(blank page) WestConnex New M Roads and Maritime Services Environmental impact statement

Similar documents
6 BRIDGES. 6.1 Design philosophy. Proposed bridges

13 Land use and property

5.7.6 St Peters Interchange Portal

M4-M5 Link Rozelle Interchange factsheet 2017

WestConnex. New M5 State Significant Infrastructure Application Report. November 2014 ISBN:

NEWSLETTER #03 BEAUDESERT ROAD LOGAN MOTORWAY

West Gate Tunnel Project. Incorporated Document May Incorporated document pursuant to section 6(2)(j) of the Planning and Environment Act 1987.

4.1 Build Alternative 1 Construction Phasing

TRANSPORTATION COMMITTEE

BACKGROUND INFORMATION DOCUMENT

Moving The Metro. A special construction update for the metro Omaha area.

Chapter 27 Route Window SE7 Church Manorway Bridge. Transport for London

7.5 Impacts on the Section 4(f) Properties

CITY OF SYDNEY SUBMISSION ON WESTCONNEX STAGE 3 M4-M5 LINK CONCEPT DESIGN (RELEASED MAY 2017)

Victoria Bridge Municipal Class EA Civic Works Committee

APPENDIX D: Visual and Aesthetic Conditions for NCCU Station Refinement. Durham-Orange Light Rail Transit Project

Western Belfast Bypass almost finished

Start of works exhibition

Appendix SPAIN Madrid M30-Río-TUNNEL

ALTERNATIVES. NCDOT made an early decision to first determine how to build the project (construction method) followed by what to build (alternatives).

Chapter 24 Route Window SE5 Arsenal Way shaft. Transport for London

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

1 Metrolinx overview. Mission We connect our communities. Vision Getting you there better, faster and easier

Open Space, Connectivity and Landscape Design

Alta Vista Transportation Corridor Environmental Study Report November 2005

E kv Transmission Line Underground Relocation Project. Initial Evaluation of Bridge Structures

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

PROPOSED IMPROVEMENTS

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Transportation Authorities Project Descriptions

OP Council Resolution June 16, Planning and Development Services

Meeting Purpose: Date and Time: Location: Attendance: Handouts:

Appendix 18F: Tauriko Business Estate Services Strategy Statement and Sequencing Schedule

Public Meeting #3 May 9, 2009 MVVA Team

Purpose of Open House #3

A. INTRODUCTION B. PROJECT LOCATION

Rt. 29 Solutions Project Delivery Advisory Panel. January 7, 2016

Proposed Bunnings Warehouse. 90 Benalla Road Shepparton

SH20 Manukau Harbour Crossing Project Notice of Requirement Auckland City Council

I539. Smales 2 Precinct

WestConnex M4-M5 Link Mini-EIS for Haberfield/Ashfield area

Chapter 9 Route window W18 Slough station. Transport for London

Section C Bridges and retaining walls

Mavis Road Class Environmental Assessment

20. NEWHAM ROUTE SECTION - ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2

Transmission Gully Project - Urban & Landscape Design Framework

Boundaries and Fencing

Mississippi Skyway Preliminary Engineering Report

Edmonton s LRT Setting the Stage for Heading Further South

Bridge Type Assessment and Evaluation

Rt. 29 Solutions Project Delivery Advisory Panel. December 3, 2015

WestConnex PLAN. Note : This sub-plan is currently not approved by Department of Planning and Environment APPENDIX D

Chapter 10 Route window W17 Middlegreen Road, St Mary s Road and Trenches bridges. Transport for London

Michael Sheridan Roads & Maritime Services

Welcome to the Public Consultation Exhibition

Construction Engineering & Inspection

CHATSWOOD TO SYDENHAM. Project Update NORTHERN SURFACE TRACK WORKS - CHANGES IN CONSTRUCTION METHODOLOGY

Chapter 2: OUTLINE PLANNING APPLICATION PROPOSALS. A New Garden Neighbourhood Matford Barton 17

Part G: Assessment of Effects on the Environment. 11 Environmental Effects Assessment

Key development locations along the route of the scheme are identified in Chapter 4.

