Re-Engineering Votey Hall:

Similar documents
UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

Computing Services Center

Submitted to. Texas A&M University at Commerce The Texas A&M University System. Submitted by. Guanghua Wei Craig Campbell David Claridge Dan Turner

Challenges and Methods of Estimating a Conceptual HVAC Design

FINAL REPORT INFRASTRUCTURE MASTER PLAN UPDATE. Harper College. Palatine, Illinois

Submitted to. Texas A&M University-Corpus Christi The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

9/18/2017. Nicholas Thornton, CEM. Systems: HVAC, Electrical, and Technology. Overview. Today s Goals Introductions HVAC Electrical Technology Q&A

Sustainability Best Practices for HVAC Retrofits. Cal Poly State University, San Luis Obispo. Presented to the UC/CSU/CCC Sustainability Conference

Advantage Services Capabilities

Auburn University Basketball Arena:

ASHRAE Illinois Chapter 2015 Excellence in Engineering Awards

NYC Department of Education

5 Year Capital Improvement Plan Update

MID MICHIGAN COMMUNITY COLLEGE HARRISON CAMPUS Harrison, Michigan 2015 MASTER PLAN

NORTH CENTRAL MICHIGAN COLLEGE PETOSKEY CAMPUS. Facilities Conditions Assessment Mechanical And Electrical Petoskey, Michigan

Description of All Alternatives Considered-

THE COMMITTEE ON BUILDINGS AND GROUNDS SHALL CONSIDER AND MAKE RECOMMENDATIONS ON ALL MATTERS RELATING TO THE BUILDINGS AND GROUNDS OF THE COLLEGE,

4. OVERVIEW OF MECHANICAL SYSTEM

Loudoun County Public Schools Continuity of Operations Plan (COOP) Facilities Assessment Study Related to Critical Systems

Attachment F. Campus Capital Needs Sales Surtax Funded Detail Report

Song Deng, P.E. Assistant Director Energy Systems Laboratory Texas A&M University College Station, TX

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

Daikin Blueprint: Delivering Hot Water with a Chiller

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx

DDC POINT LIST. 004 Harry Griffith Hall. RFP #PW17-2 Exhibit J Page 1 of 9 AHU 1 BOILER BOX DUAL DUCT MIXING. Building: HUMBOLDT STATE UNIVERSITY

MASTER PLAN KICK-OFF Open House #1A, April 28, 2015

DIVISION 15 MECHANICAL

Civil Engineering Building

Continuous Commissioning: A Valuable Partner to Retrofit Projects

Andrea Borowski The Pennsylvania State University University Park, PA November 11, 2002 Consultant: Dr. Bahnfleth Technical Assignment M-3

Preparing the Next Generation of Building Technicians

Element Z General Design Requirements Existing Facilities Information

Trane Performance Climate Changer Air Handlers. An air handler for every need.

Ball State Architecture ENVIRONMENTAL SYSTEMS 2 Grondzik 1. Contextual Reminder

Design Presentation. Chief Operations Officer Willie Burroughs

Worried aboutthe air quality in your schools?

CHAPTER 4. HVAC DELIVERY SYSTEMS

High Efficiency Heating and Cooling Systems for Community Colleges Kirk Mescher, PE, LEED AP Principal ICCCFO

HVAC - Central System Thermal Storage

Selection of air conditioning systems

SEQUENCE OF OPERATION GUIDELINE. AIR TERMINAL UNITS SINGLE DUCT VARIABLE AIR VOLUME with HOT WATER REHEAT or ELECTRIC HEAT

MECHANICAL INFRASTRUCTURE ASSESSMENT FOR VICTOR VALLEY COLLEGE

Trane Performance Climate Changer Air Handlers. An air handler for every need.

