Installation Guide. Engineering Excellence. Single Handle Tub & Shower Valve Set: 4010B 4011B

Similar documents
Installation Guide ASME A ANSI A117.1 CUPC / IAPMO LISTED / ADA COMPLIANT. Engineering Excellence

CORALAIS BODYSPA BATH AND SHOWER FAUCET

Instructions. Certifications Brass w/built-in Stop Valve. Pressure Balance Shower Valve. Tools Required. Important Points.

INSTALLATION INSTRUCTIONS

Handshower, Hose & Handshower Accessories

Instructions. Certifications Chrome 2-handle Chrome 3-handle 10-B83-WCH-AD Chrome 3-handle 10-B82-WCH-AD Chrome 2-handle

Series # 17 3-Hole Widespread Faucet with Push Drain

CB-4070 BLACK ARCHIPELAGO PRESSURE BALANCE MIXING VALVE TRIM ONLY, TO SUIT M ROUGH

M INSTALLATION INSTRUCTIONS M FLEETWOOD SINGLE CROSS HANDLE PRESSURE BALANCE TRIM ONLY, TO SUIT M ROUGH

Thermostatic Valve and Trim

SEABREEZE. SeaBreeze Rain Shower System Model #1086-CH Owner's Manual

TUB AND SHOWER FAUCET

Single-Control Lavatory Faucet

SS-THVD2-1/2 THERMOSTATIC VALVE WITH 2 WAY DIVERTER SS-THVD3-1/2 THERMOSTATIC VALVE WITH 3 WAY DIVERTER

Instructions. Certifications CH Chrome SS Stainless Steel. Single Handle, Industrial Style, Pull-Down Kitchen Faucet.

Handshower, Hose & Handshower Accessories

Cable Drain & Cable Drain Trim Kit

INSTALLATION INSTRUCTIONS M FLEETWOOD CROSS HANDLE 3-HOLE BASIN MIXER M FLEETWOOD LEVER 3-HOLE BASIN MIXER

TUB AND SHOWER FAUCET

INSTALLATION INSTRUCTIONS M SHOWER SLIDING RAIL

Central Brass. Installation Guide C O M P A N Y

TIMES SQUARE TWO-HANDLE THERMOSTAT

Instructions CH Chrome SS Stainless Steel Certifications. Single Handle, Pull-Down, Kitchen Faucet. Tools Required.

Single-Control Bathroom Sink Faucet

Acrylic Claw Foot Tub

Lavatory Faucet INSTALLATION INSTRUCTIONS P24490-CR, P24490-LV, P24491-CR, P24491-LV, P24492-CR, P24492-LV, P24700, P24705, P24706, P24736, P24800

TRU-TEMP VALVE. Tru-Temp Pressure Balance 1/2" Rough-In Valve Owner's Manual 3001-RIV-PB-ORB 3001-RIV-PB-BN 3001-RIV-PB-CH 3003-RIV-PB-ORB

Acrylic Claw Foot Tub

Instructions. 110-KVD-CYSCH-AD-Z Chrome 110-KVD-CYSSS-AD-Z Stainless Steel Certifications. Single Handle, Pull-Down, Kitchen Faucet

Installation Instructions / Warranty

DELEVINGNE WIDESPREAD FAUCET INSTALLATION

Kallista Bath Flip Drain

Installation Instructions

808 Series. Serie 808 Série 808

Installation Instructions

R89-CB 808-CB Series. Serie R89-CB 808-CB Série R89-CB 808-CB. Tub & Shower Shower Only Trim Kit

Single Lever Pull Out Kitchen Faucet

Installation Instructions

Central Brass C O M P A N Y. A Division of Pioneer Industries, Inc. Installation Guide

Installation. S Series Navigator Thermostatic Mixing Valve

INSTALLATION INSTRUCTIONS

M (MH 1228) M (ML 1228)

INSTALLATION INSTRUCTIONS M (MH

INSTALLATION INSTRUCTIONS

WHOLE HOUSE FILTER &

Top. Front. Gibson Clawfoot Slipper Tub. Model: Note:

R Series. Serie R Série R Tub & Shower Shower Only Trim Kit

One Less Thing to Forget...

Basin Set INSTALLATION INSTRUCTIONS

Making Crimp Connections

INSTALLATION INSTRUCTIONS

Single Lever Pull-Out Kitchen Faucet

1/7 INSTALLATION INSTRUCTIONS. Rough Installation

Installation Guide Europa

Kinetico 2060f OD Sulfur Guard Installation Instructions

INSTALLATION INSTRUCTIONS

Butler Mill and Brassworks Ltd. Exposed 1/2 Thermostatic Valve Installation Instructions

RYLE WIDESPREAD FAUCET INSTALLATION

Installation, Operation and Maintenance Guide G3600 Series Thermostatic Mixing Valves

Installation S

Installation S

Installation and Operation Manual

Entertainment Faucet with Remote Valve

WATTS WALL-MOUNT WIDESPREAD BATHROOM FAUCET INSTALLATION

INSTALLATION FOR THERMOSTATIC VALVES

TARVER SINGLE HOLE FAUCET INSTALLATION

Sign Planogram: Plumbing Repair Bay Name: Plumbing Repair 4.1. Toilet Repair. 72" from floor to bottom of AV. Replacing a Fill Valve

REACH ORDERING INFORMATION NOTES T01-B

CONTEMPORARY KITCHEN AND PREP FAUCET INSTALLATION INSTRUCTIONS

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

DRAIN WATER TEMPERING INSTALL

! WARNING. Before using product, read and understand instructions.

