Area Plans. September 18, 2012

Similar documents
THE TOWN OF WASAGA BEACH

LAND USE AND COMMUNITY DESIGN VISION

TAHOE CITY VISION PLAN June 2012

The Five Components of the McLoughlin Area Plan

D-O LRT Zoning Discussion. Chapel Hill Boards & Commissions October 16, 2017

CITY OF PUYALLUP. Background. Development Services

Town Center (part of the Comprehensive Plan)

Plano Tomorrow Vision and Policies

ARLINGTON COUNTY, VIRGINIA

EXISTING COMPREHENSIVE PLAN

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

FUTURE LAND USE ELEMENT

Commercial Node Plan Devine Street/Jackson Blvd. COLUMBIA, SC

LUNDY S LANE COMMUNITY IMPROVEMENT PLAN STUDY

Somers Point Master Plan

Rio/29 Future Land Use Alternatives. Rio/29 Small Area Plan Phase 1 December 12, 2016

Village of Fair Haven Goals & Objectives

A. WHAT IS A GENERAL PLAN?

TRANSIT ORIENTED DEVELOPMENT PINELLAS COUNTY MPO LIVABLE COMMUNITIES INITIATIVE PINELLAS COUNTY COMPREHENSIVE PLAN AMENDMENTS

4- PA - LD - LIVELY DOWNTOWN. LD - Background

2035 General Plan Update and Belmont Village Specific Plan. Joint Study Session with the City Council and Planning Commission April 12, 2016

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

The transportation system in a community is an

Downtown Dubuque...it s a great time.

Attachment 4. TRPA Environmental Documentation, IEC/MFONSE

City of Hermosa Beach Administrative Policy #

THE CORPORATION OF THE TOWN OF OAKVILLE BY-LAW NUMBER

Commercial, Retail and Tourism Executive Summary December 2018

Economy Vision Statements: Social Wellbeing Vision Statements: Natural Environment Vision Statements:

VICTORIA DOWNTOWN DEVELOPMENT PLANNING

ORANGE LINE TRANSIT NEIGHBORHOOD PLANS VAN NUYS NEIGHBORHOOD COUNCIL, PLUM COMMITTEE DEPARTMENT OF CITY PLANNING, CITY OF LOS ANGELES

Policies and Code Intent Sections Related to Town Center

George Hotel application STAFF REVIEW COMMITTEE OF THE WHOLE JANUARY 14, 2014

Chapter 9: Economic Development

Town of Cobourg Heritage Master Plan. Statutory Public Meeting

North Fair Oaks Community Plan Summary and Information

Request for Proposals: Architectural/Design Guidelines

36.1. PURPOSE APPLICABILITY DESIGN REVIEW GUIDELINES

Zoning Technical Review Presented by Camiros. November 10, 2015

SECTION ONE: INTRODUCTION. introduction

Figure 1- Site Plan Concept

3. Endorse the LRT vision in transforming Surrey into Connected-Complete-Livable communities, and more specifically, the official vision statement:

New Partners for Smart Growth Conference February 5, 2010

A larger version of this map is located on the last page of this PDF.

V. Vision and Guiding Principles

2010 Plan of Conservation and Development

Introducing the Main Street Strategic Toolbox

2030 Comprehensive Plan VISION STATEMENT

PLANNING ADVISORY BOARD AGENDA OCTOBER

hermitage town center

[PLANNING RATIONALE] For Site Plan Control and Lifting of Holding Zone By-Law 101 Champagne Avenue. May 23, 2014

