TECH. BULLETIN ISSUE TWENTY

Similar documents
MARBLE RIVER WIND POWER PROJECT Agricultural Protection Measures

I N D U S T R I A L Y A R D S

Plan of Development Mountain Valley Pipeline Project. APPENDIX M Winter Construction Plan

SECTION 2.5. Construction Quality Assurance Plan

Installation Manual May 9/14 No revision

UBC Technical Guidelines Section Edition Planting Preparation Page 1 of 6

815 NE 172 nd Avenue Vancouver, WA Installation Manual

SECTION 6. Routine Maintenance Activity Details

Presented by. PURE ONE Environmental, Inc.

4.6. Low Impact and Retentive Grading

PROTECTING FIRE SPRINKLER SYSTEM PIPES FROM FREEZING IN CHAPTER FACILITIES

Information for File # JTF

Permeable Interlocking Pavers

Subgrade Preparation. Subgrade Preparation. Subgrade 3/27/2016. Tim Crosby: Grading Superintendent Chris DeJulio: Site Manager

TOWN OF TICONDEROGA WATER DEPARTMENT WINTER WEATHER PROBLEMS

Site guidance for working in root protection zones

Slope Stability Management Framework

Advanced Foundation Engineering. Soil Exploration

SITE TOPSOIL & FINISH GRADING

Shelbyville, KY Stormwater Best Management Practices. Section 2 EROSION PREVENTION AND SEDIMENT CONTROL PLAN

Te c h S p e c 3. Edge Restraints for Interlocking Concrete Pavements

CUTTING EDGE TURF PRODUCTS

Subsurface Infiltration Bed

Subsoil conditions are examined using test borings, provided by soil engineer (geotechnical).

UNIFIED FACILITIES GUIDE SPECIFICATIONS

field note Culvert foundation improvement design concepts The challenge of low-cost culvert foundations

Test Pit Observation Report. Albertville Business Park 67th Street to 70th Street NE Albertville, Minnesota. Prepared for.

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING

317)

REQUIREMENTS FOR LANDS TO BE CONVEYED TO THE CITY. The Owner will be responsible to ensure that all lands which will be transferred to the City for

All you need is the concrete

Appendix G. Detailed Design

SECTION 02230BP AGGREGATE BASE

Freezing of Water-Based Fire Protection Systems

A. Install all temporary erosion control measures (in accordance with MNDOT General Conditions 2573) prior to site disturbance.

VILLAGE OF MOUNT PROSPECT 2016 STREET RESURFACING PROGRAM Frequently Asked Questions (FAQ s)

SUPPORTING DOCUMENT STORMWATER POLLUTION PREVENTION PLAN (SWPPP) NARRATIVE

Soil Features. Madison County, Tennessee. Restrictive layer. Subsidence Potential for frost action. Risk of corrosion. Map symbol and soil name Kind

DIVISION 32 EXTERIOR IMPROVEMENTS LANDSCAPING TREES

STS Directory Accreditation number: STS 0030

PAVING PARKING AREAS AND ROADS DESCRIPTION. Alternate Names: Pavement Practices, Impervious Paving

THE ROLE OF SUCTION IN THE PERFORMANCE OF CLAY FILL RONALD F. REED, P.E. 1 KUNDAN K. PANDEY, P.E. 2

Additional personnel accompanying me on the site inspection today included Paula Fitzgerald (Biosar) and Ryan Molsee (Enel).

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

B511 - RIP-RAP, ROCK PROTECTION AND GRANULAR SHEETING - OPSS 511

SECTION 900 TURF ESTABLISHMENT

Winter work with multiple permit issues of missing perimeter control, exposed soils, missing energy dissipation, and stabilized conveyance.

511 - RIP RAP - OPSS 511 ROCK PROTECTION - OPSS 511 GRAVEL SHEETING - OPSS 511 GEOTEXTILE - OPSS 511

AASHTO M Subsurface Drainage

Break Layers. A guide to the design and specification of capillary break, salt barrier and frost barrier layers.

DRIVABLE GRASS GUIDELINE FOR PLANTED INFILL INSTALLATION

SECTION 605 PLANTING

SECTION AMENDED TOPSOIL

Desiccant Dehumidification - Effective Strategy for Drying Concrete Slabs

STS Directory Accreditation number: STS 0329

CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF INTERLOCKING CONCRETE PAVERS

17 Interior Climate Control

Inspection and Maintenance of Stormwater Best Management Practices

THE HK500, HK300 & HK150 MOBILE GLYCOL HEATING SYSTEM

THE FOLLOWING IS AN EXCERPT FROM THE 2011 CITY OF SEATTLE STANDARD SPECIFICATIONS WITH MINOR CORRECTIONS MADE TO SECTION 9-03.SEATTLE.

Methods, approaches, and procedures to minimize active agricultural land impacts during pipeline construction, surface restoration, and pipeline

Pavement Removal Fact Sheet

CHAPTER 8 SLOPE STABILITY ANALYSIS

Lecture-4. Soil Compaction. Dr. Attaullah Shah

SECTION FINE GRADING AND SOIL PREPARATION

STORMWATER PERMIT SUBMITTAL REQUIREMENTS

ATTACHMENT A BIORETENTION SOIL SPECIFICATION

Geotechnical Exploration and Evaluation Report

Reference No S053 MARCH 2012

CONSTRUCTION SPECIFICATION FOR RIP RAP, ROCK PROTECTION AND GRAVEL SHEETING

MANUAL. Instructions for installation use & general maintenance of your HORIZONTAL FREEZER HFF, FLORENCIA and MILAN Product Lines MAN-017-R

Piles, Trenching, Inverters, Cables, Material Deliveries

POND Construction. Perry L. Oakes, PE State Conservation Engineer Natural Resources Conservation Service


CHAPTER 4. SPECIAL CONDITION EROSION CONTROL MEASURES

MECHANICAL INTEGRITY INSPECTIONS OF AIR COOLERS

Tips for Maintaining and Enhancing Stormwater Management Areas

July 4, 2007 PAVEMENT MANUAL 5-2.0(1) Chapter Five DESIGN

Instructions for Operation and Maintenance of Containers

The University of Iowa Department of Civil & Environmental Engineering SOIL MECHANICS 53:030 Final Examination 2 Hours, 200 points

APPENDIX A SIMPLIFIED APPROACH TO STORMWATER MANAGEMENT FOR SMALL PROJECTS. In West Sadsbury Township, Chester County, Pennsylvania

Houses ALASKA BUILDING RESEARCH SERIES HCM N B I : A

DESIGN OF QUAY STRUCTURES PORT OF NUUK GEOTEKNIKERNES HVERDAG 2016: DTU - LYNGBY PORT OF NUUK - DESIGN OF QUAY STRUCTURES

TUNNEL CONSTRUCTION GUIDELINES 04 - GUIDANCE NOTE ON GROUND FREEZING CONSTRUCTION

SECTION VI. (Sub-section 241) Grassing. 1. