Welcome to the Public Information Update for

Similar documents
Highway 427 Industrial Secondary Plan Area 47 Schedule C Class Environmental Assessment For Arterial Roadways

St. Clair Avenue West Area Transportation Master Plan

Mavis Road Class Environmental Assessment

WELCOME TO OPEN HOUSE TWO November 28, 2018

WELCOME TO OPEN HOUSE # 3

Bostwick Road. Municipal Class Environmental Assessment. October 13, City of London. Bostwick Road Municipal Class Environmental Assessment

Better Cycling. The City will update the cycling master plan (London ON Bikes) based on the approved BRT network.

Vaughan Metropolitan Centre (VMC) Black Creek Renewal CLASS ENVIRONMENTAL ASSESSMENT

Heritage Road Improvements from Steeles Avenue to Rivermont Road

Portage Parkway Environmental Assessment Public Information Centre No. 1

Bostwick Road. Municipal Class Environmental Assessment. Public Information Centre #2 June 14, City of London

Public Information Centre #1

Public Information Centre

Improvements Municipal Class Environmental Assessment. Public Information Centre #1 June 11, 2015

Public Information Centre No. 1 King-Vaughan Road Bridge Replacement Municipal Class Environmental Assessment City of Vaughan

Rapid Transit Implementation Working Group September 14, 2017

Introduction. Public Information Package. Project website. Overview. Class Environmental Assessment Process

TABLE OF CONTENTS Page

Commissioners Road West Realignment Environmental Assessment

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

Lower Don River West Remedial Flood Protection Project TABLE OF CONTENTS. Page. Executive Summary

Master Environmental Servicing Plan & Secondary Plan

Your town s subdivision or land use ordinance standards should reference the following street standards, for example:

The purpose of tonight s PIC is to:

North York Centre South Service Road


Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation. Public Information Centre #1

Cherry Beach Shoreline Protection Infrastructure Conceptual Design and Class EA

GEOMETRIC IMPROVEMENTS AND WATERMAIN LOOPING MUNICIPAL CLASS ENVIRONMENTAL ASSESSMENT

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

Red Hill Valley Project More Than A Road October 16, 2006

WELCOME and introduction

Gold Line Bus Rapid Transit Transit Oriented Development (BRTOD) Helmo Station Area Plan

Elfrida Growth Area Study

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

APPENDIX K WINDSOR OFFICIAL PLAN

Elevated Water Storage Facility and Pumping Station Municipal Class EA for Pressure District 7: PIC # 1 Summary

Municipal Class EA Study Public Information Centre No. 1 December 13, :00 pm 7:00 pm. Please sign in so we can keep you updated on this study

ENBRIDGE GAS DISTRIBUTION INC. Proposed Relocation for Ninth Line, Markham and Whitchurch-Stouffville. Environmental Screening Report

The Gore Road Queen Street East to Castlemore Road

December 11, December 10, 2015

AMENDMENT NO. 30 TO THE OFFICIAL PLAN OF THE TOWN OF MILTON

Southwest Fleetwood Enclave

Burloak Drive Grade Separation

Public Information Centre. Welcome

Master Environmental Servicing Plan & Secondary Plan

NORTHEAST RIVER CROSSING FUNCTIONAL PLANNING STUDY

12 AMENDMENT NO. 149, TOWN OF MARKHAM HIGHWAY 404 NORTH SECONDARY PLAN

THE GARDEN CITY PLAN. City of St. Catharines Official Plan. City of St. Catharines

Clair-Maltby Community visioning

GLEN ROAD PEDESTRIAN BRIDGE ENVIRONMENTAL ASSESSMENT STUDY PUBLIC INFORMATION CENTRE #2 OCTOBER 24, 2017

Public Open House. Welcome! Presentation at 5:15 p.m. Please sign-in at the registration table

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Commissioners Road West Realignment Environmental Assessment

Pipeline Trail Master Plan Preliminary Concept Design. O Connor Mokrycke Consultants May 14, 2015 meeting

CHAIR AND MEMBERS CIVIC WORKS COMMITTEE MEETING ON AUGUST 13, 2018

The West Vaughan Employment Area Secondary Plan Policies

City of Toronto. Emery Village Transportation Master Plan

Western Road/Wharncliffe Road North Widening from Platts Lane to Oxford Street. Municipal Class Environmental Assessment Public Information Centre #1

