FLOW METER KIT #

Similar documents
CALIBRATION KIT #

CBT Bowl & wrap replacement

CF35 # INSTALLATION & OPERATION

RH 800 & 2000 COMMERCIAL INSTALLATION GUIDE

BMC OPERATION AUTOMATIC & MANUAL SYSTEMS

POLISHING DRUMS DODECAGON

cbt lw MAINtENANcE guide

CBT LW MAINTENANCE GUIDE

PS /2 Inch Angle Grinder Assembly & Operating Instructions READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT.

INSTALLATION INSTRUCTIONS TXV Coils for Manufactured Housing EMA

PWASH Gallon Parts Washer Assembly & Operating Instructions

DLCLRA. INSTALLATION INSTRUCTIONS Outdoor Unit Single Zone Ductless System Sizes 36 to 58 TABLE OF CONTENTS

Retrofit Instructions CLEARVIEW DAY COVER CAUTION: Please read this manual completely before attempting to install, operate or service this equipment

MODEL A5-2 SOLVENT & WATER RECOVERY SYSTEMS (EXPLOSION PROOF UNITS)

TSS 15/55 Hi-Lift Vacuum

Installation Instructions

BG6UL. 6 Inch Bench Grinder Assembly & Operating Instructions

Installation Instructions

Installation Instructions

PRO 2000i LOW LEVEL DEPOSITOR

Installation and Operation Manual CLEARVIEW DAY COVER CAUTION: To view a video scan the QR code above

Safety Warnings. Work area safety. Electrical Safety. Personal Safety

Installation Instructions

Installation Instructions

50T Electric Shop Press

Installation Instructions

Pocket Hardmount. Preventative Maintenance.

Refrigerant Recovery Machine. Model No Operating Manual

Rules for Safe Operation

Installation Instructions

Page 1 of 18. Part# /5/2013

COMPRESSED AIR DRYER. SAFETY... Page 2 MAINTENANCE... Page 5. INSTALLATION... Page 3 PARTS AND KITS... Page 6

Installation Instructions. Instructions de montage. Instrucciones de instalación HC

TABLE OF CONTENTS. NOTE: Read the entire instruction manual before starting the installation. TROUBLESHOOTING... 13

INSTALLATION INSTRUCTIONS

Automatic Water System Pump SERIES

Installation Instructions

User s Guide REO-MECH. Industrial Rebar Benders & Cutters

SERVICE PROCEDURE FOR RETROFITTED A/C SYSTEMS

100T Electric Shop Press

Ultra. Product Identifier according to Art.18 of Reg. (EC) No 1272/2008 [CLP]: GARLON ULTRA, Triclopyr Triethylamine Salt

OWNER S MANUAL AND INSTALLATION GUIDE PLEASE READ THIS MANUAL CAREFULLY BEFORE ATTEMPTING INSTALLATION

INSTALLATION INSTRUCTIONS TXV Horizontal Duct Coils EHD

Installation Instructions

SPECIFICATIONS FEATURES

Installation Instructions

Installation Instructions

20-GALLON MOBILE PARTS WASHER OWNER S MANUAL

PowerVac G Single to Twin Conversion Kit [ ]

PME. Series Enclosures. Battery Enclosure (BE) Field Upgrade Installation Instructions. Effective: January, Alpha Technologies

150T Electric Shop Press

OWNER S MANUAL. Models: Herkules Equipment Corporation 2760 Ridgeway Court Walled Lake, MI USA Fax

OPERATION & MAINTENANCE MANUAL RHS680

Hoshizaki America, Inc.

Up to 60 Pint Commercial Grade DEHUMIDIFIER

Sanitise Syrup Lines & Valves. Taylor PH61 Cleaning every 14 days

JOHN DEERE GATOR HPX/XUV 2 PASSENGER HEATER INSTALLATION INSTRUCTIONS (p/n: 9PH20S30)

ICRRFTSMRN'I. Operator's Manual PLUNGE ROUTER CQUS. Model No Save this manual for future reference

Dynapac Chip Spreader is an accessory that enables the spreading of stone chippings, gravel or other similiar granulates in conjunction with the

INSTALLATION INSTRUCTIONS

Heat Exchanger Block Replacement Instructions

Laing Thermotech. Autocirc The Instant Hot Water Pump Models E1-BCANCT1W-06 and E1-BCANRT1W. Installation & Operating Manual

Revision B Printed Fall Elston Manufacturing HC Heater Owners Manual

AVANI Grinding Booth

SAFETY PRECAUTIONS. 2) Before operating machine: - Make sure all safety devices are in place and operate properly.

