Standard Operating Manual. Ultra Fab Wet Station C Oxide/ Nitride Etch Station

Similar documents
Standard Operating Manual. PEL Wet Station X Clean Organic Solvent Station

Standard Operating Manual. Ultra Fab Wet Station F Non-standard Processing Station

Standard Operating Manual. Semitool Spin Rinser Dryer SRD

Standard Operating Manual

Standard Operating Manual

Amerimade RCA Wet Bench SOP Page 1 of 13 Rev /22/2014

R I T Title: RCA Bench #2

Title: Nitride and Silicon Wet Etch Semiconductor & Microsystems Fabrication Laboratory Revision: I Rev Date: 01/20/2010

Wet Bench Standard Operating Procedures

R I T Title: Manual Processing Bench #2 Semiconductor & Microsystems Fabrication Laboratory Revision: C Rev Date: 08/05/2008

Polypro Acid Wet Bench UCLA Nanolab Yellow Room. Primary contacts: Max Ho, Wilson Lin. PREPARED BY: Steve Franz DATE Rev 2/01/12

Operation Procedure for SMiF Wet Hoods (Solvent, Spin Coat, Acid, and Develop Hoods)

General Acids/Bases Bench Right and Left SOP

Emergency Response Cart Guide

The University of Washington Nanofabrication Facility (WNF) at Fluke Hall 125 Fluke Hall Seattle, WA 98195

Standard Operating Manual

Revised: January 8, Goal: Deposit, expose, and develop standard positive photoresist films as an etch mask, liftoff mask, or sacrificial layer.

Experiment #6 Photolithography: Microprocessing Technology Fabrication of the microstructures with SPR photoresist

Liftoff/Strip Solvent Bench SOP

Application: Response procedures for major and minor spills, including: organic solvents acids bases dry chemicals mercury hydrofluoric acid

Standard Operating Manual

GENERAL WET BENCH SAFETY AND USES SOP. October 2013 GENERAL SAFETY RULES

Haz Waste Management

Emergency Response Procedures

The safety refresher are mandatory for ALL users Cleanroom access and instrument usage will be denied for users who:

NMOS Fabrication Process Description

LABORATORY SAFETY. Discipline of Metallurgy Engineering and Materials Science Indian Institute of Technology (IIT) Indore DECLARATION

Standard Operating Procedure: Spinner

OPERATION MANUAL Model 800 Nanoimprint Controller

CNS Cleanroom Safety Orientation Form

General Procedures: Materials Synthesis Lab 1358 CNAM/Toll

Operation of SemiTool Spin Rinser Dryers

ROTOR COATING WET BENCH OPERATING PROCEDURE

Application Data Sheet

MIT Emergency Response Guide

CORPORATE PROFILE CONTENTS History and Highlights 2-3. Key Products and Services 4. Key Personnel 5

VIDEO CONTROLS LIMITED

Rules for Safe Operation

The Cameron Clean Room

Teaching Lab Headway Spinner SOP

Safety and Rules of the Lab

Plasma-Therm 790 RIE (Reactive Ion Etcher) Basic Operation Guide

Safety Awareness For Researchers in the Giga-to-Nanoelectronics Laboratory. Richard Barber

HI COD REACTOR and Test Tube Heater 2008 Series

Cascade Comfort Bathing Systems with Aqua-Aire Safe Operation & Daily Maintenance Instructions

Revised: July 18, 2017

Office of Research Safety Laboratory Safety Manual 215 Chemical Spill Response

USER MANUAL ICE MAKER

LABORATORY CHEMICAL HYGIENE AND SAFETY PLAN

B.) Accident -- Any suddenly occurring unintentional event which causes injury or property damage.

