Installation, Operation and Maintenance Guide. Steam Coil Installation, Operation and Maintenance. steam coils

Similar documents
Daikin Direct Expansion (DX) Cooling Coils

Daikin Water Cooling, Heating, and High Capacity Booster Coils

FLUID COIL INSTALLATION OPERATION AND MAINTENANCE

Boiler Condensate Return Basics. Presented by Steve Connor February 24, 2016

COOLING / HEATING COILS

Series 1140 and 1141 Temperature Regulators

PIP PNE00004 Steam Trap Guidelines

Niles Steel Tank Hot Water Generator Installation and Operation Manual

G Series. G Series Air Coils Installation ti Manual ENCASED/UNCASED AIR COILS. Geothermal/Water Source Heat Pumps R-410A Refrigerant 2-5 Ton

What is a Secondary Pressure Drainer?

Commercial and Industrial Applications

STEAM TRAPS FOREST PRODUCTS LIBRARY FOREST RESEARCH LABORATORY OREGON STATE UNIVERSITY. Information Reviewed and Reaffirmed. August No.

VERTICAL TUBE HEATING COILS MV & VIFB MODELS

WHY THE REMOVAL OF NONCONDENSABLE GASES AND AIR IS CRITICAL IN A STEAM SYSTEM

Silhouette. Feedwater Heater. Boiler Feedwater

AMERICAN EQUIPMENT SYSTEMS A Division Of Trevor-Martin Corporation th Terrace North Clearwater, Florida 33762

Copyright 2003 and 2005 by The American Institute of Architects (AIA) Modified by MSU Physical Plant / Engineering and Architectural Services

ClearFire Economizer Model ECF Integral or External. Addendum to manuals CFH and CFV

VENTS. Main Steam Vents. How to Select Steam Vents. For Steam Vent selection information, please refer to Selection Guidelines on page 133.

Steam Coils. Types HI-F5, HI-F8 and E-F5. Catalog 413-6

Economical and simplified solutions that offer quality and optimum steam trap service.

YARWAY NON-REPAIRABLE DRIP AND TRACER STEAM TRAPS SERIES PB, 29, 129Y AND 29S

INSTALLATION & MAINTENANCE MANUAL FOR QuickDraw

INSTRUCTION MANUAL. Keep this manual in a safe place for future reference FREE FLOAT TYPE STEAM TRAPS SS3/SS5 SERIES. Manufacturer

PRESSURE MOTIVE PUMP (PMP) APPLICATIONS

Series 151 and AV5. A wide range of process thermostatic steam traps is available to match almost any application need.

APT and APT14 Automatic Pump Traps. for effective condensate drainage and removal

Commercial/Industrial Products. Partnerships beyond metals

Main Steam Vents. Hoffman Specialty Regulators. How to Select Steam Vents

Spray Flow II cc/liter Atmospheric Deaerator. industrialsteam.com

Spray Flow II cc/liter Atmospheric Deaerator. industrialsteam.com

CS/CD/CP AIR COOLED CONDENSING UNITS (P/N E207120C R2)

LONGONI ENGINEERING SRL

Condensate Pumps Jones Boulevard Limerick Airport Business Center Pottstown PA Tel:

HEAT EXCHANGER FORMULAS & EXAMPLE

Steam System Best Practices Document No. 11

YARWAY PROCESS THERMODYNAMIC STEAM TRAPS SERIES 40/40D AND C250/260

Pamphlet A2404. Mechanical Pump & Pump/ Trap. GP Series GT Series

YARWAY PROCESS THERMOSTATIC STEAM TRAPS SERIES 151 AND AV5

Pump & Trap Combinations

Boiler Steam Supply Piping Basics November 18, ) Q: What kind of condensate traps should be used on vacuum condensate return systems?

In-Line Air Separators

TRI-PLATE B INSTALLATION, OPERATION, AND MAINTENANCE INSTRUCTIONS PART NO EFFECTIVE MARCH 1, 1983 REPRINT APRIL 16, 1999

WATER HAMMER something that never should occur in a steam system

Installation, Operation and Maintenance Instructions for Thermax Semi-Storage Calorifier

Air Cooled Condenser Installation and Operating Instructions

WMHP Series R410a Heat Pump INSTALLATION INSTRUCTIONS

Installation, Operation, and Maintenance Information

INSTALLATION INSTRUCTIONS TXV Horizontal Duct Coils EHD

Steam Trap Inspection Methods And Steam Cost Analysis

Removal of Non-condensable Gases and Air Is Critical In A Steam System

CS 2. Central Station Air Handlers Double Wall & Single Wall Installation, Operation & Maintenance Manual. Form No. 6120A

AIR CONDITIONING. Carrier Corporation 2002 Cat. No

.03 ATMOSPHERIC DEAERATOR

How to Trap: Trap Selection and Safety Factors

Cased Aluminum Coils "Dedicated Upflow / Downflow" Convertible to horizontal with separately purchased kit

INSTALLATION, OPERATION AND MAINTENANCE MANUAL IFB HEATING COILS

Technical Data TYPE T14 & T14D TEMPERATURE PILOT SPENCE ENGINEERING COMPANY, INC. 150 COLDENHAM ROAD, WALDEN, NY SD 4511A T14 PILOT

Condensing Unit Installation and Operating Instructions

.005 ATMOSPHERIC DEAERATOR

Pamphlet U2404. Mechanical Pump & Pump/ Trap. GP Series GT Series

INSTALLATION, OPERATION AND MAINTENANCE MANUAL VIFB HEATING COILS

INSTALLATION, COMMISSIONING AND OPERATING MANUAL

TABLE OF CONTENTS. NOTE: Read the entire instruction manual before starting the installation. TROUBLESHOOTING... 13

UNFIRED STEAM GENERATORS STANDARD EQUIPMENT

A hydronic system controls comfort by delivering heated or cooled fluid to the conditioned space through pipes.

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

A. Air Handling Units shall be designed to the specific requirements of the application: Recirculation or 100% Makeup.

STEAM SYSTEMS TOP SAFETY ITEMS FOR STEAM OPERATIONS. July, 2018

INSTALLATION MANUAL UN-CASED A COILS UPFLOW FOR COOLING/HEAT PUMPS FLEX COILS FOR FIELD INSTALLED TXV MODELS: UC LIST OF SECTIONS LIST OF FIGURES

Installation Instructions

Air Handler Unit. Installation & Operations Manual. Table of Contents. Bulletin No. H-IM-AH August 2002 Part Number 4346B001

INSTALLATION INSTRUCTIONS TXV Horizontal Duct Coils EHD

Series 300 VTB. Installation Instructions

Installation Instructions

VIFB Coil Technical Guide

VIFB Coil Technical Guide

Pamphlet M2404. Mechanical Pump & Pump/ Trap. GP Series GT Series

Chapter 2.3: Steam System

1.1 This section applies to air handling units for HVAC Systems.

Ball Float Controlled. Thermo Dynamic(TD) Trap Safety Valve Condensate Pump Flash Vessel Moisture Separators Deaerator Head Steam Injector Sight Glass

INSTALLATION INSTRUCTIONS Cased N Coil, Horizontal ENH4X

Installation, Operation and Maintenance LOK-FLANGE Multitube Heat Exchangers

Condensing Unit Installation and Operating Instructions

FT600 & FT601* Steam Traps Float & Thermostatic Steam Trap. Float & Thermostatic STEAM TRAPS

12 In Row. Installation Manual. MISSION CRITICAL Air Conditioning Systems. ClimateWorx International Inc.

CHAPTER 6. HEATING PRODUCTION EQUIPMENT AND SYSTEMS

INSTALLATION INSTRUCTIONS TXV Horizontal Slab Coils WLSH

How to Trap: Process Air Heaters

APPLICATION GUIDELINES STEAM MAIN DRAINAGE

Installation, Operating & Maintenance Instructions. Horizontal Models: LH & HL

INSTALLATION INSTRUCTIONS Cased N Coil, Horizontal ENH4X

KR Series Air Defrost Unit Coolers Operating and Installation Manual

The right trap for the right application.