MODEL A18 SOLVENT RECOVERY SYSTEMS (EXPLOSION PROOF UNITS)

Owner s Manual. Model AC375C Refrigerant Recovery, Recycle, and Recharge Unit

690 Power Fishing System

INSTALLATION INSTRUCTIONS TXV Horizontal Slab Coils WLSH

Owner s Manual FS-10/FreshSpa

Installation Instructions

OPERATION & MAINTENANCE MANUAL AC860

OPERATION & MAINTENANCE MANUAL TX600

Speaker Wall Mount (MSP-DCCSPM)

Equipment Alert. P-Trap Must Be Installed to Exhaust or Warranty will be Voided. Refer to this Manual for installation Instructions

OPERATOR'S MANUAL CD 400 / CD 500

DUST EXTRACTOR INSTRUCTION MANUAL. 550W (3/4 HP) INDUCTION MOTOR 1850W AUTOMATIC POWER OUTLET 65L COLLECTION BAG ø100mm X 2.

OPERATORS MANUAL FOR Mi-T-M CORONA DISCHARGE OZONE GENERATORS

INSTALLATION INSTRUCTIONS

Installation Instructions

Models: GW/R-T GW/R-2-T GW/R-3-T

Installation Instruction

7165 Dust Collector Owner s Manual

Instruction Sheet DANGER

INSTALLATION INSTRUCTIONS TXV Horizontal Duct Coils EHD

Installation Instructions

ANGULAR TILE DRILL BEAST FB750W OPERATING MANUAL

English BT3600

As part of the V.I.P. family, you are entitled to the best protection by one of the most comprehensive warranties in the industry.

Undercounter Refrigeration

Instruction Sheet DANGER

Icade. 1 Litre HERBICIDE P

Installation Instructions

hp Dust Collector With Vacuum Attachment

BG8SS. 8 Inch Slow Speed Bench Grinder with LED Lights Assembly & Operating Instructions

ELECTRIC DRILL INSTRUCTIONS. Item #21285

PRE INSTALLATION PROCEDURES

INSTALLATION INSTRUCTIONS

Packaged Air Conditioning Units. Owner s Guide to Operating and Maintaining Your Air Conditioner. This manual should be left with the owner.

Service Manual For model N260 - a 2.4 cu. ft., 2-way refrigerator. For model N a 2.4 cu. ft., 3-way refrigerator.

Transcription:

FLOW METER KIT #80495684

2 General information This manual contains technical information regarding Bayer SeedGrowth Equipment. Please read and understand these instructions completely before proceeding to install and operate the equipment. Bayer reserves the right to change specifications, models, components, or materials at any time without notice. For additional equipment information contact us at 1.800.634.6738. Please have this manual available when contacting Bayer. This manual uses signal words and symbols to help avoid personal injury. Danger, Warning, and Caution are signal words used to identify the level of hazard. Danger alerts that an extreme hazard will cause serious injury or death if operators or installers do not follow the recommended precautions. Warning alerts that a hazard may cause serious injury or death if operators or installers do not follow the recommended precautions. Caution alerts that a hazard may cause minor or moderate injury if operators or installers do not follow the recommended precautions. Always use caution and common sense when working with any chemical. Read the product label and SDS carefully and follow their instructions exactly as described. Optimal operating conditions for this piece of equipment requires an ambient temperature 32 F to +104 F (0 C to +40 C), relative humidity less than 90% (minimum condensation). Make necessary provisions to protect this piece of equipment against excessive dust, particles containing iron, moisture and against corrosive and explosive gases. Our technical information is based on Tip: calls attention to special information. extensive testing and is, to the best of our current knowledge, true and accurate but Note: emphasizes general information worthy of attention. given without warranty as the conditions of use and storage are beyond our control. Variables, such as humidity, temperature, Example: gives a problem or exercise that illustrates a method or principle. change in seed size or variety and viscosity of chemical products can all affect the accuracy of the chemical application and seed coverage. To ensure the desired application rate and optimum seed coverage, check the calibration periodically throughout the day, and make adjustments as needed. Bayer Crop Science Division 1451 Dean Lakes Trail Shakopee, Minnesota 55379 USA Phone: +1 952 445 6868 Toll Free: +1 855 363 3152 E-mail: equipment@bayer.com Web: www.seedgrowth.bayer.com Bayer SeedGrowth TM and the Bayer Cross are registered trademarks of Bayer. SGRFLOWMETERKIT01132016