SPECIAL 35 (HIBISCUS COAST GATEWAY) ZONE

City of Grande Prairie Development Services Department

I615. Westgate Precinct

8.8 Sector 8 Hataitai Park

I-70 Corridor Enhancement Plan

WELCOME! 8 8:30 6: TH STREET IMPROVEMENTS. Open House. Presentation & Q&A

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

3.5.7 Black Creek to Don Mills

21. GREENWICH ROUTE SECTION ENVIRONMENTAL BASELINE AND ASSESSMENT OF IMPACTS... 2

25 Crime Prevention through Environmental Design (CPTED)

B2B Project Team Responses to Nga Potiki Draft Addendum

PROPOSED CAPACITY IMPROVEMENTS TO NA- TIONAL ROUTE 2 (N2) AND NATIONAL ROUTE 3 (N3) WITHIN ETHEKWINI METROPOLITAN MUNICIPALITY

Southern Gateway Project and Public Green

Highway 417 Expansion East

NORTH-SOUTH CORRIDOR STUDY EXECUTIVE SUMMARY. Executive Summary

Places29: List of Implementation Projects

Wide asphalt driveway abutting school property. garage built with incompatible materials, too close to park. incompatible fencing materials

PROJECT SITE The Proposed Project includes the Allen and Pike Street malls between Delancey and South Streets (see Figure 2C-1).

Derby-Shelton Bridge Pedestrian and Bicyclist Enhancements [1]

STATUS REPORT ENVIRONMENTAL REVIEW FOR IMPROVED ACCESS. at the NORTH WHITE PLAINS STATION

FANSHAWE PARK ROAD/RICHMOND STREET INTERSECTION IMPROVEMENTS. PUBLIC INFORMATION CENTRE 2 June 16, 2016

4. INITIAL CONCEPT DEVELOPMENT AND SCREENING

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Projects

ST PETERS INTERCHANGE - AERIAL VIEW WEST OVER TUNNEL PORTAL AND MOC4 FACILITY (Artist's impression only subject to change during design development)

Design and Access Statement

Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA. Second Line West Pedestrian/Cyclist Crossing of Highway 401 Class EA

Urban Design Manual 2.0 DRIVE-THROUGH FACILITIES. Background. Urban Design Challenges

20 Non-Aboriginal heritage

Appendix E Preliminary Location Hydraulic Study

North West Rail Link - Environmental Assessment Urban Design and Visual Assessment Prepared for Transport Infrastructure Development Corporation

City of Cornwall Municipal Class Environmental Assessment. Proposed Improvement and Extension of Lemay Street

Development Control Plan No Wolli Creek

A. INTRODUCTION B. NO ACTION ALTERNATIVE

Chapter 10. Route Window C5: Tottenham Court Road East

BACKGROUND, GOALS, STUDY AREA, EVALUATION CRITERIA, ORGANIZATION

Lincoln Road Corridor Improvements. Notice of Requirement to Auckland Council from Auckland Transport. Assessment of Effects on the Environment (AEE)

FY 2005 TRANSPORTATION CAPITAL PROGRAM

Chapter 8. Visualizations

July 12, Columbus City Council City Hall 90 West Broad Street Columbus, OH RE: I-70/71 Columbus Crossroads Project

LAND USE SHEET 3 LOWER THAMES CROSSING LOWER THAMES CROSSING STATUTORY CONSULTATION. Main works construction compound

Adelaide Street / Canadian Pacific Railway (CPR) Grade Separation Class Environmental Assessment. Public Information Centre 3

Transcription:

(blank page) WestConnex New M5 5-42

(blank page) WestConnex New M5 5-44

5.5 Tunnels 5.5.1 Main alignment tunnels The main alignment tunnels would be about nine kilometres long, with the western tunnel portals located at Kingsgrove and the eastern ramp portals located at the St Peters interchange. The eastern end of the main alignment tunnels would terminate underground at St Peters in the form of stub tunnels, providing a potential future connection to the future M4-M5 link. The project has been designed to connect to the existing road network at two locations: The King Georges Road interchange, the M5 East Motorway and M5 South West Motorway via the western portals The St Peters interchange and local surface road network via the eastern portals. Tunnel stubs would also be included to potentially provide a connection to: The future Southern extension via stub tunnels at the Southern extension caverns near the Kogarah Golf Course The future M4-M5 Link via stub tunnels at the St Peters caverns near the St Peters interchange. The width of excavation would be widened at these locations to allow the tunnel stubs to diverge from the main alignment tunnels. This would result in the development of a void or cavern between the two tunnels. The main alignment tunnels include two vehicular cross passages at Bexley and Arncliffe to allow for emergency traffic switching, as well as pedestrian cross passages spaced at a maximum of 120 metres and emergency pedestrian egress between tunnels in the event of an emergency. An indicative cross passage layout is shown on Figure 5-17. The main alignment tunnels would also include a breakdown bay around the Cooks River between the Southern extension caverns and St Peters caverns. The breakdown bay would be large enough to allow a B-triple vehicle to pull over into the bay and safely park outside of the nominal tunnel shoulder width. The main alignment tunnels would be widened at this location to accommodate the breakdown bay outside of the shoulders. The speed limit within the main alignment tunnels would be 80 kilometres per hour. Tunnel portals The New M5 western tunnel portals would be located at Kingsgrove and would connect to the western surface works. The western tunnel portals would be staggered, with the eastbound portal meeting the surface around 90 metres further west than the westbound tunnel portal. The eastern tunnel portals would connect to the surface at the St Peters interchange, about 70 metres east of Canal Road. Figure 5-18 to Figure 5-20 show indicative configurations of the western and eastern tunnel portals respectively. Dive and cut and cover structures would be constructed at the western and eastern tunnel portals to create entry and exit ramps to join surface roads with the main alignment tunnels (refer to Section 6.6.5 for more detail). On and off-ramps would vary in size and shape in response to local conditions and would require a number of cuttings and embankments. The eastern and western on and off-ramps have been designed to provide for a 5.3 metre vertical clearance. The main alignment tunnels at the western and eastern tunnel portals would be line marked for two lanes with the provision to be widened in the future to three and up to five lanes (respectively), subject to additional assessment and approval. WestConnex New M5 5-45

(blank page) WestConnex New M5 5-46

(blank page) WestConnex New M5 5-48

(blank page) WestConnex New M5 5-50

(blank page) WestConnex New M5 5-52

(blank page) WestConnex New M5 5-54

Tunnel gradients The crossfall across the carriageway in each of the main alignment tunnels would be 2.5 per cent. This would allow water to drain to the low side of each main alignment tunnel for collection and management as part of the tunnel water management system (refer to Section 5.8.3). The vertical gradient along each of the main alignment tunnels would typically be between 0.5 per cent and one per cent, with the exception of the following locations: Near the western portals, where the eastbound carriageway would have a down-gradient of around five per cent and the westbound carriageway would have an up-gradient of four per cent. These gradients are required due to local geology and minimum separation distances from surface developments Immediately west of the Southern extension tunnel stubs. In this area, a section of around 600 metres of carriageway in both directions would be required at a gradient of around 2.8 per cent. This gradient is required to provide enough space for potential construction of the Southern extension in the future Near the eastern portals at the St Peters interchange, where the eastbound and westbound carriageways would have an up-gradient of around five per cent and a down-gradient of around six per cent, respectively. This gradient is required to balance the depth of tunnelling with reducing the extent of excavations within the Alexandria Landfill site. The main alignment tunnels fall towards a common low point around the Kogarah Golf Course, Arncliffe, where tunnel drainage would connect to surface water treatment facilities (Section 5.8.3). A geotechnical long section of the main alignment tunnels is provided in Appendix C. Lane configuration The configuration of traffic lanes within the main alignment tunnels would be provided in three distinct sections, separated by: The Southern extension caverns, where stub tunnels would be constructed for potential future connection to the Southern extension The St Peters caverns, where stub tunnels would be constructed for potential future connection to the future M4-M5 Link. A summary of the lane configuration and widths of the three sections of the main alignment tunnels is provided in Table 5-2. Typical cross sections within the main alignment tunnels and the New M5 ramps are shown in Figure 5-21 to Figure 5-24. Table 5-2 Main alignment tunnel section Main alignment tunnels lane configuration and widths Number of lanes Width of lanes (metres) Width of nearside shoulder (metres) Width of offside shoulder (metres) In-tunnel barrier to barrier width (metres) Western portals to the Southern extension caverns 2* 3.5 2.5 1 10.5 Southern extension caverns to the St Peters caverns and 2** 3.375 2.5 1 17 eastern portals Stub tunnels from the St Peters caverns for potential future connection to the 2* 3.5 1 2.5 10.5 future M4-M5 Link. New M5 ramps 2 3.5 2.5 1.0 10.5 *Main alignment tunnels within these sections would be linemarked for two lanes with the provision to be widened to three in the future, subject to separate assessment and approval. **Main alignment tunnels within this section would be linemarked for two lanes, with the provision to be widened to five in the future, subject to separate assessment and approval. WestConnex New M5 5-55

