MEMORANDUM. California State University Channel Islands Evacuation Planning Analysis

Similar documents
4.11 TRAFFIC Existing Conditions Existing Project Site. Existing Street System

Welcome. Comprehensive Plan & Transportation Plan Open House November 7, 2012

NORTH, NORTH REDWOOD BOULEVARD CORRIDOR STUDY

PROJECT DESCRIPTION ENVIRONMENTAL SETTING. Project Site Location FIGURE 1 - REGIONAL LOCATION MAP

FREEWAY MAINLINE FAIR SHARE WEEKDAY PM PEAK HOUR

Errata 1 Landmark Apartments Project Final Environmental Impact Report

WHAT IS THE PURPOSE OF THE OPEN HOUSE?

Division of Land / Environmental Review. Volume I FINAL ENVIRONMENTAL IMPACT REPORT WEST LOS ANGELES COMMUNITY PLAN AREA

Roles, Responsibilities, and Plans for Transportation Systems in Mass Evacuations

Economic Development & Housing Council Committee Comprehensive Plan Update September 20, 2005

112th Avenue Light Rail Options Concept Design Report JUNE 2010 PREPARED FOR PREPARED BY TBG PGH

Wentworth Institute of Technology BRA Public Meeting October 20, 2010

Planning and Operational Applications of TRANSIMS

Chapter 22. Alternatives to the Proposed Project

Study Report and Concept Recommendations

Ref: March 21, Ms. Jody Kablack Director of Planning and Community Development Town of Sudbury 278 Old Sudbury Road Sudbury, MA 01776

4.0 AFFECTED ENVIRONMENT AND ENVIRONMENTAL CONSEQUENCES

EXECUTIVE SUMMARY. Introduction

Innovative Worldwide VE Case Studies & How Cultural Values Impact Creativity

Seeking Restaurant / Retail For Total Of 6,767 SF Adjacent to UC Berkeley, High Foot Traffic

CITY OF LOS ANGELES INTER-DEPARTMENTAL CORRESPONDENCE

Street Flooding Mitigation Plan KYOVA Interstate Planning Commission. Presented to AMPO National Conference October 18, 2017

California State University, Monterey Bay Campus Parking Relocation Project Attachment to Notice of Exemption

MORRISVILLE TRANSPORTATION PLAN TOWN COUNCIL PRESENTATION AUGUST 22, 2017

4.1 Build Alternative 1 Construction Phasing

STREET DESIGNATIONS AND STANDARD ROADWAY DIMENSIONS

California Environmental Quality Act (CEQA) Environmental Review Process

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

C. WATER. 1. Surface Water Runoff. See Section C.3, Flood Hazard/Mudflow Hazard, page Ground Water

12/9/2013. HOLLYWOOD/PINES CORRIDOR PROJECT AMPO 2013 Annual Conference October 24, Our Perspective. Broward.

The impacts examined herein take into account two attributes of aesthetic values:

Chapter 7 Route window W20 Dover Road and Leigh Road bridges. Transport for London

Broadview Access Management Study 2012 Update

WESTSIDE SUBWAY EXTENSION PROJECT. Addendum to the Visual and Aesthetic Impacts Technical Report

PUBLIC HEARING. Thursday, December 14, 2017 FDOT Urban Office 2198 Edison Avenue Jacksonville, FL 32204

Executive Summary. NY 7 / NY 2 Corridor

Definitions. Average Daily Traffic Demand (ADT): The actual number or projected number of cars that pass a point in a 24-hour period.

\JIL1 u ) i r. [ouu r fo. /~ap< s 4^ (*7 S (0. uul ooo

11.0 TRANSPORTATION ELEMENT

CHARLES PUTMAN CHARLES PUTMAN AND ASSOCIATES, INC

New Stanton Project Update July 3, 2012

RE: AMENDMENT C375 GEELONG PLANNING SCHEME 1900 BARWON HEADS ROAD, BARWON HEADS

I-710 Corridor Advisory Committee. Gary Hamrick, Iteris

Rock Spring Master Plan Community Meeting #6: Land Use + Transportation Forecasts

TOWN OF PALM BEACH FOR IMMEDIATE RELEASE. Patricia Strayer, P.E., Town Engineer Phone: ,

Advance Warning Flasher System at High Speed

2 Project Description

Revised Long Range Transportation Plan

MEMORANDUM AGENDA ITEM #6c

What s New in Roundabout Design?