PARALLEL RACK SYSTEM INSTALLATION & OPERATIONS MANUAL With Master Rack Compressor Sequencer

DEAERATORS .005 ATMOSPHERIC DEAERATOR

Installation and Testing of Inverted Bucket Steam Traps Manual

Installation Instructions

How to Trap: Installation and Testing

How to Trap: Steam Tracer Lines

Transcription:

Installation, Operation and Maintenance Guide Steam Coil Installation, Operation and Maintenance Guidelines for the installation, operation and maintenance of the Heatcraft brand of steam heating coils manufactured by Modine in Grenada, MS have been provided to help insure proper performance of the coils and their longevity. These are general guidelines that may have to be tailored to meet the specific requirements of any one job. As always, a qualified party or individual should perform the installation and maintenance of any coil. Protective equipment such as safety glasses, steel toe boots and gloves are recommended during the installation and routine maintenance of the coil. CAUTION! Steam, even at low pressure, can cause serious bodily injury that may result in death. Be sure the system is off or the components are isolated before beginning work RECEIVING INSTRUCTIONS All Heatcraft coils are factory tested, inspected and carefully packaged. Damage to the coils can occur after they have left the factory. Therefore, the coils should be inspected for shipping damage upon receipt. The freight bill should also be checked against items received for complete delivery. Damaged and/ or missing items should be noted on the carrier s freight bill and signed by the driver. For additional assistance, contact your local Modine coil representative. steam coils

Nomenclature and Mounting Nomenclature 5 = Tube O.D. 5 = 0.625 or 8 = 1 5 SA 12 01 C 24.00 x 144.00 SA = Coil Type Distributing Tube 5JA, 8JA: same end conn 5GA, 8GA: same end conn (high pressure) 5DA, 8DA: dual supply, opp end conn 5LA, 8LA: dual supply, opp end conn (high pressure) 5RA, 8RA: opp end conn 5TA, 8TA: opp end conn (high pressure) Single Tube 5SA, 8SA: opp end conn 5HA, 8HA: opp end conn (high pressure) 5SB: opp end conn, 3 center-to-center 5HB: opp end conn, 3 center-to-center (high pressure) 5SS: same end conn 5SH: same end conn (high pressure) 12 = Fins Per Inch 01 = Rows mounting Steam coils must be properly mounted for condensate removal. This will aid in preventing destructive water-hammer, keeping coils from freezing, and preventing corrosive elements from collecting in the tubes. Pitched case coils should be installed level as shown in Figure 1a - Pitched in Case. Models SA, SB, HA, JA, GA, DA, LA, RA and TA come standard pitched in the casing. Models SS and SH utilize return bend construction and are not pitched in the casing, but need to be installed level as in Figure 1a. Coils that are unpitched, must be installed with the tubes pitched towards the return connection as shown in Figure 1b (with the exception of models SS and SH). A minimum pitch of 0.125 per foot of coil length is required (pitch has been exaggerated in Figure 1b for illustration to show a case that was not pitched). Unless otherwise requested, all Heatcraft steam coils shall be pitched in case 0.125 /ft. as shown in Figure 1a. Figure 1a. Pitched in Case Supply Return Figure 1b. Unpitched in Case C = Fin Design A - flat (Al, Cu) B - corrugated (Al, Cu) C - sine wave (Al, Cu) F - flat (SS, CS) G - corrugated (SS, CS) H - sine wave (SS, CS, Al, Cu) Figure 2. Steam Coils JA, GA DA, LA 24.00 = Finned Length (inches) 144.00 = Fin Height (inches) SS, SH RA, TA SA, HA 2

Coil Types Coil Types Distributing Models JA, RA and DA jet-tube steam distributing coils are excellent for any general purpose heating application. With the superior freeze resistance provided by the tube-within-a-tube construction, it is ideal for low temperature preheating and special process applications. The construction features inner tubes with directional orifices to aid in steam distribution and condensate removal. Model JA offers same-end supply and return connections. Model RA offers opposite-end supply and return connections. Model DA offers dual-supply opposite-end connections for long coils that see sub-freezing air temperatures. Models GA, TA and LA utilize cupro-nickel, carbon steel and stainless steel tubing for high-pressure construction. Single Tube Model SA steam coil is designed for general purpose heating. The construction features a single tube design with opposite-end supply and return connections. A perforated baffle located directly behind the supply connection insures proper steam distribution. Model HA utilizes cupro-nickel, carbon steel and stainless steel tubing for high-pressure construction. Figure 3. Steam Horizontal Coil Piping Diagram Air Vent Drip Leg (14 Min.) Dirt Leg (6 Min.) Control Vacuum Breaker Union Optional Location for Air Vent Union Check Gate Supply Steam Trap Dirt Leg (6 Min.) Gate Steam Trap Gate To Condensate Return Note 1: Vacuum breakers and air vents should be piped to a drain or other suitable location where discharged steam cannot lead to personal injury. Figure 4: Steam Vertical Coil Piping Diagram 5 PSIG Min Vacuum Breaker Control Air Vent Steam Standard Steam Model SS steam coil features return-bend construction and sameend connections. Model SH utilizes cupro-nickel, carbon steel and stainless steel tubing for high-pressure construction. Inner distributing tubes are not recommended for vertical tube applications. 18 (Min) Float & Thermostatic Steam Trap Check To Condensate Return Gravity Drain Note: If there is back pressure in the condensate return line or if the condensate line is elevated higher than the steam trap, then a pressure powered pump is required in order to drain coil at all times. 3

