Public Works Subcommittee Meeting on 10 June 2017 Issues requiring follow-up actions by the Administration

Similar documents
Task Force on Kai Tak Harbourfront Development

3 Summary of Major Views and Responses

Harbour-front Enhancement Committee. Urban Design Study for the New Central Harbourfront Revised Planning and Urban Design Concepts

Overview of Land Use Framework for Victoria Harbourfront. Planning Department February 2011

Wan Chai Development Phase II Planning and Engineering Review

Harbour-front Enhancement Committee Sub-committee on Harbour Plan Review

Notes. Schedule of Uses. Explanatory Statement

Task Force on Kai Tak Harbourfront Development. Proposed Establishment of Government Flying Service Kai Tak Division at Ex-Kai Tak Runway Tip

Planning for Liveability in Hong Kong

Secretary, Town Planning Board 15/F, North Point Government Offices 333 Java Road, North Point, Hong Kong (

Task Force on Harbourfront Developments on Hong Kong Island. Hong Kong Island East Harbour-front Study

Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing

Kai Tak Development Proposal of Increasing Development Intensity and Findings of Technical Study. PlanD CEDD GPA IRD ArchSD

Task Force on Harbourfront Developments in Kowloon, Tsuen Wan and Kwai Tsing

Alignment of Options 2 & 3. Lam Tin. Tseung Kwan O Town Centre South. Ocean Shores. Cemetery. Cross Bay Link. Alignment Option 1

Appendix I Minutes of Statutory Advisory Bodies Meetings

HKIUD Speech. Urban Renewal in a new dimension. 5 September Ir WAI Chi Sing GBS JP FHKEng. Managing Director, Urban Renewal Authority

Harbour-front Enhancement Committee. Wan Chai Development Phase II. Planning and Engineering Review

Appendix B. Tentative Silt Curtain Layouts

Task Force on Harbourfront Developments on Hong Kong Island

Derry City and Strabane District Council Planning Committee Report

SHORELINE, FLOOD AND COASTAL DEFENCE MANAGEMENT PLANS

Minutes of Seventeenth Meeting

Seminar Series on New Horizon in Greening Skyrise Greenery

Shoreline Master Program Town of La Conner, Washington

Task Force on Water-land Interface

Minutes of Tenth Meeting

Re: Section 12A of the Town Planning Ordinance Rezoning Agriculture to Other Specified Uses annotated Rural Use in Ha Pak Nai, Sheung Shui (Y/YL-PN/3)

Parish of Repton NEIGHBOURHOOD DEVELOPMENT PLAN

New Towns in Hong Kong: Planning for the Next Generation

Design Criteria and Action Checklist on Sustainability and Green Issues for New Capital Projects

Design Assessment Checklists for Ponds/ Wetlands

Minutes of First Meeting

The checklist can be used for a single filter strip or groups of filter strips with the same characteristics.

Task Force on Kai Tak Harbourfront Development

HBF Marine Study: Victoria Harbour: Water dependent and water related uses and associated land/water interface implications

DESIGN AND MANAGEMENT OBJECTIVES PART 7 HA 92/01 SCHEME DEVELOPMENT, IMPLEMENTATION & MANAGEMENT SUMMARY

This Powerpoint Presentation is available on the Website of the Society for Protection of the Harbour at

Former Temple Cowley Pools, Oxford TEMPLE COWLEY LIBRARY * ELEVATION SHOWN IS INDICATIVE AND SUBJECT TO FINAL DESIGN AND AGREEMENT.

MUNICIPAL RESILIENCE PLANNING ASSISTANCE PROJECT

Environmental Impact Assessment for Waterway Restoration Projects. Chris John, Technical Director Ecus Ltd.

COMPANY PROFILE. Sellhorn Middle East Engineering

Former North Works, Lickey Road, Longbridge, Birmingham

SECTION 7A: WHAKARONGO RESIDENTIAL AREA

Group Executive Liveability and Natural Assets

CHAPTER Committee Substitute for Senate Bill No. 1472

2010 ADA Standards for Accessible Design

ALTERNATIVE SHORELINE MANAGEMENT IN COASTAL MISSISSIPPI

STAFF REPORT FOR STANDARD COASTAL DEVELOPMENT PERMIT #CDP FEBRUARY 26, 2015 CPA - 1 PO BOX 238 APTOS, CA 94001

Strategic Planning in the Making: Legacy and Vision for Hong Kong. Mr. K. K. LING, JP, FHKIP, RPP Director of Planning

Mr Tony HO Chief Geotechnical Engineer Geotechnical Engineering Office Civil Engineering and Development Department Hong Kong, China

