SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING SuperLite TM I-XL minute SuperLite TM I-XL IGU minute PART 1 GENERAL

Similar documents
PART 1 GENERAL 1.01 SUMMARY

PART 1 GENERAL 1.01 SUMMARY

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING SuperClear 45-HS (patent pending)

PART 1 GENERAL 1.01 SUMMARY

PART 1 GENERAL 1.01 SUMMARY

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Fire Protective

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Fire Protective

SPECIFICATION SECTION : FIRE RATED GLASS & FRAMING GPX Builders Series Temperature Rise Door Framing

SECTION FIRE-RATED GLASS AND FRAME

A. AMERICAN ARCHITECTURAL MANUFACTURERS ASSOCIATION (AAMA) 101: Appendix Dissimilar Materials.

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 10 - SPECIALTIES

DETEX ARCHITECTURAL SPECIFICATIONS, June 2012 AO19 SERIES HEAVY DUTY LOW-ENERGY ELECTRIC SWING DOOR OPERATOR

ARCHITECTURAL SPECIFICATIONS

1. Portable fire extinguishers. 2. Fire-protection cabinets for portable fire extinguishers.

Objectives. To review updated IBC and fire test requirements when designing for life safety.

SECTION REGULATORY REQUIREMENTS. A. Relationship between Code, Ordinances, Standards and Contract Documents

Questions related to specific materials, methods, and services will be addressed at the conclusion of the presentation.

Fire-Rated Glazing Changes in 2012 International Building Code (IBC)

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

ARBOR SERIES WOOD WALLCOVERINGS

ARBOR SERIES DIVISION FLEXIBLE WOOD VENEER WALLCOVERING


B. Shop Drawings: For fire protection cabinets. Include plans, elevations, sections, details, and attachments to other work.

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS (June 2006) UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

Architectural Specification Sheet

SECTION (13900) - FIRE SUPPRESSION SYSTEMS

B. Product Data: Provide manufacturers catalogue information. Indicate valve data and ratings.

A. Curtains: Provide curtain fabrics with the following characteristics:

SECTION (16460) - LOW-VOLTAGE TRANSFORMERS

WALLCOVERINGS WALLCOVERINGS

Product Guide Specification

SECTION SECURITY TESTING AND COMMISSIONING

SECTION GENERATOR PARALLELING CONTROLS

DIVISION 10 SPECIALTIES

SECTION FIRE EXTINGUISHER CABINETS

SECTION INTRUSION DETECTION SYSTEM

A. Hydraulic calculations shall be prepared in accordance with Chapter 23 of NFPA 13 with the following exceptions:

DESIGN AND CONSTRUCTION STANDARDS SPECIFICATION GUIDELINES

FIRE SUPPRESSION SPRINKLER SYSTEM

DESIGN & CONSTRUCTION GUIDELINES

SECTION ELECTRIC FLOOR HEATING AND SNOW MELTING EQUIPMENT

SPECIFICATION: ECS SERIES CLEAN AGENT FIRE SUPPRESSION SYSTEM

NFPA 80 Overview January 21, 2016

TECHNICAL MANUAL for FIRE TAPE. E-Z TAPING SYSTEM PO BOX GREEN BAY, WI

Product Guide Specification

University of Houston Master Construction Specifications Insert Project Name SECTION DRY-PIPE FIRE SPRINKLER SYSTEM PART 1 - GENERAL

TECHNICAL MANUAL for FIRE TAPE. E-Z TAPING SYSTEM PO BOX GREEN BAY, WI

D. Reference Standards (Utilize latest editions available):

SPECIFICATION: ARGONITE Engineered Fire Suppression System

A. Product Data: Include rated capacities, operating characteristics, furnished specialties, and accessories.

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

SPECIFICATION: Kidde Engineered Fire Suppression System Designed for use with 3M Novec 1230 Fire Protection

SECTION FM-200 FIRE SUPPRESSION SYSTEM

CONTENTS AUTOMATIC TRANSFER SWITCHES

Fire Rated Door Assemblies: Compliant Designs

A. NFPA 2001 Standard for Clean Agent Fire Extinguishing Systems 2004 edition.

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

DIVISION 21: FIRE SUPPRESSION SYSTEMS SECTION Fire Protection Systems Protecting Cold Storage and Unheated Warehouses

