The Planting of Trees and Shrubs

Similar documents
DESIGN AND MANAGEMENT OBJECTIVES PART 7 HA 92/01 SCHEME DEVELOPMENT, IMPLEMENTATION & MANAGEMENT SUMMARY

DESIGN AND MANAGEMENT PART 3 HA 57/92 NEW ROADS INTEGRATION WITH RURAL LANDSCAPES SUMMARY

DESIGN AND MANAGEMENT PART 1 HA 75/01 TRUNK ROADS AND ARCHAEOLOGICAL MITIGATION SUMMARY

CORRECTIONS WITHIN DESIGN MANUAL FOR ROADS AND BRIDGES AUGUST 2009

volume 11 environmental assessment section 2 environmental impact assessment Part 7 ha 218/08

volume 11 environmental assessment section 2 environmental impact assessment Part 2 ha 202/08 environmental impact assessment

volume 11 environmental assessment section 2 environmental impact assessment Part 4 ha 204/08 scoping of environmental impact assessments

Ebbsfleet Development Corporation

Interim Advice Note 76 / 06 ASSESSMENT PART 1 AIMS AND OBJECTIVES OF ENVIRONMENTAL ASSESSMENT. Contents

E16: MAINTENANCE OF LANDSCAPED AREAS

Tree Pits Construction Guide

Vegetation Management

Cotswolds AONB Landscape Strategy and Guidelines. June 2016

Low Gradient Velocity Control Short Term Steep Gradient [1] Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent

Manufacture YCLF meeting York 20 th May 2011

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511

Professional & Qualified Tree Surgeons, Landscapers & Forestry Contractors

Introduction to the FLL Guidelines for the Planning, Construction and Maintenance of Green Roofing

LANAHL19 - SQA Unit Code AT63 04 Create grassed and planted areas

DESIGN AND MANAGEMENT OBJECTIVES PART 5 HA 90/01 PLANNING AND POLICY FEATURES SUMMARY

water saving ideas soil improvement

LAYMAN'S GUIDE TO LANDSCAPE TREATMENT OF SLOPES AND RETAINING WALLS

GRASSRINGS Turf reinforcement system

Solar Electric (Photovoltaic) Panels and Slates on Listed Places of Worship

Landscape Rebate Scheme

HERITAGE POLICY...Safeguarding the Built Heritage. Conservation Plans. A Guide to the Preparation of Conservation Plans

Roadside Mowing. Spot mowing of noxious weeds should be done as necessary to reduce propagation.

ACTIVITY: Trees, Shrubs and Vines ES 10

asphalt applications European Asphalt Standards and their application in the UK mpa asphalt Asphalt Information Service Mineral Products Association

5.1.1 The streetscape along US Highway 64 (Brevard Road); and, The built environment within new residential developments; and,

Energy Saving Fact Sheet Agriculture & Horticulture

LANDSCAPING, BUFFERING

The checklist can be used for a single filter strip or groups of filter strips with the same characteristics.

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

Preferred route announcement M25 junction 10/A3 Wisley interchange Improvement scheme

Some Tips for Landscaping Slopes:

Key elements : Filter Strips must be designed within parameters required by the Fort Wayne s Development Standards/Criteria Manual.

SECTION PLANTS. A. Includes But Not Limited To: 1. Furnish and install landscaping plants as described in Contract Documents.

Working Group Meeting

Town of Essex Small Site Erosion Control Guide

OFFICE OF THE DEPUTY PRIME MINISTER

EXPOSED ROOT STYLE BONSAI

Special Landscape Area (Great Orme and Creuddyn Peninsular). Agricultural land (grade 3a). TPO A14 (1982) - group of trees (G4) on east boundary.

INTERIM ADVICE NOTE 143/11

PO Box 484 North Sydney NSW T: F:

FOR PROJECTS INITIATED AFTER FEBRUARY 1, 2010 REVISION 1 ITEM 709 TRIANGULAR FILTER FABRIC FENCE

Introductory Briefing: Transport

1. New development including where permanent in-ground irrigation systems are installed.

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES

Derry City and Strabane District Council Planning Committee Report

SECTION LANDSCAPE MAINTENANCE FOR 90 DAYS. A. Section includes requirements for 90 day landscape maintenance for the following:

Derry City and Strabane District Council Planning Committee Report

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

3. Landscape and Streetscape

Article 6 Tree Protection

Vegetated Filter Strips and Buffers

Chapter 4 - Lawn establishment

Content. 1. Particular Preambles for Standard Method of Measurement. 2. Particular Specification for Soil Fiber System. 3.

SOIL CONSERVATION METHODS OF SOIL CONSERVATION

SECTION PLANTING PART 1 - GENERAL 1.1 RELATED DOCUMENTS

REQUEST FOR BIDS LANDSCAPING SERVICES HAYMARKET, VIRGINIA

Foreword. Síle de Valera, TD, Minister for Arts, Heritage, Gaeltacht and the Islands

The Unit is designed for candidates wishing to develop their knowledge of soils who are starting a career in the horticulture industry.

Tennis Court Rear Of 3-5 Corringway London NW11 7ED

Carparks Service Access Areas Golf Courses Caravan Parks Footpaths. Turf Reinforcement System

A Guide to Successful. Urban Tree Pit Design

Plant Care Guide. Watering

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Persimmon Homes Thames Valley Date received: 2 nd April week date(major): 2 nd July 2014 Ward: Nascot

Soil Requirements of. Healthy Urban Trees

Change Paper / Date CAIRNGORMS NATIONAL PARK AUTHORITY

Healthy for Bees: Healthy for People. Managing the grounds of public buildings for pollinators

Soil Erosion and Sediment Control

Proposed Ice Skating Rink Impact Assessment & Mitigation Measures

HYDRAULIC DESIGN involves several basic

LANDMARK HOUSE SUDS NOT DUDS Image Credit: RSH

Garages To Rear Of The Willows 1025 High Road London N20 0QE

Peatland Action Guidance for land managers. Installing peat dams. Updated May 2015

Corporate Plan reference: 2. A Strong Community 2.1 Safe and healthy communities

5.0 Storm Water Landscape Guidance Introduction

PREPARING THE PLANTING HOLE

Private Tennis Courts

Building Standards Division. Whisky Maturation Warehouses Storage Buildings (Class 1) Automatic Fire Suppression Systems

HOW TO START A COMMUNITY GARDEN IN YOUR NEIGHBOURHOOD

Legal implications of failing to

10. Fire services. 10 FIRE SERVICES p1

SECTION 605 PLANTING

GROUNDS SERVICES COVERING EVERY ASPECT OF GROUNDS MAINTENANCE, LANDSCAPING AND DESIGN.

York Potash Project Mine, MTS and MHF Environmental Statement, Part 2 Chapter: 16 Land Use and Soils Appendix 16.5 Outline Soil Management Plan

Content. 1. Particular Specification for Green Roof System. 2. Drawing. 3. Particular Preambles for Standard Method of Measurement

Loop Detectors for Motorways

Transportation Systems and Utility Infrastructure

The Corporation of the TOWN OF MILTON

BUSINESS PLAN CEN/TC 250 STRUCTURAL EUROCODES EXECUTIVE SUMMARY

CITY OF ALPHARETTA, GEORGIA LANDSCAPE STANDARDS INDEX

3 Urban Design and the State Highway Network

WOKINGHAM BOROUGH COUNCIL JOB DESCRIPTION. Service: Policy and Partnerships Section: Trees and Landscape Development Management Reports Team Leader:

Why we need the Counters Creek storm relief sewer

Effects of the Bupa retirement complex on the soil resources at 25 & 35 Ulyatt Road, Napier

LAWNS Chapter 12. Topic Outline. Establishing a Lawn. Establishing a Lawn

Transcription:

THE HIGHWAYS AGENCY THE SCOTTISH OFFICE DEVELOPMENT DEPARTMENT THE WELSH OFFICE Y SWYDDFA GYMREIG THE DEPARTMENT OF THE ENVIRONMENT FOR NORTHERN IRELAND The Planting of Trees and Shrubs Summary: This Advice Note gives guidance on the top-soiling requirements for landscape planting on trunk road and motorway schemes.

DESIGN MANUAL FOR ROADS AND BRIDGES VOLUME 5 SECTION 2 ASSESSMENT AND PREPARATION OF ROAD SCHEMES PREPARATION AND IMPLEMENTATION THE PLANTING OF TREES AND SHRUBS Contents Chapter 1. Introduction 2. General Requirements 3. Particular Requirements 4. Contract Requirements 5. Comments and Enquiries February 1981