I-75 Overpass Study Summary

ACCESS PLAN. SD 11/SPLITROCK BOULEVARD Brandon, SD. Prepared by South Dakota Department of Transportation City of Brandon

LOW DENSITY RESIDENTIAL

PREPARED FOR: PLATTEVIEW ROAD CORRIDOR STUDY EXECUTIVE SUMMARY

Proposed Bunnings Warehouse. 90 Benalla Road Shepparton

East Corridor Final Environmental Impact Statement

CITY OF INVER GROVE HEIGHTS A G E N D A CITY COUNCIL WORK SESSION June 3, :00 PM INVER GROVE HEIGHTS CITY HALL COUNCIL CHAMBERS

PROJECT STATEMENT LOCATION/DESIGN PUBLIC HEARING. 19 th AVENUE NORTH EXTENSION PROJECT FROM SPRINGDALE DRIVE TO NORTH 2 ND STREET/U.S.

4.8 LAND USE AND PLANNING

University of Denver Land Use Plan Update I. Executive Summary

SR-2 Freeway Terminus Improvement Project

This Review Is Divided Into Two Phases:

Infrastructure Engineering Planning Construction Suite 300 Minneapolis, MN Tel: Fax:

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

Silver Line CPAM UPDATE. Transportation and Land Use Committee October 14, 2016

4.0 RESPONSE TO COMMENTS

UNIVERSITY OF CALIFORNIA, SAN DIEGO

November 2018 THE DISTRICT AT CLIFTON HEIGHTS

4.500 Preston Road Overlay District

DOWNTOWN REDMOND LINK EXTENSION SEPA Addendum to the East Link Project Final Environmental Impact Statement

Better Market Street. Presentation to the SFMTA Board of Directors June 19, 2012

2 January 13, 2010 Public Hearing APPLICANT: AUTOBELL CAR WASH, INC

Tysons Circulator Study: Process and Preliminary Results Summary. March 2012

Regarding actual construction when development occurs, the following applicable guidelines are provided to address public safety issues:

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY (LACMTA)

Proposed Kenmount Hill CDS Amendment. Public Hearing October 25 th, 2018

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

2900 Steeles Avenue East at Don Mills Road in the Town of Markham

2040 Long Range Transportation Plan

March 30, Keyes Van Nuys Honda Dealership Keyes Motor, Inc.

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

TIRZ 17/Redevelopment Authority Capital Improvements Plan Projects

LOS ANGELES MISSION COLLEGE MASTER PLAN Master Plan DESIGN & DEVELOPMENT PRINCIPLES

Right-of-Way Acquisitions and Relocations Technical Memorandum

ITEM #8. Regional Smart Growth Program. Regional Smart Growth Program. Presentation Overview. Coast Highway Vision and Stategic Plan.

Integrating Land Use and Transportation

Speedway Mall Project Frequently Asked Questions

MINUTES OF THE TOWN COUNCIL MEETING SEPTEMBER 1, 2016

Southern Alleghenies ROP Projects

University of California Has ngs College of the Law

Please see attached for more detailed project information. Project Schedule Designer Award by SBC Executive Sub-Committee December 21, 2015

Reconstruction Project. Wayzata Task Force Meeting September 3, 2009

Boster, Kobayashi & Associates 59 Rickenbacker Circle Office: (925) P.O. Box 2049 Fax: (925) Livermore, CA

Metro Orange Line Extension Four Years Early and $61 Million Under Budget

STAFF REPORT NATIONAL MEDAL OF HONOR MUSEUM

IV. ENVIRONMENTAL IMPACT ANALYSIS F. PUBLIC SERVICES 1. FIRE PROTECTION

Pine Island Road Corridor Master Plan

Expo Line Transit Project. Project Status Update Meeting West End Corridor Segment C

Kildare County Council. Proposed Development of 77 no. Residential Units at College Wood Manor, Ballingappa Road, Clane, Co. Kildare.