North Oakville East Parks Facilities Distribution Plan. November, 2009

Complete Neighbourhood Guidelines Review Tool

COMMUNITY SUSTAINABILITY AND ENVIRONMENTAL MASTER PLAN IMPLEMENTATION UPDATE

Route 347. New York State Department of Transportation Region 10, Long Island. THE GREENING of ROUTE 347

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

CONTENTS 2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH 2.1 MANAGING SUSTAINABLE GROWTH THE VISION TO GOALS AND OBJECTIVES 2.3 MARKHAM STRUCTURE

Inform you of the purpose and scope of the study for PTH 100 and a proposed future St. Norbert Bypass;

Appendix B-13: Community Stakeholders Group Meeting Materials and Minutes

Rapid Transit Implementation Working Group

EXECUTIVE SUMMARY. Introduction

Asbury Chapel Subdivision Sketch Plan

Toronto Complete Streets Guidelines

9 th Street Sub Area Plan

McKay Road Interchange and Salem / Lockhart Crossing

MAYFIELD WEST SECONDARY PLAN PHASE 2

Public Information Centre # 2 Coronation Park Drainage Improvements Town of Oakville Municipal Class Environmental Assessment

BOISE, IDAHO COUNCIL WORK SESSION AGENDA September 19, :00 PM City Hall - Council Chambers

IOWA HIGHWAY 57 / WEST 1 ST STREET STUDY PUBLIC INFORMATIONAL MEETING APRIL 22, 2014

7.0 SOCIAL, ECONOMIC, AND ENVIRONMENTAL ISSUES

The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

AMENDMENT NO. 38 TO THE CITY OF BARRIE OFFICIAL PLAN SALEM SECONDARY PLAN. June 2014

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

COUNCIL ATTACHMENT 2 HIGHWAY 7 CORRIDOR AND VAUGHAN NORTH-SOUTH LINK

Recreational Pathway Crossing of Richmond Street Municipal Class Environmental Assessment. Public Information Centre #2 April 22, 2015

The transportation system in a community is an

URBAN DESIGN BRIEF URBAN DESIGN BRIEF 721 FRANKLIN BLVD, CAMBRIDGE August 2018

Welcome. Date: Thursday March 2, 2017 Time: 6:30 p.m. 9:00 p.m. Location: Woodview School Gym, 69 Flatt Road, Burlington Presentation Time: 7:00 p.m.

1 Introduction. Chapter. In this chapter:

London s Bus Rapid Transit System

Bressa Developments Limited. Planning Justification Report. Revised Draft Plan of Subdivision and Zoning By-Law Amendment

CITY OF VAUGHAN EXTRACT FROM COUNCIL MEETING MINUTES OF NOVEMBER 15, 2016

Westwood Shopping Center Sketch Plan, Plan # February 23, 2017 Item # 9

Emery Village Road 2A Municipal Class Environmental Assessment Study

2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS

2.0 A FRAMEWORK FOR SUSTAINABLE GROWTH CONTENTS

Alternatives Development Three conceptual alternatives were developed for the Race Road/Jessup Village Planning Study and are described below:

City of Grande Prairie Development Services Department KENNEDY DEVELOPMENTS LTD. OUTLINE PLAN OP-09-01

APPENDIX F: EXTERNAL APPROVALS

Transcription:

Welcome to the Public for 1

Tonight, we invite you to. Welcome to the Public 01 02 03 04 05 WelcomeL Sign-in and take a comment sheet Learn about the process. Review findings of previous studies. Learn about future development and traffic. Discover the problems and opportunities being addressed. 07 08 06 WELCOME 09 Ask questions and provide insight. Provide feedback. Let us know what is most important to you. Find out where the study is going next Your feedback is important, and will be incorporated and considered in the design process! Comment Deadline is October 6, 2017 2

Within Stoney Creek, Hamilton Barton Street, from Fruitland Road to Fifty Road Fifty Road, from Highway 8 to South Service Road Study Area and Structure 3