University of Rochester October 17, 2008 Brooks Landing Business Center

FIRE & LIFE SAFTEY STANDARD

NITROGEN-GENERATING SPRINKLER CORROSION INHIBITING SYSTEM

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Leading. Click to edit Master subtitle style. 3M Fire Protection Products Awareness & Introduction to 3M Fire Protection Products

Northpointe Renovation EPN #1701 F/A Project #17027 September 8, 2017

c. Oko-Tex (European environmental health standard)

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

SECTION INTERIOR LIGHTING

SECTION Fire Pumps

SECTION AUTOMATIC VERTICAL CONVEYOR SYSTEM CLOSURE FIRE BARRIER

NFPA 2001: Standard for Clean Agent Fire Extinguishing Systems NFPA 70: National Electrical Code (NEC) NFPA 72: National Fire Alarm Code

.2 Section Waste Management and Disposal..4 Section Electrical General Requirements.

TECHNICAL MANUAL for FIRE TAPE. E-Z TAPING SYSTEM PO BOX GREEN BAY, WI

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

SECTION GYPSUM PLASTER

WHAT TO EXPECT DURING A FIRE DOOR INSPECTION

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

SECTION AIR DUCT ACCESSORIES

Kidde Nitrogen Inert Gas Clean Agent Fire Suppression System

DSC BUILDING 1200 ALTERATIONS OCTOBER 2011

SECTION FIRE PROTECTION. A. Examine all conditions as they exist at the project, prior to submitting a bid for the work of this section

SECTION AIR COILS

Code Technologies Committee Report Fire Rated Glazing Group A changes: Fire rated glazing

Design & Construction Standards, Revised January

DIVISION 8 OPENINGS SECTION OVERHEAD COILING FIRE DOORS. A. Section Metal Fabrications: Support framing and framed opening.

B. Galvanized-Steel-Sheet Sleeves: inch minimum thickness; round tube closed with welded longitudinal joint.

Linear Heat Detection Engineering Specifications

1 P a g e w w w. s m o k e c o n t r o l. c o m. a u

STANDARD FOR FIRE RATED ROLLING DOOR ASSEMBLIES

UNIFIED FACILITIES GUIDE SPECIFICATIONS

DIVISION LOW VOLTAGE DE-ICING / SNOW MELTING SYSTEM IN EXISTING ASPHALT/CONCRETE

Executive Summary. Shell Offshore Inc. BY: Keith M. Gonzales Sr., P.E. Regulatory Requirements for Hazardous Locations

Developing a Healthcare Facility Fire Door Inspection Program

KINGS COUNTY JAIL EXPANSION PHASE III COUNTY OF KINGS SECTION

SECTION WET-PIPE SPRINKLER SYSTEMS

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

GUIDE SPECIFICATION ADVANCED RADIANT SYSTEMS DU/DUH DUAL OUTPUT RANGE INFRARED TUBE HEATERS

SECTION (15486) - FUEL-FIRED, DOMESTIC WATER HEATERS

SECTION DRY PIPE SPRINKLER SYSTEMS MODEL G SERIES DRY VALVE

Transcription:

Welcome to the SAFTIFIRST TM Guide Specification System prepared as an aid to specifiers in preparing written construction documents. For specification assistance with specific product applications, please contact SAFTIFIRST TM. To download an electronic copy, please visit www.safti.com. PART 1 GENERAL 1.01 SUMMARY SPECIFICATION SECTION 08 8810: FIRE RATED GLASS & FRAMING SuperLite TM I-XL 20-45 minute SuperLite TM I-XL IGU 20-45 minute A. Section Includes: Fire rated glazing 1. SuperLite I-XL patented, fire protective, safety rated, specialty tempered, radiant heat reducing glazing material for 20-45 minute interior and exterior applications. 2. Applications of fire rated glazing includes: a. Fire rated glazing as vision lites in door assemblies. b. Fire rated glazing as sidelites, transoms or openings in fire rated frames. B. Related Sections: 1. Section 01 3323: Shop Drawings, Product Data and Samples. 2. Section 06 4000: Architectural Woodwork. 3. Section 08 8000: Glazing. 4. Section 08 1110: Steel Doors and Frames. 5. Section 08 1120: Aluminum Doors and Frames. 6. Section 08 1113: Hollow Metal Doors and Frames. 7. Section 08 1400: Wood Doors and Frames. 8. Section 08 5130: Steel Windows. 9. Section 08 7000: Finish Hardware. 1.02 REFERENCES A. American Society for Testing and Materials (ASTM): 1. ASTM E152: Methods of Fire Tests of Door Assemblies. 2. ASTM E163: Methods of Fire Tests of Window Assemblies. 3. ASTM E2074-00: Methods of Fire Tests of Door Assemblies, including Positive Pressure Testing of Side-hinged and Pivoted Swinging Door Assemblies. 4. ASTM E2010-01: Standard Test for Positive Pressure of Fire Tests of Window Assemblies. B. National Fire Protection Association (NFPA): 1. NFPA 80: Fire Doors and Windows. 2. NFPA 252: Fire Tests of Door Assemblies. 3. NFPA 257: Fire Tests of Window Assemblies. C. Underwriters Laboratories, Inc. (UL): 1. UL 9: Standard for Safety of Fire Tests of Window Assemblies. 2. UL 10B: Standard for Safety of Fire Tests of Door Assemblies. 3. UL 10C: Standard for Safety of Positive Pressure Tests of Door Assemblies.

