Building Green: An Update on Atlanta's Green Infrastructure Approach

Similar documents
Building Green: An Update on Atlanta's Green Infrastructure Approach

Ted Turner Drive Resilience Corridor Challenge

4. CONCEPT PLAN DEVELOPMENT

Green Infrastructure and Low-Impact Development Technologies

Green Infrastructure & Low Impact Development

Post Construction BMP Inspection. Scott Taylor, P.E. Stormwater

STORMWATER MANAGEMENT CODES ANALYSIS RICHLAND COUNTY, SC SITE PLANNING ROUNDTABLE

Putting a LID on Stormwater Pollution. Michele Loudenback, RPES Stormwater Enforcement Water Quality Division

Intercept, Detain and Release. Custer Avenue CSO Relief GRESHAM, SMITH AND PARTNERS

A LOW IMPACT DEVELOPMENT MANUAL FOR COASTAL SOUTH CAROLINA TABLE OF CONTENTS

Sustainable Stormwater Retrofit Best Practices

Going Green with the NYS Stormwater Design Standards

Green Infrastructure Overview

Melissa Bernardo Hess, PE, CFM February 18, 2016

NEORSD Green Infrastructure Grant (GIG) Program Opening Remarks

Low Impact Development in Coastal South Carolina: A Planning and Design Guide

Appendices: Glossary. General Terms. Specific Terms. Low Impact Development Approaches Handbook

Rebecca Dohn October 13, 2017

Attachment 2: Permeable Pavement Design Guidelines

Third Ave CSO Integrated Green Infrastructure

CHAPTER 11 SITE DESIGN AND LOW IMPACT DEVELOPMENT

Kearney Post-Construction Stormwater Program

Retrofit of the Gwinnett County DWR Facility Using Low Impact Development Practices SESWA 2012 Annual Conference October 19, 2012

Incorporating Sustainable Practices and Water Quality into Roadway Design. May 24, 2017

Selecting Appropriate Stormwater Control Measures for Your Development Project

Evaluating Urban Stormwater Retrofits in the SE US Coastal Plain

Green Roofs and Stormwater Management Virginia Stovin

Selecting Least Cost Green Infrastructure. James W. Ridgway, PE September 29, 2015

West Virginia Stormwater Management Manual: Methods.

Structural Stormwater Best Management Practices

GREEN ON THE HORIZON. Challenges of Integrating LID into New Development. Southeast Stormwater Association

Type. July 9, Green. Green. and an. storm. ft and took. cubic yards of soil. 31 species. The growth. was installed pound to the well as from

3. Are there any projects exempt from the definition of Regulated Projects?

County of Prince Edward. Stormwater Management Plan. Agreement in lieu of a Stormwater Management Plan

Using Runoff Reduction Practices to Shrink the Water Quality Volume (WQv) September 18, 2018 Jay Dorsey

New Tools/Resources for

HEALTH SCIENCES BUILDING REDEVELOPMENT PROJECT

Case Study: Dallas Green Infrastructure for Stormwater

The Benefits and Challenges Associated with Green Infrastructure Practices

Post-Construction BMPs

2012 Saginaw Bay Watershed Conference

Ken Kortkamp, PE San Francisco Public Utilities Commission San Francisco, CA

92 Minnesota Stormwater Manual

Planning, Design, and Construction of Green Infrastructure.

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Bioretention cell schematic key

What Are We Inspecting? Stormwater Treatment Measure Type and Design

5. LOW IMPACT DEVELOPMENT DESIGN STANDARDS

Phase II Storm Water Permit Program MS4 Permit

Stormwater Management Techniques WMPF LAND USE TRAINING INSTITUTE MARCH 14, 2018

Appendix D - Technical Design Criteria for BMPs

Karen Wiggen, RLA PGM/Planning Bob Harrington, P.E. PGM/CPIS Michael Clar, P.E. - ECOSITE

Types and Basic Design of Post-Construction BMPs

Post Construction BMPs

Can Urban Redevelopment Restore Aquatic Resources

Evaluating Low Impact Development Practices for Stormwater Management on an Industrial Site in Mississippi

Draft Impervious Cover Reduction Action Plan for West New York, Hudson County, New Jersey