Project Timeline and Environmental Assessment Process Phase 1 Problem or Opportunity Phase 2 Alternative Solutions Stoney Creek Urban Boundary Expansion (SCUBE) Transportation Master Plan Completed September 2017 PIU # 1 Confirm findings of previous studies and develop the preferred roadway designs. Phase 3 Alternative Design Concepts for the Preferred Solution Will include: Existing and future conditions; Confirmation of needs and opportunities; Record of public input; Alternative designs and evaluation; Environmental impacts and mitigations. Winter 2017/2018 PIC # 1 Included in this EA Phase 4 Environmental Study Report Presented to council for approval prior to 30 day review. Spring 2018 30 Day Review Public input is an important and mandated component of the EA process. Your opinions matter. To stay up-to-date with project progress and join the discussion, please sign up to receive future direct mail notices and/or find us on Twitter to receive electronic notification. Phase 5 Implementation 4

Planning and Policy Context The current EA Study builds upon several other studies including: Hamilton to grow by 50% by 2041. Incorporates the Fruitland-Winona Secondary Plan Identifies Barton Street Pedestrian Promenade. Bike lanes recommended for Barton Street and Fifty Road Current 2009 study is being updated Stoney Creek transportation needs and opportunities. Plans based on growth up to 2031 Stormwater controls Culvert improvements Species at risk habitats Fifty Road identified as terminus of the future B Line. City of Hamilton *URBAN DRAW POLICY* as well as the City of Hamilton Urban Trails Policy, Trails Master Plan (2016), Transportation Master Plan (2007, currently being updated), and the ongoing Block Servicing Studies (2016-17) 5

Planning and Policy Context Stoney Creek Urban Boundary Expansion Transportation Master Plan (2008) Recommends: Several intersections be considered for signals, turning lanes or roundabouts Barton Street be widened to included a two-way left turn centre lane. City to consider a potential interregional, multi-modal transit terminal at Fifty Road and South Service Road 6

Planning and Policy Context Fruitland-Winona Secondary Plan (2013) Lands south of Barton Street; Recommends the Barton Street Pedestrian Promenade; Future Rapid Transit on Barton Street; Identifies current land use designations for future development; Identifies the transportation, transit and active transportation linkage objectives. 7

Problem and Opportunity Statement The City is taking this opportunity improve Barton Street and Fifty Road in order to: Provide safe, comfortable, accessible and efficient pedestrian and cycling facilities to encourage active transportation and healthier lifestyles within the community; Ensure both commuter and recreational transportation needs are met across all age groups and transportation modes; Improve connectivity between residential areas, schools, work places and other community Points of Interest ; Improve safety and reduce delays at intersections, including the intersection with the CN Rail and Metrolinx line on Fifty Road, for all vehicles and other modes of transportation; Create an innovative, landscaped, linear green space along the south side of Barton Street to encourage active transportation and provide a buffer between residential communities to the south and employment areas to the north; Plan, and reserve right-of-way, for future implementation of local and rapid transit within the study roadways. City of Hamilton s Community Vision Theme 1: Community Engagement and Participation Theme 2: Economic Prosperity and Growth Theme 3: Healthy and Safe Communities Theme 4: Clean and Green Theme 5: Built Environment and Infrastructure Theme 6: Culture and Diversity 8

Existing Land Use Existing and Future Land Use Future Land Use Primarily low-density residential to the south and employment to the north. Intersection of Highway 8 and Fifty Road is part of the Escarpment Protection Area Greenbelt areas between Glover Road and McNeilly Road, as well as along Fifty Road south of the rail corridor. Future land use has been identified through the Fruitland- Winona Secondary Plan 1. 1 Portions of this Secondary Plan are still under Appeal at the Ontario Municipal Board. 9

Existing Traffic Volumes Intersection of Fifty Road and South Service Road is extremely congested during peak periods. Remaining intersections generally function well. Future Traffic Volumes Existing and Future Traffic Volumes By 2031, approximately 1500 vehicles will use the study roads during the p.m. peak period. Addition of traffic signals and/or turning lanes or conversion to roundabouts will be needed at: Barton Street and each of Fruitland Road, Glover Road, McNeilly Road, Lewis Road and Winona Road. Fifty Road and each of Highway 8, Barton Street and South Service Road. Existing Intersection Levels of Service (LOS) During the p.m. Peak Period 2031 Intersection Levels of Service (LOS) During the p.m. Peak Period Without Intersection Improvements LOS Description of Operations LOS Description of Operations A Little to no delay at Frequent queuing and delay (< D intersections 55 sec/vehicle) Minimal delay Significant delay and queuing, B E occasionally vehicles may need to wait for a second green C Some queuing and delay Intolerable delays and queues. F (<35 sec/vehicle) 10 2031 Intersection Levels of Service (LOS) During the p.m. Peak Period With Intersection Improvements

