Technical Specification

Similar documents
Technical Specification

Technical Specification

Technical Specification

Technical Specification

Technical Specification

Metropolitan. Steam Boiler. Suitable for Pressure Jet or Rotary Cup burners Oil, gas or dual fuel firing. Outputs kg/h

BOILER HOUSE PRODUCTS GMS

Savile Plus. Steam Boiler. Suitable for Pressure Jet burners Oil, gas or dual fuel firing. Outputs kg/h

SAMPLE SPECIFICATIONS

MOHICAN. MOHICAN 4-Pass Water Boiler, HP, PSI Section

MX RANGE PACKAGED STEAM BOILERS

FEEDWATER TANK WITH DEAERATOR DATASHEET. Capacity 1000 to lt Operating Pressure 0,5 bar

FT14 and FT14HC. SG Iron Ball Float Steam Traps (1" HC, 1¼", 1½" and 2")

Brown University Revised August 3, 2012 Facilities Design & Construction Standards SECTION AIR HANDLING UNITS

EXPRESSION OF INTEREST (EOI) FOR. Fire Fighting System (FFS)

CHAPTER 2: PROPERTIES OF STEAM AND STEAM POWER

University of Delaware

BuildingName The Description of the Project P DOCUMENTS

S and SF Inverted Bucket Steam Traps Installation and Maintenance Instructions

Installation, Operation and Maintenance Instructions for Thermax Semi-Storage Calorifier

OPERATING AND MAINTENANCE MANUAL FOR VERTICAL IMMERSION HEATED STEAM BOILERS. Technical Control Systems Limited MODELS "VIHS"

STEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD

Hoval Cosmo heating boilers, outputs from 100 to 4000kW. Working pressures to 8 bar. Heatpack boilers. to 2900kW.

Ball Float Steam Trap with Integral Spiratec Sensor and Flanged Connections

Inverted Bucket Steam Traps

Flash Condensing De-aerator Heads Installation and Maintenance Instructions

LOW SURFACE TEMPERATURE RADIATORS

CRU-S Series Stainless Steel Condensate Recovery Unit

FT14 Ball Float Steam Trap (Screwed)

Clyde CK40. Cast Iron Boiler. Engineering Data Sheet 663/8 May Natural gas Class D oil Dual Fuel. 350 kw to 500 kw

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: HVAC Standards

NHS Sustainable Development: 14 th February Reduce Energy Consumption Through Steam System Modernisation. National Key Account Manager

MFP14 Automatic pumps for condensate and other industrial fluids

CRU 200 and 500 Series Condensate Recovery Unit Installation and Maintenance Instructions

Steam Traps. . Chambered valves such as; bleeding & venting valves and steam traps. Float Valves using a free fl oat

Hoval SR-plus heating boilers Outputs from 350 to 4000kW Working pressures to 8 bar

Element D Services Heating, Ventilating, and Air Conditioning

Calder. Steel Hot Water Boiler Suitable for Pressure Jet burners Oil, gas, LPG or dual fuel firing. Outputs kw. Calder Model

Calder Plus. High Efficiency Steel Hot Water Boiler Suitable for Pressure Jet burners Gas or LPG firing. Outputs kw. Calder Plus Model

MFP14 Automatic pumps. for condensate and other industrial fluids

1.1 This section applies to air handling units for HVAC Systems.

SECTION PLUMBING EQUIPMENT

Module 3: Liquid Fossil Fuel (Petroleum) Lecture 25: Refinery Equipments

U tube models PTU 09, 12, 15, 25, 30, 35, 40, 45. single linear tube models PTS 09, 12, 15, 25, 30, 35, 40, 45

Silhouette. Feedwater Heater. Boiler Feedwater

OPERATING AND MAINTENANCE MANUAL FOR PLATE HEAT EXCHANGER INDIRECT FIRED WATER HEATER. Electric Heater Company Base Model "BWXP"

Assessment Schedule - TS.6

C. ASSE 1013: Performance Requirements for Reduced Pressure Principle Backflow Preventers.

ATMOSPHERIC GAS BOILER INSTALLATION, OPERATING AND MAINTENANCE MANUAL

Heating system service plans that provide total peace of mind.

