Planning for Future Urban Area Subwatershed Studies Will address environmental matters associated with each major watercourse Conceptual Master Plan / Master Transportation and Servicing Studies For entire Future Urban Area - will confirm Greenway System, high level road/transit network, servicing, employment areas, neighbourhoods, mixed-use areas and phasing Secondary Plans/MESPs Specific land use policies for smaller areas/communities Plans of Subdivision/Building Permits Creation of lots and buildings 3
Conceptual Master Plan The Conceptual Master Plan will: - provide the planning framework for the Secondary Planning and Development Approvals process - be a non-statutory document endorsed by Council The Conceptual Master Plan has two components: - Community Structure Plan for the entire Future Urban Area in North Markham - Key Directions and Implementation Document 4
Community Structure Plan components (schedules): - Greenway System (including major parks) - Transportation Network (road, transit, cycling, walking) - Servicing Network (major infrastructure) - Land use (neighbourhoods, mixed-use areas, employment) - Major community facilities (including high school(s)) and infrastructure - Cultural heritage resources 5 Conceptual Master Plan
6 Planning Planning Markham s Markham s Future Future Conceptual Master Plan Key Directions and Implementation Document components: - Sustainability - Neighbourhood - Mixed Use - Employment - Mobility (walking, cycling, transit, roads) - Phasing
Each sub-watershed will be studied to address environmental matters such as natural heritage, groundwater, surface water, watercourses associated with each major watercourse. 7 Sub-Watershed Studies The Future Urban Area contains four sub-watersheds: - Bruce - Berczy - Eckhardt - Robinson
Servicing and Transportation Studies Three Engineering-related Studies are being initiated: - Water - Wastewater - Transportation Each study will provide infrastructure requirements to feed into the Sub-watershed Studies analysis and the Conceptual Master Plan. 8
Conceptual Master Plan Process completed through endorsement of the Conceptual Master Plan by Council 9 Project Timing Study Initiation Completion Subwatershed Studies Fall 2013 Fall 2015 Water Servicing Study Fall 2013 Fall 2015 Wastewater Servicing Study Fall 2013 Fall 2015 Transportation Study Early 2014 Fall 2015 Conceptual Master Plan Fall 2013 Fall 2015 Secondary Plans Fall 2015 2016
Coordination of Studies - Work Programs for each Study are being coordinated to follow the Environmental Assessment Master Planning Process - Common Open Houses/Public Information Centres between all Studies (as required) 10
Planning Markham s Future Coordinated Study Approach 11 Subwatershed Study Water Servicing Study Wastewater Servicing Study Transportation Study Future Urban Area Conceptual Master Plan Secondary Plans & Master Environmental Servicing Plans Plans of subdivisions & Building Permits
12 PPlanning Planning themarkham s Future Urban Futurelanning Area Markham s Future Public Engagement - Minimum of three Public Open Houses are planned: - Fall 2014 - Spring 2015 Planning Markham s Future - Fall 2015 - Public Open Houses to be linked with required Public Information Centres for the Engineering Studies - Agency & Stakeholder engagement through Technical Advisory Committee
Committee Reporting Structure Steering Committee 13 Development Services Committee Technical Advisory Committee Public /Stakeholder Consultation Staff Team and Consultants
Planning Markham s Future 14 Thank You