Bus Rapid Transit Backgrounder. December 2016

Transcription:

MEMORANDUM Date: To: From: Subject: Maggie Tougas, Cary Bearn & Miguel Nunez, AICP Evacuation Planning Analysis LA17-2966 This memorandum was prepared to assist (CSUCI) with evacuation planning at the campus. University staff have prepared an evacuation plan with information pertaining to evacuation routes and conditions. In consultation with CSUCI staff and using available data for determining the campus population of students, faculty, staff, employees, and residents, a campus evacuation scenario was studied to try and understand anticipated travel routes and travel times for people that would need to evacuate from the campus setting. It should be noted that it is difficult to predict or analyze evacuation events as they may arise suddenly, for a variety of reasons, and conditions may be such that planned evacuation routes are not available. The following effort establishes baseline travel times for traveling off the campus, estimates evacuation trip generation estimates, identifies potential evacuation routes, and estimates potential changes to travel time from several locations on-campus to reaching Lewis Road. Baseline Travel Times Travel times were collected by Fehr & Peers on Wednesday September 6th 2017, during the AM peak period, and Wednesday September 13th 2017, during the PM peak period. Table 1 shows average travel times for representative exit routes from both the Campus Area as well as the University Glen Apartments Area. The travel time runs were conducted during the first weeks of the fall semester to capture the busiest times on campus for arrival/departure activity, based on consultation with CSUCI staff. 600 Wilshire Boulevard Suite 1050 Los Angeles, CA 90017 (213) 261-3050 Fax (310) 394-7663 www.fehrandpeers.com

Page 2 of 6 Travel time runs were conducted for eight different campus locations and establish baseline travel time for trips leaving the campus and travel routes to exit the campus. The shortest route was 3.4 minutes (1.1 miles), from Central Mall East to University Drive & Lewis Road. The longest route was 7.3 minutes (2.2 miles) from Elephant Seal Cove & Channel Islands Dive to Lewis Road, via Camarillo Street and Potrero Road. TABLE 1 CSUCI CAMPUS EVACUATION TRAVEL TIME RUNS AM AND PM PEAK PERIODS Campus Area Start Point End Point Travel Distance Average Travel Time [1] 1 Central Mall - West University Dr & Lewis Rd 1.1 mi 4.1 2 Central Mall - East University Dr & Lewis Rd 1.1 mi 3.4 3 Central Mall - East Camarillo St & Lewis Rd 1.8 mi 4.53 4 Chapel Dr & Camarillo St Potrero Rd & Lewis Rd 1.9 mi 5.13 University Glen Apartments 5 Anacapa Island Dr Traffic Circle Camarillo St & Lewis Rd 2.2 mi 6.23 6 Elephant Seal Cove & Channel Islands Dr Camarillo St & Lewis Rd 2.1 mi 6.23 7 Elephant Seal Cove & Channel Islands Dr Potrero Rd & Lewis Rd 2.2 mi 7.25 8 Anacapa Island Dr & Channel Islands Dr Potrero Rd & Lewis Rd 2.3 mi 6.57 Note: [1] Travel times were collected by Fehr & Peers on Wednesday September 6 th 2017, during the AM peak period, and Wednesday September 13 th 2017, during the PM peak period. Average travel times are presented for each route Evacuation Trip Generation The number of people on-site, including students, faculty, staff, and residents varies throughout the day. This analysis assumes a worst case condition in which both the Campus and the University Glen area is fully occupied. Table 2 presents the assumptions made in terms of estimated number of people on-site as well as the estimated number of evacuation vehicles. The trip generation estimate shown in Table 2 assumes 2.5 students per vehicle, 1.5 faculty/staff per vehicle, and one vehicle per household. Based on these assumptions, the analysis assumes 4,413 evacuation trips.

Page 3 of 6 TABLE 2 CSUCI CAMPUS EVACUATION EVACUATION TRIP ASSUMPTIONS Campus User Students living oncampus Students living offcampus Faculty and Staff Maximum Number of Evacuation Vehicles 643 1,757 685 Assumptions Assume 1608 students living on campus with 2.5 students per evacuation vehicle Assume 6,000 enrolled minus 1,608 students living on campus equals 4,392 students living off-campus. Assume all 4,392 students are on-campus and evacuate with 2.5 students per evacuation vehicle Assume all faculty/staff are on-campus with 1.5 average faculty/staff per evacuation vehicle Retail 70 Assume full evacuation of 70 retail permits. U Glen - Existing 658 Assume one evacuation vehicle per dwelling unit (658 dwelling units) U Glen - Assume one evacuation vehicle per dwelling unit (600 dwelling 600 Proposed units) Total 4,413 Evacuation Routes Figure 1 shows potential evacuation routes from various points on campus. Evacuation routes were informed by trip generation estimates, travel time, distance, and roadway capacity. Since this analysis is intended to replicate an evacuation scenario, several assumptions were made regarding local travel patterns and traffic operations: Vehicle traffic would be outbound only, minimizing conflicts with pedestrians and inbound vehicles, and allowing the flexibility to convert inbound lanes to outbound lanes on key roadways such as University Drive