CONTENTS 3 CONTENT #1 SYSTEM DIAGRAM 04 #3 EXPOSURE CONTROL 09 #2 EQUIPMENT INSTALLATION 05 Flow Meter Kit Box 1 05 Mounting Hardware Kit 05 4 Pump Digital Display 05 Flow Meter Assembly 06 Change pump elements 14 #4 OPERATION 10 LS Pump+RH Basic+Calibration 10 #5 THEORY OF OPERATION 15 #6 MAINTENANCE 16 Clean the Flow Meter 16 Replace Flow Meter Fittings 17

4 System Diagram SYSTEM DIAGRAM BASIC FLOW METER Assembly 4 Pump Display Signal Cable Kit Tubing Flow Meter Assembly Installation Kit Flow Meter User Manual Parts Kit Replacement Parts 80495684 4-pump display W / flow meter assembly (1) 80526784 Flow meter assembly: add-on EXPLANATORY NOTES Dry Weight 14.94lbs Service Required 115V Capacity: up to 4 flow meters 80568142 Replacement: 4-pump display 80488459 Replacement: flow meter only with fittings

Equipment installation 5 Equipment Installation 4 Pump Digital Display Remove all components and check for any damage that may have occurred during ship- ping. Report any damage IMMEDIATELY! The 4-Pump Digital Display will fit on old and new style RH Basic Control Mount Plates. Mount the 4-Pump Digital Display within close proximity to the RH Basic Controller and CBP supply tanks. Flow Meter Kit Box 1 4-Pump Digital Display Flow Meter Assembly Flow Meter Parts Kit Hardware Kit* Signal Cable Tubing Operations Manual Mounting Hardware Kit 1/4-20 bolt (4) 1/4-20 lock-nut (4) 1/4 washer (4) Flow Meter installed on old style 3-piece RH 4-pump control panel Required assembly tools Hose Cutter 7/16 Wrench Anti-Seize

6 Equipment installation Step 1: Use the template drawing to mount the 4-Pump Display in a remote place. Score each hole and drill four 5/16 holes. Pre-drilled foot pattern holes are 6.00 x 10.75 on center. Flow Meter Assembly Step 1: The Flow Meter Kit ships from the factory in a separate box from the 4-pump display. Remove from packaging and locate the Flow Meter Assembly to the CBP Tank Stand. Align the 4-Pump Display over the four holes and fasten in place. Step 2: Align the top two pre-drilled bolt holes on the 4-Pump Display with the two holes directly beneath the 4-Pump Control already mounted in place on the RH Basic Treater. Fasten the 4-Pump Display to the Mount Plate with 1/4-20 hardware* in the following order: 4 each bolt+flat washer+[frame]+wiz nut. Use two 7/16 wrenches and securely tighten.

Equipment installation 7 Step 2: Insert the U-bolt from behind the Tank Stand Frame and push through the Mount Plate. Use a 7/16 wrench and fasten in place in the following order: U-bolt+[Frame+Mount Plate]+washer+lock nut. Securely tighten. Repeat on other end of Flow Meter Assembly. Step 5: Connect one end of the Transfer Tube to the 1/2 Press-lock Fitting on the pump, located underneath the CBP Tank. Step 3: Connect the signal cable to the bottom of Flow Meter Assembly. Carefully insert pin into the receptacle and screw the shield tight. Step 6: Cut to fit and connect the other end of the Transfer Tube to the 1/2 Press-lock Fitting underneath the Flow Meter. Step 7: Connect one end of the factory supplied Recirculation Tube to the 1/2 Male Run Tee located underneath the Calibration Tube. Step 4: Connect the other end of the signal cable to bottom of 4-Pump Display Box.

