Similar documents
A. Base Bid: 1. Heating Contractor provide: a. Control sequences for HVAC systems, subsystems, and equipment.

CHAPTER 4. HVAC DELIVERY SYSTEMS

SECTION SEQUENCE OF OPERATION FOR HVAC CONTROLS PART 1 GENERAL

Job Name Control Systems Description Date

RE: Phase 2 Improvements DATE: July 1, 2016 New Administration Building Wernle Youth & Family Treatment Center 2000 Wernle Road Richmond, Indiana

UNIVERSITY OF MISSOURI Heating Ventilating and Air-Conditioning (HVAC) 2016 Q1

HVAC Controls Upgrades: Requirement Details ( )

Florida Department of Transportation

ASHRAE JOURNAL ON REHEAT

Computing Services Center

Case Study: Furman University Charles H. Townes Center for Science. Michael K. Mantai, PE, CCP President System WorCx

1080 Marina Village Parkway, Suite 501 Alameda, CA (510) Fax (510) HVAC DESIGN INTENT

H3/V3 Series Horizontal and Vertical Indoor Air Handling Units. Engineering Catalog

1. When using the COMcheck software, the compliance report submitted by the permit holder shall indicate that the applicable code is.

HVAC 101. The Basics of Heating, Ventilation and Air Conditioning

November 11, City of Sparks 215 S. 21 st St. Sparks, NV

Engineering Guide VAV Diffusers. Please refer to the Price Engineer s HVAC Handbook for more information on VAV Diffusers.

HVAC Controls Upgrades: Requirement Details ( )

SECTION SEQUENCE OF OPERATIONS FOR BUILDING CONTROLS

BULLETIN. Temperature Controls (VAV) (3/11/2010)

Madeira City Schools Madeira, Ohio. HVAC Assessment. December 2011 (Revised February 2012)

SECTION FUNCTIONAL PERFORMANCE TESTING (FPT) PROCEDURES - CONSTRUCTION MANAGER EDITION

Single Zone System. One duct system Used mostly in small buildings Forced air system All spaces controlled by a single thermostat Single air return

UNIFIED FACILITIES GUIDE SPECIFICATIONS

BULLETIN. Temperature Controls (Chilled Water) Phase III only (3/11/2010)

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

Chilled Water DOAS Fan Powered Terminal Units

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 11/11/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

PURCHASING DEPARTMENT LOUISVILLE, KENTUCKY

AIR-CONDITIONING SYSTEMS AND APPLICATIONS. Abdullah Nuhait Ph D. King Saud University

BULLETIN. Temperature Controls (Chilled / Hot Water)

HAP e-help. Modeling Induction Beams in HAP v4.8 QB TIP 001

FLORIDA A&M UNIVERSITY PERFORMANCE CONTRACT SCOPE OF WORK

SECTION HVAC TABLE OF CONTENTS PART 1 - SYSTEM DESCRIPTION / OUTLINE SPECIFICATIONS FILED SUB BID PROJECT OVERVIEW...

4. OVERVIEW OF MECHANICAL SYSTEM

Raised Access Floor - (AE Breadth Area)

"This is only the scope of work for the project. For more information, interested parties should contact Procurement at

control sequences model QST / EST Series Table 47: QST / EST Analog Electronic Control Strategies Fan Powered Air Terminals

Retrocommissioning Findings Summary: Building X #1 Priority: Major Comfort/Control Problems

Technical Assignment 3 11/15/04. Executive Summary

Civil Engineering Building

Tighe&Bond. Groton Heights School Mechanical Evaluation. 1 Existing Conditions. 1.1 Water Service Entrance

Displacement Ventilation

BULLETIN. Temperature Controls (10/2013)

Application Guide siemens.com/thermostats

Virginia Tech Standards for Building Automation System

HVAC Mandatory Provisions Part II, Page 1

Air Conditioning Clinic

HVAC DISTRIBUTION and DELIVERY SYSTEMS

Field Application of Advanced Residential Air Conditioning Systems

Product Data. Features/Benefits. 33CS Carrier Comfort System Variable Volume and Temperature (VVT )

Automatic Temperature Controls, Energy Management Systems and Metering

Mechanical System Redesign. Dedicated Outdoor Air System. Design Criteria

1.1 DESCRIPTION A. The purpose of this section is to specify Division 23 responsibilities in the commissioning (Cx) process.