Slow it, Spread it, Sink it using Green Stormwater Infrastructure

Green Infrastructure in the Greater Lansing Area

Green Infrastructure Program Updates

Stormwater Control Plan: Small (Tier 1) Land Development Project

Part 4: CRS Stormwater Management Activity (450) and Urban Flooding Best Practices

Green Infrastructure on Brownfields

C.3 STORMWATER TECHNICAL GUIDANCE. Table of Contents. Glossary... viii. Chapter 1 Introduction/How to Use this Handbook

Draft Impervious Cover Reduction Action Plan for West Long Branch Borough, Monmouth County, New Jersey

INTRODUCTION TO GREEN INFRASTRUCTURE HOW WE CAN PROTECT OUR COMMUNITIES AND OUR WATERS Maywood Public Library Bergen County, New Jersey

New Development Stormwater Guidelines

J. Paul Guyer, P.E., R.A.

Impervious Cover Reduction Action Plan for City of Vineland, Cumberland County, New Jersey

Retrofitting Sacramento State Campus with Low Impact Development Stormwater Control Measures: A Local Project with Regional Intent

Green Infrastructure Recommendations For Parks and Public Spaces

Coffee Creek Park Development Low Impact Development (LID)

Introduction to Low Impact Development. Fred Milch. East Central Florida Regional Planning Council

LID/GI and BMP Case Studies

Stormwater Low Impact Development - A Natural Solution

Reducing New York City s CSOs Using Green Infrastructure

Why and How to Evaluate the Feasibility of Infiltrating or Harvesting and Using Stormwater. Laura Prickett, EOA, Inc.

Managing Stormwater within the Road Right-of-Way: An Urban NAI Approach

APPENDIX G: TOWN ORDINANCE REVIEW

Storm Water Managament at the University of Michigan

Retrofitting Low Impact Development (LID) for Stormwater at Sacramento State. City of Sacramento Sacramento State Facilities Management

WQ-07 INFILTRATION TRENCH

From and

Green Infrastructure and the Urban Forest: Thinking Outside the Planter Box

12/31/2014 County of Mendocino s Low Impact Design Standards Manual v1.0 A P P E N D I X 8. Site Design Measures. 32 P a g e

IMPLEMENTING STORMWATER MANAGEMENT REQUIREMENTS FOR DEVELOPMENT

Citywide Integrated Stormwater Management Plan (ISMP) DRAFT ACTION PLAN REVIEW Public Consultation November 16 th, 2016

Managing Stormwater Naturally. July 17, 2013

My Soil Won t Drain, Can I Still Use LID? Rob Buchert, John Knutson, Erik Pruneda

What is stormwater runoff? Why is it a problem? Available Financial Incentives for Stormwater BMP s Downspout Disconnection - up to $20

Urban Water Management and Soils (ESRM 311 & SEFS 507)

LOW IMPACT DEVELOPMENT GUIDANCE MANUAL AND LID WORKING GROUP ACTIVITIES. Powerpoint Templates. MS4 Statewide Stormwater Summit June 18, 2013

Directors Rules for Seattle Municipal Code, Chapters Stormwater Code

Sustainable Storm Water Management

LID IN REGION 6 HARRIS COUNTY STORY. Alisa Max, PE Manager, Watershed Protection Group Harris County Public Infrastructure Dept.

Growing Sustainable Communities Conference

Contents. Adapted/abbreviated from GSWMM Coastal Stormwater Supplement, August

Keele Campus Storm Drainage. Presented by Mark Hagesteijn September 24, 2013

County of Fairfax, Virginia

Appendix G. Detailed Design

Transcription:

City of Atlanta Mayor Kasim Reed Department of Watershed Management Building Green: An Update on Atlanta's Green Infrastructure Approach Cory Rayburn, CPESC, CFM Environmental Program Manager SESWA Spring Seminar April 17, 2015 1

Presentation Outline Overview of Atlanta s program and how it s unique First two years of Implementation Single Family and Small Commercial design manuals Challenges and Solutions Common green infrastructure practices used Recent public green infrastructure projects Southeast Atlanta Green Infrastructure Initiative combined sewer capacity relief Historic 4 th Ward economic development 2