NO: R035 COUNCIL DATE: FEBRUARY 24, 2014

IMPLEMENTING SOMERSET COUNTY S INVESTMENT FRAMEWORK

PINE CURVE REZONING. BACKGROUND Purchased as two parcels in 2001 and 2002

City of Tacoma Planning and Development Services

PUBLIC OPEN HOUSE HURONTARIO-MAIN CORRIDOR SECONDARY PLAN

Welcome. Walk Around. Talk to Us. Write Down Your Comments

17.11 Establishment of Land Use Districts

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

TOWN AND VILLAGE OF NAPLES JOINT COMPREHENSIVE PLAN 2013 VOLUME II GOALS, OBJECTIVES, AND RECOMMENDATIONS

DALY CITY VISIONING PROCESS COMMUNITY WORKSHOP 3 MAY 8, 2008

LAND USE OVERVIEW WHAT YOU WILL FIND IN THIS CHAPTER

Chapter 2: Vision, Goals and Strategies

Welcome to the Oakridge Centre Open House

A Growing Community Rural Settlement Areas

East Bench Master Plan Update

Visioning Statement and Guiding Principles

The Community and Transportation Linkage Planning Program

Official Plan Review: Draft Built Form Policies

Silverdale Regional Center

West Ocala Vision & Community Plan City Council Work Session. Presented by West Ocala Community Plan Steering Committee

Planning Charlotte s Future. Planning Committee June 21, 2016

S A C R A M E N T O C O U N T Y JACKSON HIGHWAY & GRANT LINE EAST VISIONING STUDY

The City of Poway Creating a Town Center. Patti Brindle, AICP City Planner, City of Poway APA Luncheon September 28, 2006

New Westminster Downtown Parking Strategy Public Open House #1 September 13, 2012

3. VISION AND GOALS. Vision Statement. Goals, Objectives and Policies

The Lincoln Neighborhood Corridor Plan. The LiNC

Downtown North Las Vegas Demonstration Site Project. Project Update

CHAPTER 7: Transportation, Mobility and Circulation

General Plans. Tom Dansie, AICP Steve Pastorik, AICP

South Central Connecticut Region Plan of Conservation & Development 2018 Update. Municipal Planners

Mark-up of the effect of the proposed Bronte Village Growth Area OPA No.18 on the text of section 24, Bronte Village, of the Livable Oakville Plan

ANC 2A Presentation. November 9, 2006

The University District envisions, in its neighborhood

JANUARY 19, 2011 CENTRAL AVENUE-METRO BLUE LINE TRANSIT-ORIENTED DEVELOPMENT IMPLEMENTATION PROJECT COMMUNITY FORUM

Create Policy Options Draft Plan Plan Approval. Public Consultation Events. Phase 2

Lehigh Acres Land Development Regulations Community Planning Project

Living in Albemarle County s Urban Places

City Council Presentation November 6, 2017

Transit / Housing Oriented Redevelopment

SITE PLAN AREA. Met Park 6 Site Area (122,368 sf) Met Park 4/5 The Bartlett. Met Park 3 The Acadia. Met Park 2 The Millennium.

About Momentum Midland

Downtown Streetscape Manual & Built Form Standards

HE VISION. Building a Better Connected Place

Transportation. Strategies for Action

FUNDING CORRIDOR REVITALIZATION

1.0 Purpose of a Secondary Plan for the Masonville Transit Village

2040 LUP is a part of the Comprehensive Plan and carries the same legal authority. Economic Challenges

GO Station Mobility Hubs: Draft Precinct Plans. Committee of the Whole July 12, 2018

Beachside Redevelopment Committee

Transcription:

Area Plans September 18, 2012

Transfer ratio for existing development up to 1:6 depending on sending parcel sensitivity and distance from community centers and/or transit routes. Within Town Center and Regional Center 70% land coverage for facilities in land capability 4-7. Non-conforming coverage may be transferred when relocated to a Town Center or Regional Center. 1:1 transfer ratio required for transferred land coverage from sensitive lands to Community Plans (versus previous requirement to retire coverage with transfers greater than 50% coverage. Coverage exemptions for temporary structures, pervious coverage, pervious decks, and non-motorized public trails. Additional height for public safety buildings.

Single land use plan adopted by TRPA and a land management or other government agency for specific geographic areas Land use allowances and development standards May also establish standards that replace regionwide standards Must comply with Regional Plan Goals and Policies, Thresholds and the Compact Once adopted, additional projects may be exempt from TRPA review, established in an MOU Annual monitoring

Increased Density Increased Height Zoning: Possible consolidation of zoning use categories Alternative comprehensive coverage management systems BMPs: Area-wide water quality treatments and funding mechanisms Land use and site design refinements to address current issues

Area Plans instead of Community Plan Updates Smart Growth and Sustainability Policy implementation Incentivizing environmental redevelopment in Commercial Nodes New land use system to replace Plan Area Statements Complete Street Policy implementation Community Design Policy implementation (i.e. gateways, way-finding, public art, ADA compliance, etc.)

