Cold Lake Marina Master Plan

Similar documents
Highest & Best Use Study Marina Park Lands

George Hotel application STAFF REVIEW COMMITTEE OF THE WHOLE JANUARY 14, 2014

Workshop #3 June 13, 2016

Emerson Park Master Plan Update. Public Meeting III August 27, 2014

PRINCE ARTHUR S LANDING. Thunder Bay, Ontario

Online Survey Results 1 Port Street East

Washington Plaza at the. Lake Anne Village Center

City of Plattsburgh DRI: Downtown Streetscapes & Riverfront Access. Downtown Streetscape and Riverfront Access Design

{Best Practices. Summary of Tools, Strategies and Best Practices from 11 Michigan Case Study Communities

TOWN COUNCIL / PLANNING COMMISSION

A L F O N S O A R C H I T E C T S

THE TOWN OF WASAGA BEACH

TAHOE CITY VISION PLAN June 2012

IMAGINE CLEARWATER. Community Workshop 3. November 2016

PRELIMINARY DESIGN + DEVELOPMENT PLAN

PHASE ONE. A summary report: What the community told Alcoa during Phase One of the community engagement program for Point Henry 575.

DISCUSSION TOPIC: ST JOHNS RIVER & ITS TRIBUTARIES (BPII) 2030 COMPREHENSIVE PLAN POLICES AND REGULATORY FRAMEWORK

Welcome! HORSESHOE BAY PARK. Welcome!

Port of Camas-Washougal Waterfront Trail Master Plan

Sub-committee on Harbour Plan Review of Harbour-front Enhancement Committee. Ninth Meeting

Route 1 Corridor Study

Johnson Street Bridge Public Realm Update

Ship Creek Redevelopment

MARINA MARKET & WATERFRONT DEVELOPMENT STUDY PORT ARANSAS, TEXAS

Public Workshop #2 October , Welcome. Former Kingston Penitentiary & Portsmouth Olympic Harbour

VIRGINIA KEY CONSENSUS MASTER PLAN

Riverfront Development Plan

Goals and Action Items

TOWN OF MIDLAND TERMS OF REFERENCE AND REQUEST FOR PROPOSALS

ROCKAWAY BOARDWALK Community Board 14 Parks Committee Meeting June 4, 2014

CHAPPLES PARK MASTER PLAN

M i s s i o n B a y W a t e r f r o n t

2.1 Location and Size

Waterfront Development Master Plan

General Plan Infill Policies (workshops and hearings)

CENTRAL ESTUARY PLAN AVISION FOR OAKLAND S WATERFRONT

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

Naomi Weiss, Executive Director, DBPA Jason Jeffries, Project Manager, City of Daytona Beach

STUART MASTER PLAN. The Town on its Western Waterfront. Treasure Coast Regional Planning Council/City of Stuart TCRPC/Tom Spain

Inspiration Port Credit. Exploring the Options Public Engagement March 26, 2013

Master Plan Implementation Committee Meeting

HEARING PUBLIC GOALS. Conduct a public hearing on the proposed Public Works Plan Amendment #7 (PWPA7);

SUBJECT: Waterfront Hotel Planning Study Update TO: Planning and Development Committee FROM: Department of City Building. Recommendation: Purpose:

Welcome. Community Consultation Meeting November 28, Review and discuss the Bathurst Quay Neighbourhood Plan Framework

India Basin/Hunters Point Shoreline Community Workshop May 21, 2008

Current City Warehouse Facility. City Market Re-Use Concept. Indoor Market/ Maker s Incubator 1.06 acres +/- Open Air Market 1.

Loved hearing what others shared and having a dialogue about the possibilities/opportunities

HUMBER BAY PARK PROJECT - BUILDING CONCEPT

Delaware River Waterfront Corporation

jmt.com MARINE Part of a diversified family of solutions

Zoning and Development Considerations in the Boothbay Harbor Maritime/Water Dependent District

Workshop 3. City of Burlington Waterfront Hotel Planning Study. September 14, The Planning Partnership

Thank you! Events and Entertainment in Northeast False Creek. Tuesday, March 7, 2017

CONSULTATION SUMMARY. Public and Online Consultation #1

Planning for Waterfront Communities

Shared Principles and Emerging Plan Directions

Update on Angus Glen. Community Park. Development Services Committee. December 6, Part A ANGUS GLEN PARK MASTER PLAN. Town of Markham & LA+ED

Appendix A. Park Land Definitions

CARMODY PARK MASTER PLAN

WHAT WE LEARNED FROM YOU

OVERVIEW NEW PARK AT 318 QUEENS QUAY WEST

Vision for East Cowes

ASHTABULA COUNTY COASTAL MANAGEMENT PLAN

Highland Falls Waterfront Redevelopment Feasibility Study Village Board Meeting March 20, 2017

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

DRAFT PLAN PRESENTATION

Prepared by: a for the of the. Waterspace Strategy Sustainable Development Liverpool South Docks

