PVC Venting Addendum. RIVA Plus WALL HUNG GAS BOILER FOR CENTRAL HEATING SUPPLY

Similar documents
Direct Exhaust Venting Kit Instructions

Aqua Balance. Direct Exhaust Venting Kit Instructions

Prestige Gas Vent Stainless Termination Kit

Vent Supplement Ultra-80, -105, -155, -230 & -310

Corr/Guard PRESSURE RATED VENTING SYSTEM IMPORTANT: DO NOT INSTALL WITHOUT FIRST READING THESE INSTRUCTIONS VERY CAREFULLY.

Riva ADVANCE COMBI BOILER INSTALLATION, OPERATION INSTRUCTIONS WALL HUNG GAS BOILER FOR CENTRAL HEATING SUPPLY

INSTALLATION OF DURAVENT POLYPRO SINGLE WALL POLYPROPYLENE VENTING SYSTEMS

INSTALLATION OF CENTROTHERM INNOFLUE SINGLE WALL POLYPROPYLENE VENTING SYSTEMS

FLANGED CORR/GUARD CORR/GUARD INSTALLATION INSTRUCTIONS

SMALL DIAMETER CORR/GUARD & SLEEVED CORR/GUARD

INSTALLATION INSTRUCTIONS

Vertical Termination Part No: 3CGRVT 16 7/8" 18 Vent Pipe Extension Part No: 3CG18 9 7/8" Wall Hanger Part No: 3CGWH 7 7/8" 7 3/8"

Manual Addendum. This Addendum needs to be used in conjunction with the Evergreen Boiler Manual P/N _0518

ASX7-4-IOM-6 J

INSTALLATION INSTRUCTIONS

Installation Instructions for use by heating contractor

Installation guide and material checklists

ASX7-5-IOM-3 J

200i. Vent/air manual. Installation instructions for vent and air piping. Also read and follow: 200i Boiler manual 200i Control manual

INSTALLATION AND OPERATING INSTRUCTIONS TABLE OF CONTENTS IMPORTANT

Installation Instructions

GWS. Venting Manual. Gas-Fired Water Boilers. Hazard definitions. Contents. Venting method definitions

Installation Instructions for use by heating contractor

Common Vent System. Common Vent System

Installation & Maintenance Instructions

TYPE L VENT / VENT SYSTEM FOR PELLET BURNING APPLIANCES

PVC, CPVC, PP & SS Vent Supplement

COMMON VENT SYSTEM. Features and Benefits. Model Applicability

Commercial High Efficiency Water Heater

Z-VENT MODEL SVE SERIES III INSTALLATION AND MAINTENANCE INSTRUCTIONS

Venting Supplement. Direct Vent Through-Roof or Through-Unused-Chimney. Water Boiler Series 3 & 4

Esteem 399 Low NOx Gas Fired Boiler

INSTALLATION AND SERVICE MANUAL

TRIAD Boiler Systems, Inc Atlantic Drive, Unit 2 West Chicago, IL

UTICA BOILER. SSV Submittal. Project Name: Project Location: Contractor:

INSTALLATION INSTRUCTIONS FOR FANLESS MAKE-UP AIR MODEL NER (USA)

INSTALLATION AND SERVICE MANUAL

Installation & Operation Manual Models: WH

Direct Vent Training & Installation Instructions for Venting 40/50 gallon models Telescoping Vent Kit (standard)

FTV Boiler Model Numbers: FTV110, FTV110C, FTV150, FTV150C, FTV190 & FTV190C Version Date:

Installation Instructions. PolyPro Single-Wall Gas Vent System for Category II & IV Gas-Burning Appliances. PolyPro

Vmax Boiler Model Number: VM110, VM110P, VM153 & VM153P Version Date: INSTALLATION AND OPERATION MANUAL

EUTECTIC EC-10DV Series

High Effi ciency Condensing Stainless Steel Gas Hot Water Supply Boiler Models IEW-199, IEW-399 Installation and operation instructions

POWER VENTED GAS FIRED WATER HEATER

KG6RC Series TECHNICAL SPECIFICATIONS FEATURES AND BENEFITS

HIGH-EFFICIENCY UPFLOW FURNACE INSTALLER'S INFORMATION MANUAL

GAS FIRED BOILERS FOR FORCED HOT WATER VENTING ADDENDUM. ECR International Ltd. - Olsen Division P.O. Box 900 Wallaceburg, Ont.

CQS POWER VENT. General. Venting Requirements. Venting Instructions PREEVA Indoor, Power-Vented Heater Model PDH

VENTING APPLICATION GUIDE

INSTALLATION INSTRUCTIONS FOR FANLESS MAKE-UP AIR MODEL NER

Direct Vent Tankless Water Heater Installation and Operation Manual

Water Heater. Promising endless. Installing an On-Demand

INSTALLATION INSTRUCTIONS SLP98DFV

Noble Fire Tube Boiler and Combi Installation & Service Manual NKC NKB

G6RC Series TECHNICAL SPECIFICATIONS

Installation Manual CONDENSING TANKLESS GAS WATER HEATER DANGER WARNING CAUTION CAUTION

HIGH-EFFICIENCY DOWNFLOW / HORIZONTAL FURNACE INSTALLER'S INFORMATION MANUAL

CAUTION. Requests to Installers In order to use the water heater safely, read this installation manual carefully, and follow the installation

Installation Instructions. PolyPro Single-Wall Gas Vent System for Category II & IV Gas-Burning Appliances. PolyPro

INS A T LL T A ION, OPER T A ING AND SERVICE INSTRUCTIONS FOR FREEDOM CONDENSING HIGH EFFICIENCY DIRECT VENT GAS - FIRED HOT

By Bernard Dalsin Mfg. Co. Installation and Operating Instructions Read these instructions and keep them for future reference

Installation and Maintenance Instructions

GB162 Concentric Horizontal Vent Kit

Pellet Stove. Flex Pipe. Appliance Connector

Installation Manual CONDENSING TANKLESS GAS WATER HEATER DANGER WARNING CAUTION CAUTION

Installation Instructions for use by heating contractor

Installation & Operation Manual Models:

Vmax Boiler Model Number: VM110, VM110P Version Date:

Installation Instructions for use by heating contractor. Vitodens Common Venting System IMPORTANT

GOLD GV. Venting Supplement for 3 venting. Water Boiler Series 3 & 4

SEPARATED COMBUSTION WARNING

CHAPTER 8 CHIMNEYS AND VENTS

INSTALLATION INSTRUCTIONS A95DF2V, 95G2DFV Warm Air Gas Furnace / Downflow Air Discharge Direct Vent & Non-Direct Vent

HIGH EFFICIENCY FIRE TUBE CONDENSING GAS BOILER MODELS CHS-85 through CHS-399

Installation & Operation Manual Models:

R9-9/10 Price - $5.00

Installation & Operation Manual Models: WH

I Product Description

INSTALLATION INSTRUCTIONS FOR MINI MAKE-UP AIR MODEL FER

POWER VENT. Standard Power Vent, Fan Type Unit Heaters: Standard Power Vent, Blower Type Unit Heaters: General WARNING WARNING. Model UDAP & Model APD

Fire Tube Combi Boiler Installation & Service Manual Models:

FOR YOUR SAFETY WARNING FOR YOUR SAFETY. high efficiency, separated combustion gas-fired unit heaters models PTC and BTC

A95DF2V, 95G2DFV Warm Air Gas Furnace / Downflow Air Discharge Direct Vent & Non-Direct Vent

Trinity Tft Model Numbers: Tft Version Date:

P.O. Box , Dallas, TX INSTALLATION INSTRUCTIONS. 92AF1DF and 95AF1DF. Counterflow Warm Air Gas Furnaces

Installation Instructions for use by heating contractor

STERLING RSG SERIES INFRARED RADIANT TUBE HEATER

Venting Supplement Saf-T Vent 3" venting Special gas vent system vent and combustion air supplement for 3" diameter venting Hazard definitions

DURAVENT POLYPRO VENTING PRODUCTS

INSTALLATION INSTRUCTIONS GUH95A & GUH92A. Warm Air Gas Furnace Upflow/Horizontal Left and Right Air Discharge

GOLD. Venting Supplement. Water Boiler Series 3 & 4. for 3" venting

Installation & Operation Manual Models:

Ventis Direct Vent. Installation Instructions

Trinity Tft Model Numbers: Tft Version Date:

Trinity Ti Model Numbers: Ti Version Date:

Saf-T Vent SC Plus/SC 316

INSTALLATION INSTRUCTIONS A95DF1E & 95G1DFE Warm Air Gas Furnace Downflow Air Discharge

Installation Operation Maintenance

FasNSeal. Installation Instructions

Transcription:

PVC Venting Addendum RIVA Plus WALL HUNG GAS BOILER FOR CENTRAL HEATING SUPPLY

Biasi Riva Plus PVC venting accessories Part #: RI 10999.0912 Trade Price: $140.00 PVC venting adapter: This adapter is required to allow the connection of PVC to the boiler. Adapter mounts to the concentric connection on the top of the boiler and splits to a seperate connection for intake and exhaust air. No matter what termination you intend to use this adapter kit is required. Part #: RI 116035 Trade Price: $180.00 PVC concentric termination: This termination allows you to exhaust gases and take in fresh air through one hole in the side of the building. Two PVC pipes connect to the back of the termination via a gasket connection to provide a clean and fi nished look on the outside of the building. Part #: RI 116030 Trade Price: $215.00 PVC concentric vertical termination: This termination allows you to exhaust gases and take in fresh air through one hole in the roof of the building. Two PVC pipes connect to the bottom of the termination via a gasket connection to provide a clean and fi nished look on the outside of the building. Flashing kits are available for both fl at roofs as well as pitched roofs. Site Constructed Vent Termination PVC separate venting termination: The contractor terminates the venting outside the building using PVC pipe on hand. Using mesh screens that are supplied with the boiler adapter and adding three elbows and a short length of 3 PVC pipe the contractor can make a simple vent termination.

PVC vent requirements All piping that is used to vent the Riva boiler must conform to the standards listed below. Parts Material United States Canada Exhaust and Intake PVC ANSI/ASTM D1785 Piping CPVC ANSI/ASTM DF441 Pipe Cement / PVC ANSI/ASTM D2564 ULC S636 Primer CPVC ANSI/ASTM F493 It is not permitted to use a cellular foam core pipe for venting the Riva boiler. All intake piping can be constructed of PVC pipe. The fi rst 8 feet of exhaust pipe must be CPVC pipe. After that point it is permissible to assemble the rest of the vent in PVC. Canadian Installations: PVC/CPVC vent pipe must be listed to ULC S636. Pipe, fi ttings, and cements are certifi ed as a system and must be installed as such. Different manufacturers have different materials, joining systems and adhesives. Do not mix pipe, fi ttings, solvents, or joining methods from different BH Vent manufacturers, this can result in unsafe conditions. Consult PVC/CPVC manufacturer s installation manual for correct joining of pipe for gas venting. General installation: 1. Cut pipe to required lengths and dry fi t the venting and intake system to ensure a proper fi t. 2. Disassemble the system and de burr the inside and outside of the pipe ends. 3. Chamfer the outside of each end of the pipes. 4. Make sure that each pipe end and fi tting are clean. Once they are do not handle the joining surfaces. 5. Apply primer to both the fi tting and the pipe end. 6. While the primer is damp, apply a even coating of cement to the pipe end and the fi tting. 7. Insert the pipe into the fi tting making sure the pipe is completely seated. 8. Rotate the pipe 1/4 turn and hold in place for 30 seconds. 9. Wipe any excess cement away and check that there is a complete bead of sealant around the joint of the fi tting. 10. Allow to cure for 2 hours before commissioning the boiler. 11. Install perforated metal pipe supports onto the pipe, making sure there is no sagging in the pipe. Place supports as close as possible to elbows to relieve stress on the joint.

PVC boiler adapter A B D C Figure 1.1 This kit is required to vent the Riva boiler using PVC/CPVC pipe. The kit includes a boiler connection adapted for PVC/CPVC. When venting with PVC/CPVC this boiler adapter is required in addition to one of the terminations on the following pages. Canada: All PVC/CPVC pipe, fi ttings, and cement must be approved to ULC S636. Do not mix pipe and joining compounds from different manufacturers as this can result in an unsafe condition and void the certifi cation. Attach the collar (C) from the adapter kit to the top of the boiler using the supplied screws. Insert the boiler adapter (B) into the collar. Check that the exhaust gasket (D) is installed on the outlet of the boiler fi rst. Once the adapter is positioned in place, tighten the clamp on the collar and install the supplied self tapping screw through the pre drilled hole on the collar. Insert the PVC adapters (A) into the boiler adapter (B). Slide the CPVC/PVC pipe into the PVC adapters (A), do not use any solvents or cement on this connection. It is a gasket connection that requires no sealing.

PVC concentric vent kit Figure 1.2 This kit allows horizontal termination of the fl ue pipe using PVC/CPVC pipe. The kit includes boiler connection and termination adapted for CPVC/PVC. 3 PVC/CPVC pipe may be added up to the total overall maximum permissible length of 100 intake and exhaust combined. Optional 45 and 90 elbows can be used to offset the fl ue route. Each additional elbow reduces the overall acceptable length of the fl ue system as follows: Venting Specifi cations Max Length (intake + exhaust) 100 ft. 45 elbow 1.6 ft. equivalent Min Length (intake + exhaust) 3 ft. 90 elbow 3.2 ft. equivalent Canada: All PVC/CPVC pipe, fi ttings, and cement must be approved to ULC S636. Do not mix pipe and joining compounds from different manufacturers as this can result in an unsafe condition and void the certifi cation. Drill 5.5 hole through the outside wall making sure there is 1 foot clearance above normal snow level. Insert the termination through the flexible exterior gasket and the building wall. Fix the exterior gasket to the wall using 4 contractor supplied fasteners. Slide the interior wall gasket over the termination and fi x it to the wall using 4 user supplied fasteners. Assemble the gaskets into the twin pipe adapter. Install the twin pipe adapter onto the termination. Install the PVC adapters supplied onto the twin pipe adapter according the manufacturers instructions. Install piping pitched back toward the boiler making sure not to exceed the maximum allowable length. Intake air piping can be constructed of PVC pipe. Exhaust piping should be CPVC for the fi rst 8 feet. Intake and exhaust piping should be assembled and secured according to the pipe manufacturers instructions. Install the vent adapter onto the top of the boiler using the gasket and screws provided. Install the pipe onto the boiler by simply pushing it into the adapters. Do not cement the pipe into the adapters, this is a gasket connection.

PVC roof vent kit Figure 1.3 This kit allows vertical termination of the fl ue pipe using PVC/CPVC pipe. The kit includes boiler connection and termination adapted for CPVC/PVC. 3 PVC/CPVC pipe may be added up to the total overall maximum permissible length of 100 intake and exhaust combined. Optional 45 and 90 elbows can be used to offset the fl ue route. Each additional elbow reduces the overall acceptable length of the fl ue system as follows: Venting Specifi cations Max Length (intake + exhaust) 100 ft. 45 elbow 1.6 ft. equivalent Min Length (intake + exhaust) 3 ft. 90 elbow 3.2 ft. equivalent Canada: All PVC/CPVC pipe, fi ttings, and cement must be approved to ULC S636. Do not mix pipe and joining compounds from different manufacturers as this can result in an unsafe condition and void the certifi cation. Choose the appropriate weather collar for the installation, Pitched or Flat. Drill a hole through the roof large enough to accommodate the 5.5 vent terminal. Fix the fl ue collar in place and insert the termination from outside the building. Fix the supplied wall clamp around the vent terminal but do not tighten it. Assemble the gaskets with the concentric pipe adapter. It may be necessary to use a small amount of water. Install the PVC adapters supplied onto the twin pipe adapter according the manufacturers instructions. Install piping to the boiler making sure not to exceed the maximum allowable length. Intake air piping can be constructed of PVC pipe. Exhaust piping should be CPVC for the fi rst 8 feet. Intake and exhaust piping should be assembled and secured according to the pipe manufacturers instructions. Install the vent adapter onto the top of the boiler using the gasket and screws provided. Install the pipe onto the boiler by simply pushing it into the adapters. Do not cement the pipe into the adapters, this is a gasket connection.

PVC separate vent kit Figure 1.4 This kit allows horizontal termination of the fl ue pipe using 3 PVC/CPVC pipe. The kit includes PVC/CPVC boiler adapters and CPVC termination. PVC pipe may be added up to the total overall maximum permissible length. Optional 45 and 90 elbows can be used to offset the fl ue route. Each additional elbow reduces the overall acceptable length of the fl ue system as follows: Venting Specifi cations Max Length (intake + exhaust) 100 ft. 45 elbow 1.6 ft. equivalent Min Length (intake + exhaust) 3 ft. 90 elbow 3.2 ft. equivalent Canada: All PVC/CPVC pipe, fi ttings, and cement must be approved to ULC S636. Do not mix pipe and joining compounds from different manufacturers as this can result in an unsafe condition and void the certifi cation. Drill two 4 holes through the outside wall or the roof. Insert the pipes from the boiler through the wall making sure they slope towards the boiler. Intake air piping can be constructed of PVC pipe. Exhaust piping should be CPVC for the fi rst 8 feet. Install the trim plate with the gasket facing the building using four fi eld supplied screws. Secure the pipes in place inside the building using installer supplied hangers. Make sure there is no sagging or low spots for condensate to collect. Cut the intake and exhaust pipes so they extend at least 2 1/2 past the trim plate. Solvent cement a PVC elbow facing the ground onto the air intake. The Intake elbow must be at least 12 above normal snow level. Solvent cement a PVC/CPVC elbow facing up onto the exhaust outlet. Solvent Cement the 6 length of PVC/CPVC pipe into the elbow. Sovent Cement a PVC/CPVC elbow onto the pipe making sure the elbow faces away from the building. Install the rodent screens into the intake and exhaust. This is a friction fi t. Install the vent adapter onto the top of the boiler using the gasket and screws provided. Install the pipe onto the boiler by simply pushing it into the adapters. Do not cement the pipe into the adapters, this is a gasket connection.