(blank page) WestConnex New M5 5-56

(blank page) WestConnex New M5 5-58

(blank page) WestConnex New M5 5-60

(blank page) WestConnex New M5 5-62

(blank page) WestConnex New M5 5-64

5.5.2 M4-M5 Link stub tunnels The main alignment tunnels would be continued north of the St Peters caverns, for around one kilometre to a point underground around Canal Road, to form stub tunnels for potential connection to the future M4-M5 Link. The stub tunnels would continue in the same configuration as the two lane sections of the main alignment tunnels, but would not be opened to traffic as part of the New M5 project. The stub tunnels would be managed and maintained to allow for connection to the future M4-M5 Link. The M4-M5 Link stub tunnels would only be operational after being connected to the future M4-M5 Link. 5.5.3 Southern extension stub tunnels Stubs tunnels would be constructed in a southerly direction from the Southern extension caverns near the Kogarah Golf Course. These stub tunnels would extend about 20 metres and would provide for a potential connection to the future Southern extension. The stub tunnels would continue in the same configuration as the two lane sections of the main alignment tunnels, but would not be opened to traffic as part of the project. The stub tunnels would be managed and maintained to allow for connection to the Southern extension in the future. The Southern extension stub tunnels would only be operational if connected to the Southern extension in the future. 5.6 St Peters interchange The St Peters interchange in its ultimate configuration (ie in the event the entire WestConnex program of works is completed) would connect the New M5, the future M4-M5 Link and the future Sydney Gateway with: Euston Road at the intersection of Campbell Road Gardeners Road at the intersection with Kent Road via a new bridge over the Alexandra Canal Sydney Airport and Port Botany via the future Sydney Gateway. The construction of all roads within the operational footprint of St Peters interchange would be constructed as part of this project; however, some sections of road would not connect to any operating roads. The project operational layout of the St Peters interchange is shown on Figure 5-25. The ultimate configuration of the St Peters interchange is shown on Figure 5-26. The configuration of the St Peters interchange and the stages in which it would be constructed are described in Section 5.6.1. WestConnex New M5 5-65

(blank page) WestConnex New M5 5-66

(blank page) WestConnex New M5 5-68

(blank page) WestConnex New M5 5-70

5.6.1 Interchange configuration St Peters interchange ultimate configuration The St Peters interchange, in its ultimate configuration (ie in the event the entire WestConnex program of works is completed), would be a four level interchange and would include seven bridges connection. It would provide connections between: The New M5 and Euston Road at the intersection of Campbell Road The New M5 and Gardeners Road The New M5 and the future Sydney Gateway The future M4-M5 Link and the future Sydney Gateway The future M4-M5 Link and Gardeners Road The future M4-M5 Link and Euston Road at the intersection of Campbell Road. Construction staging The St Peters interchange would be constructed as part of the project. Construction of the St Peters interchange would include: The closure of the former Alexandria Landfill site (refer to Section 5.9) Construction of roads and embankments within the St Peters interchange site Construction of operational ancillary infrastructure associated with the New M5 (refer to Section 6.6.7) Connection of the New M5 with the local road network at the intersection of Euston Road with Campbell Road, and with Gardeners Road via a new bridge over the Alexandra Canal Landscaping and revegetation works within the interchange site. Construction of the St Peters interchange would allow for two additional future stages to provide connections between the St Peters interchange and the: Future M4-M5 Link Future Sydney Gateway. The additional future stages of works would provide the ultimate connectivity through the interchange between the New M5, the future M4-M5 Link, the future Sydney Gateway and the local road network. These stages would be subject to future environmental assessment and approval. The construction of all roads within the St Peters interchange site would be delivered as part of this project. The road construction works within the Alexandria Landfill site, would include landforming and construction of embankments as part of the Alexandria Landfill closure plan. All roads that form part of St Peters interchange would be constructed as part of the initial stage with the aim of minimising potential disruptions to the operation of the New M5 and local road connections during construction of the additional future stages of the WestConnex program of works. Sections of road that provide the following road connections would be constructed within the boundary of the St Peters interchange site but would not connect to any operating roads as part of the initial stages of interchange construction: The New M5 and the future Sydney Gateway The future M4-M5 Link and the future Sydney Gateway The future M4-M5 Link and Gardeners Road The future M4-M5 Link and Euston Road at the intersection of Campbell Road. WestConnex New M5 5-71