Installation and operation Installation 1. Carefully remove the coil from the shipping package to avoid damage to the finned surface area. Damaged fins can be straightened using an appropriate fin comb. 2. Heatcraft recommends cleaning the coil with a commercially available coil cleaner prior to installation. Refer to Maintenance on Page 4 for cleaning recommendations. 3. Mount coil properly to insure positive condensate drainage. Refer to Mounting instructions on page 1. 4. Proper clearance should be maintained between the coil and other structures such as the fan, filter racks, transition areas, etc. 5. Utilize vacuum breakers on each coil. Steam traps require a positive pressure differential to force the condensate through the valve seat. If the coil s pressure drops below atmospheric, the pressure differential across the valve will be negative and the condensate will not drain. This condition can lead to serious damage or failure of the coil due to freezing, water hammer and corrosion. Refer to piping diagram for recommended placement. See Note 1 in Figure 3 - Steam Horizontal Coil Piping Diagram on Page 2. 6. Trap each coil separately. Differences in pressure from coil to coil can result in the backing-up of condensate which will result in poor coil performance and possible damage. 7. Provide an air vent for each coil at its highest location. Modine provides a 0.5 threaded vent connection on the return manifold as a standard on all steam coils. Non-condensable gasses present in the steam will collect in a coil and reduce its capacity. Therefore, it is necessary to provide a means for the removal of these gasses. Also, these gasses can diffuse into the condensate forming byproducts, which can lead to severe corrosion. See Note 1 in Figure 3 - Steam Coil Piping Diagram on Page 2. 8. Steam supply lines need to be drained of condensate. This can be accomplished by the use of drip legs. This ensures that high quality steam enters the coil. 9. Condensate return piping should be the same size as the coil s return connection from the coil outlet to the steam trap. Not following this guideline could result in the coil to become filled with condensate and the system to stall. For more information on steam stall, see page 4. 10. Once installed, the coil should be pressurized to 100 psig with dry nitrogen or other suitable gas. The coil should be left pressurized for a minimum of 10 minutes. If the coil holds the pressure, the field connections can be considered leak free. If the pressure drops by 5 psig or less, re-pressurize the coil and wait another 10 minutes. If the pressure drops again, there are more than likely one or more small leaks, which should be located and repaired. Pressure losses greater than 5 psig would indicate a larger leak, which should be isolated and repaired. Be sure to check valves and fittings as potential sites for leakage or bleed. 11. All field brazing and welding should be performed using high quality materials and an inert gas purge (such as nitrogen) to reduce oxidation of the internal surface of the coil. 12. All field piping must be self supporting. System piping should be flexible enough to allow for thermal expansion and contraction of the coil. The use of flexible connections and/or swing joints is recommended. 13. The coil along with the control valve and trap should be isolated by manual valves to allow for servicing. 14. For horizontal coil installation, refer to Figure 3 - Steam Horizontal Coil Piping Diagram on Page 2 for general piping. 15. For vertical coil installation, refer to Figure 4 - Steam Vertical Coil Piping Diagram on Page 2 for general piping. 16. Inner distributing tubes are not recommended for vertical tube applications. 17. If you are unsure about any portion of the installation, contact your local steam specialist for assistance. Failure to properly install the coil can result in irreparable damage to the coil as well as other components in the system. Operation 1. Proper airflow distribution is vital to coil performance. Air-flow anywhere on the coil face should not vary by more than 20%. 2. Air velocities should be maintained between 200 and 1500 feet per minute. 3. Operating pressures must be at or below the maximum operating pressure for that coil at the steam temperature. Pressure and temperature limitations can be determined through Modine s Pressure and Temperature program. Contact your local Modine coil representative for assistance. 4