Laboratory SAFETY RULES

1. Conduct yourself in a responsible manner at all times in the laboratory.

Research and Graduate Studies Department. Policy Number: 215 Laboratory Safety Date: 1/12/2001 Supersedes: New Chemical Spill Response Page: 1 of 11

Inverter Split-type Room Air Conditioner

Protocol for Chemical Spills. By Gordon Krueger Environmental Safety Specialist University of Northern Iowa Environmental Health and Safety

NRF Lithography Processes SOP 8/3/2015 Rev 17 Page 1 of 24. NRF Lithography Processes SOP

Regulations - guidance

Safety in the Chemical Laboratory

CHM 130LL: Lab Safety Name: Answer Key _ Section:

SUBFAB DOC PDOC 0152 ROGER SHILE 7/11/97. SCIENCE MISSION SQUID CARRIER SUBSTRATE (Part# ) FABRICATION 1. Document Revision Record

EMERGENCY RESPONSE PLAN FOR

Facility Safety Rules Hazard Communication Emergency Procedures Fire Safety. Safety Orientation

Acid / Base Bench Procedures and Operation Manual

Owner's Manual TABLE OF CONTENTS

The Do's and Don ts in the Instrument Sterilisation Process

USER'S INFORMATION MANUAL

EMERGENCY RESPONSE GUIDE IMMEDIATE EMERGENCY PROCEDURES

SAFE WORK PROCEDURE. List the Hazards and risk controls as per risk assessment. assessment reference:

Equipment Standard Operating Procedure Greg Allion and Kimberly Appel

Gas Fired Residential Combi Boiler Floor and Wall Mount Models

Go to the Lab! Lab Safety Begins Before You

Emergency Preparedness and Disaster Resistance in the Laboratory

HyProCoat 330. Organo-mineral finish for chromated zinc Excellent corrosion resistance Free from tears after drying Excellent ductility.

PDS 2010 Parylene Coater SOP

Fabrication and Characterization of a Packaged MEMS Gas Flow Sensor

OXFORD PLASMALAB 100 PECVD

Owner's Manual TABLE OF CONTENTS

Chapter 3: Emergency Planning for Laboratories

Outlines. 1. Introduction of Safety at Laboratories. 2. Emergency Situations. 3. Basic Safety Rules for All the Labs (Engg.

1. Conduct yourself in a responsible manner at all times in the laboratory.

Lab Safety. Section 2L. Chemistry I & II

SCD. SMALL CYLINDER DRYER with Touchscreen Controller INSTRUCTION MANUAL MANUAL NUMBER Issued March 2015

Dehumidifier User Manual. (For the series of DP40~DP70)

Ultrasonic and Megasonic Cleaners

METHOD STATEMENT INFORMATION REQUIRED

Fume Hood Safety TYPES OF FUME HOODS

until filters are dry. Once dry, place the filters shiny side up in petrislides. The petrislide do NOT need to be acid washed.

Zep Dyna Clean Installation and Operator's Manual

STUDENT SAFETY RULES

MARSHALLTOWN MEDICAL AND SURGICAL CENTER LAUNDRY/LINEN SERVICES. SUBJECT: Infection Control POLICY NO: 106

NANO-MASTER Single Wafer/Mask Cleaning Systems

Emergency Response Guide for Laboratories

National Chiao Tung University

Personal Protective Equipment

Operating Instructions for the SAMCO RIE800iPB

MODEL 7000 SUCTION UNIT

A. General Safety LAB/ROOM: INSPECTED BY: DATE:

The Alfa Laval. Cleaning procedures. for. HeatExchangers.

Portable Air Conditioner. Instruction Manual

User s Manual. CONCEPT Processor 305 DW / 405 DW / 505 DW 505 DW XP

Transcription:

Standard Operating Manual Ultra Fab Wet Station C Oxide/ Nitride Etch Station Version 1.1 Page 1 of 18

Contents 1. Picture and Location 2. Process Capabilities 2.1 Cleanliness Standard 2.2 Substrate Size 3. Contact List and How to Become a Qualified User 3.1 Contact person 3.2 Training to Become a Qualified Wet Station User 4. Operating Procedures 4.1 System Description 4.2 Safety Warnings 4.3 Operation Precautions and Rules 4.4 Initial Status checks 4.5 Initial System Checks 4.6 Personal Protective Equipment (PPE) 4.6.1 Sequence for Wearing PPE 4.6.2 Sequence for Removing PPE 4.7 Quick Dump Rinse Operation 4.8 Aspirator Operation 4.9 BOE oxide etch Operating Procedure 4.10 BOE PSG (POCl3/BBr Doping) etch operation procedure 4.11 Nitride Etch Operating Procedure 4.12 Etch Rate for materials 4.13 Clean up 4.14 Check out Version 1.1 Page 2 of 18