As these roads approach the boundary of the interchange site, embankments would be constructed and stabilised. It is anticipated that if the future M4-M5 Link and the future Sydney Gateway projects proceed, they would tie-in to these embankments to complete the interchange and provide operational connections. Landscaping and revegetation works within the St Peters interchange site would be undertaken across the site in accordance with an urban design concept plan (refer to Chapter 14 (Visual impacts and urban design) and Appendix L (Urban design report). A section of the interchange site immediately south-west of Campbell Road and south of Albert Street, would be kept as an area of hardstand, with the anticipation of it being used to support construction of the future M4-M5 Link (refer to Figure 5-25). As part of the project, this area would be physically separated from the remainder of the interchange to restrict access. The intersection of Campbell Road and Euston Road would be upgraded to safely and efficiently manage traffic entering and leaving the St Peters interchange. The upgraded intersection would be integrated with other local surface road improvements (refer to Section 5.7.2). The upgraded intersection would be signalised and would allow motorists to: Exit the eastbound New M5 or the future southbound M4-M5 Link main alignment tunnels along the off ramps and either turn left onto Campbell Road, or continue straight along Euston Road Enter the westbound New M5 or the future northbound M4-M5 Link main alignment tunnel by turning left or right from Campbell Road, or travelling straight from Euston Road, to connect to the on ramps Continue to travel along Campbell Road (local through traffic). An indicative layout of the upgraded intersection is provided in Figure 5-25. The connection of the road network at the intersection of Campbell Road and Euston Road to the future M4-M5 Link would be constructed as part of the project, with the aim of minimising potential disruptions to the operation of the New M5 and local road connections during construction of the additional future stages of the WestConnex program of works. This road connection would only be operational if connected to the future M4-M5 Link. Within the St Peters interchange connections between the New M5 and Euston Road at the intersection of Campbell Road and between the future M4-M5 Link and the future Sydney Gateway would be via two-lane carriageways with 3.5 metre wide lanes. These two connections would be signposted with a speed limit of 80 kilometres per hour, and would transition to 60 kilometres per hour at the Campbell Road intersection with Euston Road. All other connections within the interchange would be via single-lane carriageways with lanes around 3.5 metres in width. These ramps within the interchange would be signposted at 60 kilometres per hour, with advisory speed signs as required. A cross section showing the indicative lane configuration and lane widths of the New M5 ramps between the eastern portals and the upgraded Campbell Road / Euston Road intersection is provided on Figure 5-24. 5.6.2 Bridges and structures The St Peters interchange would comprise seven bridges which would provide direct connectivity between the New M5, the future Sydney Gateway, the future M4-M5 Link and the local road network. Retaining walls within the interchange would be required to retain batter slopes where the level difference and the distance between the adjacent roadways and the boundaries do not allow the use of batter slopes. WestConnex New M5 5-72