Maintenance and system stall Maintenance 1. Scheduled plant maintenance should include the draining and flushing of the condensate drip legs and sediment traps as well as inspection of condensate traps, vacuum breakers, air vents and valves. Boiler water analysis should also be performed on a regular basis. 2. To continually deliver optimum heating capacity, both the external and internal heat transfer surfaces must be maintained as clean and corrosion free as possible. The finned surface can be maintained by the use and constant inspection of pre-filters. The filters should be replaced as needed. 3. Should the finned surface become fouled, the coil can be cleaned utilizing commercially available coil cleaning fluids. Caution should be exercised in selecting the cleaning solution as well as the cleaning equipment. Improper selection can result in damage to the coil and/or health hazards. Be sure to carefully read and follow the manufacturer s recommendations before using any cleaning fluid. Clean the coil from the leaving air-side so that foreign material will be washed out of the coil rather than pushed further into the coil. 4. Internal coil maintenance consists primarily of preventing scale and corrosion. This is accomplished through aggressive boiler water treatment, removal of dissolved oxygen and the removal of non-condensable gasses such as carbon dioxide. NOTE! Boiler water treatment is beyond the scope of this manual. Contact your local water treatment specialist for assistance in establishing a proper boiler-water treatment program. System Stall System stall is lack of positive differential across the steam trap, and temperature controlled equipment will always be subject to this problem when the trap must operate against back pressure. Under these conditions, a vacuum breaker is ineffective because stall always occurs above atmospheric pressure. Even when steam is supplied at a constant pressure or flow to batch type equipment, stall can occur for some period of time on startup when the steam condenses quickly and the pressure drops below the required differential. What happens when the system stalls is that the effective coil area drops as the steam chamber floods and heat transfer is reduced until the control valve responds to deliver an excessive supply of steam to the coil. This results in a hunting system with fluctuating temperatures and hammering coils as the relatively cooler condensate alternately backs up, then at least some portion is forced through the trap. This hunting occurs on the milder temperature days because the coil is sized for the lowest possible air temperature. The coil cannot change surface area, so the steam pressure/temperature control valve takes over to accommodate the change in load. drained into an atmospheric return because of the large amount of energy that is lost from the vent. Primary Types of Drainage Systems 1. Gravity drain to atmospheric (0PSIG) condensate return with no elevation after the steam trap. This gravity drainage system must assure that there is never pressure above atmospheric in the condensate return. CAUTION, failed open steam traps and other leaks from the steam piping to the condensate return piping will pressurize the condensate return enough to cause steam stall. High temperature/pressure condensate will flash back into steam immediately downstream of the steam traps and cause back pressure on the steam traps draining the coil causing steam stall. Condensate return lines designed for atmospheric pressure must be adequately sized to allow for the flash steam and condensate. They must be pitched toward the condensate receiver which is vented to atmosphere. The vent line off of the atmospheric receiver must be sufficient size to vent all flash steam without building up a back pressure in receiver. 2. Closed loop system using an Automatic Pump Trap. To make equipment drain by gravity against back pressure, the steam trap should be replaced by an Automatic Pump Trap (APT). In this arrangement, the equipment does not have a vacuum breaker but is pressure equalized to drain by gravity to the APT, then the equalizing line is isolated while condensate is pumped from the system. This arrangement will drain the coil free of condensate at all times (even under a vacuum). If there is sufficient differential pressure to move the condensate through the APT then it functions as a normal steam trap. Then when needed it functions as a pump, using steam as a motive force to move the condensate to the condensate system. The APT is a simple and efficient solution to a difficult problem. Without the need for high Net Positive Suction Head NPSH, the APT will operate with only 8 installation head from the base of the pump, and remove condensate from a coil under vacuum, atmospheric or higher pressures, discharging to either high or low level condensate return lines. The solution to all system stall problems is to make condensate drain by gravity under all conditions including vacuum. Atmospheric systems tend to operate more predictably and are generally easier to control but major heating equipment is usually not 5

Modine Grenada LLC Tel: 800-225-4328 Fax: 662-229-4212 Grenada, MS Email: coils@modine.com