AV work? 2. Who is responsible for Tele/Data wiring and equipment? Bid RFI 001 Response: 1. Owner vendor is responsible for AV equipment. 2. Owner vendor is responsible for Tele/Data wiring and equipment. Bid RFI 003 Question(s): 1. Are we going to need substrate for acoustical cement plaster ceilings? 2. Where are metal ceiling located on the plans? Bid RFI 003 Response: 1. Yes, see Specification for description. See sheet A-124.00 RCP 4 th Floor Owner/Bid Add 1 dated 03/08/2018 for clarification. 2

Bid Addendum 1 Description Architectural 1. A-104.00 a. Added Radiator Covers b. Provide better definition of Wire Shelf scope c. Moved Operable Partition back in pocket 2. A-124.00 Clarified scope of Metal Ceiling Panel by revising hatch pattern 3. A-204.00 a. Added Radiator Covers 4. A-205.00 a. Providing better definition of Wire Shelf scope 5. A-402.00 a. Moved Operable Partition back in pocket 6. A-500.00 a. Moved Operable Partition back in pocket 7. A-502.00 a. Added Radiator Covers 8. Updated Specification TOC 9. Updated 055000 Metal Fabrications Specification added Radiator Covers 10. Updated 099900 Finish Color Schedule added color for ceiling 3

Mechanical 1. Changed steam coils to electric duct heaters. a. M-001.00 Revised control sequence and heater schedule for electric duct heaters. b. M-104.00 Deleted steam coils and steam condensate pumps. Added electric duct heaters. c. M-500.00 Deleted steam coil details. d. Added specification 238216.14 ELECTRIC-RESISTANCE AIR COILS. Electrical 11. E-001.00 a. Added vacancy sensor symbol. 12. E-100.00 a. Provide dual circuits for all track lighting. b. Change occupancy sensor to vacancy sensor for open areas. c. C12 task lighting to be fed by quad receptacle. (reflected on power plan) 13. E-101.00 a. Added drawing, lighting control plan for lighting system zoning clarification 14. E-200.00 a. Quad receptacle for cord reel and C12 task lighting in 1 st and 2 nd year studio b. New panel location for LPB. c. Relocated existing panel in space and re-name LP-4. Re-locate and extend branch circuits currently fed by this panel. d. Added Electric duct heat for AHU-1 and AHU-2. e. Revise location for heat press f. Perimeter quad receptacle changed to duplex. g. Changed receptacle type from quad to duplex for AV. 4

h. Circuiting have been revised for this drawing due to the removal of panel LPC from scope and clarification. i. Add note to make sure conduits for AV, Telecom, Security are captured (this scope previously shown on low voltage drawings) 15. E-500.00 a. Revised panel schedule to reflect updated circuiting. b. Revised one-line diagram a. Relocated existing panel in space and re-name LP-4. Re-locate and extend branch circuits currently fed by this panel. b. Removed LPC from scope. c. New electrical feed from building to feed LPA and LPB. (scope requiring coordination with building.) 16. E-600.00 a. Revised lighting scheme to match E-101.00 17. E-700.00 a. Provide current limiters for all track lighting Fire Alarm 18. FA-300.00 a. Moved 2 strobe devices. 19. FA-500.00 a. FA clarification on riser. b. Added building maintenance contractor information. 5

Fire Protection 1. F-001.00 a. Note 3.A. was updated to reflect information from existing sprinkler shop drawings. b. Detail number 8 was deleted because Riser diagram on drawing F-800.00 was created. c. Detail number 3 was deleted because duct work in areas with exposed ceilings do not exceed 4 feet wide. 2. F-004.00 a. Demolished sprinkler legend was added. b. Location of existing sprinklers were added to the drawing. 3. F-104.00 a. Two sprinklers by column lines 5 and E were deleted because duct work reduced size to less than 4 feet. Duct work is no longer an obstruction. b. Two sprinklers by column lines 5 and B were deleted because duct work reduced size to less than 4 feet. Duct work is no longer an obstruction. c. Two sprinklers by column lines 4 and F were aligned with adjacent sprinklers for aesthetic reasons. d. One sprinkler by column lines 4 and B was aligned with adjacent sprinklers for aesthetic reasons. e. One upright sprinkler by column lines 2 and F was changed from an upright to a concealed sprinkler. f. One upright sprinkler by column lines 2 and F was deleted from the concealed space located above the suspended ceiling. 6

g. Two upright sprinklers by column lines 3 and A were deleted from the concealed space located above the suspended ceiling. 4. F-800.00 a. Riser diagram was expanded to include the entire building. THIS ADDENDUM IS PART OF THE CONTRACT DOCUMENT AND SHALL BE INCLUDED WITH YOUR REQUEST FOR PROPOSAL SUBMITTAL. YOUR SIGNATURE BELOW WARRANTS THAT YOU UNDERSTAND THIS ADDENDUM AND THAT YOU HAVE MADE THE APPRORIATE ADJUSTMENTS IN YOUR PROPOSAL AND CALCULATIONS. Signature Print Name and Title of Authorized Representative Print Name of Company/Partnership/Individual Date 7