A summary of the roadway bridge structures within the interchange is provided in Table 5-3 and shown in Figure 5-27. An indicative cross section of the St Peters interchange is shown on Figure 5-28. Bridges within the interchange would be constructed at three general levels, with level one being at the ground surface: Level two (closest to the ground): Level three: Level four: New M5 to Gardeners Road New M5 to the future Sydney Gateway The future Sydney Gateway to the future M4-M5 Link The future M4-M5 Link to the future Sydney Gateway Gardeners Road and Euston Road, at the intersection with Campbell Road, merging and connecting to the future M4-M5 Link. The multi-level design of the interchange would provide grade-separated connectivity and efficient connections between roads without the need to provide traffic signals. It would also remove any direct interfacing of traffic travelling in opposing directions and would allow posted speed limits to be maintained, providing safe and efficient connections between roads. A new pedestrian and cycle bridge would be provided that connects Sydney Park to Mascot. The new bridge would be delivered as part of the project to improve pedestrian and cyclist accessibility (refer to Chapter 9 (Traffic and transport)). This bridge would be delivered as part of the local road upgrades component of the project and is discussed in more detail in Section 5.7.6. Retaining walls within the interchange would be located: Between the New M5 ramps and the Princes Highway Along the future Sydney Gateway on and off-ramps near Canal Road Along the Gardeners Road bridge extension near Burrows Road. 5.6.3 Pedestrian access Three new pedestrian pathways would be provided around the St Peters interchange to enhance pedestrian connectivity. These pedestrian pathways are shown on Figure 5-25 and would include: Parallel to the Princes Highway along the north-western site boundary, providing a pedestrian connection between the Princes Highway at the intersection of Canal Road and Campbell Street, near the intersection of Albert Street Along the northbound (western) side of Canal Road Between the future Sydney Gateway and the Princes Highway, providing a pedestrian connection between the future Sydney Gateway crossing of Canal Road with the Princes Highway at the intersection with Canal Road. WestConnex New M5 5-73

(blank page) WestConnex New M5 5-74

Table 5-3 Bridge number Bridge Level St Peters interchange road bridges Connectivity Number of lanes Minimum lane width (metres) Shoulder width (indicative) 1 2 New M5 (eastbound) to Gardeners Road (eastbound) 1 3.5 Two metre nearside One metre offside 2 2 New M5 (eastbound) to the future Sydney Gateway 1 3.5 Two metre nearside One metre offside 3 3 The future Sydney Gateway (northbound) to the future 2 3.5 2.5 metres nearside M4-M5 Link (northbound) One metre offside 4 3 The future M4-M5 Link (southbound) to the future Sydney 2 3.5 2.5 metres nearside Gateway (southbound) One metre offside 5 2 The future M4-M5 Link (southbound) to Gardeners Road 1 3.5 Two metres (eastbound) nearside One metre offside 6 4 Gardeners Road and Euston Road, at the intersection with Campbell Road, merging and connecting to the future M4-M5 Link 1 3.5 Two metre nearside One metre offside Total carriageway width (metres) (indicative) 6.5 60 6.5 60 10.5 60 10.5 80 6.5 80 6.5 60 Posted speed (km / h) WestConnex New M5 5-75 Environmental Impact Statement

(blank page) WestConnex New M5 5-76

ST PETERS INTERCHANGE BRIDGES - PLAN NORTH 5 SOUTH w Ne M M5 Bridge abutment ps Ram Reinforced concrete pier New Reinforced concrete pier ad Gardners Ro Bridge abutment ramp Gardeners Road onto M4 - M5 Link e 3) (WestConnex Stag New y wa at e yg e n Syd to mp -ra on M5 ps Ram on-ramp Potential Sydney Gate way ney Gateway Potential Syd New M5 (ea st bound) off-ramp to Sydne way y Gate NOT TO SCALE ST PETERS INTERCHANGE BRIDGES - SECTION Approach slab Bridge deck N S W Interchange bridge Reinforced concrete pier Twin rail safety barrier Bridge abutment THORNTON N S W THORNTON N S W C VAHTRA 1 Interchange bridges NOT TO SCALE Refer to Figure 5-26 for section location Figure 5-27 Indicative St Peters interchange bridges plan and section

(blank page) WestConnex New M5 5-78

WEST Security fence EAST Terraced retaining walls, revegetated with native trees and shrubs N S W Vegetated median to create visual separation of carriageway C VAHTRA 1 N S W Gardeners Road on-ramp (eastbound) Capped spoil mounding revegetated with native trees and shrubs New M5 eastbound carriageway C BENNETT New M5 westbound carriageway Gardeners Road off-ramp (westbound) NOT TO SCALE Figure 5-28 Indicative cross section - St Peters interchange

(blank page) WestConnex New M5 5-80