MASTER PLAN N0. 76 (SITE DEVELOPMENT PLAN DETAILED PLANNING AREA 12 PRECINCT 13) 2013

Plumpton Neighbourhood Development Plan Revised Pre Submission Document - Regulation 14 Consultation

Derry City and Strabane District Council Planning Committee Report. Amended layout from approval A/2004/0462/F with reduction from 166 units

Harbourfront Commission Task Force on Harbourfront Developments on Hong Kong Island. Minutes of Fourteenth Meeting

By & Fax. Creating a Better Pedestrian Environment to Improve Streetscape and Promote Walking

The Role of CHIA in the Evaluation of Heritage Significance: The Hong Kong Experience. Ellen Cameron

Land off Nursery Road / Church Street, Lozells, Birmingham, B19. Erection of 5 no. dwellings and retention of area of public open space.

Suggested Reference List for the HKILA Professional Practice

SECTION 2.4 URBAN DEVELOPMENT AND STRATEGIC URBAN DIRECTIONS

JOINT PUBLIC NOTICE. 26 June United States Army Corps of Engineers State of Louisiana

Guided Learning Hours (GLH) 4 Invigilated Assessment (IA) 1 Total Qualification Time (5)

Landscape Act. (Act No. 110 of June 18, 2004)

DRIVEWAY REGULATIONS

Master Plan for Preservation and Scenic Conservation (1995)

Preliminary Concepts for the East Lantau Metropolis

SOUTH CAMBRIDGESHIRE DISTRICT COUNCIL. Executive Director (Operational Services) Corporate Manager (Planning and New Communities)

DEMERGER OF A PORTION OF THE ASSETS of FIBRE OTTICHE SUD F.O.S. S.R.L. to PRYSMIAN S.p.A. (hereinafter, the Transaction )

Appendix 3A - Caerphilly. CR1- Ty Du, Mafon Road, Nelson. CR2- Oakdale. CR3- Navigation Colliery, Crumlin

Growth opportunities in Asia Pacific. 18 September 2013

Impact Assessment The Next Generation May 2012, Calgary Stampede BMO Centre, Calgary, Alberta, Canada

Site north of Hattersley Road West (east of Fields Farm Road), Hattersley

Planning and Growth Management Committee

Folly Beach Planning Commission

BEDFORD BOROUGH COUNCIL PLAN IMPLEMENTATION MONITORING REPORT

30% Design Technical Report

Coastal Planning in Texas. Tony Williams Senior Director of Planning Coastal Resources Division Texas General Land Office

North Oakville East Parks Facilities Distribution Plan. November, 2009

Land Adj. 63 Sunny Bank Road, Sutton Coldfield, Birmingham, B73 5RJ

Stock-Taking on Integrated Coastal Zone Management (ICZM) in the Black Sea IMPLEMENTATION AUDIT QUESTIONNAIRE 2010

Environmental Impact Assessment

3 Urban Design and the State Highway Network

Highway Oriented Commercial Development Criteria

OFFICE CONSOLIDATION SECONDARY PLAN AREA 22 THE BRAMALEA SOUTH INDUSTRIAL SECONDARY PLAN

For household use only. Page. Model. Contents R-B500PT6

Integrated Planning for a Sustainable & Compact City: Singapore s Experience

TOWN OF WHITBY REPORT RECOMMENDATION REPORT

24 October 2013 Civil Engineering and Development Department

Development Solicitation Request for Qualifications. The Historic Hollering Place Development

ST. MARY S SOIL CONSERVATION DISTRICT (SMSCD) AND DPW&T CONCEPT EROSION AND SEDIMENT CONTROL AND STORMWATER MANAGEMENT GUIDELINES AND CHECKLIST

Reserved Matters application for a site that straddles the boundary between CBC and BBC

FEBRUARY I O.2f,17 D.G. AGT 2{-665 ENROLLED ORJGINAL AN ACT

SCHEDULE 10 TO THE URBAN GROWTH ZONE. Shown on the planning scheme map as UGZ10. Truganina Precinct Structure Plan. 1.0 The Plan

Site off Hattersley Road West (bound by Hattersley Road West to the north west and Sandy Bank Avenue to the south and west), Hattersley

UPDATED PLANNING STATEMENT TO ACCOMPANY AN APPLICATION FOR;

Rapid City Planning Commission Rezoning Project Report

PETERHEAD PORT AUTHORITY ENVIRONMENTAL STATEMENT. Non-Technical Document

Waterfront Promenade adjacent to the Hong Kong Children's Hospital at Kai Tak. Harbourfront Commission Aug 2015

Adaptive Management Strategies for Resilient Coastlines: A Case Study on the Ft. Pierce, FL Breakwater Project

PURPOSE OF THE PRESENTATION

Transcription:

LC Paper No. PWSC223/16-17(01) Public Works Subcommittee Meeting on 10 June 2017 Issues requiring follow-up actions by the Administration PWP Item No. 786CL Tung Chung New Town Extension Reclamation and Advance Works At the Public Works Subcommittee (PWSC) meeting on 10 June 2017, Members requested the Government to provide supplementary information (shown in italics below). After consulting the relevant departments, the Government s consolidated reply is set out below. At the request of Hon Tanya CHAN, the Administration should provide supplementary information such as illustration diagram, location plan and design plan of the eco-shoreline to be provided along the proposed seawall at Tung Chung East (TCE). 2. PWP Item No. 786CL Tung Chung New Town Extension Reclamation and Advance Works is the first public works project adopting eco-shorelines, with the primary objective of mimicking the physical properties of natural inter-tidal zones as far as practicable, in a bid to provide a more suitable habitat, namely a tidal eco-system, for colonisation of marine species. On the location of the eco-shoreline (see Diagram 1), we need to take into account various environmental factors and constraints in the vicinity of the shoreline, such as salinity of the water body, susceptibility of the shoreline to sea waves and abundance of sunlight. Mangrove eco-shorelines (see Diagram 2) would be provided at inter-tidal zones along the seashore less susceptible to sea waves. In addition, seawall blocks would be laid along the seaward side to reduce the wave action which may affect the mangroves. On another front, mangrove eco-shorelines would be provided near the drainage box culvert outfall and outlet of Tai Ho Bay. As mentioned in paragraph 8 of LegCo Paper No. PWSC192/16-17(01), the lower salinity of the water body there and natural nutrients from catchment areas may promote the growth of mangroves. 3. For the locations relatively susceptible to wave actions or with insufficient sunlight, rocky eco-shorelines would be provided, where bio-blocks with varying levels and sizes of cavities would be placed at inter-tidal zones (see Diagram 2) for retaining sea water during low tide conditions, with a view to providing appropriate

habitats for marine species. Cavities and pots would be provided for vertical seawalls (see Diagram 3), mainly for protection of and provision of habitats for marine creatures and plants. In addition, eco-tiles would be placed on the surface of the vertical seawall, providing uneven surfaces for easy attachment and growth of tiny creatures. At the Request of Dr Hon LAU Siu-lai, the Administration should provide supplementary information to explain: (a) the Marking Scheme (including such details as the respective weights for tender price and contractors past performance) adopted by the Government in tender evaluation for PWP Item No. 786CL; and (b) how the Government can ensure that tenders from the contractors with past non-compliance in public works projects will not be accepted for PWP Item No. 786CL. 4. As far as general public works contracts are concerned, either the Formula Approach or Marking Scheme Approach will be adopted in tender evaluation. Given the technical expertise involved in the TCE reclamation works, we will adopt the Marking Scheme Approach in tender evaluation in light of the importance of works quality. Only tenders from those tenderers with substantial relevant experience shall be considered. 5. The Government accords high importance to contractors past performance in delivering public works contracts. Under the guidelines as set out in the DEVB s Technical Circular (Works) No. 4/2014, contractors past performance and other technical factors shall be taken into account in the marking criteria for technical attributes as detailed below: Marking Criterion Mark Tenderer s past performance 18-35 Tenderer s relevant experience 0-20 Tenderer s technical resources 5-40 Tenderer s technical proposal 30-60 Tenderer s design 0-30 Total

According to the above guidelines, the respective weights for technical and tender price score are generally 40/60. 6. The Government has all along put in place an established system for managing the contractors performance in delivering public works projects. For instance, if two consecutive adverse quarterly performance reports in respect of a public works contract were given to a contractor, the contractor concerned will be suspended from tendering for public works contracts until its performance is improved. As for alleged non-compliance by individual contractors, such as failure to comply with statutory environmental or safety requirements during construction, works departments will record such non-compliance in quarterly performance reports upon verification by relevant law enforcement departments. As mentioned above, if two consecutive adverse quarterly performance reports in respect of a public works contract were given to a contractor, the contractor concerned will be suspended from tendering for public works contracts until its performance is improved. At the request of Dr Hon YIU Chung-yim and Hon LEUNG Kwok-hung, the Administration should provide supplementary information and actual example(s) to explain the reason for rezoning the Metro Core Area of TCE Development Area from Comprehensive Development Area ( CDA ) to Other Specified Uses ( OU ) annotated Commercial and Residential Development cum Public Transport Interchange ; and whether such change in zoning is to avoid future application to the Town Planning Board (TPB) at the implementation stage. 7. The metro Core Area is located in Area 113 to the north of the proposed TCE MTR Station and zoned OU annotated Commercial and Residential Development cum Public Transport Interchange on the approved Tung Chung Extension Area Outline Zoning Plan (OZP). The zone is intended for an integrated development for commercial and residential uses cum public transport interchange with the provision of open space and Government, Institution or Community (GIC) facilities, with a view to developing into a territorial business/financial centre and regional and district commercial/shopping centre in future. 8. The OZP (including the land use zonings and planning control of Area 113) has undergone relevant statutory planning and public consultation procedures and was approved by Chief Executive in Council after TPB s consideration. The approved OZP was gazetted on 27 February 2017. Future development in Area 113 has to comply with the planning intention, the designated land uses, the maximum plot ratio

