A RESOLUTION SETTING FORTH CATS S COMMITTMENT TO COMPLETE STREETS

Similar documents
RESOLUTION NO. WHEREAS, the City of Riverdale (the City ) has a planning commission and has adopted a general plan pursuant to applicable law; and

MCORE Agreement Letter of Understanding with Illinois American Water

SAN RAFAEL CITY COUNCIL AGENDA REPORT

VILLAGE BOARD MEETING STAFF REPORT

CITY OF CHARLOTTESVILLE, VIRGINIA CITY COUNCIL AGENDA

EAST LAKE TARPON COMMUNITY OVERLAY

Streets for People, Place-Making and Prosperity. #TOcompletestreets

FDOT D4 Complete Streets

BETTER PUBLIC TRANSPORT PROJECT WATERBEACH TO SCIENCE PARK AND EAST CAMBRIDGE CORRIDORS

ARLINGTON COUNTY, VIRGINIA. County Board Agenda Item Meeting of February 23, 2019

COLVER ROAD INDUSTRIAL CONCEPT PLAN

This page left intentionally blank.

Honorable Mayor and Members of the City Council. Submitted by: Eric Angstadt, Director, Planning and Development

Executive Summary. NY 7 / NY 2 Corridor

SAN RAFAEL GENERAL PLAN 2040 INTRODUCTION AND OVERVIEW

WHEREAS, the current Comprehensive Plan was adopted in 2005; and

Scope of Services. River Oaks Boulevard (SH 183) Corridor Master Plan

CAL POLY MASTER PLAN UPDATE, March 2015

1.0 Circulation Element

Live Oak Ramp Removal

Welcome. Walk Around. Talk to Us. Write Down Your Comments

TENNESSEE STATE ROUTE 109 CORRIDOR MANAGEMENT AGREEMENT MEMORANDUM OF UNDERSTANDING CORRIDOR MANAGEMENT ALONG STATE ROUTE 109

9 CITY OF VAUGHAN OFFICIAL PLAN AMENDMENT NO BOCA EAST INVESTMENTS LIMITED

TORONTO COMPLETE STREETS GUIDELINES

Rezoning Transportation Analysis Petition Number: General Location Identifier:

DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES. m e m o r a n d u m

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Staff Report and Recommendation

implementation r expression in landscape

September 25th, 2018 $2000 fee pd CC

John M. Fleming Managing Director, Planning and City Planner. Old East Village Dundas Street Corridor Secondary Plan Draft Terms of Reference

Section 1. Executive Summary

City of Hermosa Beach Administrative Policy #

MINUTES OF THE TOWN COUNCIL MEETING SEPTEMBER 1, 2016

CHAPTER 7: Transportation, Mobility and Circulation

RESOLUTION NO. WHEREAS, the proposed Master Plan for Villa Esperanza (VE), located at 2116

Urban Planning and Land Use

Biscuit Run Gateway. TJPDC staff recommends combining the following projects:

Richmond Road Complete Street Meeting #1, April 25, 2016

NOTICE OF SPECIAL MEETING

VENTURA COUNTY ORDINANCE NO (Adopted November 7, 2017, Supersedes Ordinance No. 4415)

TRANSPORTATION ELEMENT GOALS, OBJECTIVES, AND POLICIES

CITY COUNCIL STAFF REPORT

LAND USE DESIGNATIONS AND ZONING CLASSIFICATIONS

Official Plan Amendment for Scarborough Rapid Transit (SRT) Extension Final Report

Town of Blooming Grove Comprehensive Plan. Public Meeting October 13, 2004

INFRASTRUCTURE EXISTING INFRASTRUCTURE A. Circulation B. Signals C. Drainage D. Utilities

Secrest Short Cut and Monroe Expressway Small Area Plan AUGUST 29, 2018

ADOPTION OF THE REVISED OPEN SPACE AND CONSERVATION ELEMENT OF THE GENERAL PLAN

Atlanta BeltLine Corridor Environmental Study. Scoping Meeting August 2008

Complete Streets in Lancaster County

TRANSIT-ORIENTED DEVELOPMENT POLICY DRAFT. City Planning and Development Department Kansas City, Missouri

that the Town Board of the Town of East Greenbush will hold a public hearing on April 11,

FOSTER COMPREHENSIVE PLAN UPDATE CIRCULATION

Former Rockcliffe Airbase Community Design Plan Guiding Design Vision and Principles December 4, 2013

MODEL ACCESS MANAGEMENT PLAN MINNESOTA TRUNK HIGHWAY 7 COMPREHENSIVE PLAN AMENDMENT (HUTCHINSON SEGMENT)