Ultra Fab Wet Station C Oxide/ Nitride Etch Station 1. Picture and Location This tool is located at NFF Room 2240 Cleanroom Class 1000. 2. Process Capabilities 2.1 Cleanliness Standard: Clean 2.2 Substrate Size: 2 or 4 3. Contact List and How to Become a Qualified User 3.1 Emergency Response and Communications Security Control Center: 2358-8999 (24hr) & 2358-6565 (24hr) Safety Officer: Mr. Wing Leong CHUNG 2358-7211 & 64406238 Deputy Safety Officer: Mr. Man Wai LEE 2358-7900 & 9621-7708 NFF Senior Technician: Mr. Henry YEUNG 2358-7896 NFF Technician: Mr. Michael KWOK or Charles TANG 23587896 3.2 Training to Become a Qualified User Please follow the procedure below to become a wet station qualified user. 1. Read through the on-line equipment operating manual of the equipment; Version 1.1 Page 3 of 18

http://www.nff.ust.hk/equipment-and-process/equipment-operation-manual.ht ml. 2. Attend the equipment hand-on operation training either by peer or NFF staff. 3. If training is provided by NFF staff, user must log in NFF equipment reservation system, and register these trainings. 4. Send an e-mail to Mr. Henry YEUNG requesting wet station qualified exam. 5. Pass the examination for the equipment operation and security. 4. Operating Procedures 4.1 System Description The Wet Station C is for hot phosphoric acid etching of silicon nitride and BOE etching of Silicon Oxide. This Wet Station provides one set PCT heated quartz temperature controlled bath with a condensation coil for hot phosphoric acid etching of silicon nitride (far right) and temperature control BOE oxide etch (far left), a plastic tank for BOE PSG dip (middle) and three quick dump rinse baths (QDR). POWER ON Manual Aspirator to N-tank EMO POWER OFF Chemical resisted Glove CLEAN BOE PBSG (BOE) Nitride Strip H3PO4 QDR QDR QDR EMO Power On/OFF SILENCE RESET Drain On/Off Manual Aspirator Red button for emergency stop of the wet station Main power on/off for wet station Silence any alarm at this wet station Resets alarm system to this wet station Dispose chemical to Neutralization Tank Aspirates HF/Acid to HF/N-tank Collection Tank Version 1.1 Page 4 of 18

LOW PURGE PLENUM L/L Red indicator light will flash when no enough air to purge the electronics for this wet station Red indicator light will flash when the plenum liquid level is too high There are six controllers at this wet station. The UFT-65 Filtered Etch Temperature Controller is for Filtered BOE Etch bath. The UFT-820 Temperature Controller is PCT Tiger TT4 Heated bath. The UFT 48-9 Quick Dump Rinser is for quick dump rinse (QDR) bath. The UFT 620 Timer is for time counting for HF bath. 4.1.1 UFT-65 Filtered Etch Temperature Controller Present Temperature display Present Time display PWR ON/OFF Turn on/off the power of temperature controller SYS ON/OFF Activate and deactivate the heater, chiller and recirculator pump Timer Run Start or Restart the timer Timer Stop/Reset Stop and Reset the timer Alarm Sil Silence the audio for both the timer and any alarm conditions Cancel flashing alpha code in the process display Examine the process set point and this Timer Preset Reset Exit the program mode PROG Adjust parameters into program mode Save Permanently save the system setup parameters Up key, active in the program mode to increment the display Down key, active in the program mode to decrement the display Version 1.1 Page 5 of 18

4.1.2 UFT-820 Temperature Controller Present Temperature display Present Time display PWR ON/OFF Turn on/off the power of temperature controller Heat On/Off Activate and deactivate the heater output. Timer Run Start or Restart the timer Timer Stop/Reset Stop and Reset the timer Alarm Sil Silence the audio for both the timer and any alarm conditions. Cancel flashing alpha code in the process display Examine the process set point and this Timer Preset. Reset Exit the program mode PROG Adjust parameters into program mode Save Permanently save the system setup parameters Up key, active in the program mode to increment the display Down key, active in the program mode to decrement the display Version 1.1 Page 6 of 18