Smart Water Heater Controller

BROEG SINGLE HOLE FAUCET INSTALLATION

TRADITIONAL PLP PULLDOWN FAUCET INSTALLATION INSTRUCTIONS. Model #s: 5500, 5600, 5610, 5200, 5210

MINIATURE THERMOSTATIC VALVE

Installation & Service Guide

TEMPERATURE CONTROLLERS

TRADITIONAL KITCHEN AND PREP FAUCET INSTALLATION INSTRUCTIONS

LUDGATE SINGLE HOLE FAUCET INSTALLATION

COPPER FREESTANDING TUB

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

SPEAKMAN SAFETY PRODUCTS Installation Instructions SEF-TW

ADAIR ORDERING INFORMATION T01-A

INSTALLTION FOR THERMOSTATIC VALVES

Installation Manual Water Tempering Manifold

Top Control Dishwasher

Installation S

Installation Instructions

PLP P ULLDOWN FAUCET INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS

Aplos Single Handle Basin Bathroom Faucet

Installation Instructions

General System Layout Sketch

Installation Instructions. For the 18 Built-In Dishwasher and Front Color Panels

CEILING FED RISER RAIL KIT. Installation Guide. tritonshowers.co.uk/digital

Parts & Material Included

Installation Instructions PRO SERIES

SAN RAPHAEL GRANDE ORDERING INFORMATION NOTES T01-B INSTALLATION INSTRUCTIOINS 4.8L SKIRTED CLASS FIVE ONE-PIECE TOILET 4.

Transcription:

Engineering Excellence Installation Guide Single Handle Tub & Shower Valve Set: 4010B 4011B This product meets the following standards: ASME A112.18.1 ANSI A117.1 CUPC / IAPMO LISTED Pioneer Industries, Inc. 2009

Thank you for purchasing this Pioneer quality product. Tools Required Propane Torch Lead-Free PEX Crimp Tool Adjustable- Solder Wrench Sealant Tape Hacksaw & Pipe Cutter Straight & Phillips Screwdrivers Prior to Installation Observe all local plumbing and building codes before you begin installation. Carefully shut off both hot and cold main water supplies. Pioneer reserves the right to make changes in the design of faucets without notice as specified in the pricebook. Caution: (1). These products may cause personal injury due to scalding if the temperature is set too high. We recommend that temperature is set below 120 F (49 C). (2) Anti scald device or pressure balance spool is not installed in the valve. The spool is included in the trim pack. The valve won t work properly without the pressure balance spool being installed in the valve. 2

Valve Installation 1. Establish the location of the valve. Install the required support framing. To determine the correct mounting distance required for the various trim options to fit properly, refer to table A. 2. The distance specified in table A is measured from the valve outlet/inlet centerline to the finished wall surface. Note: Trim may not appear as designed if installed without following this procedure. 3. Remove the components before soldering 4. Locate the Valve and install 1/2 Piping (B) and Elbows (A) to bath and shower outlets. Do not use more than one Elbow (A) on the spout outlet. Ensure the up marking on the valve face toward the ceiling. If this installation is for bath or shower only, cap shower or bath port accordingly. Do not forget to put the washer underneath of the cap. Apply sealant or Teflon tape to threaded connections. Use 1/2 diam. NPT threaded adapters or 1/2 diam. copper to copper solder Connections directly to the outlets. Caution: Do not use PEX or CPVC between the valve and tub spout. Series Table A Series Table A 4LG100T~400T 2-1/2 4CB100T~400T 1-3/4 4DM100T~400T 2-1/2 4PR100T~400T 2-1/8 3

Valve Installation 4. Install cold and hot water supplies (C&D) using 1/2 cast iron, copper to copper, CPVC or PEX connections. 5. Connect appropriate size of 1/2 pipe nipples (E&F) to bath and shower outlets. 6. Replace the components. While replacing the inlet stop do not tighten more than 5lbs/inch2. Overtightening may cause damage to the inlet stop. 7. For back to back installation - Remove the mud guard (M), retainer ring (L), retainer sleeve (K), O-ring (J) and stem unit (I). 8. Rotate the stem unit (I) 180 (clockwise or counterclockwise). 9. Reinstall the stem unit (I), O-ring (J), retainer sleeve (K), retainer ring (L) and mud guard (M). 3

Valve Installation 10. For all installations, install caps (O) on the bath and shower nipples (N). Turn on the hot and cold water supplies and check for any leaks. 11. Remove the caps (O) from bath and shower nipples (N & P) and remove the mud guard (M) from valve. 12. Turn the valve counterclockwise to the open position. Block the tub nipple (P) to flush debris out of the shower nipple (N). 13. For thick or thin wall installation refer to the drawings. 4

To Set Or Adjust Water Temperature 14. Turn the stem (Q) counterclockwise to the full open position. 15. Allow water to run for some time until the hot water comes out. Check the temperature with thermometer (R) for the hot water. 16. If necessary adjust the temperature limit screw (S). Rotate the temperature limit screw (S) counterclockwise to increase the water temperature and clockwise to decrease the water temperature. Adjust to get the desired water temperature. Caution: Anti scald device or pressure balance spool is not installed in the valve. The spool is included in the trim pack. The valve won t work properly without the pressure balance spool being installed in the valve. For more care information or trouble shooting inquiries about your Pioneer product, please see the contact information on the back page. 4

Engineering Excellence 3325 S. Garfield Ave City of Commerce, CA 90040 Telephone: (800) 338-9468 (323) 888-8873 Fax: (323) 888-9515 Hours: M - F, 7:30am to 5:00pm PST