Issues Requiring Future Study

Legislation Passed August 8, 2017

SDOT DPD. SDOT Director s Rule DPD Director s Rule DCLU DR SED DR of 7 CITY OF SEATTLE

CITY OF MANHATTAN BEACH STAFF REPORT. THROUGH: Marisa Lundstedt, Director of Community Development

CITY OF LARKSPUR Staff Report. August 21, 2013 Council Meeting UPDATE ON TRANSPORTATION AUTHORITY OF MARIN (TAM) GREENBRAE CORRIDOR WORKING GROUP

INTERGOVERNMENTAL COORDINATION ELEMENT

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER A By-law to adopt Amendment Number 1 to the Official Plan of the Vaughan Planning Area.


The Illinois Department of Transportation and Lake County Division of Transportation. Route 173, including the Millburn Bypass

Seattle Transit Master Plan

Table L-1 Summary Action Strategy. Action Item Timing Status Responsible Agency

PORTLAND DEVELOPMENT COMMISSION Portland, Oregon RESOLUTION NO APPROVING THE FOURTH AMENDMENT TO THE NORTH MACADAM URBAN RENEWAL PLAN

VANCOUVER ISLAND HIGHWAY AGREEMENT

Corridor Vision. 1Pursue Minnehaha-Hiawatha Community Works Project. Mission of Hennepin County Community Works Program

Implementation Guide Comprehensive Plan City of Allen

Status Update (2006 vs. Now) Citizen s Advisory Committee February Plan for Prosperity

Chapter 5: Natural Resources and Environment

Attachment 1 PFAC Resolution #394 of December 4, 2014

CITY OF SIMI VALLEY MEMORANDUM

THE CITY OF VAUGHAN BY-LAW BY-LAW NUMBER

EXHIBIT A. Tax Increment Reinvestment Zone No. 1 (Town Center) First Amended Project Plan 1

DRAFT Subject to Modifications

PSRC REVIEW REPORT & CERTIFICATION RECOMMENDATION

WELCOME and introduction

Blueprint Denver A BLUEPRINT FOR AN INCLUSIVE CITY. Executive Summary

Grand Rail Commercial Development Site Plan Application

Ten Mile Creek Planning Area

Planning & Zoning Commission Meeting Date: June 04, 2012

RESOLUTION NO. R Refining the route, profile and stations for the Downtown Redmond Link Extension

Preserve the Flower and Strawberry Fields and Save Carlsbad Taxpayers* Money

HISTORIC TOWN CENTER MASTER PLAN CITY COUNCIL PRESENTATION APRIL 3, 2012

COUNTY COUNCIL OF PRINCE GEORGE S COUNTY, MARYLAND SITTING AS THE DISTRICT COUNCIL FINAL DECISION APPROVAL OF DETAILED SITE PLAN

The Village of Sugar Grove, in partnership with Kane County, the Illinois Department of Transportation, and the Illinois Tollway welcomes you to the

3 TOWN OF WHITCHURCH-STOUFFVILLE OFFICIAL PLAN AMENDMENT NOS. 116 & 117

AGENDA ITEM # 13A/B. AGENDA ITEM EXECUTIVE SUMMARY Village Board Meeting December 10, 2018

Port Credit Local Advisory Panel October 20 th Meeting

11.0 TRANSPORTATION ELEMENT

Planning Roles. Responsibilities

Asbury Chapel Subdivision Sketch Plan

CHAPTER 7: VISION AND ACTION STATEMENTS. Noble 2025 Vision Statement

Executive Summary General Plan Amendment Initiation

REGIONAL TRANSPORTATION COMMISSION OF SOUTHERN NEVADA AGENDA ITEM

A P P E N D I X B - O P P O R T U N I T Y S I T E S

Southern Gateway Project and Public Green

Transcription:

A RESOLUTION SETTING FORTH CATS S COMMITTMENT TO COMPLETE STREETS WHEREAS, the University of Illinois, the City of Champaign, the City of Urbana, and the Champaign-Urbana Mass Transit District have formed the Campus Area Transportation Study (CATS) to jointly address campus area transportation problems within a defined University District; and WHEREAS, CATS s adopted mission is To better accommodate pedestrian, bicycle, transit, and vehicle movements in a more user-friendly environment ; and WHEREAS, the University of Illinois 2007 Master Plan Update adopted the principles set forth in the 1999 Campus Area Transportation Study and gives the highest priority to transportation strategies that emphasize pedestrian, bicycle, and transit movement; WHEREAS, the complete streets concept has developed as a design philosophy within the field of transportation and which supports CATS s mission; and WHEREAS, the term complete streets describes a comprehensive, integrated transportation network designed and constructed to support safe and convenient travel along and across streets for all users, whether traveling by foot, bicycle, motor vehicles, or transit, and regardless of age or physical abilities; and 1