4.1.3 UFT 48-8 Quick Dump Rinser Remaining Cycle display START RESET PROG HOLD Activate the dump rinser Deactivate the dump rinser, automatically reset itself in preparation for another run, and exit the program mode Adjust parameters into program mode Halt the operation temporarily 4.1.4 UFT 620 Timer Present Time display Timer Run Start or Restart the timer. Timer Stop/Reset Stop and Reset the timer, entering the program mode. Up key, active in the program mode to increment the display. Down key, active in the program mode to decrement the display. Version 1.1 Page 7 of 18

4.2 Safety Warnings 1. Follow NFF Health and Safety Manual. 2. Some chemicals are dangerous when mixed with other chemicals or heated while others are dangerous on their own. 3. Do not allow to heat HF or BOE chemical. 4. Mixing hot piranha with organic compounds may cause an explosion. This includes acetone and IPA. 5. All chemicals used in NFF are controlled items. No chemicals can be brought in or taken out without permission. 6. Users should have a good understanding of all the chemicals they intend to use and know what to do when accidents of the materials with which they are working. 7. HF is potentially lethal. If HF is spilled on a person, FOR SKIN CONTACT: i. Move victim immediately under safety shower and flush affected area with large amounts of cool running water. ii. Remove all contaminated clothing while flushing with water. iii. The rinsing may be limited to 5 minutes, with 2.5% CALCIUM GLUCONATE GEL (available in first aid kit) applied as soon as the rinsing is stopped. iv. While the victim is being rinse with water, someone should alert first aid or medical personnel, arrange for subsequent treatment and inform NFF staff. v. Apply the gel every 15 minutes and massaged into the tissue continuously until pain and/or redness disappear. It is advisable for the individual applying the gel to wear rubber gloves to prevent a possible secondary HF burn. vi. After treatment of burned area is begun, the victim should be examined to ensure there are no other burned areas that have overlooked. vii. Arrange to have the victim seen by a physician. During transportation to hospital or waiting for a physician to see the victim, continue massaging calcium gluconate gel. FOR EYE CONTACT: Version 1.1 Page 8 of 18

i. Immediately flush the eyes for at least 15 minutes with large amount of gently flow water under eye washer. ii. While the victim is being rinse with water, someone should alert first aid or medical personnel and arrange for subsequent treatment. iii. Take the victim to a doctor, preferably an eye specialist, as soon as possible. iv. Rubbing of eyes is to be avoided. 8. If other chemical is spilled, remove clothing and rinse affected area in safety shower for 15 minutes and inform NFF staff. Seek urgent medical advice. 9. Chemical Spill Control, in the event of small spill, it can usually be cleaned up safely by NFF staffs only, but the spill is too large to clean up safely or if someone has been injury or contaminated, immediately call the SCC. Report all spills of hazardous chemicals to SEPO. 10. The Emergency Off Button (EMO Button) shuts down the machine immediately. Only use the EMO in emergency situations. Emergency situations are where injury of personnel or serious damages of the system impends immediately. 11. According to the general fire emergency procedure of HKUST, please report the accident to the Security Control Center first. The nature of other emergencies will determine whether you will call police, staff, or both. If someone is injured, the 9-999 emergency number should be called before calling staff. If there is a facilities problem, such as a flood or a utility problem that does not present a danger to lab users but may result in damage to equipment, the staff or EMO need to be called. The 9-999 emergency should not be called for facility or equipment problem. Always call 9-999 when a potentially life threatening situation might exist (injury, fire, gas leak, etc.) 12. All spills on the wet bench during process should be cleaned up immediately. 13. When working at the wet station, always use appropriate personal protective equipment (PPE) apron, face shield, chemical resisted gloves. After complete the process, rinse the PPE and fully dry it and return it back. 14. The apron must fully cover your shoulders at all times, make sure it is tied around the neck and do not let it slip off while you work. Version 1.1 Page 9 of 18