Existing and Future Transportation Network Existing Transportation Network Barton Street and Fifty Road are two lane roads with gravel shoulders and ditches. Limited sidewalks. All intersections are currently stop controlled except: Barton Street at Fruitland Road (signalized); Fifty Road at Highway 8 (signalized); Fifty Road at South Service Road (being signalized). Future Transportation Network The SCUBE TMP recommends: A two way left turn lane along Barton Street from Fruitland Road to Fifty Road. Fifty Road be widened for future rapid transit. Based on the traffic analysis completed as part of the current study, it was confirmed that: A single lane in each direction (with centre two-way-leftturn lane on Barton Street) will be able to provide the required capacity to 2031 on both study roadways. Grade separation of Fifty Road and the CNR crossing will be required in the near future. Barton Street looking east beyond Escarpment Drive.. Fifty Road looking north towards the CN Rail crossing. 11

Active Transportation Planned Active Transportation and Transit A need for improved pedestrian facilities has been identified. These will include: 4.0 m-wide Pedestrian Promenade on the south side of Barton Street, and Continuous, wide, sidewalks along both study roadways. Cycling facilities will also be provided along both roadways. Transit Limited existing transit services (Trans-Cab) Provides short distance service within three sections of Stoney Creek Service provided along entire length of Barton Street study area Service runs Monday-Saturday, 5am to 1:20 am Local transit services will ultimately be provided. Rapid transit corridor as part of the City of Hamilton BLAST program, to be implemented in the future pending budget approval Potential for a future multi-modal transit hub along Fifty Road between South Service Road and the CN Rail Line. While not currently warranted, extension of the B line to Fifty Road has been contemplated (to follow Barton Street from east of Fruitland Road). Need to reserve right-of-way width that could support rapid transit. Well-used multi-use pathway in Conyers, GA left) and cycle lanes in Richmond, BC (right). 12

Active Transportation Facility Alternatives AODA-Compliant Pedestrian Facilities All proposed facilities would be compliant with the Association for Ontarians with Disabilities Act. Cycling Facilities Provided as either on or off-road facilities, or a combination. Standard Arterial Sidewalk 2.0 m wide concrete sidewalk. Dedicated Cycle Lanes Generally 1.5 m wide and may have a buffer. Wide Arterial Sidewalk Ideally 3.5 m width to accommodate higher volumes. Cycle Track Physically separated facilities solely for use by cyclists. Multi-Use Pathways Shared facilities for pedestrians and cyclists. Typical multi-use pathway width is 3.0 m. Multi-use pathway proposed for Barton Street is 4.0 m wide (referred to as a Promenade ) 13

Barton Street Pedestrian Promenade Part of approximately 5 km long greenspace that will enhance the interface between the employment lands to the north, and the residential development to the south Will be designed with the principles of: Place-making, Walkability, Seating and shade, Linkages, Innovative green technologies, and Landscaping Will make Barton Street the prime pedestrian and cycling corridor in the area. Fruitland-Winona Secondary Plan Concept of Barton Street, looking south towards the Pedestrian Promenade. Grande Promenade, Hot Springs, AR Pedestrian Promenade in Houston, TX. Potential Barton Street alternative cross-section looking east with Pedestrian Promenade on south side. 14

Technical Studies Being Completed The following investigations and inventories are being completed as part of the current Class EA: Natural Heritage Inventories Archaeology Background studies and fieldwork will determine the presence of species-atrisk, sensitive vegetation communities, sensitivity of watercourse crossings, and critical features. Identification of where mitigation may be needed, including water crossings. Fluvial Geomorphology To confirm stream channelization, flows and fish passage. Identification of mitigation measures as required. Hydrogeology Determine whether the project will present any risk to the existing water wells and apply mitigation measures as required. Determine whether the land within the project limits is an archaeological site or has the potential to have archaeological resources. Built and Cultural Heritage Determine whether any built or cultural heritage features exist within the project limits. Identification of where mitigation may be needed to protect these features. Transportation & Traffic Identification of existing safety concerns. Modelling of existing and future traffic to determine lane requirements and test intersection configurations. 15

