Dry-Deck 20 Installation Instructions

Similar documents
Dry-Deck 20 Installation Instructions

Installation guidelines for. This booklet should be given to the customer after installation and demonstration. Models: Digital Smoothflow Kit

Installation guidelines for Models SDP303T Whale INSTANT MATCH PREMIUM Kit

Installation guidelines for Models SDP134T Whale INSTANT MATCH with Bluetooth wireless technology Kit

Easi-Slide Exterior Utilities Sockets Water In Socket

Installation guidelines for. Including. This booklet should be given to the customer after installation and demonstration. Models:

Installation guidelines for. Including. This booklet should be given to the customer after installation and demonstration. Models:

Pump Shower Drainage Solutions

SDS233T. Instant Match Transformer. Quick Connect Guide WITH

The company and its products have built a reputation for quality, reliability and innovation backed up by excellent customer service.

INSTALLATION AND OPERATION MANUAL

WC2 & WC3 Installation & Maintenance Instructions

THE BOILING WATER DISPENSER INSTALLATION & OPERATING INSTRUCTIONS IMPORTANT: READ AND SAVE THESE INSTRUCTIONS FOR THE BENEFIT OF THE USER

TH100 Three in One Instant Hot Water Tap

INSTALLATION MANUAL ESM9+ / ESM11+ / ESM15+

Installation and User Care Instructions

MIX Boiler & Font Range Service Manual

Water Heater MkII WH1302 / WH1302B INSTALLATION & USER INSTRUCTIONS. Thank you for purchasing this Whale product.

The easy solution for waste water removal

Performance on demand. Eliminate poor mains water pressure and flow problems. with mainsboost

AKW M11 DigiPump. Installation and User Care Instructions. Box contents for. 1x *15mm. *1x 22mm

Flomate Mains Boost Pump Installation & Maintenance Instructions

All Whale gas products must be installed by a Qualified Gas Engineer in accordance with the installation instructions and BS EN

Digital waste pumps. Digital waste options. Pump diagrams. Digipump m1, m2, m3 & m4 installation

BOILING UNIT REDITAP. Installation and User Guide. IMPORTANT: This booklet should be left with the user after installation and demonstration

AIR ADMITTANCE VALVES FOR DOMESTIC PROPERTIES Guidance Notes

CommStat 4. Controller for Redundant Telecom HVAC Systems PRODUCT DATA SHEET. Features and Benefits

POWERFLOW Series. Unvented Electric Storage Water Heaters. Installation & Operating Instructions Manual

NON-SUBMERSIBLE WATER PUMP

ascent Installation & maintenance instructions Customer/technical services Guarantee Mono basin filler with infrared sensor GUARANTEE REGISTRATION

Installation, Operation & Maintenance Instructions

WALLACE MAXIPUMP 3000, 5000, 6000 and HYDROJET 30P, 30C, 140 AND HJ400 INSTALLATION AND MAINTENANCE INSTRUCTIONS

Grohtherm Wireless! Installation Instructions Pumped

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION INSTALLATION MANUAL

Panamatic. Midi & Mini. Installation instructions.

CommStat 6. Controller for Redundant HVAC Systems PRODUCT DATA SHEET

Manual and Thermostatic Power Shower Units

Mix Boiler & Font Range ( #, #, #, , )

DC Heat Recovery Unit MVHR Wholehouse heat recovery unit

Grohtherm Wireless! Installation Instructions Pumped High Pressure

Flo~mate Mains Boost Pump Installation & Maintenance Instructions

A wide range of recreational vehicle exterior utilities sockets featuring unique Whale Easi-Slide Lid.

SCHWAN INSTALLATION GUIDE

LC3000 Level Controller Installation and Maintenance Instructions

Please also see 10 golden rules for correct Saniflo installation on

Digital Marine Exhaust Temperature Alarm

Performance on demand

TECHNICAL HANDBOOK. for MULTISPLIT NETWORK SYSTEMS OR GROUP CONTROL

BLADE BATH SHOWER MIXER DECK MOUNTED CHR WITH KIT INSTALLATION INSTRUCTIONS P BS-E A/2

HW3 Handwash Installation and Operating Instructions

4100S. The operation and functions described in this manual are available from Software Version 4100S onwards.

DOMESTIC STEAM GENERATOR Installation Instructions

Titon CME1 Q Plus Mechanical Extract Ventilation Unit

Installation and User Instructions HS10U, HS15U.