15. Even you wearing PPE, never put your hands or fingers into a chemical bath. 16. Do not walk away from wet station while wearing PPE. If you need to step away from the wet station at any time, rinse off gloves at the rinse bath, dry with wiper and put it back. 17. Never touch any surface while wearing chemical-resisted gloves that other lab users may come into contact with, such as table tops, door handles, phone, computer keyboards, face shield, apron, etc. Gloves shall be removed before touching other surfaces. 18. Check the leakage of chemical-resisted gloves by N2 Gun every time. 19. Tanks are breakable, carefully place wafers in them, never bang a cassette on the side. 20. Keep the cassette handle with cassette throughout the etching or cleaning process. 21. No Solvent allowed at this wet station. 22. Never operate the heated tanks without the proper fluid level. 23. Read and understand the MSDS for the chemical being used. 24. Know the location of the nearest safety shower and eyewash station. 25. Make sure the wet station having sufficient exhaust. 26. Improper disposal of waste could result in explosion and injury. Take time to consider how to dispose in your process or contact NFF staff. 27. Don t dispose hot chemicals. The temperature should be below 30 C before disposing. 28. If the machine failure while being used, never try to fix the problem by yourself. Please contact NFF staff. 29. Set the cooling coil flowmeter to 25gph underneath of the wet station before turning on the heater of Bath C1. Check the DI water drip is 5cc/min also. 4.3 Operation Precautions and Rules 1. Do not operate the machine unless you are properly trained and approved by NFF. 2. All wet-processing baths are designed and arranged according to their cleanliness levels and purpose; users are not allowed to use those solutions for different purpose. Version 1.1 Page 10 of 18

3. Each Wet Station has its own Teflon wafer cassette and cassette handler and 2 dipper basket (chemically resistance). User doesn t mix it with other wet stations. 4. The Teflon cassette, cassette handle, 2 dipper basket with blue button label is only allowed in this wet station. 5. Avoid touching wafers with tweezers and hands. 6. Don t dispose hot chemicals. The temperature should be below 30 C before disposing. 7. Don t leave any unnecessary things on top of the wet station. 8. If your wafers have an unknown contaminant or ever contact with any metal on them, they are not allowed in this wet station. 9. Photoresist should not go into the Nitride Strip bath, the chemical will destroy the resist to contaminate the bath. 10. If a wafer falls out or breaks, do not attempt to retrieve it. Contact NFF staff. 11. If wafer has the Photoresist as a masking material, the wafer should have been oven post-bake before BOE etch. 12. If your features of the pattern are very fine, you may use oxygen plasma to descum your wafer(s) before etching. 13. You can also use Nanospec or Ellisopmeter to check thickness of film after dry the wafer(s). 14. Close the cover after each use. 15. Process Temperatures are set and should not be changed without NFF Staff approval. 16. Please fill all the details of the log sheet attached. Version 1.1 Page 11 of 18

4.4 Initial Status Checks 1. Please check the status of shutdown notice posted in the NFF reservation website. 2. Before operate the machine, please make sure you have read the check list and fill the log sheet. 3. Please check-in the equipment via Equipment Card Reader. 4.5 Initial System Checks Before starting, verify the machine is in the correct idle state: 1. If system power is off, notify NFF staff to turn on power switch on the controller. Leave system ON, after your process. 2. Verify that the chemical you want to use is filled to the proper level. 3. Verify that the bath temperature is reached the set point. 4. Verify that the wet station has DI water and Nitrogen. 5. Verify that the exhaust level is normal. 6. Check log sheet that last user had no problem. 4.6 Personal Protective Equipment (PPE) Users are required to use additional Personal Protective Equipment (PPE) when working in the wet station. 4.6.1 Sequence for Wearing PPE PPE consists of three items that should be worn in the following order: an apron, a face shield, and chemical resisted gloves. Check all items for damage before each use, inspect the apron and face shield for damage (e.g. cracks, scratches). Gloves are to be inspected for damage and contamination. Use Nitrogen Spray Gun injects the Nitrogen to the chemical resisted glove and immerse to the DI water Bath for leakage check. Face Shield places over face and eyes, and then adjust to fit. 4.6.2 Sequence of removing PPE PPE should be removed in the following order: chemical resisted gloves, a face shield, and an apron. Rinse and dry the chemical resisted gloves, remove them and hang them up. Hang face shields and avoid damage it. Lastly remove the Version 1.1 Page 12 of 18