GARCIA GALUSKA DESOUSA Consulting Engineers

Job Name Control Systems Description Date

Heating Efficiency Program COLORADO

The M & V Guided Recommissioning Process. Energy & Water Conservation Program. September 2015 MOO

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

NYC Department of Education

NASSAU COMMUNITY COLLEGE. Garden City, New York Capital Committee Meeting January 12, :00 PM

Element Z General Design Requirements Existing Facilities Information

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

F.W. Olin Physical Science Laboratory

Contact Information. Steven Potratz, P.E. WSU Facilities Services, Engineering Services Manager Phone

West Hartford Public School District

High Efficiency Dehumidification System (HEDS)

EADQUARTERS. Technical Report One. Stephanie Kunkel Mechanical Option

CARRIER edesign SUITE NEWS. Modeling 100% OA Constant Volume Air Systems. Volume 6, Issue 1. Page 1 Modeling 100% OA Constant Volume Air Systems

DACC Health Sciences Building Air Handler Assessment/Study

Operating Performance

Technical Assignment 3

NYC Department of Education

PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY

VariCool VAV. (Variable Air Volume) 9 to 70 tons Variable Air Volume Water-Cooled and Chilled Water. Unique Solutions for All-Indoor HVAC Projects

Teesside University upgrades its emergency lighting system with Hochiki Europe

Excellence USA. HANSA Air Handling Units. HANSA Air Handling Units. References. Quality of air means quality of life

HVAC Efficiency In Healthcare. Presenter Mr. Nate Lincoln

MEP CONDITION ASSESSMENT

Implementation of the Laboratory Air Handling Unit Systems (LAHU)

NYC Department of Education

Urbana Free Library HVAC Analysis. Prepared for the Urbana Free Library. Prepared by Paul Boland, P.E., and Nathan Alderman, E.I.T.

b.) Technical Information:

BES-TECH TECHNOLOGY & SYSTEM INTEGRATION

Brown University Revised June 29, 2012 Facilities Design & Construction Standards SECTION ELECTRICAL DESIGN CRITERIA

System Components with ` Emphasis on Packaged Rooftop Application and Installation. Jerry Cohen President Jacco & Assoc.

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

B. Use UT Austin specifications and equipment schedule format for HVAC equipment where available.

Cook - Wissahickon Elementary School

THIS IS A DESIGN GUIDE NOT A SPECIFICATION. Montgomery County Public Schools Facilities Guide DIVISION 15 MECHANICAL

Heating and Comfort Policy. Reviewed April 2014

implementation r expression in landscape

DMTF: Specific Building Recommendations

Safety & Security update April 2014

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

NYC Department of Education

Wold Architects and Engineers. 332 Minnesota Street Suite W2000 Saint Paul, MN

Master Facility Planning Update School Board Meeting May 26, 2016

FRUCHTMAN & ASSOCIATES

Best Humidifier Guide. Nortec s Guide to the Best in Humidification. Humidification and Evaporative Cooling

MINUTES JOINT MEETING FINANCE/AUDIT AND CONSTRUCTION COMMITTEES UNIVERSITY OF SOUTHERN INDIANA BOARD OF TRUSTEES. July 6, 2006

Michigan State University Barrier-Free/Accessibility Project Status Summary March 2017

AIR HANDLING SYSTEM RETRO-COMMISSIONING TRENDING ANALYSIS

NYC Department of Education

NEW FEATURES IN THE CARRIER HOURLY ANALYSIS PROGRAM v4.80

Transcription:

Re-Engineering : Investment of Deferred Maintenance $$ into an aged Engineering Building by: Lynn Wood Retro-Commissioning Engineer Physical Plant Department

New Construction: STEM $104M Central Campus Residence Hall $70M Bailey Howe Bridge Kalkin- Ifshin Hall $11M Billings $8.5M Deferred Maintenance: 1962 to 2017 $5M

Importance of Deferred Maintenance $$: Deferred maintenance Deferred maintenance is the practice of postponing maintenance activities such as repairs on both real property (i.e. infrastructure) and personal property (i.e. machinery) in order to save costs, meet budget funding levels, or realign available budget monies. The failure to perform needed repairs could lead to asset deterioration and ultimately asset impairment. 50% of Buildings that are over 50 years old 214 out of 243 Buildings are over 30 years old Mechanical and Electrical Equipment typically has a 15-20 year life cycle Roofs last 20-30 years Warranty for 20 years Code and Safety require upgrades Technology is constantly changing Utility costs continue to increase so it is important to upgrade to more efficient energy users Older equipment is expensive to maintain

