Mills 300A mith Mills 300A Smith CAST IRON 300A3 OIL, GAS OR COMBINATION GAS/LIGHT OIL COMMERCIAL BOILER/BURNER
COMBUSTION CHAMBER DETAILS SIDE VIEW GAS FIRED FRONT VIEW WATER SIDE VIEW NATURAL DRAFT WATER POWERFLAME I=B=R RATINGS, BURNER CAPACITIES, DRAFT and CHIMNEY DATA BOILER MODEL NUMBER 300A 300A 7 300A 8 Boiler Horsepower 3.8. 3. I = B= R Gross Output (MBH) 78 790 NET I= B= R RATINGS Sq. Ft. 3 9 77 Steam MBH (Note ) 87 7 38 Water MBH (Note ) 03 8 7 I=B=R Burner Capacity GPH (Note 3) 0. 3.0.8 Gas MBH 99 889 78 I=B=R Combustion Efficiency (%) 83. 83. Gas 80.7 80.7 Draft Requirements (Inches, W.C.) Over Fire Draft Loss.0.08.09 To ta l Size.08.0. Natural Draft Chimney x x0 0x0 Height (Feet) (Note ) 9 3 Inside Dimensions Rectangular Smokepipe to Fit Smokehood Outlet (Ins.) x x x8 Induced Draft Fan Capacity CMF (Wing & Auburn) 7 73 8 300A 9 300A 0 300A.8 7. 8. 03 77 80 783 88 87 7 89 00 37 8..0.0 8 307 37....3.. 0x0 0x0 0x 30 37 x8 x8 x0 990,7,0 300A 300A 3 300A 90.8 00. 09. 300 3 98 08 8 30 0 8 3 9 387. 9. 3.0 383..7.9.8.9. 0x x x 0 7 x0 x0 x0 Insert "LO" for Light, "G" for Gas, "G/O" for Gas/. Insert "S" for Steam, "W" for Water. Note Net I=B=R Steam ratings shown are based on piping and pickup allowances of.88 except for Section (.3), 7 Section (.3) and 8 Section (.9). Note Net I=B=R Water Ratings shown are based on an allowance of.. Note 3 Based on Light having a heat content of 0,000 Btu/Gal.,383,,7
MILLS 300A QUICK RESPONSE BOILERBURNER SUPPLY DRUMS REAR VIEW NATURAL DRAFT WATER INTERMEDIATE SECTION REAR VIEW WING FAN Designed and tested according to the A.S.M.E. boiler and pressure vessel code. Section IV for maximum allowable working pressure. Steam lbs.. Water 0 lbs.for 80 psi working pressure consult Smith. BOILER MODEL NUMBER 300A 300A 7 300A 8 Induced Draft Fan Catalog Number (Note ) Wing Fan to Fit Smokehood D/ D/ D/ Auburn Fan and Smokehood to Fit Boiler A A A Induced Draft Chimney, Inside Dimensions Metal Flue Pipe or Smooth Lined Masonry Round (I.D.) Min. 3 3 Rectangular Minimum 9 x 3 9 x 3 3/ x 3 / Unlined Brick (Nom. Inches) Rectangular Minimum x x x Heating Surface (Sq. Ft.) 8. 97.. Furnace Volume (Cu. Ft.) (Note ).3 9.7.9 Water Content (Gallons) Steam 8. 79.0 89.0 Water 07.0 3.0 39. Weight (Lbs.) (Note 7),7,8,90 Gas or Combination Gas/Light I=B=R Ratings Gross Output, to 3, MBH 300A 9 300A 0 300A D/3 D/3 D A A0 A0 7 3 x 7 3 x 7 x x 0 x 0 0 x 0. 8.8.. 9.39 3. 99. 0.0 0.0.0 7.0 88.0,7 7,300 7,880 300A 300A 3 300A D D D A0 A7 A7 7 8 8 x x 0 x 0 0 x 0 0 x 0 x 3.8 37. 00.8 3.88 39..3 30.0 0..0 0..0 37.0 8,7 9,30 9,70 Note Chimney height shall be sufficient to avoid creating a nuisance. See chart, "Induced Draft Chimney" for inside dimensions. Note The induced draft fan selections listed are based on a chimney capable of offsetting the friction in the fan discharge connection. For other conditions, consult your Smith representative. Note Includes the volume of the precast combustion chamber. Note 7 Includes boiler castings, trim, draft inducer, combustion chamber and jacket. To obtain gross operating weight, add weight of water.