apron and be careful to hang it. If it has any liquid in the apron, use a wipe to dry it. Do not leave inside out. Apron Face Shield Chemical resisted Gloves 4.7 Quick Dump Rinse Operation The purpose of QDR is to rapidly wash surface of the water and leave the wafer in a clean condition. 1. Place the wafer in the quick dump rinse (QDR) bath, initially should be full of DI water and close the lid. 2. Press the START button of UFT 48-8 quick dump rinser controller to activate the QDR. It will cycle down from 4 to 0 in the display window. 3. After completion of the cycle the warning sound will be audible until the RESET button are pressed. 4. Press RESET button to automatically reset itself in preparation for another run. 5. Press HOLD button to manually dump or fill the bath. 4.8 Aspirator Operation 1. The aspirator can be activated by pressing the ASPIRATOR button located on the front panel of the wet station. The aspirator timer is set by default to thirty seconds. 2. Use the aspirator to dispose the water-soluble acids to Neutralization Tank except HF and BOE. 3. Be careful not to mix solvents with acids when aspirating this is a potentially Version 1.1 Page 13 of 18

explosive combination. 4.9 Buffered Oxide Etch (BOE) Silicon dioxide Etch Operation Procedure The purpose of BOE is to remove the sacrificial oxide layer, to remove unwanted silicon dioxide on patterned silicon wafer(s). The reaction is performed in a dilute solution of HF, buffered with NH4F to avoid depletion of the fluoride ions. It will reduce the attacks of the Photo resist by the HF. 1. Press SYSTEM ON to turn on the circular pump and control the temperature. 2. Wait around 5minutes to stabilize the bath temperature. 3. Check time need to etch through the oxide of known thickness, it is better to etch one dummy first. Calculate the time taken, and then add 10% of that time to reach the final time to etch the whole batch. 4. Open wet station cover. 5. Wear Personal Protective Equipment (PPE) following the Section 4.6.1. 6. Place the wafer to designated Teflon Cassette. Use designated Teflon Cassette handles to attach to the notches on both end walls of Teflon cassette. Both of them are marked with blue label. 7. Place the wafer on the QDR with DI water dip to pre-wet the surface thereby promoting access of the BOE to the patterned region in the resist. 8. Carefully lower the cassette handle into the BOE solution. Make sure that all the wafer(s) are immersed. If the features of the pattern are very fine, then you may wish to raise & lower the cassette once or twice to ensure the wafer surface has definitely been wetted with the BOE solution. 9. Press Timer Run to count the etch time. 10. After the etch time is finished, carefully remove the cassette from the solution and immerse it into the QDR follow the section 4.7. 11. If the silicon dioxide has not been completely etched away, a film of water will adhere to be the etched surface and will appear wet. If silicon dioxide is completed etched away, the surface will become hydrophobic and the wafer will appear dry. 12. If still have silicon dioxide on the wafer(s), re-immerse the wafer(s) in the BOE solution for a while and recheck the wafer. 13. Repeat step 8-12 until Silicon dioxide is completely etched. 14. Take off PPE, chemical resistant gloves, face shield and then apron, follow the Version 1.1 Page 14 of 18

section 4.6.2. 15. Remove Cassette Handle and load cassette with wafers into Spin Rinser Dryer SRD for final rinse and dry cycle (Refer to SRD operation Manual). 16. Close wet station cover. 4.10 PSG, BSG PBSG Etch Operation Procedure This bath is used to remove the oxide doped with boron, phosphorus or both. 1. Check time need to etch through the oxide of known thickness, it is better to etch one dummy first. Calculate the time taken, and then add 10% of that time to reach the final time to etch the whole batch. 2. Place the wafer to designated Teflon Cassette. Use designated Teflon Cassette handles to attach to the notches on both end walls of Teflon cassette. Both of them are marked with blue label. 3. Open the Wet station cover. 4. Wear Personal Protective Equipment (PPE) following the Section 4.6.1. 5. Place the wafer on the QDR with DI water dip to pre-wet the surface thereby promoting access of the BOE to the patterned region in the resist. 6. Carefully lower the cassette handle into the BOE solution. Make sure that all the wafer(s) are immersed. If the features of the pattern are very fine, then you may wish to raise & lower the cassette once or twice to ensure the wafer surface has definitely been wetted with the BOE solution. 7. Press Timer Run to count the process time. 8. After the etch time is finished, carefully remove the cassette from the solution and immerse it into the QDR follow the section 4.7. 9. If the silicon dioxide has not been completely etched away, a film of water will adhere to be the etched surface and will appear wet. If silicon dioxide is completed etched away, the surface will become hydrophobic and the wafer will appear dry. 10. If still have silicon dioxide on the wafer(s), re-immerse the wafer(s) in the BOE solution for a while and recheck the wafer. 11. Repeat step 8-12 until Silicon dioxide is completely etched. 12. Take off PPE, chemical resistant gloves, face shield and then apron, follow the section 4.6.2. Version 1.1 Page 15 of 18