Vapor-Compression Refrigeration

State College Area School District High School South Building EXISTING CONDITIONS ASSESSMENT

********************************************************************************************************** SYSTEMS REQUIREMENTS HVAC TEMPLATE 02/18

Technical Development Program COMMERCIAL HVAC SYSTEMS. Water Source Heat Pump Systems PRESENTED BY: Ray Chow. Sales Engineer

Improving Performance with a Building Tune-Up. Janice Peterson, P.E. LEED AP Market Manager, Building Operations BetterBricks

Division 26 ELECTRICAL TABLE OF CONTENTS

Updated: September 12, 2018 DIVISION INTEGRATED AUTOMATION. INTEGRATED AUTOMATION Page 1 of INTEGRATED AUTOMATION

Manual Supplement. Model Number: 8680-N2. Communications Protocol. Contents of this manual supplement include:

Additions & Alterations to Ascension Parish Library Galvez Prairieville, Louisiana Project No. 1401

GARCIA GALUSKA DESOUSA Consulting Engineers

Appendix 13. Categories of Cooling and Heating systems

System Components with ` Emphasis on Packaged Rooftop Application and Installation. Jerry Cohen President Jacco & Assoc.

State of the art building simulation software... Frenger Radiant chilled beam performance at 1 Shelly St - Sydney

Challenges and Methods of Estimating a Conceptual HVAC Design

DACC Health Sciences Building Air Handler Assessment/Study

SECTION TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

buildingscience.com Windows and Occupant Comfort EEBA Building Solutions 2003 Lincolnshire, IL

SECTION SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

Radiant Exchange in Stratified Environments: Considerations and Challenges for Hourly Energy Simulation of UFAD, DV, and Radiant Cooling Systems

ADDENDUM No: 3 JOSEPHINE COUNTY BUILDING OPERATIONS DEPARTMENT. February 29, NO CHANGE: March 8, 2012 / NOT LATER THAN 2:00 PM

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

Architectural Engineering Senior Thesis Mechanical System Redesign

INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O 4/19/2012

MHNCCX DX with Hot Water Heat Ceiling Concealed 4-Pipe Heat / Cool Fan Coil 12,000-36,000 BTUH

Guide Spec Summary. Option List. Date: 05/21/2001. EarthWise VAV Terminal Units Full Spec. Prepared by: Phone Number: Prepared for:

Gas-Fired Indoor and Outdoor Duct Furnaces

Linear Floor Heaters

Electric Coils. Blower Coils. Product Information

Application Data Part Numbers: 33ZCVVTZC-01, 33ZCBC-01, 33ZCVAVTRM, 33ZCFANTRM

HVAC REPAIR/REPLACEMENT 07/18/12 SECTION HVAC - MAJOR EQUIPMENT

FAST AND ROBUST BUILDING SIMULATION SOFTWARE. Chilled Beam Performance: 1 Shelly Street, Sydney

Intelligent Heating for Your Home

Commercial Heating Products. Our products do more in a wide range of applications. Expect More.

AHU Air Handling Unit Fundamentals. j.ilangumaran

SECTION PLUMBING/HVAC FINAL TESTING, ADJUSTING AND BALANCING

CARRIER edesign SUITE NEWS. Interpreting High (Low) Peak Design Airflow Sizing Results for HVAC. Equipment Selection.

APPLICATION GUIDE BEAMS

INSTALLATION INSTRUCTIONS FOR 9330F4552 FREE DELIVERY PLENUM KITS

Submitted to. Texas A&M University at Galveston The Texas A&M University System. Submitted by. Yeqiao Zhu Dan Turner David Claridge

The Art of Building Science

Operation & Maintenance Manual

PACKAGED ROOFTOP UNITS, AIR-SOURCE HEAT PUMPS, WATER-SOURCE / GEOTHERMAL HEAT PUMPS, & OUTDOOR AIR HANDLING UNTS. RQ Series.

7. MECHANICAL SYSTEM DESIGN

Mission Critical. Series 6, 8 & 9. vertical floor mount Ton Units. Air Conditioning Systems

COMcheck Software Version Mechanical Compliance Certificate

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

Transcription:

General Notes. See V sheets for scope of work details on thermostats, terminal units, air handling units and exhaust fans. Abbreviations: T.C.C. = Temperature Controls Contractor, M.C. = Mechanical Contractor. All work to be in electrical metallic tubing (EMT) in mechanical rooms, plenum rated cable above accessible ceilings for Class II circuits per all applicable state, local and federal codes including but not limited to NEC.. M.C.C. shall be the prime contractor and shall assume the responsibility to prevent service outages during construction through coordination with subcontractors and the Owner. 5. Blank plates shall be installed to cover variance in opening left by existing thermostat as comparted to the new thermostat X KEYED NOTES:. M.C. to replace existing finned tube radiation thermostatic control valve assembly with new electric actuated control valve assembly. T.C.C. shall tie valve to nearest VAV controller. This is Bid Alternate. M.C. to cut and cap unit heater pneumatic air lines as required. T.C.C. to provide new DDC current switch and enable/disable relay, wiring to controller specified in V... M.C. to demo radiant heat system existing wet differential pressure switch and existing three way control valve assembly and provide new three three way control valve assembly. T.C.C. to provide start/ stop relay, current switch, supply and return temperature sensors, wiring to controller specified in V..