Model AV Alarm Valve With and Without Model RC-1 Retard Chamber European Conformity Valve Trim General Description

.2 Section Waste Management and Disposal..5 Section Performance Verification of Mechanical Piping Systems.

HYDRONIC SPECIALTIES TACO AC(F)-PAX 05/15/2008

Boiler Mountings. Engr. Omar Sadath, Maritme Lecturer & Trainer, Bangladesh

LP30 High Integrity Low Level Alarm Probe Installation and Maintenance Instructions

APT and APT14 Automatic Pump Traps. for effective condensate drainage and removal

Design and Construction Standards SECTION PLUMBING EQUIPMENT

MULTIPLEX SELF RECUPERATIVE gas burner

Water Fuel + Air for combustion Blowdown

Problem Cause Remedial action. Gauge glass There was excess chemical dosage The normal ph recommended was 9.5 to See photo 3 & 4.

HYDRONIC SPECIALTIES TACO AC(F)-CA 05/08/2008

D-8 OUTLINE SPECIFICATION FOR HTHW HEAT EXCHANGERS

.005 ATMOSPHERIC DEAERATOR

GFT-060/40/H2. Designed and built According AD-2000 regulation Homologation and branded CE According to the European Directive CE

ClearFire Economizer Model ECF Integral or External. Addendum to manuals CFH and CFV

Drum Level Instrumentation and

STREBEL S-CB + Cascade Kits

DEAERATORS .005 ATMOSPHERIC DEAERATOR

D-11 OUTLINE SPECIFICATION FOR HTHW (ABOVE GRADE) HYDRONIC PIPING

ALDRICH COMPANY THREE PASS FIRETUBE BOILER CLASSIC SERIES OPERATING & MAINTENANCE MANUAL

Warewashing. Minirack EVOLUTION RANGE. Market leading rack machines with proven design

Installation and Commissioning Instructions FMU3 Floor Mixing Unit with Grundfos UPM3 Pump

STEAM VALVE SUPPLY & SYSTEM DESIGN

Boiler Condensate Return Basics. Presented by Steve Connor February 24, 2016

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION PUMPS

Rental Boiler Specifications (Nebraska Boiler)

CRU 200 and 500 Series Condensate Recovery Units

HYDRONIC SPECIALTIES TACO MPT Tank(s) 05/30/2012. A. Multi-Purpose Tank buffer tank, air separator, and hydraulic decoupler

DIVISION 15 MECHANICAL

DIVISION FINNED WATER-TUBE WATER HEATERS

PT15 MATERIAL : DIMENSIONS - Nominal in inches. AVAILABLE SPARES: Disc (Packet of 5) ORDERING INFORMATION: Refer to "HOW TO ORDER" page.

SECTION GENERAL-SERVICE COMPRESSED-AIR SYSTEMS

Update In Progress. Division 23 Heating, Ventilation, and Air Conditioning Page Section FLUID SYSTEMS EQUIPMENT PART 1 GENERAL

WATER-TUBE POOL HEATERS

!!! Sample Written Program For Your Company. For BOILER SAFETY. Provided By:!!!

Bosch Commercial and Industrial Heating High efficiency steam boilers (175kg/h to 55,000kg/h)

ISO INTERNATIONAL STANDARD. Rotary positive displacement pumps Technical requirements

C. ASME Compliance: Fabricate and label water chiller heat exchangers to comply with ASME Boiler and Pressure Vessel Code: Section VIII, Division 1.

BETTER HOME COMFORT AND PEACE OF MIND STARTS WITH THE BEST SERVICE PLANS.