Aquatic Investigations Natural Heritage Investigations Terrestrial Investigations Aquatic habitat assessments were completed at 7 streams and Fifty Creek (locations illustrated on the next panel) Crossings 5.2, 6.1, and 7.2 are ephemeral (flow only after rainfall) and provide indirect fish habitat Crossings 5.0, 6.0, 7.0, 7.1 are intermittent (longer duration flow and dry parts of the year) and provide indirect fish habitat Fifty Creek is a permanent watercourse providing direct warm water fish habitat. No aquatic Species at Risk in the study area. MNRF reported four bird Species at Risk in the area: Barn Owl, Barn Swallow, Bobolink, and Chimney Swift. Common Nighthawk was also reported in City of Hamilton records. Breeding bird studies identified 44 species of birds. Barn Swallow, Eastern Meadowlark and Bank Swallow were identified. Each of these species are listed as threatened Key Natural Heritage Features Fifty Creek Valley Environmental Sensitive Area Dean Vista Park woodlands Watercourse Crossing 12.0: Fifty Creek Watercourse Crossing 5.2-Upstream Watercourse Crossing 5.0- Downstream 16

Natural Heritage Investigations, Continued 17

Preliminary Technical Study Findings 2 3 7 9 CONSTRAINT OPPORTUNITY OPPORTUNITY CONSTRAINT Extensive existing overhead utilities located immediately behind the existing shoulder/sidewalk. Provide sidewalk or multi-use path on north side to encourage active transportation. Improve drainage Parking for commercial building fronts Barton Street, may be impacted by new ROW widening FRUITLAND ROAD 1 2 3 4 BARTON STREET 5 6 7 SUNNYHURST AVENUE 8 9 KENMORE AVENUE 10 BLOCK 1 THE GRAND OLYMPIA 1 4 5 6 8 10 CONSTRAINT OPPORTUNITY CONSTRAINT CONSTRAINT OPPORTUNITY CONSTRAINT OPPORTUNITY Improve quality and type of Homes are located in close Improve watercourses Homes are located in close Improve drainage active transportation facilities proximity to existing right-ofway proximity to existing right-of- on south side. limit. way limit Grand Olympia located in close proximity to the existing right-of-way limit. Several Hamilton Conservation Authority (HCA) regulated features exist within the study limits. Permits will likely be required. 18

Preliminary Technical Study Findings 4 6 CONSTRAINT Extensive existing overhead utilities located immediately behind the existing shoulder/sidewalk. CONSTRAINT Home is located in close proximity to existing right-ofway limit. CORNELL AVENUE JONES ROAD KAYCAN 6 1 2 3 4 5 BLOCK 2 BLOCK 1 1 2 3 5 CONSTRAINT OPPORTUNITY OPPORTUNITY OPPORTUNITY Parking and access to bays for Barton Auto Service in close proximity to existing right-of-way. Signalization or implementation of roundabouts at major intersections. Mature trees could provide shade to future pedestrian facilities. Improved drainage through provision of a single, properly sized culvert. Low impact development to be employed. 19

Preliminary Technical Study Findings 1 4 6 7 8 CONSTRAINT ISSUE OPPORTUNITY POTENTIAL CONSTRAINT CONSTRAINT Extensive existing overhead utilities located immediately behind the existing shoulder/sidewalk. Hamilton Fire Station located on Barton Street. Emergency vehicles access will be required at all times. Improved walking and cycling connectivity to Dean Vista Park and Glover Golf Club. Cultural meadows and/or Orchards are common habitat for birds. Terrestrial studies will confirm presence Avoid adverse impacts to Dean Vista Park. GLOVER ROAD 1 2 3 4 FIRESTATION BARTON STREET 6 8 7 9 GLOVER GOLF & SPORTS PARK BLOCK 2 FORMER STONEY CREEK CHRISTIAN FELLOWSHIP CHRISTINA AVENUE 5 2 3 5 9 POTENTIAL CONSTRAINT CONSTRAINT CONSTRAINT OPPORTUNITY Since the study area is heavily disturbed due to anthropogenic activities, archaeological potential is deemed to be low. Driveway of home lies within current right-of-way Lands in this area fall under the protection of the provincial Greenbelt Plan as Tender Fruit and Grape Lands. Design to try and maintain mature trees to provide shade for future pedestrian facilities. 20

Preliminary Technical Study Findings 2 4 5 6 7 CONSTRAINT CONSTRAINT CONSTRAINT CONSTRAINT OPPORTUNITY Home is located in close proximity to existing right-ofway limit. Extensive existing overhead utilities located immediately behind the existing shoulder/sidewalk. Access to local businesses, such as Hamilton Builders Supply, has to be considered Design to try and maintain existing orchard. Upgrade pedestrian walkway and increase offset from edge of travelled lanes. 5 6 1 2 4 BARTON STREET HAMILTON BUILDERS SUPPLY 7 3 BLOCK 3 WINONA ELEMENTARY SCHOOL 1 3 OPPORTUNITY Signalization or implementation of roundabouts at major intersections. CONSTRAINT Homes are located in close proximity to existing right-ofway limit. 21

Preliminary Technical Study Findings 2 3 4 7 8 9 OPPORTUNITY CONSTRAINT CONSTRAINT OPPORTUNITY CONSTRAINT CONSTRAINT Improve drainage throughout the study area. Barton Street is skewed through the Lewis Road intersection. Extensive existing overhead utilities located immediately behind the existing shoulder/sidewalk. Improve active transportation infrastructure along north side of Barton Street New townhomes are being constructed at this location. Bell service station located in close proximity to the existing right-of-way LEWIS ROAD ESCARPMENT DR. 8 9 WEST AVE. 3 4 BLOCK 3 BARTON STREET 7 WINONA ELEMENTARY SCHOOL 1 3 5 6 TUSCANI DR. 10 1 5 6 10 CONSTRAINT OPPORTUNITY OPPORTUNITY CONSIDERATION Winona Elementary school property. Access and safety will be important considerations during design. Improve active transportation linkages to school and employment areas to the east and west. Potential extension of Escarpment Drive, in support of future rapid transit implementation. Neighborhoods are located in close proximity to existing right-of-way limit. Minimize property impacts. 22

Preliminary Technical Study Findings 1 2 4 5 7 8 12 CONSTRAINT CONSTRAINT CONSTRAINT CONSTRAINT CONSTRAINT CONSTRAINT CONSTRAINT No sidewalk or asphalt path for active transportation. Auto repair shop parking located very close to existing right-of-way Residential development on both sides of Barton Street limits extent to which right of way can be widened. Private gardens located in close proximity to existing edge of pavement. Sidewalk in close proximity to roadway. Existing residential properties in close proximity to the current Barton Street right-ofway. St. Gabriel s Elementary School Property. Safe pedestrian access needs to be maintained at all times. 12 ST GABRIEL CATHOLIC ELEMENTARY SCHOOL 2 5 8 1 3 4 6 7 9 10 11 WINONA PARK 3 6 9 10 11 CONSTRAINT OPPORTUNITY OPPORTUNITY OPPORTUNITY OPPORTUNITY Extensive existing overhead utilities located immediately behind the existing shoulder/sidewalk. Improve drainage. Park floods in high rain. Design to try and maintain existing mature trees to provide shade and interest. Improved active transportation linkages to Winona Park. Improve visibility of cross walk between Winona Park and sidewalk leading to St. Gabriel s Elementary School. 23

Preliminary Technical Study Findings 1 3 4 5 6 CONSTRAINT CONSTRAINT CONSTRAINT CONSTRAINT CONSTRAINT Steep slope adjacent to roadway, would require retaining wall Extensive existing overhead utilities located immediately behind the existing shoulders on both sides of roadway Homes are located in close proximity to the existing rightof-way limit. Existing commercial property located in close proximity to existing edge of pavement on Barton St. Existing residential buildings located in close proximity to existing Barton Street edge of pavement. N 6 WINONA GARDENS 1 2 3 4 5 8 9 CN RAILWAY 10 7 2 7 8 9 10 CONSTRAINT CONSTRAINT CONSTRAINT CONSTRAINT OPPORTUNITY OPPORTUNITY Environmentally Sensitive Area (ESA) south of Barton Street and Fifty Road intersection Fifty Mile Wetland Complex. Existing creek crossing under intersection. Potential habitat for sensitive species. Stone wall with heritage value. Potential for grade separation of CN Rail line being investigated. Improved active transportation linkage from North of QEW to St. Gabriel Elementary school on Barton Street. 24

Investigate Innovative Solutions Theme 4 of the City of Hamilton s Community Vision is Clean and Green. Potential use of innovative materials will demonstrate what can be accomplished with sustainable alternatives. Cost/benefit analysis for potential materials will be completed as part of the EA and further investigated during detailed design. These include: Use of solar panels along the pedestrian promenade Solar-powered LED lighting Permeable pavements Handling of stormwater through Low Impact Development Potential car share parking Solar-powered electric car charging stations Low impact development in green spaces Solar-powered pavers at installation in Sandpoint, Idaho. Collected energy can be stored to power street lights and/or the light the actual panels themselves. The Colas Group, a subsidiary of France s Bouygues SA, has developed Wattway, the world s first photovoltaic road surface which can be applied directly onto existing roadway surfaces. Under ideal conditions, a single home could be powered for every 20 m 2 of Wattway installed (equivalent to ~ 3 m length of standard local roadway). The use of solar-powered LED street lighting reduces electrical needs by an estimated 950 kwh /year/ light. Additionally, no trenching is required for installation of wiring. 25

Moving Towards a Preferred Design As we move towards a preferred design, alternatives will be evaluated according to the following criteria: Conformance to Planning Objectives Residential / Business Access and Displacement Emergency Services Noise Levels Impacts Archaeological, Built Heritage and Cultural Landscape Impacts Agricultural Impacts Property Impacts Land Use Impacts Addresses Problem and Opportunity Statement Transportation Network Safety Transportation Network Connectivity Transportation Network Capacity Promotion of Active Transportation Transit Supportive Development Structural Impacts Stormwater Management and Low Impact Development Hydraulic and Hydrology Impacts (Creeks) Geometric Design Standards Walkability to schools, stores and employment areas Social / Cultural Natural Environment Evaluation Criteria Technical Engineering Technical Financial Natural Heritage Feature Impacts Vegetation and Wetland Impacts Avian and Wildlife Environment Impacts Species at Risk Impact Watercourses and Aquatic Environment Impacts Groundwater Impacts Utility Relocation Capital Costs Life Cycle Costs Operating Costs Maintenance Costs Property Acquisition 26

Thank you for your Participation! Over the coming year, the Study Team will: 1. Complete the Environmental Inventory through field investigations to confirm findings of the SCUBE and Fruitland-Winona Secondary Plan studies. 2. Develop the preferred design concepts and cross-sections. Using comments received, the conceptual designs will be developed. 3. Present and gather input on the preliminary designs at PIC #2, anticipated in Winter 2017/2018. 4. Complete the preliminary designs based on feedback from PIC#2, the conceptual designs will be advanced to the preliminary design stage. Anticipated impacts and mitigation methods will be fully documented. 5. Prepare the Environmental Study Report (ESR) and present to council for approval 6. Once approved, file the ESR for review and comment during a 30 day review period. The ESR will be available to the public for comment and if anyone is strongly opposed to the report, an appeal may be made to the Minister of the Environment and Climate Change under the EA Act. We Want to Hear From You! Let us know what is most important to you, your family and/or your business. Please place comment sheets in the Comment Box or send to one of the mailing or email addresses listed on the comment sheet and project website. /barton-fifty-ea Only those that express interest and provide contact information will be notified directly of future steps in the study process. Comment Deadline October 6, 2017 27

Barton Street and Fifty Road Date: September 21st, 2017 Results of Ecological Investigations Fisheries and Aquatic Ecosystems Terrestrial Ecology And Species at Risk Aquatic habitat assessments were completed at 7 streams and Fifty Creek (locations illustrated on the next panel) MNRF reported four bird Species at Risk in the area: Barn Owl, Barn Swallow, Bobolink, and Crossings 5.2, 6.1, and 7.2 are ephemeral (flow only after rainfall) and Chimney Swift. provide indirect fish habitat Common Nighthawk was also reported in City of Hamilton records. Crossings 5.0, 6.0, 7.0, 7.1 are intermittent (longer duration flow and dry parts of the year) and provide indirect fish habitat Fifty Creek is a permanent watercourse providing direct warm water fish habitat. No aquatic Species at Risk in the study area. Watercourse Crossing 12.0: Fifty Creek Watercourse Crossing 5.2-Upstream Infrastructure Planning Section Breeding bird studies identified 44 species of birds. Barn Swallow, Eastern Meadowlark and Bank Swallow were identified. Each of these species are listed as threatened Key Natural Heritage Features Fifty Creek Valley Environmental Sensitive Area Devils Punchbowl Escarpment Green Belt Winona Park Hamilton Region Conservation Regulated Limits. Watercourse Crossing 5.0- Downstream 1

Barton Street and Fifty Road Results of Ecological Investigations, Continued Infrastructure Planning Section 2