2003- TVCP Team appointed 2006-TVCP Team Draft Plan 2007-Mintier & Associates Draft Plan

We shall transform the Tahoe Valley area into a strong and vibrant business district We shall embrace outdoor enthusiasts and provide a healthy balance of commerce, employment, entertainment, and livability. Our Community Plan will create smaller, pedestrian-friendly districts Our plan shall encourage retail businesses and services that meet local needs, encourage local ownership, and appeal to visitors seeking to mix with the local community.

Establishment of at least 15,000 square feet of CFA available to be used in the TVAP area Matching and conversion incentives for development transferred in to the Tahoe Valley area Incentives for developing Housing as part of mixed use projects within the Tahoe Valley area. Pedestrian oriented design with access to alternative transportation Clear and easy to understand Development Standards that will result in high quality and functional new development and redevelopment

The City shall transform the Tahoe Valley Community Plan area into an attractive gateway commercial district that serves both residents and visitors.

The City shall ensure that the Tahoe Valley Gateway District will be a primary area in the city for resident-serving commercial uses, workforce housing (e.g., housing affordable to local workers in all industries), and affordable housing. The City should work with property owners to transform the Node into a contemporary, pedestrian-oriented, mixed-use, commercial service district served by a transit center and alternate transportation opportunities.

Visioning Public Input Final Plan Draft Policy Environmental Review Policy Public Input Draft Plan

Update to reflect current City policy documents Revisit/Complete Policy Direction Comprehensive Coverage Program General Community Outreach Draft and Final EIR/EIS Coordination with TRPA staff on RPU consistency analysis Additional staff time Consultant Assistance

Potential Timeline

February 2011 Members of South Tahoe Association of Resorts (STAR) contacts City Staff regarding potential South Shore Vision Plan November 2011 South Shore Vision Plan presented at City Council and Douglas County Board joint meeting December 2011-present preparation of the Area Plan

central destination that provides full services for tourist and permanent residents and offers unique experiences related to the many outdoor recreation possibilities that surround the core area. a sustainable outdoor tourism recreational destination by incorporating active streetscapes featuring strolling, shopping, entertainment and outdoor food and beverage opportunities. transit and alternative travel will provide an essential part of the envisioned destination resort experience significant environmental gain and improved scenic quality

Consolidated list of land uses for user friendliness Increased density 6 story height for Regional Center Development standards to allow for active facades and sidewalks Shared/underground parking limit on area of surface parking Modified sign standards Multi-modal transportation opportunities

The City shall reinforce the Stateline/Ski Run Community Plan area as the primary visitor and tourist district in South Lake Tahoe.

The City shall ensure that the Stateline Node will be an area in the city for tourist-serving commercial uses, Tourist Accommodation Units, workforce housing (e.g., housing affordable to local workers in all industries), and affordable housing. The City should work with property owners to transform the Node into a pedestrian center served by transit that connects community resources, visitor facilities, recreation, and Lake Tahoe.

Visioning Public Input Final Plan Draft Policy Environmental Review Draft Plan Policy Public Input Completed Step Incomplete Step

Addition of Ski Run Blvd Outreach to Ski Run stakeholders Revisions to policy and standards to address the Ski Run area General public outreach Coordination with TRPA staff on RPU consistency analysis Additional Staff Time Consultant Assistance

Potential Timeline

Staff time available includes oversight and management additional time required for writing and technical analysis Sustainable Communities Grant Funding-Planning only, not environmental Ski Run Area Plan Housing Element Update Required within 18 months of SCS adoption (estimated March 2014) General Plan and City Code Amendments required for consistency with Updated Regional Plan Greenhouse Gas Emissions Inventory of City operations