OPX INDUSTRIAL RANGE THERMAL OIL

FM 517 San Leon, TX Toll Free: Office: (281) Fax: (281)

GESTRA Valves for Pure and Sterile Steam Systems. Intelligent solutions for sensitive processes

Phillips. HORIZONTAL AND VERTICAL ASSEMBLIES For Ammonia (R-717) and Halocarbon Refrigerants

Miniature Hobby Boiler Inspection and Certification Requirements

Condensate Boiler Feed Water Make-Up

INSTALLATION AND OPERATING INSTRUCTIONS GN2. HIGH EFFICIENCY CAST IRON BOILER FOR LIQUID and/or GAS FUELS

Condensate Return Feedwater Systems For Low and High Pressure Steam Boilers

Series 300 VTB. Installation Instructions

B.C.S. Shop Heaters 26, 30 & 36 (36 shown)

PA ma Loop Powered Level Preamplifier

Transcription:

Cochran Ltd Newbie Works, Annan, Dumfries & Galloway, Scotland, UK DG12 5QU Telephone: +44 (0)1461 202111 Fax: +44 (0)1461 205511 Email: info@cochran.co.uk www.cochran.co.uk COCHRAN HEAT RECOVERY Package Steam Boiler Technical Specification A Cochran Group Ltd Company Registered Office: Newbie Works, Annan, Dumfries & Galloway DG12 5QU Company Number: SC379382 Registered in Scotland Page 1 of 11

COCHRAN HEAT RECOVERY PACKAGE STEAM BOILER SPECIFICATION The COCHRAN HEAT RECOVERY PACKAGE STEAM BOILER is of single pass type constructed in accordance with BS EN 12953. The boiler complies with the requirements of the Factories Act (1961) and Arrangement 1 of Guidance on Safe Operation of Boilers Ref: BG01 developed by the Safety Assessment Federation (SAFED) and the Combustion Engineering Association (CEA), the latter being the acceptance criteria for compliance with HSE and UK Inspection Authority requirements. Additionally, the Boiler is CE Marked to meet the requirements of: Pressure Equipment Directive Low Voltage Directive Electro-Magnetic Compliance Directive Machinery Safety Directive Throughout the manufacturing process, the BOILER is subject to inspection by a leading Independent Insurance Company. In addition, COCHRAN apply their own quality procedures that comply with the requirements of ISO 9001:2008. The attached schedules detail the specification of the Boiler proposed in the tender enclosed. Schedule Number Description Page Number 1 Boiler - Pressure Parts 3 2 Boiler Mounted Fabrications 5 3 Steam and Water Mountings 6 4 Feed Pump & Water Level Controls 7 5 Control Panel / Wiring 8 6 Painting 9 7 Terminal Points 10 8 Tools / Documents 11 We reserve the right to amend or alter this Specification during the tender validity period or the manufacturing stage of any subsequent order to comply with any alteration or amendment to applicable Standards, Safety Codes, Guidance Notes or Revisions in Manufacturing Techniques. Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 2 of 11

Schedule 1: Boiler Pressure Part GENERAL All plate used in the construction of the boiler is cut and profiled by computer controlled equipment. The shell, furnace and reversal chamber plates are then rolled, assembled, machine welded and subjected to NDT (either radiographic or ultrasonic) to ensure compliance with the latest construction standard requirements. Tube plates are drilled by computer controlled equipment to ensure the correct ligament is maintained and a satisfactory tube hole finish is achieved. Boiler Shell Single pass of convection tubes are fitted between the boiler front and rear tube plates.. All plain tubes are expanded then welded into position whilst stay tubes and stay bars are fully welded into position to ensure that stressing of the tube plates and tube nests are within construction code limits. Access and Inspection For inspection purposes, openings are provided to gain access to the steam/water side of the boiler. One 420 320mm elliptical manway opening is provided on the top of the boiler. Two 320 220mm elliptical headhole openings are provided in the lower quadrants toward the rear of the boiler, one provided on each side. One 125 90mm elliptical handhole opening is provided in the rear tubeplate. Seatings Mountings and controls are fitted to pads, standpipes and bosses welded to boiler shell. Materials Specification Shell and Shell Attachments: Shell and Tube Plates: Stay Bars: Plain and Stay Tubes: Mandoor Head Holes Muddoor Lifting Lug: Pads (Valves): Standpipes: BS EN 10025-2 P265 GH BS EN 10273 P235 GH BS EN 10216-1-TR2 BS EN 10216-2 BS EN 10217-1-TR2 BS EN 10217-2 BS EN 10025-2 P265 GH BS EN 10025-2 P265 GH ASTM A106 GR B Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 3 of 11

Schedule 2: Boiler Mounted Fabrications Casings; Insulation & Supports Front and Rear Casings Boiler front and rear casings are fabricated from mild steel plate fully welded to the Boiler tubeplates and shell. Front casing is insulated internally to reduce radiation loss to a minimum and incorporates hinged doors with screen plates which allow access to boiler tubeplates and tubes to facilitate tube cleaning, tube removal and inspection. Rear casing is provided with flanged outlet for economiser / chimney connection. Hinged doors allow access to tubeplate and tube nest and are also fitted with screen plates. Insulation and Sheeting Exposed areas of boiler shell and tubeplates are insulated with 100 mm thick high density insulation to reduce radiation loss to a minimum and is retained in position with bands. 20G (0.812mm thick) "Stucco" aluminium sheeting to BS1470 SICH.H. is applied to the shell. Tubeplates, pads and standpipe penetrations are finished with aluminium collars. To aid access for inspection purposes inspection doors and valves are not provided with insulation, this is available on request as an added option. Pipework is provided uninsulated as the client may find it easier to insulate on site with other connecting pipework between the package and the system. Economiser An Economiser that preheats the feed water by recovering sensible heat from the exhaust gases can be supplied and mounted on the rear smokebox. This can increase the available steam capacity from the Heat recovery section. The economiser is supplied complete with insulation and cladding, safety valve, temperature gauge, flow and return pipework (insulation and cladding of pipework excluded) and an automatic bleed valve to prevent possible steaming of the feed water within the Economiser during no-flow conditions. A manual water bypass system that allows an operator to mechanically isolate the water supply to and from the economiser can be provided. Please refer to your covering Tender for details of the full scope of supply offered. Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 4 of 11

Supports Boiler supports are fabricated as an all-welded structure fabricated from suitably sized hollow sections, incorporating outriggers which are welded or bolted as appropriate for the boiler feed pump and control panel. Jacking points are provided on the support structure to assist in offloading, positioning and manoeuvring the boiler. Ladders and Platform (OPTIONAL EXTRA) Access ladder and platform can be fitted to allow access to top of boiler and safety valve. The ladder incorporates safety hoops beginning at a level of 2515 mm from floor level of the Boiler baseframe terminating above the level of the platform safety railing. The platform is provided on three sides with safety handrailing to a height of 950 mm, the fourth side left open for access to the boiler valves. Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 5 of 11

Schedule 3: Steam & Water Mountings STEAM AND WATER MOUNTINGS General As standard, the valves and gauges we offer comply with BS EN 12953 and are fitted to the boiler standpipes with suitable joints and flanges drilled to BS EN 1092. Flange fixing is by metric studs and nuts or bolts. Standard valves and fitting are tabulated below: Qty Description Manufacturer Material 1 Steam Stop Valve, Angle pattern type Ari Armaturen Cast steel 1 Single Spring High Lift Safety Valve sized to provide Spirax Sarco SG Iron 100% discharge capacity 1 Feed water isolation, Angle pattern type Ari Armaturen Cast steel 1 Feed water, wafer pattern non-return Gestra Flowserve Stainless steel 1 Multi stage, fixed speed, centrifugal feed pump Grundfos Stainless steel 1 Water strainer, Y Type (supplied loose) ISIS Fluid Control Cast Iron 1 Manual Blowdown Valve, ball type RTK Control Carbon steel 2 Reflex type water gauge assembly with steam & Klinger Carbon steel water cocks fitted to a plate type column 1 Standard integrity Probe type controls. On-off Flowserve - operation upto and including 8000 kg/hr, Modulating control from 9000 kg/hr and above 1 Bourdon type, Direct mounted Pressure Gauge Stewart Buchanan Aluminium 1 Air vent valve David Auld Valves Bronze 1 DN25 Blanked connection for TDS Control or Chemical injection - - Drain pipework from the water gauge drain cocks and safety valve drain are extended in suitably sized pipework terminating individually at boiler centre line. NOTES: Valve materials are provided for the rating, pressure and temperature requirements. For multi-boiler installations an additional steam non-return valve will be required to comply with the requirements of Guidance Notes BG01. Cochran can provide this additional valve on request if not being supplied by your Installation Contractor. Please refer to quotation for any additional valves or mountings offered. Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 6 of 11

Schedule 4: Feed Pump & Water Level Controls WATER LEVEL CONTROLS DIRECT MOUNTED PROBE TYPE Water Level Controls are Direct Mounted Probe Type which are located on the top centreline of the boiler shell. Modulating water level control is provided. Including: Modulating Feed Water Control Valve High Water Alarm 1st Low Water Level Alarm and System Lockout 2nd Low Water Level Alarm and System Lockout NOTE: As standard the water level control probes do not have self-monitoring capability but this facility can be offered if required. FEED WATER PUMP The feed water pump is multistage type sized to suit the boiler working pressure and rating. The pump is fitted to the boiler on an outrigger fixed to the baseframe and connected to the boiler feed check valve in suitably sized mild steel pipework. The pump is continuously running if an economiser is fitted and provided with an automatic bleed valve to prevent possible steaming of the feed water within the Economiser during no-flow conditions. A feed water inlet strainer is supplied loose. Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 7 of 11

Schedule 5: Control Panel; Wiring & Testing CONTROL PANEL A Boiler control panel is fitted to the Boiler supports and includes the necessary control equipment, starters, water level alarms, controls for feed pump and mains isolation. Control pressure switches are attached to the side of the panel. ELECTRICAL WIRING Heat resistant cabling is used for wiring between water level controls and the control panel, all other wiring is in PVC covered wiring carried in flexible conduit. Colour Coding to BS EN 60204-1:2006. FUNCTIONAL TESTING An electrical functional test of the boiler safety and control system is carried out and witnessed by the Cochran Q.A. Department Inspectors. Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 8 of 11

Schedule 6: Painting Surfaces are degreased prior to painting and one coat of primer, one coat of undercoat and one finishing coat is applied. Standard Colours are as follows:- Baseframe, all Valves, Platform and Ladder (when fitted) Front and Rear Casings Screen Plates Sheeting Control Panel Feed Pump Black Black Blue Unpainted Stucco Aluminium Manufacturer s Standard Manufacturer s Standard Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 9 of 11

Schedule 7: Terminal Points Flanges to BS EN 1092 except where otherwise stated. Screwed connections BSP except where otherwise stated. Description: Stop Valve (Outlet) Safety Valve (Outlet) Blowdown Valve (Outlet) Feed Water (Inlet) Drain Pipework (Outlets) Flue Gas (Outlet) Economiser Bleed valve Flanged Flanged Flanged Flanged Screwed Vertical Flanged Screwed Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 10 of 11

Schedule 8: Tools/Documents TOOLS Tube cleaning brushes and rod handle are provided. DOCUMENTS General Arrangement Drawing and Electrical Wiring Diagrams are provided. Certificate of Compliance is provided, certified by independent Inspection Authority. Operation and Maintenance Manual is provided. NOTE: In order to take advantage of all Technical Developments, we reserve the right to amend details given in this Specification. Cochran Ltd, Newbie Works, Annan, Dumfries & Galloway DG12 5QU Page 11 of 11