The Professional s Choice

RS Pro Infrared Temperature Sensor

Please do not hesitate to contact us with any enquiries.

Gas and Electric Water Heater. WH0802 or WH0802B or WI0802B INSTALLATION & USER INSTRUCTIONS. Thank you for purchasing this Whale product.

Intelligent Security & Fire Ltd

Unvented Calorifier Range. Operating and Maintenance Manual. For Models & 500

LC2200 Level Controller Installation and Maintenance Instructions

FRANKE MINERVA 3-IN-1 HOT WATER TAP HEATING TANK INSTALLATION GUIDE

Installation, Operation & Maintenance Instructions

INSTALLATION MANUAL. Ecoline Geo RI HP PLEASE LEAVE THIS MANUAL WITH THE OSO UNIT AFTER INSTALLATION

MHG201 Gas Hob Manual for Installation, Use and Maintenance

Installation guide COMBI. Before installing read this guide first

Type ETO2. Controller for ice and snow melting 67222A 04/14 (JRK) GREEN COMFORT Maximum comfort with low energy consumption OJ Electronics A/S

Alpha CombiMax 350 and 600

Installation and Maintenance

SEALED THERMAL STORE

X62 Tap Range. Please keep these instructions for future reference

Instruction manual. Remote control electric IR HEATER

120 VOLT POTENTIAL PRESENT. MAKE SURE POWER INPUT TO UNIT IS TURNED OFF DURING INSTALLATION AND WIRING PROCEDURE.

Titon HRV1 Q Plus HRV1.5 Q Plus HRV2 Q Plus Heat Recovery Ventilation Units

FTEN1, FTEN2, & FTEN4 1, 2 & 4 ZONE FIRE DETECTION AND ALARM CONTROL PANELS

U.1347LS. Perrin & Rowe Kitchen Filtered Hot Water Dispensers 2 3/8" 5 1/2" 10" 6 1/2" 3 7/8" Ø1 7/8" 1 3/4" MAX Ø1 1/4" HOLE

Instructions for the fan motor control system, SILVER C

Bath Shower Mixer

Installation instructions. RECOUP Retrofit+ Shower Waste Water Heat Recover unit

Installation, Operation & Maintenance Instructions

ORIGINAL INSTRUCTIONS

OWNERS INSTRUCTION MANUAL

FSW300 Series Flow Switch

PERFORMANCE SHOWER PRODUCTS

Powerflow Unvented water heater

Gas Only Space Heater Mk II SH2201 / SH2211B INSTALLATION & USER INSTRUCTIONS. Thank you for purchasing this Whale product.

Installation Manual QB1 21 & QB1-21C

Francis Pegler Memento Single Sequential Exposed Thermostatic Shower

Vented systems explained Performance without compromise Vented System (Gravity Fed) Positive Head Systems

INTA ION MODERN BAR / BATH SHOWER MIXER CP

SHOWER PUMPS. Installation Manual. 1.5 bar and 2.0 bar

OPERATING MANUAL ORWAK March 2005 PUBL. NO Edition 4

User and Installation Instructions. Wall Mounted Water Boiler WMB3F/B and WMB3F/W IS435 ECN3461

Poolsmart Plus Touchscreen Heating Controller. Installation & Operating Manual

pump solutions Full technical data sheets are available to download: For further advice on selecting the correct pump call:

Dene Bath Shower Mixer

Instruction Manual Machine P/N: # & #

SERVICE MANUAL. Ecoboiler Model range: T20 ( ) T30 ( )

CommStat 4 Controller

Transcription:

Dry-Deck 20 Installation Instructions Installation guidelines for Model Number SDP073R Dry Deck 20 Give booklet to customer after installation and demonstration of product use. See rear cover for list of parts contained in the kit.

2 Thank you for purchasing this Dry-Deck 20 product. Whale is the market leader in pumped shower drainage kits. These kits have the reputation of working reliably for many years without requiring maintenance. The front cover shows the product installation in an apartment with the components in an adjacent room accessed via a cupboard. Assess your installation prior to fitting so that the pump, surge damper, control unit and sensors are in accessible positions. Typical installations would have these components in an adjacent cupboard or in a false wall with an access panel. Incorrect installation may invalidate warranty. Principles of Operation This kit has been designed for the pumping of shower waste water. The Dry-Deck 20 control unit uses flow sensors to measure the flow rate of water into the shower. The pump speed is controlled directly by the control unit which uses the signals sent from the flow sensors to adjust the pump speed to match the flow from the shower. This minimises suction noise at the gulley. A simple setup is required to match the pump performance to the characteristics of the installation. Contact our Technical Helpline: 0845 0694 253 if you need further assistance. For email assistance use dry-deck@whalepumps.com The Dry-Deck system is designed to work on shower bases with an adequate fall to the gulley. Where the fall is insufficient, the water will not refill the gulley rapidly enough and so suction noise will be increased. We recommend the use of a shower former i.e. Impey Aqua Dec or equivalent. This eliminates the risks of puddling or insufficient fall to the gulley. Forming a shower base by hand is a highly skilled task and should be carried out by a trained installer. Do not attempt this if you are unsure and seek professional advice.

3 Installation Warnings Contents Warnings Before installation read the instructions. All electrical and mechanical components (control unit, surge damper, pump and flow sensors) must be accessible after installation. The maximum flow rate the pump is designed to work with is 20 ltrs/min. Avoid plumbing the pump outlet into the waste piping that other appliances drain into as there is a risk of induced syphoning. Use an antisyphon trap in these situations. With installations where the floor is being formed in the screed, we recommend the following minimum falls: 30mm in 1m, 15mm in 500cm, 7.5mm in 250cm Plumbing installation must comply to latest WRAS regulations. The electrical wiring must conform to EU wiring regulations BS7671:2008 Part 7 (17th Edition). Pipework must be secured to prevent further vibration and noise. User Warnings It is advisable where the property is unattended for an extended period that the water supply to the shower is shut off. If there is a reduction in pump performance after installation please contact your installer. Pump Installation 4 Plumbing 4 Plumbing of Waste Pipe 5 Plumbing Gulley 6 Control Unit 7 Schematic of Dry-Deck Components 8 Flow Sensor Connection 9 Electrical Connections 10 Pump Setup 11 Flow Restriction 14 Pump Operation 14 Auxilary Functions 15 Plumbing of Waste Pipe 17 Use with a Macerator Pump 17 Fault finding flow chart 18 Declaration of Conformity 20 Specification 20 Component Dimensional Diagrams 21 Dry Deck 20 Components 24 Illustrations 1.1 Pump Orientation 4 1.2 Rotation of Pump Head 4 1.3 Plumbing Pump Head 4 1.4 Pipe Layout Dimensions 5 1.5 Fitting of 50mm Tray Gulley 6 1.6 Control Unit Mounting 7 1.7 Dry Deck Component Connections 8 1.8 Flow Sensor 9 1.9 Connections to Control Unit 10 1.10 Control Panel Settings 11 1.11 Flow Restriction 14 1.12 Pump Head Cross Section 14 1.13 Solenoid Switch 15 1.14 Pump Run Switch 16 1.15 Waste Adaptors 17 1.16 Plumbing to Macerator Pump 17

4 Pump Installation 1.1 Before mounting the pump refer to the plumbing diagram opposite for maximum pipe specification. 1.1 Mount the pump on a solid wall to prevent vibration. Use a back board if this is not possible. Note: If mounted to a stud wall pump vibration may cause noise through the resonance of the wall. In these situations mount the pump on a bracket off the floor. The pump may be mounted horizontally on the floor if required. Fix the pump in position through the feet with the fixings provided. 1.2 1.2 Rotate the pump head if necessary to give a straight run of pipe to the waste. Loosen the clamping ring on the pump head and rotate the head before retightening clamping ring. Note: Do not remove the pump head. Top Tip To aid servicing the head of the pump must be above the floor by at least 150 mm (maximum height of 500 mm). 1.3 Plumbing 1.3 Push fit fittings are provided to connect the pump to inlet and discharge pipework. Push fit fittings are necessary to aid maintenance and fault diagnosis. All pipework in and out of the pump must be in 22 mm. Ensure fittings are pushed home and locked.

5 Plumbing of Waste Pipe 1.4 Inlet and Outlet pipe must always be in 22mm. Min 1:40 fall Horizontal to waste pipe - To increase pump life ensure that 1 1 4 or 1 1 2 pipe is used with a gravity fall where the pipe length is greater than 1m. If less than 1m use 22mm pipe. 1.4 Only one vertical lift on the inlet to the pump and one vertical rise from the discharge from the pump is allowed. When laying the pipe under the floor use only slow radius bends. Use slow radius bends above the floor to ease the flow of water and reduce loading on the pump. Ensure pipe edges are burr-free. Burrs may cause a build up of hair etc. that will reduce flow. Pipework must be secured to prevent further vibration and noise. Push home and Twist lock the securing ring on the push fit fittings (If semi rigid pipe is being used follow the manufacturers instructions to prevent air leaks).

6 Plumbing Gulley 1.5 Gulley Options: For conventional gulley options for wet floor and walk in showers see page 22 and 23. Note: The Gulley must be purchased separately from your distributor. 1.5 Use silicone on top of the seal to ensure proper sealing beneath the tray. Using the hand tool provided to tighten the locking ring. Fit the gulley cover into the sockets and push down with the palm of your hand to secure. When fitting in solid floors, remove enough concrete for the installation of the pipe and gulley connections. Where copper pipe runs under the concrete it must be lined to protect it and prevent corrosion. 1.5a Top Tip Leave the hand tool in place to prevent building debris, grout etc. falling into the gulley. Only remove the hand tool and fit the gulley cover when the installation is complete.

7 Control Unit 1.6 Location of Control Unit: Locate the control unit outside the showering area in accordance with BS7671: 2008 Part 7 (17th Edition). Tighten all cable entry grommets, even unused ones, to seal the Control Unit. Connect Control Unit to 240V a.c. supply via an unswitched 5 amp fused spur. The control unit meets IP45 requirements. 1.6a 1.6b 1.6c

8 Schematic of the Dry-Deck Components 1.7

9 Flow Sensor Plumbing Connection 1.7 Flow Sensor Fit the flow sensors with the arrow in the direction of flow to the shower, downstream of any other connections to the water supply. Sika sensor 1.8 Ensure flow sensor is accessible. The flow sensors must be mounted in a straight length of unstressed pipe. Note: For the Sika sensor, a filter is not required. See Fig 1.8 Commissioning Checklist Ensure all pipes are pushed home into the push fit fittings and locked. Check all plumbing for leaks whilst the pump is running. Ensure flow sensor is fitted in a length of unstressed pipe.

10 Flow Sensor Electrical Connections Switch off the power to the control unit before making connections. Feed wires through cable grommets prior to connection to the control unit. Sika sensor Connections 1.9 Strip wires 10mm and twist prior to inserting into spring loaded contracts. Push contact arm back with a finger or small screwdriver before inserting wire fully and then release. Check for a good connection by giving a gentle tug on the wires. Tighten cable grommets after connection. Wiring Connections: 1. Flow Sensor to Dry-Deck Control Box - Connect the flow sensor(s) as shown (For cold supply use FSA and for hot supply use FSB): Sika Sensor(s) See Fig 1.9 - White wire to Power (PWR) - Green to Signal (SIG) - Brown to Ground (GND) 2. Pump to Dry-Deck Control Box - Connect Pump Supply Wires as Shown: - Black wire to PUMP BLACK - Red wire to PUMP RED Warning! Avoid fouling the insulation when crimping to the pump supply wire.

11 Pump Set Up 1.9 A simple set up is all that is required for trouble-free efficient performance of the Dry-Deck 20 system. 3. Pump Speed: 1.10 This sets the speed of the pump in relation to the flow rate from the sensors. Prior to making adjustments turn the shower on and wait until the pump runs. Set the shower flow rate in the range 6-9 ltrs/min as indicated on the display. How to Adjust Settings: a. Pressing the < or > button will switch between the various menu options, indicated by the message on the display. b. The up and down arrows are used to adjust the value. c. Press OK key firmly to store value. Press OK to enter configuration screens. Follow the sequence of screens and set values as required to complete setup. 1. Language: English is the default language. For other options use up and down arrows. Note: For pumped showers use the lowest flow rate to set the Pump speed. This may be outside the band 6-9 ltrs/minute. Watch the level of water within the shower using the gulley cover as a guide. If the water level is falling reduce the speed of the pump by pressing the down arrow. Use initial changes of 5 until fine tuning is required. If the water level is rising make changes in blocks of 5 to increase the speed of the pump by using the up arrow. After making a change watch the water level. Wait at least 30 seconds, as the system needs to stabilise, until you see if the water is rising or falling. When the water level is slightly over pumping, store the speed setting by firmly pressing the OK button. 2. Sensor Type: Select Sika sensor. Sensor Type SIKA OK

12 Pump Set Up (contd.) 4. Pump Speed - Fine Setting: This setting is required to fine tune the speed at flow rates other than that used to set the main flow rate. A 4.6 B 5. 4 A +B10.0 F i n e S p e e d + 1 9 a. Increase the flow from the shower in increments of 2 litres and watch the water level around the shower gulley. If this is rising or falling over time make adjustments until a constant level is observed then programme in the setting by pressing the OK Note: For pumped showers 2ltr increments may not be possible. Use the selections on the shower. b. Repeat the above process. The narrow adjustment corrects the flow rate over a band 1 ltr/min either side of the flow rate that is being calibrated. When the maximum flow rate is set then proceed to the next setting by pressing the > key. O v e r - R u n T y p e O K A U T O - S E N S E 5. Pump Shut Down: Over Run (Auto-Sense) Preferred Option Auto-Sense operates by recognising when the pump is drawing air through the pump (after waste water is removed from the tray). This is done by recording the lowest current taken by the pump as a limit value. In subsequent shower operations when this value is reached the pump turns off. To set the Auto Sense value select this mode, turn off the shower. P u m p C u r r e n t 8 1 L i m i t O K 0 When the pump has removed the water remaining in the tray the pump current will decrease. When it has reached the lowest value (by observing when the value stops falling) press OK key to store this value. Over Run (Time-Delay) Alternatively to set a fixed Over Run delay select Time-Delay. O v e r - R u n T y p e O K T I M E - D E L A Y Select value of time delay (in seconds) and store. O f f D e l a y S e l e c t T i m e 6. Start Volume: This selects the initial amount of water (litres) in the tray before pumping starts. To minimise noise the water should be above the level of the gulley. S t a r t D e l a y S e l e c t V o l u m e 1. 2 L t r s (Factory default is the minimum setting of 0.6 ltrs). Pressing the up arrow will increase the amount of water from 0.6 ltrs to 4 ltrs passing through the shower head before the pump starts. Make this adjustment during final commissioning.

13 Pump Set Up (contd.) 7. Purge Cycle: P u r g e C y c l e S e l e c t 1 5 m i n C y c l e O N When ON is selected the pump restarts at a low speed 15 minutes after showering is completed. This is done to remove run off water that gathers in the gulley. In some installations, i.e. ensuite, the client may wish that the Purge Cycle is disabled by selecting OFF. Dry-Deck Review Screens The following are the status displays that may be scrolled through when the pump is off:- Standby Time of Pump S t a n d b y n e x t < > 1 2 3 4 5 6 h r s 2 3 m i n Inlet Pipe Diameter: (Always 22mm For Dry-Deck) I n l e t p i p e n e x t < > D i a m e t e r 2 2 m m Flow Sensor Type:- Flow Sensor exit> Type SIKA System Type and Software Level DryDeck V2.3 Review> Adjust Note: To adjust any of the pump settings press OK Running Time of Pump Factory Default Settings To return the unit to Factory Default settings start at the System Type and Software Level Screen. DryDeck 20 V2.3 Review> Adjust O n T i m e n e x t > 1 2 3 4 5 6 h r s 2 3 m i n Press then > six times to get to the screen asking if factory default settings are wanted. Press ^ to select YES and ^ to confirm. The unit will then be reset to default settings.

14 Flow Restriction 1.10 In installations where the flow rate exceeds the specification of the Dry-Deck 20, one method to restrict flow is to insert a flow restrictor in the outlet of the mixer valve. Where a standard shower head is not used then pressure reducers may be used on the hot and cold supply. 1.11 Pump Operation 1.11 The Whale pump uses a single membrane to pump the water away. On the suction stroke, water and debris are drawn in through the inlet valve. With a chamber full of water the pump discharges the water through the two non-return valves on the outlet. The two outlet valves protect the pump against losing prime. The aggressive flushing keeps the pump valves clear of debris resulting in a pump which does not require regular maintenance. 1.12 Unlike other pumps, the Whale has the ability to run dry without causing damage to the pump. An additional advantage of the three non-return valves, is that no smells can be passed back from the waste stack into the shower area.