OPTIONAL DISCHARGE POSITIONS AUBURN INDUCED FAN WCATER COLUMN, PIPING, FITTINGS AND STEAM CONTROLS SIDE VIEW WING FAN REAR VIEW AUBURN FAN SIDE VIEW AUBURN FAN DIMENSIONS, ELECTRICAL REQUIREMENTS MILLS 300A Overall length Natural Draft All Models Wing Fan Auburn Fan Furnace Length Foundation Length Water Supply Drum Size Location Steam Supply Drum Size Location Smokehood Outlet Adapter Natural Draft Auburn Fan Dimensions A A A B D J K Y D F J Y N O P J L M S T W EE JJ 97 03 09 3 37 3 7 3 9 3 0 8 9 3 37 7 / 3 / 7 77 3 / 38 / / 0 / / / 8 / 7 / 80 / 3 8 0 7 78 8 7 7 39 39 9 9 3 8 0 7 78 8 7 7 39 7 3 9 7 77 83 89 The manufacturer should be consulted before selecting a boiler having unusual piping and pickup requirements, such as intermittent system operation, extensive piping, etc. For forced hot water heating systems where the boiler and all the piping are within the area to be heated, the boiler may be selected on the basis of gross output. Note 8 Fractional horsepower motors are for operation with /30V, 0Hz current at constant speed. Integral horsepower motors are for 30/0V, 0Hz or 08V, 0Hz current at constant speed. Other voltages and variable speed options are available on special order. 3 7/8 7/8 77/8 7 7/8 7 7/8 37/8 37/8 37/8 37/8 37/8 / 3 / / / / 8 9 7 3/ 9 30 7 / 9 / 7 /
The forced draft flame retention burners for light oil, gas or gasoil firing are U.L. certified and have been custom designed for optimum performance in each size 300A unit. All burners have prewired burner mounted controls with standard low fire start, high fire run and two 300A SPECIFICATIONS All Units Foundation front plate completely cut and tapped. Insulated metal jacket. Precast combustion chamber complete with insulating blocks. Return yoke with flexible seals. Two " drain valves with pipe and fittings. Steam Units Manual reset highpressure limit control. Operating pressure control. Syphon, pipe tree for control mounting including inspector's gauge cock. ASME sideoutlet safety valve set at psi. Combination water column, low water cutoff and pump controller with piping. " pressure gauge. Units Pressureatomizing oil burner (lowhighoff) firetested at the factory. Prewired burnermounted controls. BURNERS STANDARD EQUIPMENT position air control. Burner specification sheet lists standard and optional burner components. Burners can be furnished for lohilo and full modulation firing, and equipped with control systems to comply with most insurance and state or local code Water Units Manual reset hightemperature limit control. Operating temperature control. ASME relief valve set at 0 psi. Low water cutoff and piping. Pressurealtitude gauge. Mercury column thermometer. Dip tube. Air removal fitting. Manual air vent valve. Gas Units Forced draft flame retention power burner. Prewired electronic burnermounted control panel with numbered terminal strip (V, phase, 0 Hz control circuit). U.L. approved gas train. Combination Gas/ Units Forced draft pressure atomizing flame retention combination gas/oil burner. Prewired electronic burner mounted control panel with numbered terminal strip (V, phase, 0Hz control circuit). BURNER AND ELECTRICAL INFORMATION BOILER MODEL NUMBER 300A 300A 7 300A 8 70CRD 70CRD 80CRD Burner Model Number CO COA COA CG CG CG0A CGO CGO CGO0A /3 Electrical Requirements Carlin PowerFlame Burner Motor (HP) (Note 8) LO300 LO300 Gas G300 Gas/ GO300 Carlin PowerFlame /3 /3 Induced Draft Fan Motor (HP) LO300 LO300 G300 GO300 Wing Auburn / / / / / /3 300A 9 300A 0 300A 80CRD 00FFD 00FFD COB COB C3O CG0B CG0B C3G0 CGO0B CGO0B C3GO0 /3 /3 /3 300A 300A 3 300A 0FFD 0FFD 0FFD C3O C3O C3O C3G0 C3G C3G C3GO0 C3GO C3GO Insert "LO" for Light, "G" for Gas, "G/O" for Gas/. Insert "S" for Steam, "W" for Water.