Volume 5 Section 2 Chapter 1 Introduction 1. INTRODUCTION 1.1 A fundamental principle of highway design and construction is that the completed road should be properly integrated into and related to its setting. That the environmental impact of a new highway can be minimised by the application of the principles of landscape design during the planning and construction of the road has been well established by practice and experience over many years. It is the Department's policy that outline landscape proposals should be prepared by landscape architects coincidentally with the early stages of engineering design and these two aspects integrated into a unified concept that is maintained and developed through the subsequent planning stages. Whenever these proposals are embodied within Statutory Orders or otherwise form part of the Department's evidence at Public Inquiries the Department is publicly committed to their implementation. 1.2 The specification for Road and Bridgeworks Clauses 601(9) and 611 deal with top-soiling, grassing and turfing and the Notes for Guidance suggest thicknesses of top-soil required for grassed areas. There are at present no general specification requirements relating to the special treatment required in those areas which are to be planted with trees or shrubs. This Advice Note provides information and guidance relative to the inclusion of particular requirements. February 1981 1/1

Volume 5 Section 2 Chapter 2 General Requirements 2. GENERAL REQUIREMENTS 2.1 The basic need is for a general provision of 300mm of top soil in those areas where planting is to be carried out. This is necessary not only for the establishment of the plant material, but to produce a growth rate which will provide some visual effect within a reasonable length of time. 2.2 The provision of an adequate surface layer of top soil during the engineering contract is therefore the most practical way of producing satisfactory growing conditions. This has been stressed by the Minister's Landscape Advisory Committee and is accepted by the Department. 2.3 As an alternative where sufficient top soil to achieve 300mm depth is not available, planting may be specified in specially prepared pits into which top soil is imported but this is expensive and, as root development is restricted, it does not produce satisfactory growth in the early years of establishment. February 1981 2/1

Volume 5 Section 2 Chapter 3 Particular Requirements 3. PARTICULAR REQUIREMENTS 3.1 Wherever the areas of proposed planting have been designated by the landscape architect, the scheme designers should consider all aspects of the horticultural requirements for a successful implementation. Likely problems and possible solutions are as follows:- 3.1.1 Availability of top soil An assessment of the quantity of top soil which will become available from site stripping should be made to determine where there is need for importation or otherwise a reduction in requirements. For example, where there is an overall shortage of top soil and the planting is considered of vital importance, it may be acceptable to reduce the general depth of top soil in grass areas to, say, 75mm to ensure enough is available to cover planting areas with 300mm. In areas where only a shallow covering of soil occurs naturally it may be possible to reduce the 300mm requirement in planting areas. The drawings and bills of quantity should show the top soil requirements on an area by area basis and if a requirement for importing top soil cannot be accurately assessed at design stage a provisional item should be billed. Where areas of woodland are to be cleared any top soil present should be ignored in the assessment since it is normally destroyed during clearing operation. 3.1.2 Stability of slopes Because top soil must not be compacted (as normal fill) and is often placed on a smooth surface of compacted soil there is a risk that slips, slides and washouts may occur on slopes. These risks can be minimised by paying attention to the following features:- - Cutting off drainage (either new or existing land drains) behind the boundary fences so that drainage does not discharge on to slopes. - Requiring side slopes to be left roughly trimmed so that their roughness provides a key to help support and retain the top soil layer. On very steep or long slopes the thicker layers of top soil needed in areas of tree planting should be stabilised by stakes and brushwood facines or woven fencing. - Requiring top soil to be spread immediately before the grass is sown, to ensure the speedy establishment of grass. Clause 611.3 requires the Contractor to pay due regard to season. February 1981 3/1

Volume 5 Section 2 Chapter 4 Contract Arrangements 4. CONTRACT ARRANGEMENTS 4.1 As a general rule landscape proposals and planting schemes should be developed at firm programme report stages to ensure that both engineering and landscape requirements are integrated as far as it is possible to do so in the contract documents. The essence of good planning at the design development stage is collaboration between the Engineer designers and the Landscape Architects. 4.2 The stripping and handling of top soil in wet weather will destroy its physical structure, and storing for long periods in large heaps so that air and moisture cannot penetrate throughout destroys the micro-fauna which are essential if it is to remain a viable material. Its handling and stacking therefore has to be carefully managed if it is to be conserved. 4.3 Ideally storage heaps should be kept shallow, machinery used in handling should be light, and compaction avoided in all stages. Under the conditions of an engineering contract these provisions are often difficult to fulfil but, nevertheless, if the dangers of over compaction and handling under poor weather conditions are understood it may be possible to avoid unnecessary damage to the soil. Since it may not always be possible to preplan these requirements at tender stage, the Engineer should in those circumstances order the necessary measures to be taken during the construction stage against provisional items included for the purpose. February 1981 4/1

Volume 5 Section 2 Chapter 5 Comments and Enquiries 5. COMMENTS AND ENQUIRIES February 1981 5/1