REQUEST FOR ALTERNATE TO BID (SUBMITTAL FORM ATTACHED)

Similar documents
Sizes. Colors. Features

INSTALLATION INSTRUCTIONS

SAFETY AND INSTALLATION MANUAL MODEL 8100

SECTION (15820) - AIR DUCT ACCESSORIES

Microwave Oven Hood Combination

DaVinci Heat Exchanger Touch-Screen Version

Installation instructions for vented tumble dryer DOMESTIC. Dear Customer,

SECTION PANELBOARDS Painting Wire and Cable Overcurrent Protective Devices.

DaVinci Heat Exchanger

C44 INSTRUCTION MANUAL HEAT DISTRIBUTION / TV KIT N A T U R A L LY V E N T E D [ ] PLEASE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE

Shutters, Mounts & Vents. Finish your masterpiece.

Installation Instructions

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

Installation & Maintenance Instructions

INSTALLATION INSTRUCTIONS

Finish your masterpiece.

INSTALLATION INSTRUCTIONS

BDM Direct Vent systems are for use with direct vent gas fired appliances.

Installation Instructions

By Bernard Dalsin Mfg. Co. Installation and Operating Instructions Read these instructions and keep them for future reference

INSTALLATION INSTRUCTIONS TD75. Vented tumble dryer DOMESTIC. Carefully read the instructions for use before using the dryer.

Questions on Installation? Call: 800.GE.CARES (US) WARNING RISK OF FIRE TOOLS YOU WILL NEED 4" DIA. METAL DUCT (RECOMMENDED)

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

RVAC-100 VACUUM CLEANER MANUAL. For Household Use Only

SUBJECT: SELKIRK MODEL DT DIRECT VENT SYSTEM FOR PELLET & CORN FIRED APPLIANCES / TERMINATION CLEARANCES TO OPENINGS IN BUILDINGS

beautiful detail. Shutters, Mounts & Vents Measurements & Dimensions Build bold ROYAL85 royalbuildingproducts.com 2017 Royal Building Products

A. Section Includes: Fire extinguishers and cabinets including necessary accessories.

beautiful detail. Shutters, Mounts & Vents Measurements & Dimensions Build bold ROYAL85 royalbuildingproducts.com 2017 Royal Building Products

INSTRUCTION MANUAL HEAT DISTRIBUTION / TV KIT N A T U R A L LY V E N T E D [ ]

INSTALLATION GUIDE. Horizontal series. HRV MODEL 8160 and MODEL 8220 ERV MODEL 3160 and MODEL 3220

Installation & Maintenance Data IM Contents

C Series. Cool Surface System INSTRUCTION MANUAL SIDE VENT [ ] PLEASE KEEP THESE INSTRUCTIONS FOR FUTURE REFERENCE

Installation. Leveling

TERRACE VIEW APARTMENTS

INSTALLATION INSTRUCTIONS

Questions on Installation? Call: 800.GE.CARES (US) WARNING RISK OF FIRE 4" DIA. METAL DUCT (RECOMMENDED) 4" DUCT CLAMPS (2) OR 4" SPRING CLAMPS (2)

TEMSPEC INC. VERTICAL FAN COIL UNIT MODELS TVA, TVE, TVS

Questions? Call 800.GE.CARES ( ) or visit our Web site at: GEAppliances.com In Canada, call or visit

Installation Instructions

Installation Instructions for Heat Recovery Ventilators with 2 Speed RNC Electronics. RNC Series. Residential Heat Recovery Ventilators (HRV)

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

The most advanced Supply Box System from Oatey - the choice of plumbing professionals.

Dryer. User manual DV22K6800** DV22K A-00_EN (US)_ indd :15:41

BUILDER S PRE-INSPECTION CHECKLIST

WARNING: ELECTRICAL GROUNDING INSTRUCTIONS

Important Instructions

Planning and Design Guide 2002 Vrs 2.0

12.0 cu.ft., 2 way, 4-door, R.V. refrigerator with ice maker.

Installation Electric Dryers Instructions 01

Questions? Call 800.GE.CARES ( ) or visit our Web site at: GEAppliances.com In Canada, call or visit

Installation Instructions

SECTION (15767) - UNIT HEATERS

TWIN-FLOIII HEATER INSPECT THE SHIPMENT IMMEDIATELY WHEN RECEIVED TO DETERMINE IF ANY DAMAGE HAS OCCURRED DURING SHIPMENT.

TERRACE VIEW APARTMENTS

TERRACE VIEW APARTMENTS

SMALL DIAMETER CORR/GUARD & SLEEVED CORR/GUARD

Table of Contents What to Expect with Your Installation. Top Housing. Ceiling Plate. Tools Needed.

The most advanced Supply Box System from Oatey - the choice of plumbing professionals.

BUILDER S PRE-INSPECTION CHECKLIST

Ventilating Fan FV-05VFL2 FV-08VFL2 FV-11VFL

ELECTRIC DRYER INSTALLATION INSTRUCTIONS

Owner s Guide and Installation Manual

SonusClip Installation for walls or ceilings on wood or steel framing. Installation Instructions for Wall & Ceilings

ZC Kit AGP Pellet Insert

Vertical Stack Fan Coil Units Models: TVA, TVE, TVS

INSTALLATION. Glass Panel Doors (select models) CAUTION

UL 94 Flammability Ratings: Introduction

INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT

B. Shop Drawings: For fire protection cabinets. Include plans, elevations, sections, details, and attachments to other work.

BK AND BKT BLOWER ACCESSORY INSTALLATION INSTRUCTIONS

CONTENTS DESCRIPTION UNPACKING DIMENSIONS

Corr/Guard PRESSURE RATED VENTING SYSTEM IMPORTANT: DO NOT INSTALL WITHOUT FIRST READING THESE INSTRUCTIONS VERY CAREFULLY.

INSTALLATION INSTRUCTIONS WALL MOUNT LINER INSERT

INSTALLATION GUIDE NZ AU E

TERRACE VIEW APARTMENTS

SUPPLEMENTARY INSTRUCTIONS

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

SECTION FIRE-SUPPRESSION STANDPIPES

BUILDING CODE GUIDELINE FOR MECHANICAL INSPECTIONS

Installation Instructions

INSTALLATION INSTRUCTIONS

Installation and Care Instructions

DOUBLE DISHDRAWER TM DISHWASHER

LABORATORY AIR COMPRESSORS AND VACUUM PUMPING SYSTEMS

Inspection Checklist Mechanical Rough in

IMPORTANT: Read and save these instructions. Washer Dryer 120 Volt Installation Instructions. Gas Large Capacity Thin Twin IMPORTANT:

Concepts Serving Systems

Q U A L I T E D E P U I S

C. All components of the systems described shall meet the requirements as stated herein and shall be approved by the Architect and Consultant.

FIRE SUPPRESSION SPRINKLER SYSTEM

SERIES 500. Installation & Maintenance Instructions. Ceiling Mounted Fan Forced Heater WARNING SAVE THESE INSTRUCTIONS. Recessed Mount.

Sprinkler Guards Model C Model D

INSTALLATION INSTRUCTIONS

Installation and Maintenance Instructions

Z-VENT MODEL SVE SERIES III INSTALLATION AND MAINTENANCE INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Pentz EF5 Installation Guide

24 IN. (61 CM) ELECTRIC WASHER/DRYER INSTALLATION INSTRUCTIONS WASHER/DRYER SAFETY DANGER WARNING

PAC International, Inc. RSIC-1 FS System 37" and Larger (200 lb max)

Catalog Broiles Drive Jacksonville, TX Tel: Fax: buildersbest.com

Transcription:

REQUEST FOR ALTERNATE TO BID (SUBMITTAL FORM ATTACHED) requests to add and/or substitute the DBX1000 Dryer Vent Box, manufactured by Construction Solutions, on the following project. The utilization of the DBX1000 will employ the following benefits: ATTRACTIVE Has a clean white appearance that coordinates with the washer boxes now being installed in most new homes. PRACTICAL - Conceals the dryer vent and gas valve connection in the wall away from harms way, available for easy access hook-up connection. DURABLE - Manufactured from durable high impact polystyrene plastics. Easy to clean and is heat and moisture resistant. ELIMINATES CALLBACKS The patented trim ring reduces job walkthrough tags for the drywall and painting contractor s touch-up repairs around the metal vent receptacle. ADDED VALUE - The DBX1000 recoups up to five feet of living space by positioning the dryer closer to the wall and even with the washer. EASY TO INSTALL - Can be installed with several nails or screws. The patented trim ring provides an attractive finished appearance. MULTIFUNCTIONAL The DBX 1000 is multi-positional for field conversion as an up/down/or direct vent. It can also be used behind gas ranges or stoves to keep the gas valve and connection in the wall.