Deferred Maintenance: Approximately $5 M in Deferred Maintenance Boilers for Fleming Museum Roof Life Safety Systems Electrical Switchgear Main Electrical Distribution Generator Telecom Infrastructure Replacement AHU-1 Dual Duct Dual Duct VAV Boxes Controls

Collaborative Effort: FD&C Responsible for Overall Project Costs $10M for Renovations of Labs part of the STEM Initiative Boilers for Fleming Museum PPD Ray Doner and team Fire Alarm and Electrical Improvements strongly advised by Mike Enos AHU-1 Dual Duct & Dual Duct VAV Boxes Davis Zone Contributions Controls Dedicated team from FD&C and PPD for Design Review Construction Team

Construction Schedule: Jan - May 21 3pm-11pm shift for rough-in and electrical May 21 - DeEnergized Votey, Building Vacated for construction August 1 - Energized Votey! August 15 - Certificate of Occupancy!! ~3 months to complete $10M in Deferred Maintenance and Renovations

Deferred Maintenance: Approximately $5 M in Deferred Maintenance Boilers for Fleming Museum Life Safety Systems Electrical Switchgear Main Electrical Distribution Telecom Infrastructure Replacement Generator AHU-1 Dual Duct Dual Duct VAV Boxes Controls

Boiler Replacement: 2 new Boilers for Fleming Museum located in Votey Provides redundancy with Central Plant for reheat and dehumidification houses Vermont's most comprehensive collection of art and anthropological artifacts. It presents innovative exhibitions of contemporary and historic art from around the world

Deferred Maintenance: Approximately $5 M in Deferred Maintenance Boilers for Fleming Life Safety Systems Electrical Switchgear Main Electrical Distribution Telecom Infrastructure Replacement Generator AHU-1 Dual Duct Dual Duct VAV Boxes Controls

Life Safety Systems: Code compliance with new sprinkler system Fire Alarm System, Device and Wiring Upgrade

Deferred Maintenance: Approximately $5 M in Deferred Maintenance Boilers for Fleming Life Safety Systems Electrical Switchgear Main Electrical Distribution Generator Telecom Infrastructure Replacement AHU-1 Dual Duct Dual Duct VAV Boxes Controls

Electrical Switchgear, Main Electrical Distribution, Generator: Before the Electrical Upgrade there was no safe PPE to wear to work on electrical equipment

Deferred Maintenance: Approximately $5 M in Deferred Maintenance Boilers for Fleming Life Safety Systems Electrical Switchgear Main Electrical Distribution Generator Telecom Infrastructure Replacement AHU-1 Dual Duct Dual Duct VAV Boxes Controls

Telecom: Total removal of existing network infrastructure rebuilt Pulled over 200,000 feet of new network cable

Deferred Maintenance: Approximately $5 M in Deferred Maintenance Boilers for Fleming Life Safety Systems Electrical Switchgear Main Electrical Distribution Generator Telecom Infrastructure Replacement AHU-1 Dual Duct Dual Duct VAV Boxes Controls

Dual Duct AHU-1 New Chilled Water and Steam Coils

Dual Duct AHU-1 New Motors, Electrical Feeds, Sheaves, Bearings

Dual Duct AHU-1 Epoxy Coating on Floors and condensate pans

Dual Duct AHU-1 New Dampers and Filter Banks

Controls: And some works of art left for historic purposes the old pneumatic panel that we decided to keep for its value as an artifact at least in CEMS eyes :)

Controls: Upgraded to a new control panel for Dual Duct AHU-1, including over 30 Dual Duct VAV boxes, EF-1 thru 8 VFD interface

Soils Lab 123

Hydraulics Lab 101

Shop 122

Shop 122

Materials Teaching Lab 248

Biomedical Engineering Teaching Lab 225

Entrance First Floor

Bridge to STEM: Votey is now connected to STEMour latest addition to College of Engineering Math and Science (CEMS) providing impressive experiences for our learners. The University 's largest-ever capital project will bring a state-of-the-art STEM (science, technology, engineering and mathematics) complex of laboratories, classrooms and research facilities to campus and prepare our students for careers in rewarding, high-growth fields.

And that is how our Engineering Building was Re-Engineered

REMEMBERING SPECIAL TIMES AT COOK: Sometimes there just isn t enough Deferred Maintenance $$ s to bring a building back THE END