General Notes. See H sheets for scope of work details on finned tube radiation valves, hot and chilled water system components, unit heaters and heat pumps.. Abbreviations: T.C.C. = Temperature Controls Contractor, M.C. = Mechanical Contractor. All work to be in electrical metallic tubing (EMT) in mechanical rooms, plenum rated cable above accessible ceilings for Class II circuits per all applicable state, local and federal codes including but not limited to NEC.. M.C.C. shall be the prime contractor and shall assume the responsibility to prevent service outages during construction through coordination with subcontractors and the Owner. 5. Blank plates shall be installed to cover variance in opening left by existing thermostat as comparted to the new thermostat.. Test and Balance scope X. Test and balance required at each air flow at each VAV, use original air flow schedule, adjust flow as required to satisfy load. Grilles and diffusers not included in test and balance work. Re-sheaving is not part of this scope of work. Intent of this project is to have a neutral to slightly positive building at the conclusion of the project KEYED NOTES:. T.C.C. to replace existing pneumatic VAV unit controls with new DDC VAV controller with integral actuator and discharge air temp sensor. Connect tubing to air flow sensor from controller. Extend bus communications and power to each DDC controller. M.C. to replace existing pneumatic reheat control valve actuator with electric control valve actuator and cut and cap pneumatic air lines at each VAV.. M.C. to cut and cap pneumatic air lines as required and remove existing thermostat. T.C.C. to provide new DDC thermostat in same location and wire to controller specified in V. (if unspecified wire to nearest DDC controller).. T.C.C to provide DDC start/stop relay and current switch for exhaust fan and wire to controller specified in V.. M.C. to cut and cap pneumatic air lines as required.. T.C.C. to replace existing pneumatic fan powered box controls with new DDC VAV controller with integral actuator, discharge air temp sensor, and relays as required. Connect tubing to air flow sensor from controller. Extend bus communications and power to each DDC controller. M.C. to replace existing pneumatic reheat control valve actuator with electric control valve actuator and cut and cap pneumatic air lines at each VAV. 5. Provide ceiling mounted occupancy sensor as required. Wire to controller specified in V.. Install relays as required. 6. M.C. to cut and cap pneumatic air lines as required and remove existing thermostat and humidistat. T.C.C. to provide a DDC thermostat in the same location and a wall mounted CO sensor. Wire both devices to controllers specified in V.. 5 6 6 5

General Notes. See H sheets for scope of work details on finned tube radiation valves, hot and chilled water system components, unit heaters and heat pumps.. Abbreviations: T.C.C. = Temperature Controls Contractor, M.C. = Mechanical Contractor.. All work to be in electrical metallic tubing (EMT) in mechanical rooms, plenum rated cable above accessible ceilings for Class II circuits per all applicable state, local and federal codes including but not limited to NEC.. M.C.C. shall be the prime contractor and shall assume the responsibility to prevent service outages during construction through coordination with subcontractors and the Owner. 5. Blank plates shall be installed to cover variance in opening left by existing thermostat as comparted to the new thermostat X Test and Balance scope. Test and balance required at each air flow at each VAV, use original air flow schedule, adjust flow as required to satisfy load. Grilles and diffusers not included in test and balance work. Re-sheaving is not part of this scope of work. Intent of this project is to have a neutral to slightly positive building at the conclusion of the project KEYED NOTES:. T.C.C. to replace existing pneumatic VAV unit controls with new DDC VAV controller with integral actuator and discharge air temp sensor. Connect tubing to air flow sensor from controller. Extend bus communications and power to each DDC controller. M.C. to replace existing pneumatic reheat control valve actuator with electric control valve actuator and cut and cap pneumatic air lines at each VAV.. M.C. to cut and cap pneumatic air lines as required and remove existing thermostat. T.C.C. to provide new DDC thermostat in same location and wire to nearest DDC controller.. T.C.C to provide DDC start/stop relay and current switch for exhaust fan and wire to controller specified in V. (if unspecified wire to nearest DDC controller). M.C. to cut and cap pneumatic air lines as required.. T.C.C. to replace existing pneumatic fan powered box controls with new DDC VAV controller with integral actuator, discharge air temp sensor, and relays as required. Connect tubing to air flow sensor from controller. Extend bus communications and power to each DDC controller. M.C. to replace existing pneumatic reheat control valve actuator with electric control valve actuator and cut and cap pneumatic air lines at each VAV.