Training: MED-SOLAR. MODULE 6 Maintenance of PV Power Plants

Similar documents
Work involving High Voltage (HV) Systems and Maintenance of Plant.

Power Plants with Webel Solar Modules

Statutory Compliance Checklist

Quality assurance and safety aspects. Dipl.Ing. Udo Siegfriedt DGS-Berlin Brandenburg

Operation & Maintenance Task Force

Emergency Response Plan

Health & Safety Policy

SECTION AUTOMATIC TRANSFER SWITCHES

PART 1 GENERAL Quality Assurance A. Fire Alarm Contractor Qualifications:

Fire Safety Management

SECTION SECURITY TESTING AND COMMISSIONING

Installation Manual Universal Top-of-Pole Mount UNI-TP/08LL

SECTION ELECTRICAL SYSTEMS COMMISSIONING

NFPA 70E Edition Update

PART 1 GENERAL Quality Assurance A. Fire Alarm Contractor Qualifications:

SolarPower Europe O&M Task Force

Prefunctional Checklist

Pole Mounting System Installation & Certification Manual

LASER SAFETY PLAN OPHTHALMOLOGY

WIND TURBINE DAMAGE PREVENTION

GWC1815 GWC1820PC.

PQS Independent type-testing protocol

DTW Master Specification Section EMCS: Start Up, Verification and Commissioning

Pole Mounting System Installation & Certification Manual

Technical Assessment Guideline Applicable for the Kiwa KQ Certification Scheme:

Logbook. Precept EN Fire Detection/Alarm Panel. & Precept EN Repeater

HEALTH & SAFETY ARRANGEMENTS FOR PORTABLE APPLIANCE INSPECTION & TESTING

Policy and Organizational Statements

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 11/06/2018

Roof Mounting System. Installation Manual. Standard (XRS) and Light (XRL) Rails with Integrated Grounding *ETL Listed Per UL Edition v1.

Directive on Laser Safety. NRC Occupational Safety and Health Manual

TeckNet LED05 LED Desk Lamp

Conditions for the provision of services Valid from 1 November only for the Jablotron Alarms series of alarms

Diocese of Cleveland Facilities Services Corporation

CONTRACT AGREEMENT FOR THE MAINTENANCE SERVICE AND INVERTER WARRANTY UP TO 20 YEARS (so-called Super Service Contract)

NECA S System Approach to Electrical Safety for NFPA 70E

NECA S System Approach to Electrical Safety for NFPA 70E

LA AUDIT ASSISTANCE SURVEY: Pre-survey checklist

PHOTOVOLTAIC SYSTEMS

NATIONAL ELECTRICAL CODE (NEC) & NFPA 70E ARC FLASH ELECTRICAL SAFETY

NOTTINGHAM CITY HOMES

Inspection Testing And Commissioning Of Electrical

Instruction Manual. Vapour Pump Thermal Snap-Switches. Cooling-Fail Thermal Snap-Switch

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

PART 3-O REQUIREMENTS FOR SPRINKLER SYSTEMS MAINTENANCE AND SUPERVISION. 3-O Introduction O.1 Scope of Maintenance and Supervision...

Table OUT OF SERVICE. Building Fire Video 1/15/ Inspection, testing and maintenance. Standards Further Referenced by FCNYS

Design Manual Installation Operation Maintenance

PQS Independent type-testing protocol

SAFETY MANUAL. Multispectrum IR Flame Detector X3301

H&S Forum. Fire Safety Policy Glascote Academy

Roof Mounting System. Installation Manual. Light Rail (XRL) 2013 Edition v1.3. Solar Mounting Made Simple

Roof Mounting System. Installation Manual. Standard Rail (XRS) 2013 Edition v1.3. Solar Mounting Made Simple

Systems of inspecting the existing building and the procedures of auditing engineering plans. M. Mostafa

7.0 SAMPLE PERMITS, FORMS AND CHECKLISTS SELF INSPECTION CHECKLIST

Michigan State University Construction Standards COMMISSIONING OF FIRE ALARM SYSTEMS PAGE

MME Standard Operating Procedure (SOP)

PQS Quality Assurance protocol. TITLE: Cold Room/Freezer Room:

OPERATION MANUAL (Web Site Downloaded only)

Safety & Security Code of TU Vienna

UNIVERSITY OF ROCHESTER ENVIRONMENTAL HEALTH & SAFETY

Ambient Weather WS-0211 Wireless Wendy the Weather Wizard User Manual

PART 3 REQUIREMENTS FOR SPRINKLER SYSTEMS and SPRINKLER INSTALLERS

LIFE SAFETY & FIRE PREVENTION MANAGEMENT PLAN

National Industrial Security Monitoring Station Evaluation

HEALTH, ENVIRONMENT AND SAFETY MANAGEMENT FOR FACILITIES MANAGERS COURSE OUTLINE

LPI Lightning Warning System - LWS MKIII

SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING.