SUBMITTAL FORM PROJECT INFORMATION Project Name: Project Address: City: State/Zip: Start Date for Dryer Venting: Builder/Contractor: CONTRACTOR INFORMATION THIS PRODUCT SUBMITTAL PACKAGE HAS BEEN FURNISHED BY: Contractor Name: Address: City: State/Zip: Contact: Phone/Fax: Email: SUBMITTAL INFORMATION THIS SUBMITTAL PACKAGE INCLUDES: Alignment Considerations/Specifications and Scope of Work: Installation Instructions: UL Mark Reference Documents:

Alignment Considerations For standard, side-by-side washer & dryer alignments, the DBX 1000 should always be installed on the bottom framing plate. In many cases job superintendents or subcontractors think the DBX 1000 should be installed 5 or 6 inches above the floor when in fact they are taking away the main benefit of using the DBX 1000. Installing the unit above the baseboard eliminates the ability to move the clothes dryer all the way back against the wall because the flex hose now has to bend upwards to reach the receptacle area. As shown in the diagram below, most standard American dryers locate the 4 Inch exhaust port at the bottom center of dryer's rear panel, 3 Inches above floor level. With that in mind, the DBX 1000 is properly installed when set on the bottom framing plate and aligned with the dryer location. Ideally, the center of the DBX 1000 should be located in the wall as close to the center of the proposed dryer location as possible. Figure 1 14 ½ Clothes Dryer (Side View) Dryer Flex Hose 4 Inch Exhaus t Vent DBX 1000 Framing Plate Dryer Exhaust Vent 42 ½ Clothes Dryer (Rear View) Washer/Dryer Placement Considerations Dryer Left of Washer Alignment. The DBX1000 should be installed on the bottom framing plate with its left edge from 4 to 14 inches from a left perpendicular wall. Dryer Right of Washer Alignment. The DBX1000 should be installed on the bottom framing plate with its left edge from 38 to 52 inches from a left perpendicular wall. 2 Inches 30 Inches Dryer Washer Washer Dryer Dryer Left Dryer Right Specifications and Scope of Work Builder Specification Wording for HVAC Recessed Dryer Vent Receptacle with Trim Ring Construction Solutions DBX1000 Architectural Technical Specifications for DBX 5.01 (6 Construction) and DBX 10.01 (4 Construction) Model Number DBX 5.01 (6 Construction) by Construction Solutions Model Number DBX 10.01 (4 Construction) by Construction Solutions Made of High Impact Polystyrene which Meets UL Standards for 94HB Flammability Testing and is recognized by Underwriters Laboratories Inc. Representative samples of this component have been evaluated by UL and meet applicable UL requirements. Provide a 16 or 24 on center stud bay with 2 X 6 or 2 X 4 wall structure.

4 Inch Wall Material used in the DBX 1000 meets UL94 HB Flammability Testing and is recognized by Underwriters Laboratories Inc. Representative samples of this component have been evaluated by UL and meet applicable UL requirements. For optimum results, install the DBX1000 recessed vent receptacle for 4 Inch Walls as follows: Box Installation - 16 Inch On-Center Spacing: 1. Orient box to match desired venting direction, score & remove appropriate top or rear 4-inch oval vent pipe knock out. Allow minimum of 4 inches of vent of pipe to extend inside box 2. If gas line is to be installed, locate 1⅝ straw clamp on top of box. Cut the webs between the 8 fins with a utility knife. Push the gas line through the straw clamp. The fins will flex inward holding the pipe. 3. Slide box into position taking care to correctly align vent pipe and gas pipe (if present). 4. Spacing tabs will automatically position box so that bottom, inside edge is from 2¼ to 2⅝ inches 5. Attach box directly to both right and left studs using the six flange screw holes. Screws are recommended for mounting. Box Installation - 24 Inch On-Center Spacing: 1. Orient box to match desired venting direction, score & remove appropriate 4-inch oval vent pipe knock out. Allow minimum of 4inches of vent of pipe to extend inside box. 2. If gas line is to be installed, locate 1⅝ straw clamp on top or bottom of box. Cut the webs between the 8 fins with a utility knife. Push the gas line through the straw clamp. The fins will flex inward holding the pipe. 3. Slide box into position taking care to correctly align vent pipe and gas pipe (if present). 4. Spacing tabs will automatically position box so that bottom, inside edge is from 2¼ to 2⅝ inches 5. Attach one side of box directly to stud using the three flange screw holes. 6. Snap in the two mounting straps on the other side of the box and attach these to the second stud using the strap screw holes. Screws are recommended for mounting. Trim Instructions: 1. Snap out left or right trim ring cut out (see detail below). 2. Leave 1¾ inches between inside edge of box and end of baseboard to allow for trim ring clearance. 3. Snap trim ring into opening, no caulking required. 4. Leave unfinished or paint with desired color. 4 Vent Pipe Knockouts Box made from High Impact Polystyrene ( HIPS ) Meets UL94 HB Flammability Testing Install in up to 24 on center location, brackets included Easy to remove 4 oval knockouts Top and Bottom Straw clamps for gas pipe Snap on trim ring accommodates up to ¾ drywall US Patented Product 6,938,640 10 ⅛ 1⅝ Straw Clamp 1¾ 4 Rear Knockout Top Oval Clearance Notches 1⅝ Straw Clamp (on Bottom) Mounting Straps For 24 OC 1 Depth 3½ 1¼ 4 Wall DBX 1000 Recessed Vent Box 1¾ Clearance to Edge of Baseboard 2¼ to 2 ⅝ Clearance to Unfinished Floor 1¾ Snap On Trim Ring ¼