Page 4 of 6 Stop-controlled intersections would operate as yield-controlled intersections Existing peak hour vehicle volumes on Lewis Road were assumed during an evacuation scenario for the purposes of forecasting operations at intersections along Lewis Road Based on the evacuation assumptions described above, not all cars on campus would be evacuated from the campus The assumptions above reflect a scenario when campus and residences are both fully occupied, which may not be the case if or when an evacuation is ordered Evacuation Travel Times To estimate the evacuation travel times, an evacuation scenario was analyzed based on the trip generation and evacuation routes presented above. Estimated delay was calculated for each intersection using the Highway Capacity Manual (HCM) methodology. Table 3 shows the estimated evacuation travel times. Estimated evacuation travel time was calculated by aggregating the intersection delay along each of the evacuation routes and combining it with the baseline travel time runs. One best practice is to estimate future evacuation travel times through the development of a simulation model for the campus that is calibrated to current conditions and reflects the existing roadway network and characteristics. While CSUCI continues evacuation and emergency planning this analysis was conducted without a simulation model and one may be considered in the future. Based on the methodology described above, estimated evacuation travel times range from 8.5 minutes from the Central Mall-East to Camarillo Street & Lewis Road to approximately 21 minutes from Elephant Seal Cove & Channel Islands Drive to Potrero Road & Lewis Drive.

Page 5 of 6 TABLE 3 CSUCI CAMPUS EVACUATION ESTIMATED EVACUATION TRAVEL TIMES Start Point Campus Area End Point Travel Distance Baseline Travel Time Estimated Evacuation Travel Time 1 Central Mall - West University Dr & Lewis Rd 1.1 mi 4.1 15.93 2 Central Mall - East University Dr & Lewis Rd 1.1 mi 3.4 15.37 3 Central Mall - East Camarillo St & Lewis Rd 1.8 mi 4.53 8.5 4 Chapel Dr & Camarillo St Potrero Rd & Lewis Rd 1.9 mi 5.13 18.34 University Glen Apartments 5 Anacapa Island Dr Traffic Circle Camarillo St & Lewis Rd 2.2 mi 6.23 10.99 6 Elephant Seal Cove & Channel Camarillo St & Lewis Rd 2.1 mi 6.23 Islands Dr 10.95 7 Elephant Seal Cove & Channel Potrero Rd & Lewis Rd 2.2 mi 7.25 Islands Dr 20.76 8 Anacapa Island Dr & Channel Potrero Rd & Lewis Rd 2.3 mi 6.57 Islands Dr 20.17 Conclusions Based on the evacuation travel times presented above, the longest estimated evacuation travel times were identified for the existing University Glen Residential Area and the southern portion of campus. Some recommendations that may improve travel times throughout campus are listed below: Additional staffing intersection with a traffic control operators can improve operations and allow more efficient use of existing travel lanes. For example, the traffic control operator can help facilitate merges, prevent roundabouts from blocking up, or identify gaps for turning vehicles. The following intersections could benefit from staffing to improve operational efficiency: o All three major intersections along Lewis Road o The three roundabouts along Channel Islands Drive o Camarillo Street & Channel Islands Drive

Page 6 of 6 o University Drive & Santa Barbara Avenue o University Drive & Lot A3 entrance/exit o Ventura Street & Oxnard Street o Oxnard Street & Potrero Road Contraflow lanes can provide additional capacity for vehicles exiting campus. Implementing contraflow lanes requires traffic control devices (e.g., staffing, cones, signage) to inform drivers of where and when the lanes are active. Locations to consider for implementing contraflow lanes would be along the following roadway segments: o University Drive (between Santa Barbara Ave and Lewis Road) o Channel Island Drive (between Anacapa Island Drive and Lewis Road) o Camarillo Street (between Santa Barbara Avenue and Lewis Road) Policy to enforce early evacuation of non-essential staff will further reduce the number of people attempting to evacuate at the same time. The estimated evacuation travel times presented in this memorandum are based on high-level assumptions and utilize an intersection based methodology. To more accurately estimate evacuation travel times a microsimulation model should be considered. Finally, conducting evacuation preparedness activities like a practice evacuation would allow for campus staff to observe evacuation behavior and travel times, and to identify and evaluate the effectiveness of changes to staffing and policy, like those described above, that help serve the campus condition and needs.

1,0 62 ve h icl 1,842 1,50 9 ve es vehicle s hicle s Figure 1 Evacuation Routes