WHEREAS, the Illinois Department of Transportation (IDOT) has adopted a complete streets policy in conformance with the Illinois Complete Streets Law (Public Act 95-0665); and WHEREAS, the Campus Area Transportation Study s Technical Advisory Committee has recommended establishing complete streets guidelines for the University District to promote campus transportation facilities being designed, constructed, maintained, and reconstructed to accommodate all users; and WHEREAS, the University District includes streets falling under the jurisdiction of the University of Illinois, the City of Champaign, the City of Urbana, and the Illinois Department of Transportation, and CATS members strive to coordinate transportation policies and improvements of its constituent organizations; WHEREAS, CATS wishes to promote best management practices in building and maintaining transportation facilities; and WHEREAS, CATS has determined it is in the best interest of its members to adopt a complete streets policy. NOW, THEREFORE, BE IT RESOLVED BY THE CAMPUS AREA TRANSPORTATION STUDY (CATS) POLICY COMMITTEE, as follows: Section 1. That the complete streets principles attached hereto as Attachment A are adopted. 2

Section 2. That member jurisdictions of CATS are requested to adopt and implement their own complete streets policies, guidelines and procedures in conformance with Attachment A. This Resolution is hereby passed by the affirmative vote of the members of the Committee, the ayes and nays being called at a regular meeting of said Committee. PASSED AND ADOPTED by the CATS Policy Committee by a vote of to, this day of, 2012. Chair, CATS Policy Committee 3

Attachment A Complete Streets Principles Adopted: Purposes. The purpose of these Complete Streets Principles is to promote complete streets principles for all transportation infrastructure projects carried out within the University District, whether by the University of Illinois, City of Champaign, City of Urbana, or the Champaign- Urbana Mass Transit District. Complete Streets Principles. The complete streets concept is to design, build, maintain, and reconstruct public streets to provide for the safety and convenience of all users of a corridor, whether traveling by foot, bicycle, transit, or motor vehicle; regardless of age or physical abilities; and including freight providers, emergency responders, and adjacent land users. University District. Reflecting the Campus Area Transportation Study Area and subsequent modifications by the City of Champaign and City of Urbana, the University District is currently defined as follows: Beginning at the intersection of the southern right-of-way (ROW) line of University Ave. with the eastern right-of-way line of First Street in the City of Champaign, thence easterly along the southern ROW line of University Ave. to its intersection with the western ROW line of Lincoln Ave. in the City of Urbana; thence southerly along the western ROW line of Lincoln Ave. to its intersection with the northern ROW line of Windsor Road in the City of Urbana; thence westerly along the northern boundary of the Windsor Ave. ROW to its intersection with the eastern ROW line of Neil Street in Champaign; thence north along the eastern ROW line of Neil Street to its intersection with the southern ROW line of Springfield Ave; thence easterly along the southern ROW line of Springfield Ave. and its extension to the eastern right-of-way line of First Street; thence northerly along the eastern ROW line of First Street to the point of beginning. Values. The values to incorporate within complete streets considerations should not only include safety, mobility, and fiscal responsibility, but also community values and qualities including: environmental, scenic, aesthetic, historic and natural resources, and social equity values. This approach demands careful multi-modal evaluation for all transportation corridors integrated with best management strategies for land use and transportation. The public should be consulted, when appropriate, as a factor in the transportation infrastructure decision-making process. 4

Adaptability. The complete streets concept recognizes the need for flexibility to accommodate different types of streets and users, and to promote complete streets design solutions that fit within the context(s) of the community. Applicability. Appropriate complete streets accommodation(s) should be considered as part of all transportation infrastructure projects, including: Project identification scoping procedures and design approvals, including design manuals and performance measures construction maintenance, and reconstruction. Complete streets principles should: Apply to both existing and future streets, Apply to all transportation infrastructure projects, regardless of funding source(s), and Not apply to streets ultimately to be privately owned and maintained. Existing Policies and Regulations. To support complete streets design principles, existing policies and regulations of member jurisdictions should be reviewed and modified where appropriate. Such policies and regulations may include any: 1. Comprehensive plan 2. Campus master plan 3. Transportation plan(s) 4. Subdivision code 5. Manual of practice 6. Departmental policies and procedures, and 7. Any other applicable procedures and standards. Latest Standards. In furthering complete streets principles, transportation projects should make use of the latest and best design standards, policies, and guidelines. 5