1 6 Inch Wall Material used in the DBX 1000 meets UL94 HB Flammability Testing and is recognized by Underwriters Laboratories Inc. Representative samples of this component have been evaluated by UL and meet applicable UL requirements. For optimum results, install the DBX1000 recessed vent receptacle for 6 Inch Walls as follows: Box Installation - 16 Inch On-Center Spacing: 6. Orient box to match desired venting direction, score & remove appropriate, top or rear, 4-inch vent pipe knock out. Allow minimum of 4 inches of vent of pipe to extend inside box 7. If gas line is to be installed, locate 1⅝ straw clamp on top of box. Cut the webs between the 8 fins with a utility knife. Push the gas line through the straw clamp. The fins will flex inward holding the pipe. 8. Slide box into position taking care to correctly align vent pipe and gas pipe (if present). 9. Spacing tabs will automatically position box so that bottom, inside edge is from 2¼ to 2⅝ inches 10. Attach box directly to both right and left studs using the six flange screw holes. Screws are recommended for mounting. Box Installation - 24 Inch On-Center Spacing: 7. Orient box to match desired venting direction, score & remove appropriate 4-inch vent pipe knock out. Allow minimum of 4inches of vent of pipe to extend inside box. 8. If gas line is to be installed, locate 1⅝ straw clamp on top or bottom of box. Cut the webs between the 8 fins with a utility knife. Push the gas line through the straw clamp. The fins will flex inward holding the pipe. 9. Slide box into position taking care to correctly align vent pipe and gas pipe (if present). 10. Spacing tabs will automatically position box so that bottom, inside edge is from 2¼ to 2⅝ inches 11. Attach one side of box directly to stud using the three flange screw holes. 12. Snap in the two mounting straps on the other side of the box and attach these to the second stud using the strap screw holes. Screws are recommended for mounting. Trim Instructions: 5. Leave 1¾ inches between inside edge of box and end of baseboard to allow for trim ring clearance. 6. Snap trim ring into opening, no caulking required. 7. Leave unfinished or paint with desired color. 4 Vent Pipe Knockouts Box made from High Impact Polystyrene ( HIPS ) Meets UL94 HB Flammability Testing Install in up to 24 on center location, brackets included Easy to remove 4 knockouts Top and Bottom Straw clamps for gas pipe Snap on trim ring accommodates up to ¾ drywall US Patented Product 6,938,640 10 ⅛ 1⅝ Straw Clamp 1¾ 4 Rear Knockout 1⅝ Straw Clamp (on Bottom) Mounting Straps For 24 OC Depth 5½ 1¾ 1¼ 6 Wall DBX 1000 Recessed Vent Box 1¾ Clearance to Edge of Baseboard 2¼ to 2 ⅝ Clearance to Unfinished Floor Snap On Trim Ring ¼

Subject: DBX 1000 Dryer / In-Wall Recess Receptacle Dear Customer, This letter is to answer any questions you may have concerning Underwriters Laboratories evaluation of the materials used in the DBX 1000. The High Impact Polystyrene Material (HIPS) used in the DBX 1000 is recognized by Underwriters Laboratories Inc. Representative samples of this component have been evaluated by UL and meet applicable UL 94 requirements in both the United States and Canada. This is the only material used in the manufacture of our product (Receptacle, Trim Ring and Straps). The authorized designation for the HIPS material used in the DBX 1000 dryer vent is a UL Recognized Component and the UL authorized identifying mark is shown as: The material in the DBX 1000 meets UL standard 94HB and fully satisfies the International Residential Code (Section M1502). It is not suitable for a one hour fire rated wall system. The same is true for laundry room washer boxes. What does UL 94 HB Mean? UL 94 flammability testing is part of plastic Recognition and subsequent certification in the "Plastics Recognized Component Directory" (formerly known as "Yellow Cards"). HB rated materials are considered appropriate for mechanical and/or decorative purposes including enclosures, structural parts and insulators. We hope this addresses any concerns you may have. Should you have any questions regarding this matter, please don t hesitate to contact Construction Solutions at 480-346-8240. You may also verify our status on the UL website at www.ul.com. (Navigate to certifications and enter Construction Solutions file number E249870.) You may also contact UL at 877-854-3577. Thank you for your confidence in our quality products! Sincerely, Craig M. Liston National Sales Manager Constructions Solutions 480-346-8241