Stadium District Masterplan

VANCOUVER CONVENTION CENTRE EXPANSION PROJECT (VCCEP) SUPPLEMENTARY BULLETIN: * WATER-ORIENTED DEVELOPMENT

Community Conversation. Thursday, March 30, James St N 7:00 pm 9:15 pm

Beaverton City Council: Work Session. SIDEDistrict. May 6, 2014

RE-Imagining the Downtown Colorado Springs Master Plan

preliminary master plan Cover Slide executive summary public presentation

Dyersville Downtown Plan. Open House October 24, 2017

REGIONAL ACTIVITY CENTER

MAGALIESBURG DEVELOPMENT INITIATIVE (MDI)

City Council March 27, Parks, Recreation, and Trails Master Plan

Public input has been an important part of the plan development process.

Please read the entire document

ELK GROVE GENERAL PLAN VISION

City Council Special Meeting AGENDA ITEM NO. C.

BRADENTON RIVERWALK EXPANSION MASTER PLAN

PARTF Scoring System for Grants

CHAPPLES PARK MASTER PLAN. Presentation to Council April 10, 2017

process of the Land Development Code to assure regional parks are available County-wide.

S E C T I O N 8 THE GOALS AND OBJECTIVES: KEY ELEMENTS 8.1 ENHANCEMENT OF THE ROSE GARDEN

INTEGRATING FAST FERRY SERVICE IN WOODBRIDGE

c1900 c facebook.com/gravingdocks th March 2017

APPENDICES DESIGNING PUBLIC SPACES - ENERGIZED PUBLIC SPACES DESIGN GUIDELINES WORKING DRAFT DECEMBER 2018 A1

Planning Commission March 14, Presented by: City of Bellingham Port of Bellingham

Comprehensive Plan Advisory Panel Meeting #3

chapter DESIGN GUIDELINES NEW RIVER MASTER PLAN REPORT

Comprehensive Plan ADOPTED APRIL 2014

Council Agenda Report

ASPEN HILL Minor Master Plan Amendment

Request for Proposals

FOR IMMEDIATE RELEASE Contact: Dyana Koelsch

Promoting Economic Development Through Upfront SEPA Review: Lessons from South Downtown Tacoma

Bourne Downtown Site Planning

Lynn Waterfront Master Plan

Transcription:

Cold Lake Marina Master Plan

Intro to Team Moffatt & Nichol is recognized throughout the world for our role in the revitalization and redevelopment of urban waterfronts, including the evolution of modern marina and small craft harbor design Brook McIlroy is an award-winning urban design, planning, landscape architecture and architecture firm specializing in the design of waterfronts

Master Plan Milestones 1. Kickoff Meeting July 2012 2. Public Outreach August 2012 (Race The Base Weekend) 3. Preliminary Concepts Submitted October 2012 4. Draft Report Submitted November 2012 5. Presentation to Council November 27, 2012 6. Final Report Submitted January 2013 7. Final Presentation to Council February 26, 2013

7 TH STREET INDIAN RESERVE #149 A 8 TH STREET STUDY AREA

Project Intent The intent of the Marina and Waterfront Master Plan is to expand the Cold Lake Marina capacity and improve marina user experience while simultaneously providing opportunities for revitalization and further development of the adjacent waterfront. The upland improvements are intended to foster opportunities for businesses on the waterfront through increased use of and visitation to the waterfront by boaters and non-boaters. The master plan provides marina and waterfront guidance through 2035.

Guiding Principles 1. Expand Marina Capacity 2. Enhance Marina Services 3. Revitalize the waterfront as a mixed-use area to attract both residents and visitors. 4. Provide additional public amenities & activities attractive to all citizens/all age groups 5. Public investments in the waterfront should be strategically designed to leverage private sector investment. 6. Demonstrate design excellence and environmentally sustainable practices

Marina Market / Drivers How many more slips are supported in the marina market? Factors that drive marina occupancy Underserved existing population (wait list) Population growth Changing demographics (young working class) Tourism Commercial

Market Projection Based on market drivers, capacity to expand marina to 400 to 600 slips over next 20 years

Basis of Marina Concept A marina is more than a parking lot for boats the marina can be a destination Enhance public access to the marina while maintaining security Include event areas Include wider, more flexible slips and fairways Improve boat ramp (2 to 4 lanes) and fuel dock operations Include electricity for bigger boats

Basis of Landside Concept A Compelling Waterfront with a wide range of activities. Create a critical mass of activity appeals to all ages, year-round, all interests What We Heard from Survey & Consultation.more public amenities 2 Key Ingredients Public outdoor spaces including a splash pad/ice rink, park space, trails etc. A new waterfront Centre restaurant, meeting/events and support spaces. These strategic public sector investments will catalyze private-sector redevelopment

Catalyze A New Waterfront District

Concept 1 Waterfront Features Expand Existing Marina 457 Slips 348 Parking Amenities Bldg Keep Exist. Bldg Splash Pad/ Ice Rink Greenspace

Concept 2 Waterfront Features New Breakwater Central Platform 596 Slips 306 Parking Amenities Bldg Demo Exist. Bldg Splash Pad/ Ice Rink Greenspace

Concept 3 Waterfront Features T-Dock 544 Slips 415 Parking Amenities Bldg Demo Exist. Bldg Splash Pad/ Ice Rink Greenspace

Parking Marina Parking 80 possible stalls on the east end of the marina where the current boat launch and amenities building sit. East Marina Lot 29 possible spots to match existing parking on the west end of marina. West Marina Lot Fill is required for both sites.