Combination water feeder and low water cutoff. (Steam boilers only, piping not included). Field draft control for natural draft units in the following sizes: " ( section), " (7 section), " (80 section) and 8" ( section). Induced draft fan Wing or Auburn. Fan systems are equipped with constant speed,70 rpm, 0Hz motor. Adjustable pitch sheaves are used to achieve fan speed Smith CAST IRON BOILERS OPTIONAL EQUIPMENT Draft control panel which includes magnetic starter, prepurge and draft safety switch and eightpoint terminal block ( phase) or point terminal block (3 phase) installed and wired in panel box suitable for wall mounting. Red warning light (for low draft condition) in cover. Field draft controls with special mounting collars are available for Auburn and Wing fans. Startup and one year's service. MAKE UP WATER FOR STEAM BOILERS In modern automatic intermittently operating steam heating systems there regularly occurs a period of pickup during which the return of condensate from the system lags behind the evaporation of the boiler. The duration of this pickup period varies according to the physical characteristics of the system. It is generally agreed that average systems require from to 30 minutes to achieve a balance between condensate return and evaporation. With modern fast steaming boilers, careful consideration of the provisions for makeup water must be given to insure the following operating results:. Maintain a safe, effective boiler water line.. Avoid the introduction of excessive amounts of raw makeup water. 3. Prevent nuisance burner shutdown because of temporary low water level. In some localities standard practice for compact piping systems has consisted of providing an automatic water feeder to supply makeup water directly to the boiler according to drop in water level. This arrangement requires the introduction of raw makeup water during each pickup period and, in most instances, the excess system water must be drained manually at frequent intervals. Operation in this manner usually results in increased corrosion of system components and the consequent added maintenance. Some states and municipalities require a mechanical water feeder for all steam boilers to function as a safety feeder.. This feeder should be set to commence feeding when water level is approximately inch above the bottom of the gauge glass but does not function as a principle source of makeup water. Smith recommends a feed water system capable of satisfying the three previously listed requirements. It should include a condensate return unit consisting of at least one condensate pump sized to feed water to the boilers at a rate sufficient to maintain operating water level at full boiler rated output and a condensate receiver having sufficient storage capacity to provide for the operation of the boiler during startup of a cold system. In the following schedule, the minimum recommended pumping rates and storage capacities for each 300A Series boiler size are listed. For two boilers, the SCHEDULE Minimum Minimum No. of Boiler Sections Pumping Rate GPM () Receiver Capacity Gals. () (3) 7 8 9 0 3 In the interest of product improvement, Smith reserves the right to make changes without notice. / 7 8 0 / 3 7 8 70 80 9 03 37 This schedule is based on the following:. Minimum recommended pumping rate is double the boiler evaporating rate at catalog rating.. Minimum storage capacity will provide minutes of boiler operation at full rating using 80% of the receiver capacity without the addition of makeup water. Makeup water feeder should be set to commence feeding when receiver water level drops to /3 full. 3. The receiver capacities shown are considered adequate only for compact buildings. Receivers for extended buildings require two or three times larger tanks depending upon the sizes, length and pitch of the piping. For single boiler applications, the pump controller furnished with the boiler can be used to start and stop the condensate pump. For two or more boilers each pump controller should be wired to start and stop the pump and, in addition, a positive closing water level regulator or electric valve must be provided in the feed connection to each boiler. In all instances a manual fill connection to each boiler should be provided. Smith does not furnish the condensate return Printed in U.S.A. Westcast, Inc. 0 North Elm Street Westfield, MA 008 Tel: (3) 93 FAX (3) 3799 www.smithboiler.com