Why use green infrastructure in Atlanta? Environmental Protection Improves water quality Supports Mayor Reed s sustainability initiatives Compliance Complies with NPDES permit Removing Barriers Prepares the City for potential changes in federal stormwater rules Community Addresses drainage issues in redeveloping historic neighborhoods Maximizes infrastructure investments by further reducing combined sewer overflows and flooding 3

4

Amended Stormwater Ordinance Added Green Infrastructure requirement for new and redevelopment projects Process for success Technical Advisory Committee Robust stakeholder involvement Give and take approach Outreach, education, and technical guidance documents Unanimous Council approval in Feb 2013 5

What s makes Atlanta unique? Requires green infrastructure on single family infill and commercial development/redevelopment 1.0 Runoff Reduction Volume (RR v ) Mandatory versus voluntary* No direct financial incentive Low threshold for compliance * Allows for fallback to 1.2 Water Quality (80% TSS reduction) upon showing 1.0 RR v is not possible on the given site written rationale and separate approval required 6

Who has to do what? Single family development (RR v only) New or infill home construction Large additions (> 1,000 ft 2 ) Small commercial category (RR v only) 500-5,000 ft 2 added or replaced impervious surface Commercial adding > 5,000 ft 2 Full blown stormwater management plan and hydro study Rate Reduction up to 25-year storm 100-yr no increase in peak discharge rate All Commercial projects Infiltration testing Pre-submittal consultation Site-specific Operation and Maintenance Plan 7

The Pioneer Projects Green Roof - Atlanta City Hall Cistern & Green Roof - Southface Bioretention - Adair Park Bioretention - 14 th St DWM office Bioswale - Fernbank Museum Porous Concrete - Felder St Pervious Pavers - English Park Wet pond, wetlands bench, sewer capacity relief, urban reforestation - Historic Fourth Ward Bioswale - Klaus Building - GT campus 8

Recent Installs Bioretention - Kelly St Porous Concrete - Delia s Chicken Sausage Stand Bioswale - Edgewood Townhomes Bioretention - Whitehall Terrace ROW Cistern SFR - Leslie St Permeable Pavers - Urban Market on Howell Mill Permeable Pavers - 6 th and Juniper Bioretention - Regions Bank Permeable Pavers - Lakemoore Townhomes 9

Adopted the Coastal Stormwater Supplement PROS Provides design criteria and credit system for green infrastructure Dependant on soil type CONS Does not address SFR or Small Commercial Created SFR and Small Commercial design manuals Atlanta Regional Commission (ARC) in process of updating Blue Book 10

Simplified Design Approach 11

SFR Manual Provides a list of acceptable practices Reduces the need for complicated calculations Provides tear-off details and construction specification for each practice Simplifies the review and approval process 12

General Info & Tear-off Details 13

Easy-to-Use Sizing Tables Impervious Area Treated Design Options Practice Size Modified French Drain Example Options within practical range Accommodate actual rainfall and runoff data Allows for median infiltration duration Assumes 0.25-0.50 in/hr infiltration rate 14

Small Commercial Manual For projects that add/replace between 500 and 5,000 ft 2 of impervious surface Catered to small urban redevelopment and addition projects Supplement to CSS and Blue Book Provides clarification to specific issues 15

Step-by-step Processes 16

Simplified RRv Calculation 17 Example: 3,800 ft 2 addition

Sizing Charts for each Practice 18

Example Design 19

Construction Sequence Extensive green roof installation 20

Retrofit examples - Landscape Islands 21

Typical Details 22

Innovative designs included Upturned S Underdrain Creates saturated zone Aids in denitrification Additional infiltration in poor draining soils 23

Example Landscape Plans 24

Maintenance Checklists 25

Tracking green infrastructure with GIS 270+ Commercial 1,100+ Single Family Residential GIS attributes contain: Owner Date of completion Copy of I&M agreement Inspections information Green infrastructure BMPs Detention BMPs Runoff Reduction Volumes 26

Challenges & Solutions 27

Green infrastructure can compete for space Creativity with site layout Upfront coordination between Civil, LA, and Architect Dual purpose practices: permeable pavement landscape islands bioretention green roof underground detention/infiltration systems Able to meet tree planting and runoff reduction requirements with one practice 28

Appropriate site layout? 29

Infiltration Practices in Atlanta Soils analysis required for all commercial sites Infiltration rates, high water table, bedrock, contaminated soils Clay soils and compaction Loosening compacted soils on redevelopment sites Prevent compaction during construction Innovative designs (upturned underdrain) to encourage surface drainage and promote infiltration in clay soils Erosion control Phasing installation to prevent sedimentation issues Installation of appropriate BMPs 30

Erosion control and phasing 31

Erosion control and phasing 32

Common Practices on Commercial Sites Bioretention/Bioswales/Stormwater Planters Infiltration below an underground detention system Permeable Pavement Infiltration Trenches/Dry Wells Rainwater Harvesting/Cisterns Green Roof (only 2) < 20% of sites fell back on old Water Quality standards for part or all of the volume requirement 33

WQ Fallback Requires written rationale and separate approval Extreme economic hardship or physical impossibility Must consider infiltration-alternative BMPs (lined stormwater planters, rainwater harvesting & green roofs) Rainwater harvesting reuse potential depends on type of project Irrigation, evaporative cooling, toilet flushing 34

Return on Investment Grand Hyatt in Buckhead retrofit Rainwater Harvesting: 50,000 ft 2 rooftop Evaporative cooling towers and toilet flushing Cost of project: $100,000.00 Annual savings: $42,000.00 ROI = 2.4 years 35

Green Roof Costs and Benefits $10-$24/ft 2 Extends life of roof Cooler air intake and insulation benefits = energy savings Amenity potential 36

Underground Infiltration Systems Saves space compared to traditional dry/wet ponds Appropriate pretreatment required Surface drainage area to infiltration area ratio May require additional aggregate under system for structural support (without compacting subsoils) Geotextile underliner vs. choker stone Erosion control during installation! 37

Common Practices on SFR 55% Dry Wells 21% Rain Gardens 10% Modified French Drains 6% Permeable Pavement 5% Cisterns (not rain barrels) 3% Vegetated Filter Strips 38

Southeast Atlanta Green Infrastructure Initiatives Combined Sewer Capacity Relief 39

Custer CSO Basin Location Heart of Atlanta Highly impervious Piped Streams Repeated Flooding 40

Contributing Conditions Point of Surface Flooding July 2012 (Peoplestown) 41

Short-term Projects First 6 months 42

Curb Extension Whitehall Terrace - converted parking spaces into bioretention area 43

Bioretention and Cistern Rosa Burney Park - converted area with poor soil conditions into bioretention 44

Bioretention Windsor Street - redirected runoff from street into new bioretention area 45

Bioretention Kelly Street - converted paved street into bioretention area 46

Intermediate Projects Media lot vault Completed Feb 28, 2014 Permeable Pavers Design-build contractor selected Construction began 3/31/2015 Estimated completion date Spring of 2016 Media Lot Vault 47

Permeable Pavers ~6 miles of permeable pavers: Mechanicsville Peoplestown Summerhill 48

Historic Fourth Ward Park Opened 2011. Combined Sewer Capacity relief 49

Historic Fourth Ward Park Opened 2011. Combined Sewer Capacity relief 50

Public-Private Partnership 51

Which would you prefer? 52

Spurring Redevelopment 2006 2008 2009 Plans for pond 2010 finalized, adjacent Construction on pond condobegins construction pond continues begins 2011 Pond complete Adjacent park and Beltline underway ~$500 Million in redevelopment 2012-2013 Apartments, condos, & Ponce City Market underway Beltline complete 2014 Apartments, condos, Ponce City Market nearing completion Masquerade redevelopment underway 53

Mayor s Commitment It is my goal for Atlanta to become one of the top tier sustainable cities in the nation -Mayor Kasim Reed 54

Questions? www.atlantawatershed.org/greeninfrastructure Cory Rayburn, CPESC, CFM City of Atlanta Department of Watershed Management crayburn@atlantaga.gov 404-546-1334 55 David Mason, PE, D. WRE CDM Smith masond@cdmsmith.com (615) 340-6516