8 Equipment installation Step 8: Connect the other end of the Recirculation Tube to the 1/2 Press-lock Fitting on the Flow Meter Assembly (right side). VENT TREATMENT RECIRCULATION VENT Step 9: Connect one end of the Treatment Tube to the 1/2 Press-lock Fitting on the Flow Meter Assembly (left side). FLOW METER TRANSFER Flow Meter installed on CBP Tank Step 10: Insert the other end of Tubing into the Treater Chemical Inlet Assembly Press Lock Fitting. Repeat installation for each Supply Tank (1-4) used with the system.

Exposure Control 9 Exposure Control Always use caution and common sense when working with chemicals. Read the product label and SDS carefully and follow their instructions exactly as described. The following Personal Protective Equipment (PPE) recommendations and best practices help promote safe use in seed treatment. Wear protective clothing Wear disposable or reusable coveralls with long sleeves. Hand protection required Wear chemical-resistant gloves. Treatment products Keep products in a locked room that has been approved for crop protection products. Wear a mask Wear respiratory protection. Wear rubber boots Wear chemical resistant rubber boots. Eye protection required Wear protective eyewear. Labels Label recommendations and directions for handling must be followed, including treatment procedure (use of sticker) as well as the safety requirements. Calibration Seed treatment equipment must be checked and calibrated regularly to ensure accurate and safe application. Clean seed Use well cleaned seed to avoid creation of polluted dust that will contaminate the treating facility, workers, farmers and the environment during sowing. Cleaning Use a vacuum to clean machines and coveralls. Never use compressed air. Laundry Wash soiled reusable clothing separately. Workers must take a shower after each shift. Empty containers Non-returnable empty containers must be triple rinsed before they can be disposed. For others the recommendation of the producer must be followed. Spillage Spillage must be avoided; it must be thoroughly cleaned up to avoid contaminating the environment and waterways. Maintenance Keep machinery clean between treating sessions.

10 Calibration Calibration Warning! Exercise extreme caution when working with chemicals! Refer to the Exposure Control Guide on page 9. Step 3: Ensure the Pump Head is clamped down onto the Pump Element. LS Pump + RH Basic Control + Closed Calibration Step1: Connect the Tank Agitation Power Cord to an external 115VAC power source. Tank agitation begins when power cord is plugged into power source. Ensure the Tank Valves are in the CLOSED position. Step 4: Ensure the Main Flow Valve underneath the CBP Tank from the Filter is in the TREAT mode. Step 2: Open the Tank Cover Lid and pour in desired chemicals. Allow chemicals to agitate for a few minutes. Step 5: Ensure the Recirculation Valve is in the RECIRCULATION mode.

Calibration 11 Step 6: Turn the Tank Valves are in the TREAT mode. Step 9: Turn the RH Basic PUMP #1 Switch to the PRIME position. PUMP 1 Step 7: Turn the LS Control Pump Switch to FORWARD. Step 10: The Pump will run, purging the treatment lines of air and send chemical to the Treater Chemical Inlet Assembly. Step 8: Ensure the RH Basic Main Power Switch is in the ON position (UP) Power light will also indicate that the power is ON when lit. POWER Step 11: Then turn PUMP #1 Switch to OFF position. Repeat for all Pumps used (1-4). PUMP 1

12 Calibration Step 12: Open the calibration drain valve, turn to right to stop recirculation back into tank. Step 15: Turn the RH Basic PUMP #1 Switch to OFF position. PUMP 1 Step 13: Turn the RH Basic PUMP #1 Switch to the PRIME position. Step 16: Hold the Pump 1 Reset button for 3 seconds: the value will display 0.0. PUMP 1 Step 14: The Pump will run, filling the Calibration Graduated Beaker with chemical just up to the ZERO mark. Step 17: Turn the RH Basic PUMP #1 Switch to the PRIME position. PUMP 1