Parking Fire Hall and Cenotaph 104 possible stalls on Fire Hall site approx. half as many if building is redeveloped 32 possible stalls on Cenotaph site Allee created for Cenotaph

Parking Existing Empty Lots 46-70 possible stalls 18 trailer stalls Potential creation of a green space on 8 th and Lakeshore.

Parking Private and On Street 90 possible stalls along alley were existing businesses sit. There is also potential for on street parking parallel and angle. Max. along Lakeshore would be 45-50 additional stalls. Current on street parking has not been accounted for within the site but would likely give an additional 50-75 stalls in the neighborhood.

Public Amenities A waterfront plaza featuring a splash pad and ice rink providing a public attraction 365 days a year A new amenities building will highlight the waterfront as a destination place year round. Restaurant, meeting/event space, public washroom, change facilities and support space. T-dock, floating docks and additional seawall for public use ie. Fishing, seating, picnic places, viewing areas, kiosk retail, etc Additional green space and boardwalk elements will add to the over feel and enjoyment of the area for the city and tourist alike. Beach area and an upgraded viewing deck will book end the site and give additional amenities.

Marina: Thunder Bay Waterfront

Summer Splash Pad to Winter Skating Rink: Thunder Bay Waterfront

Spirit Garden: Thunder Bay Waterfront

Delta Hotel: Thunder Bay Waterfront Condominiums: Thunder Bay Waterfront

Waterfront Plaza 10,000 sq.ft Splash Pad / Skating Rink Fountain with Lighting Music Event Space

Waterfront Pavilion Concept 20,000 sq.ft 2-3 levels Restaurant/Café Meeting & Event Space Visitor information Public washrooms Change facilities Vending

Waterfront District Development Capacity for approximately 700,000 sq. ft of new high quality development Hotel with meeting space, Multi-unit residential, Senior s residences, Retail, Restaurants and other business space Expanded Tourism Diversification of the Economy Jobs and Enhanced Quality of Life Economic Impact Assessment Funding Package

Cost Analysis Concept 1 $14M to $17M Concept 2 $17.75M to 21.6M Concept 3 $19M to $23M

Summary Market Supports Expansion Public Supports Expansion Opportunity to Make the Marina a Destination for Boaters and Non-Boaters Need to Create a Sense of Place Public Amenity Splash Pad/Ice Rink, Green Space, Indoor Space to Stimulate the Waterfront Need to Address Parking

Summary - Concept Comparison No Change Concept 1 Concept 2 Concept 3 Slip Count 250 457 596 544 Boat Ramp 2 Ramps with limited trailer queuing area and in water staging area that conflicts with the fuel dock 2 to 4 Ramps with trailer queue area and in water staging area 2 to 4 Ramps with trailer queue area and in water staging area 2 to 4 Ramps with trailer queue area and in water staging area Parking 94 parking stalls and 10 to 15 trailer stalls 348 parking stalls and 18 to 27 trailer stalls 306 parking stalls and 18 to 27 trailer stalls 415 parking stalls and 18 to 27 trailer stalls Parking for west basin is limited and may require fill Parking for western docks is limited and may require fill Parking for west basin is limited and may require fill Environmental Impacts No Change Minimal fill in the lake Two sub-harbours will need to have flushing/circulation culverts connecting to the lake Minimal fill in the lake Harbour will need to have flushing/circulation culverts connecting to the lake Covers 3,900 square meters of lake bottom Two sub-harbours will need to have flushing/circulation culverts connecting to the lake Extends into deepest water offshore Phased Construction N/A Phase 1 = 273 new slips in place of original 250 Phase 1 = 166 new slips plus original 250 Phase 1 = 284 new slips in place of original 250 Existing can remain in place during construction of Phase 1 Existing can remain in place during construction of Phase 1 Existing must be removed for construction of Phase 1 Cost N/A $14,000,000 to $17,000,000 $17,750,000 to $21,600,000 $18,980,000 to 22,895,000

Next Steps Select a Concept Environmental and Bathymetric Surveys (Summer Months) Economic Impact Assessment - Funding Package Apply for Permits 2 to 4 months after surveys Permitting 4 to 12 months Design Development concurrent with permitting Construction Documents 3 to 4 months after permitting Procurement 2 months after CD s Construction 12 to 18 months Enjoyment!

Cold Lake Marina Master Plan Thank-You!