15 Auxilary Functions 1.12a Solenoid Switch: See diagram 1.13. The Solenoid SW terminals are to provide water shut off to the shower by the use of an additional momentary contact switch and auxiliary solenoid drive transformer. To use the system the user closes the momentary contact switch, this causes Solenoid 1 and Solenoid 2 to be energised for 30 minutes. After the 30 minute period, the shower is again shut off from the water supply. Specification for 12V dc Solenoid Driver Transformer Part No: SDA421T Solenoids (Not Supplied with kit) Momentary contact switch (Not supplied with kit) 1.13

16 1.12b Pump Run Switch: See diagram 1.14. The pump run SW terminals are provided as a means by which the pump can temporarily be operated, without the shower operating, using an additional momentary contact switch. When the momentary contact switch is pressed the pump runs for 2 minutes then enters the over run cycle. This may be used where the wet room is washed down and water needs to be pumped away. 1.14

17 Plumbing of Waste Pipe The outlet of the pump may be connected into the waste pipe, e.g. former bath waste. Black rubber fittings are provided for this. 1.15 In confined bathrooms pump discharge may go into the sink waste pipe using suitable adaptors. See Fig 1.15 for McAlpine examples and their catalogue for other variants. C10V V33T Use with a Macerator Pump 1.13 Where the situation demands or if the waste pipe run is greater than that specified for the Whale pump a macerator pump may be used. Contact the technical helpline (0845 0694 253) for advice. 1.16 From pump The discharge from the pump must go into the top of the macerator box and not into lower side entries. DO NOT USE the bottom entries. Note: Where a macerator is used in a bathroom it is preferable to run a separate discharge from the Dry- Deck pump to the waste. This reduces noise as the macerator will run intermittently while the shower is running if used in conjunction with the Dry-Deck. Warning: Any failure of the macerator will not be detected by the Whale pump.

18 Repeat Set up. If pump does not turn off, contact Customer Service for further diagnostics.

Notes 19

20 EU Declaration of Conformity Description of Equipment: Shower Drain System Manufacturer s Declaration We hereby declare, under our sole responsibility, that the above equipment complies with the provisions of the following EC Directives. Requirements for household appliances, electric tools and similar apparatus. Immunity. Signed Electromagnetic Compatibility Directive 2004/108/EC, on the approximation of the laws of the Member States relating to electromagnetic compatibility. Low Voltage Directive 2006/95/EC on the harmonization of the laws of the Member States relating to electrical equipment designed for use within certain voltage limits. CE mark first affixed: 01/01/96 Basis on which conformity is declared The above equipment complies with the protection requirements of the EMC Directive and the principal elements of the safety objectives of the Low Voltage Directive. Standards applied EN 60335-1:2001/A2:2006 Safety of household and similar electrical appliances EN 60335-2-41:2003/A1:2004 Particular requirements for pumps EN 55014-1:2000/A2:2002 Electromagnetic compatibility. Requirements for household appliances, electric tools and similar apparatus. Emission EN 55014-2:1997/A1:2001 Electromagnetic compatibility. Richard Bovill Engineering Director Specification Dry Deck Unit Model: 755.241 Power rating 137VA Double insulated Mains cable 3.0m 3 core 0.75mm 2 6A 6.3 amp fast blow fuse Warranty Please see the enclosed warranty statement. Trademarks/Copyright 2017 WHALE All rights reserved. Reproduction in whole or in part without permission is prohibited. WHALE is a registered trademark of Munster Simms Engineering Limited. Whale s policy is one of continuous improvement and we reserve the right to change specifications without prior notice. Illustrations are for guidance purposes only. Neither the accuracy nor completeness of the information contained in this or any Product literature is guaranteed by the Company and may be subject to change at its sole discretion.

21 Control Unit - SDS273T 204 mm Pump - SDS041T Surge Damper - 755.228

22 Tiled Floor Gulley - AK1615 90mm Gulley (Tray Thickness 5-13mm) - AK1695 90mm Gulley (Tray Thickness 20-29mm) - SDA001T

23 Linear Gulley (Example) Vinyl Floor Gulley - AK1610 50mm Gulley - 755.140

Dry-Deck 20 Components & Spares List Qty Description Part number 1x Control Unit SDS273T 2x Sika Flow Sensor SDS263T 1x Pump SDS041T 1 x Surge Damper 755.228 4x 1 2 BSP-15mm Comp Fitting 755.237 1x 22mm Reducing Tee 59.AM3022AW 3x 22mm Equal Straight 59.AM0422W 1x Waste Pipe Adaptor 1 1 2 / 1 1 4-22mm 755.44 755.45 1x Installation Guide 182.04 1x Warranty Card 181.129 1x Warranty Statement 181.148 Diaphragm Service Kit SDS061T Insert Flow Sensor Extension Kit 3 m SDS281T Contact Details Whale 2 Enterprise Road, Bangor, Co. Down, BT19 7TA. N.Ireland. Technical Helpline: 0845 0694 253 whalepumps.com dry-deck@whalepumps.com tel: 028 9127 0531 fax: 028 9146 6421 Ref. No 182.04_v8_0917