D. Consumer Product Safety Commission (CPSC): 1. CPSC 16 CFR 1201: Safety Standard for Architectural Glazing Materials. E. American National Standards Institute (ANSI): 1. ANSI Z97.1: Safety Glazing Materials Used in Buildings - Safety Performance Specifications and Methods of Test. F. Glass Association of North America (GANA) 1. GANA Glazing Manual. 2. FGMA Sealant Manual. G. [American Recovery and Reinvestment Act 1. Section 1605, Title XVI Buy American Provision] H. [Insert building code used by Authority Having Jurisdiction] 1.03 SYSTEM DESCRIPTION A. Performance Requirements: Provide a fire rated glazing manufactured, fabricated and installed to maintain performance criteria stated by manufacturer without defects, damage or failure. 1. Fire Rating: 20-45 minutes without hose stream. Use of SuperLite I-XL and I-XL IGU 45 minute is subject to AHJ approval because it is fire tested without hose stream. SuperLite I-XL is a directional product. SuperLite I-XL IGU is a bi-directional product. 2. Fire protective, specialty tempered, heat reflective glass tested in accordance with NFPA 80, NFPA 252, NFPA 257, UL 9, UL 10B and UL 10C. 3. Testing Laboratory: Fire test shall be conducted by a nationally recognized independent testing laboratory. B. Listings and Labels: 1. Fire rated glazing shall be under current follow-up service by a nationally recognized independent testing laboratory approved by OSHA and maintain a current listing or certification. Assemblies shall be labeled in accordance with limits of listings. 1.04 SUBMITTALS A. Submit listed submittals in accordance with Conditions of the Contract and Division 1 Submittal Procedure Section. 1. Shop Drawings: Submit shop drawings showing layout, profiles and product components. 2. Samples: Submit 6x6 glass samples. 3. Technical Information: Submit latest edition of manufacturer s product data. 1.05 DELIVERY, STORAGE AND HANDLING A. General: Comply with Division 1 Product Requirements Sections. 2

B. Ordering: Comply with manufacturer s ordering instructions and lead-time requirements to avoid construction delays. C. Delivery: Deliver materials to specified destinations in manufacturer s or distributor s packaging undamaged, complete with installation instructions. D. Storage and Protection: Store off ground, under cover, protected from weather and construction activities and at temperature conditions recommended by manufacturer. 1.06 PROJECT CONDITIONS A. Field Measurements: Verify actual measurements for openings by field measurements before fabrication. Show recorded measurements on shop drawings. Coordinate field measurements and fabrication schedule with construction progress to avoid construction delays. 1.07 WARRANTY A. Project Warranty: Refer to Conditions of the Contract for project warranty provisions. B. Manufacturer s Warranty: Submit, for Owner s acceptance, manufacturer s standard warranty document. Manufacturer s warranty is not intended to limit other rights that the Owner may have under the Contract Documents. 1. Warranty Period for SuperLite I-XL: Lifetime warranty from date of shipping. 2. Warranty Period for SuperLite I-XL IGU: 10 year warranty from date of shipping. PART 2 PRODUCTS 2.01 FIRE RATED GLAZING A. Material: SuperLite I-XL and SuperLite I-XL IGU 20-45 specialty tempered glazing with partial radiant heat protection. 1. Patented product, no known equal. B. Manufacturer: SuperLite I-XL and I-XL IGU as manufactured and distributed by SAFTI FIRST. 1. Contact: 100 N Hill Drive, Suite 12, Brisbane, CA 94005; Telephone 888.653.3333; Fax 888.653.4444; email info@safti.com; Web site www.safti.com. 2. Fire rated glass and framing must be provided by a single-source, US manufacturer. Distributors of fire rated glass and framing are not to be considered as manufacturers. B.1. Design Requirements: SuperLite I-XL 1. Thickness: Must be 1/4 (6 mm) thick. 2. Weight: Must weigh 3.0 lbs./sq. ft. 3. Solar Heat Gain Coefficient: Must provide 0.70 SHGC. 4. Sound Transmission Rating: Must provide STC 28 rating. 5. Appearance: Must be specialty tempered float glass. 6. Visible Light Transmission: Must meet 0.82 3