of 8.8 and building height restriction of 185mPD as stipulated on the OZP. According to the Explanatory Statement of the OZP, future development of the site shall be governed by Master Layout Plan (MLP) submission, as required under the lease, by the project proponent to the satisfaction of the Director of Lands before the development proceeds. 9. On the other hand, Area 113 is zoned CDA on the Recommended Outline Development Plan (RODP) under the Planning and Engineering Study on the Remaining Development in Tung Chung Feasibility Study and is intended for comprehensive commercial and residential development with provision of public transport interchange. According to the Town Planning Board Guidelines No. 17A on Designation of CDA Zones and Monitoring the Progress of CDA Developments 1, the CDA zoning was introduced in OZPs with the key objective to facilitate urban restructuring and to phase out incompatible development and non-conforming uses. In designating an area as CDA, TPB will carefully take into consideration of such factors as the planning intention for the area, land status, ownership and other development constraints, including the likely prospect for implementation. The CDA zoning will only be designated where there are no better alternative zoning mechanisms to achieve the desired planning objectives. 10. For the preparation of an OZP, Planning Department would take into consideration different factors, land uses and planning intention in designating land use zones so as to impose suitable planning control. Given that Area 113 in Tung Chung is a piece of reclaimed government land, the planning objectives of the site (such as maximum plot ratio, building height restriction, necessary GIC facilities and open space) can be incorporated into land grant provisions, under which future development of the site shall be governed by MLP submission by the project proponent to the satisfaction of the Director of Lands to ensure proper design of the development before the development proceeds. It is therefore unnecessary to designate the site as CDA. Development Bureau Planning Department Civil Engineering and Development Department June 2017 1 The Guidelines are available on the TPB website: http://www.info.gov.hk/tpb/en/forms/guidelines/pg17a_e.pdf

> 813000 E ± Y Û Í 814000 E ± Y ± Y õ¾ðªl SLOPING SEAWALL 815000 E 4 4 ¾ª BREAKWATER ± Y õ¾ðªl MANGROVE ROCKY MANGROVE ± Y Û Í ROCKY ± Y õ¾ðªl MANGROVE 鐵路車廠 Railway Depot CHEUNG TUNG ROAD 818000 N ± Y ñ ü Ï (130 RECLAMATION AREA (130 HECTARES) ± Y SLOPING SEAWALL ª½ ß VERTICAL SEAWALL µ¾ª CHEUNG TUNG ROAD 7 125 SLOPING SEAWALL 北大嶼山公路 CHEUNG TUNG ROAD _ jà NORTH LANTAU HIGHWAY 大蠔灣 TAI HO WAN - 渡輪碼頭 Ferry Pier 海堤灣畔 Seaveiw C erscent 817000 N 涌 ¹Ï«h Tung Chung 涌 綫 機場 drawing title 快綫 涌 TUNG CHUNG 藍天海岸 CoasatlSky nil e TUNG CHUNG LINE > 環 Cenut yr Lnik 昇薈 Ca bir bean Coast The Vsi oinayr AIR 映灣園 PORTEXPRESS NORTH > LANTAU HIGHW AY + 8 翔路 ªF F s «ÂíÂX i - ñ ü Ϋe Á u TUNG CHUNG NEW TOWN EXTENSION - RECLAMATION AND ADVANCE WORKS - ECO-SHORELINE LAYOUT PLAN 200 300 白芒 Pak Mong µ Ø item no. ñ scale ¹Ï«h 7 117 牛牯塱 Ngau Kwu Long 1 : 12 000 drawing no. HKI-Z2509 ¹Ï LEGEND: ì office u a SITE BOUNDARY ½c Î t ë ( BOX CULVERT NO.1 ±Æ OUTFALL `Àô CIRCULATION DRAIN ä q ΠHONG KONG ISLAND AND ISLANDS DEVELOPMENT OFFICE g ì uµ CIVIL ENGINEERING AND DEVELOPMENT DEPARTMENT A3 420MM X 297MM

直立式生態海岸線海堤 Vertical Seawall with Eco-shoreline Cavity 洞孔 Pots 陶盤 Eco-tiles 生態方塊 8