Calibration 13 Step 20: Hold the Pump 1 Correction factor button and use the up/ down arrow to adjust the correction factor and the run total until the total matches the amount captured in the beaker. Once the run total matches the Beaker amount, the Pump calibration is complete. Step 18: The Pump will run, filling the Calibration Graduated Beaker with chemical for one minute. Example: if the required application rate is 10 ounces (296ml) of treatment per hundredweight (cwt) of seed (60lbs in 1 minute), the desired amount of treatment that needs to fill the calibration beaker in 1 minute would be 177.6ml... 296ml 100cwt = 2.96ml x 60lbs = 177.6 Step 19: Turn the RH Basic PUMP #1 Switch to OFF position. Ensure chemical does not drain from the graduated cylinder! If required, open and close the Drain Valve to ensure the Valve properly seals! PUMP 1 Note: Speed Indicator sets the speed of the pump. The higher the number, the faster the speed of the pump... turn dial right or left. 296ml 100cwt = 2.96ml x 60lbs = 177.6 Multiple calibration runs may need to be made by adjusting the LS pump speed, until the desired amount of chemical pumped reaches the target amount. The calibration process will need to be repeated whenever a new seed type or seed size is introduced into the treating process. Note: Refer to the Treatment Product Label on the chemical jug for the regulated application rate. Follow the direction exactly as stated on the label! Changes beyond the control of the operator or the functionality of the machine, such as temperature, humidity and winds speed throughout the day, can affect the calibration.

14 Calibration Step 21: Turn the Drain Valve underneath the calibration Tube to the right. Chemical will drain from the Beaker back into the Supply Tank. Repeat these calibration steps for each Supply Tank used until desired calibration results are achieved. Step 23: Turn the RH Basic PUMP #1 Switch to the PRIME position. PUMP 1 Step 24: The Pump will run, purging the treatment lines of air and send chemical to the Treater Chemical Inlet Assembly. Step 22: When calibration is complete, turn the Recirculation Valve in the TREAT mode. Step 25: Then turn PUMP #1 Switch to OFF position. Repeat for all Pumps used (1-4). PUMP 1 Note: Check pump calibration on each lot of seed. If extremely high or low temperatures exist, the viscosity and flow of certain treatment products may be affected. A typical example would be treating early in the morning at colder temperatures compared to treating in the afternoon when the temperature has increased.

15 THEORY OF Operation THEORY OF Operation Note: The Flow Meter Kit is designed to be used in conjunction with the RH Basic Seed Treating System. The flow meter digitally displays the current chemical flow rate of each Pump (1-4) used underneath each CBP supply tank. For best accuracy: Calibrate at/near the flow rate required for optimal treating: (1500lb/min)/100 x 2oz/cwt* = 30oz/min. *cwt=per hundred weight of seed Screen Name Pump 1 Flow Rate Display Pump 1 Screen Pump 1 Run Totals Display Pump 1 Correction factor adjustment button Pump 1 Reset to Zero button Pump 2 Correction factor adjustment Pump 2 Reset to Zero Increase/Decrease values Advance to screen #3-4 OK - accept values To toggle between Empirical and metric units, hold the DOWN arrow for 5 seconds and release. Hold down again to switch back.

16 MAINTENANCE MAINTENANCE Warning! Exercise extreme caution when working with chemicals! Refer to the Exposure Control Guide on page 9. Step 2: Replace the Transfer Tube in the 1/2 Press-lock Fitting underneath the Flow Meter. Clean the Flow Meter Step 1: Remove the Transfer Tube from the 1/2 Press-lock Fitting underneath the Flow Meter. Step 4: Hardware Kit marked A408160PK / 80027796 has two brushes. Insert a brush up into the bottom of the flow meter and thoroughly clean the flow meter. Clean the brush responsibly.

MAINTENANCE 17 Replace Flow Meter Fittings Step 1: Hardware Kit marked A408160PK / 80027796 has two fittings that can be replaced on top of the flow meter. Remove the tube from the fitting. Use a wrench to loosen each nut (if both need replacing). Step 2: Remove the fitting(s) and replace with new one. Tighten new nut securely in place. Reconnect the tube into the fitting.

Bayer Crop Science Division 1451 Dean Lakes Trail Shakopee, Minnesota 55379 USA For fast and easy access to our website scan the code with your smartphone and an appropriate app. www.seedgrowth.bayer.com