7. Fire Rating: Must be fire rated from 20-45 minutes without hose stream and provide measurable radiant heat protection. This is a directional product that reflects radiant heat transfer from one side only. 8. Impact Safety Resistance: Must meet CPSC 16 CFR 1201 Cat. I & II. B.2. Proprietary Products System: SuperLite I -XL IGU 1. Thickness: Must be 3/4 (19 mm) thick. 2. Weight: Must weigh 6 lbs./sq. ft. 3. Appearance: Must be insulated specialty tempered float glass. 4. Fire Rating: Must be fire rated from 20-45 minutes without hose stream and provide measurable radiant heat protection. 5. Impact Safety Resistance: Must meet CPSC 16 CFR 1201 Cat. I & II C. Manufacturer s Fire Rated Glazing Material: 1. Each piece of fire-rated glazing material shall be labeled with a permanent logo including name of product, manufacturer, testing laboratory, fire rating period and safety glazing standards. 2. Glazing material installed in Hazardous Locations, subject to human impact, shall be certified and permanently labeled as meeting applicable requirements referenced in NFPA 80: a. CPSC 16 CFR 1201, Cat. I & II D. Substitutions: No substitutions allowed. 2.02 MATERIALS A. Glazing Accessories: Manufacturer recommended fire rated glazing accessory as follows: 1. Glazed with EPDM tape or other flame resistant gasket material and calcium silicate setting blocks. 2.03 RELATED PRODUCTS *********************************************************************************************************** Note: Basis of design for fire rated framing system is GPX Framing as manufactured by SAFTI FIRST TM ********************************************************************************************************************************* A. Glazing shall be installed in an equally rated framing system. 2.04 SOURCE QUALITY A. Obtain fire rated glazing products from a single manufacturer. B. Fabrication Dimensions: Fabricate to approved dimensions. The general contractor shall guarantee dimensions where practicable within required tolerances. PART 3 EXECUTION 3.01 MANUFACTURER S INSTRUCTIONS A. Compliance: Comply with manufacturer s product data including product technical bulletins and installation instructions. 4

3.02 EXAMINATION A. Site Verification of Conditions: Verify substrate conditions, have been previously installed under other sections, and are acceptable for product installation in accordance with manufacturer s instructions. 3.03 INSTALLATION A. Installation shall be in strict accordance with the fire glazing material manufacturer s specifications. Field cutting or tampering is strictly prohibited. 3.04 CLEANING AND PROTECTION A. Protect glass from contact with contaminating substances resulting from construction operations. Remove such substances by method approved by manufacturer. B. Wash glass on both faces not more than four days prior to date schedule for inspections intended to establish date of Substantial Completion. Wash glass by method recommended by glass manufacturer. C. Remove temporary coverings and protection of adjacent work areas. D. Remove construction debris from project site and legally dispose of debris. END OF SECTION In the interest of continuous improvement of its product line, SAFTIFIRST TM reserves the right to modify its products composition, colors, textures, sizes, and other physical and performance attributes and these guide specifications at any time. SAFTIFIRST TM makes no expressed or implied warranties regarding content, errors, or omissions in the information presented. Specifications modified or rewritten not in conformance with manufacturer s standard processes, products, and procedures may void warranties and related remedies. 5