13. Remove Cassette Handle and load cassette with wafers into Spin Rinser Dryer SRD for final rinse and dry cycle (Refer to SRD operation Manual). 14. Close wet station cover. 4.11 Nitride Etch Operation Procedure The Tiger Tank Nitride Etch (TTN) Series bath system contains a control and cooling system to accommodate Nitride Etch/Strip for 4 Silicon wafer(s) applications with high temperature Phosphoric Acid. Automatic DI water replenishment to maintain consistent acid/water ratio, efficient reflux cooling, and precision heat control allow for improved etch uniformity and selectivity. 1. Wear Personal Protective Equipment (PPE) following the Section 4.6.1. 2. Place the wafer to designated Teflon Cassette. Use designated Teflon Cassette handles to attach to the notches on both end walls of Teflon cassette. Both of them are marked with blue label. 3. Set the cooling coil flowmeter to 25gph underneath of the wet station before turning on the heater. Check the DI water drip is 5cc/min. 4. Open the Wet station cover. 5. Place wafer(s) in the left BOE bath to remove any native oxide which will Version 1.1 Page 16 of 18

inhibit the nitride etch. 6. The bath temperature is set for 165 C. It will take about 60 minutes for the bath to reach the desired temperature. 7. Place the cassette into phosphoric bath, leave the cassette handle on the cassette when putting your wafer(s) into phosphoric bath. 8. Press Timer Run to count the process time. 9. The DI water drip will turn on automatically based on the temperature of the phosphoric bath. User doesn t need to make any adjustments. 10. Be very careful to remove the cassette from the hot phosphoric bath. Under high temperature, cassette handle and cassette become loose. 11. After the process time is reached, transfer the wafer(s) directly from the hot phosphoric bath into the Quick Dump Rinser follow section 4.7. 12. Take off PPE, chemical resistant gloves, face shield and then apron, follow the section 4.6.2. 13. Remove Cassette Handle and load cassette with wafers into Spin Rinser Dryer SRD for final rinse and dry cycle (Refer to SRD operation Manual). 14. Transfer wafer to your own wafer box. 15. Close wet station cover. 16. After the bath temperature has dropped to less than 100 C, close the cooling coil flowmeter. 4.12 Etch rates for materials Films BOE (1:6) Etch Rate (A/min) Hot H3PO4 (165 C) Etch Rate (A/min) Si3N4 10 41.3 Wet SiO2 1000 1.6 Dry SiO2 1000 2.3 Sputter SiO2 > 78000 36.7 Densify LTO 1782.3 1.7 LTO 5078.5 9.9 PSG 5500 Low Freq. SiO2 2056 4 High Freq. SiO2 2946 7 Low Freq. Si3N4 106 134 High Freq. Si3N4 433 333 Oxy-Nitride 3385 259 4.13 Clean up Version 1.1 Page 17 of 18

1. Clean up the wet station. Thoroughly rinse off any drips (assume they are acid) with DI spray gun, gently dry with the N2 gun. Ensure the bench top is clean and dry. 2. Leave the dump rinsers filled with water and the lid closed. 3. Close wet station Cover. 4. Do not leave cleanroom wipers on the bench top. 5. Fill out the log sheet. 4.14 Check out Check out the equipment via Equipment Card Reader after use. Version 1.1 Page 18 of 18