PROFILE. industrial services rental trading

Spectron LSN (Life Safety Network) Suggested Specifications

Health and Safety Policy. Version Author Revisions Made Date 1 Colin Campbell First Draft March 2014

Florida International University. Biosafety Cabinet Program

a) Establishment of emergency procedures to be followed at the time of an emergency;

SECTION 4. Parts Management

Fire Smoke Damper Actuator Replacements SECTION COMMISSIONING OF HVAC

Solar Keymark in Europe. DI (FH) Gundula Tschernigg AIT Austrian Institute of Technology

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

SECTION (16460) - LOW-VOLTAGE TRANSFORMERS

LPI Lightning Warning System (LWS) MKIII

HOW TO ORGANIZE AN OPERATION AND MAINTENANCE PROGRAM TABLE OF CONTENTS MODULE INTRODUCTION.,... UNIT I. OVER VIEW

Building Standards Division. Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems

Installation Manual Universal Top-of-Pole Mount UNI-TP/02

Electrical Safety Compliance: NFPA 70E

NOT PROTECTIVELY MARKED. Fire Legislation

SECTION GENERATOR PARALLELING CONTROLS

LPI Lightning Warning System (LWS) MKIII

Laser Safety, Utilization and Credentialing Policy

Warning Signs & Labels Fitted to Electrical Equipment on Rail Mounted Vehicles

June 2017 (Updated 18 January 2018) Fire Safety Policy. Peter Webb, Project Manager Compliance First Choice Homes Oldham Limited

Sheetz Inc. Fire Protection Service Guidelines

SAFETY MANUAL. Electrochemical Gas Detector GT3000 Series Includes Transmitter (GTX) with H 2 S or O 2 Sensor Module (GTS)

School of Forest Resources. Annual. Safety Training. Mike Day, SFR Safety Coordinator. Hardhats. Gloves. Fall protection harnesses

SPECIFICATION FOR GAPLESS METAL OXIDE DISTRIBUTION TYPE SURGE ARRESTERS WITH POLYMERIC HOUSING

Installation Manual. Top of Pole Mount Edition v1.01. For models:

Fire Safety Register

APC BC300 Series 40kW 208/450/480V User Guide

Allianz Engineering Inspection Services Ltd. Electrical Services. Product Information

Residential Solar Water Heater

Fire Safety Policy 29/09/2017. Holme Grange School Whole School Policy Including EYFS. Fire Safety Policy

AE PV Heating Element. Screwing in Heating Unit. Installation Manual. Version 01.6

USER MANUAL PLEASE READ AND UNDERSTAND THIS MANUAL COMPLETELY BEFORE USING & INSTALLING THE FIXED SOLAR PANEL KIT.

Transcription:

Training: MED-SOLAR MODULE 6 Maintenance of PV Power Plants

The 3 levels of O&M intervention a) Surveillance level - basic up keeping duties to be performed by the operator s local service, e.g. technicians, keepers, etc. verify that operational values are correct (fulfill the nominal specifications) b) Preventive maintenance level duties to be performed by the professional maintenance contractor (Maintenance Contractor) Verify that performance indicators, output, protection and durability are kept within the correct operational ranges c) Supervision Evaluation level duties to be performed by the premise administrator or a subcontracted engineer evaluator (Engineering consultant) data collection and analysis, write up of evaluation reports

Level of preventive maintenance Source: MDC Egypt

O&M plan reference contents The O&M Plan must always be: adapted to the plant implemented and to the site hosting it prepared by or with assistance of qualified professional (s) Reference list of contents 1. Cover with title, authors, date, and revision tracking registry 2. Identification of roles and staff for Basic Maintenance and Professional contractors with copies of contracts in annex 3. PV plant description project as-built 4. Task check-lists specifying responsibility, frequency for each task 5. Protocol for Basic Maintenance (operating ranges, templates for O&M Book, Troubleshooting) 6. Monitoring plan specifying parameters, data logging, data downloading and management

Reference O&M task checklists - Checklists by O&M level - Tasks organised in categories - subsystems given in a PV installation: - Also, frequency for each task must be specified: SUBSYSTEM 0 - General 2 - Battery 3 - Charge Controller and data logger system 4 - Inverter 5 - DC distribution and protections 6 - Technical Cabinet 7 - AC connection to Grid FREQUENCY (preventive actions) at all times weekly monthly yearly every 3-4 years 8 - AC feeder line and priority loads

Task Checklist (18) for level 1 Surveillance level O&M CODE SUBSYSTEM NAME - DESCRIPTION Frequency 1 0 - General Existence and availability of O&M checklists at all times 2 0 - General Existence and availability of O&M plan at all times 3 0 - General Availability and updating of O&M book records (O&M book) at all times 9 0 - General Access to Solar Panels (roofs), Tanks and control system rooms is restricted only to maintenance and authorised personnel at all times 11 Visual check for shading of the collectors during the day (midmorning, noon, and mid-afternoon) yearly 12 Prevent eventual vegetation growth that may produce shading. 13 Cleaning of eventual dusty or soiled panels 14 Visual Check for cracks, hot spots, colour defects in PV panels 15 Sealant around roof penetrations should be in good condition. 16 Visual Check all nuts and bolts fixing the panels to any support structures for tightness, absence of corrosion in metallic parts

Task Checklist (18) for level 1 Surveillance level O&M CODE SUBSYSTEM NAME - DESCRIPTION Frequency 17 Verify the reference photocell and the temperature sensor condition (tight fixation, good contact, wire continuity) 18 Visual check the wiring good condition 20 2 - Battery Check the battery density and voltage (each cell) 21 2 - Battery Check the battery bank voltage monthly 22 2 - Battery 23 2 - Battery Visual check of cell condition - free of sediments and cristals, electrolyte level, free of corrosion, connections tight and protected) Check availability of densimeter, gloves, goggles, distilled water, thermometer, funnel monthly monthly 25 3 - Charge Controller and data logger Check that basic performance parameters lie within design specifications. Register basic parameters in M&E book monthly 33 6 - Technical Cabinet Check good ventilation, restricted acces and availability of H&S equipment (fire extinguisher, hazard signaling panels/plates, existing eye wash) monthly

Level 1 Surveillance level Source: OPEXEnergy Source: Solar Clean Hymach Source: Solar Clean Hymach

O&M templates (Surveillance level ) - Monthly-Trimestral

Task Checklist (12) for level 2 Maintenance Contractor O&M CODE SUBSYSTEM NAME - DESCRIPTION Frequency 4 0 - General Existence and availability of as-built drawings at all times 5 0 - General Existence and availability of technical documentation at all times 6 0 - General Existence and availability of operations manuals at all times 7 0 - General Existence and availability of the monitoring and evaluation (M&E) plan at all times 8 0 - General Availability and updating of M&E reports (M&E book) at all times 10 0 - General General check-up of all elements and operating conditions 19 Check the panels and wiring condition, fulfilment of operating specifications 24 2 - Battery 30 4 - Inverter Check good condition of wiring and terminals (including earthing), tight connections, free of dust. Check inverter state: operation, displays, alarms, verification of modes of operation, etc 31 5 - DC distribution and protections Check good condition of wiring and terminals (including earthing), tight connections, free of dust. 32 5 - DC distribution and protections Check good condition of the ELV connection board - meter, switches, wiring and terminals (including earthing), tight connections, free of dust. 34 7 - AC connection to Grid Check good condition of the LV connection board - meter, switches, wiring and terminals (including earthing), tight connections, free of dust.

Task Checklist (4) for level 3 Engineering consultant CODE SUBSYSTEM NAME - DESCRIPTION Frequency 26 3 - Charge Controller and data logger Download monitoring data, check raw data for eventual errors or inconsistencies 27 3 - Charge Controller and data logger Analyse monitoring data and prepare evaluation reports (, yearly and aggregate). Draw conclusions and recommendations on basic and operational parameters. 28 3 - Charge Controller and data logger If 3rd level monitoring is set, Analyse Complete monitoring data, prepare evaluation reports (, yearly and aggregate) and draw conclusions / recommendations 29 3 - Charge Controller and data logger Check that Operational performance parametres lie within design specifications. Register operational parameters in M&E book monthly

Technical O&M costs Revenues in large commercial and utility plants and microgrids = afford O&M contracted to professional staff. Some contractors offer integrated services: monitoring, insurance and performance assurance. The cost of O&M can widely vary not only as a function of technology, plant size and site conditions but also as a function of market development in the country. Reference rule of thumb: 1.5 2.0% of the investment costs Autonomous and back-up plants are more complex and expensive, maintenance-wise, than pure grid-dependent plants due to the additional components such as batteries and load control devices, and also due to their relative smaller size.

Insurance RISK Insurance: protection from unexpected damage COVERS: natural conditions (fire, lightning, storm, snow, ), water damage and flood, short-circuits, overcurrent and overvoltage, explosion, errors during construction or installation, material errors, subsidence, landslide, rockslide, thef and vandalism, operating error, negligence NOT COVER: earthquake, war, terrorism, nuclear accidents/ radiation or radioactive substances, internal unrest, normal operational or premature wear, corrosion, existing deficiencies

More information: www.medsolarproject.com xavier.vallve@tta.com.es MED-SOLAR PROJECT @MEDSOLARPROJECT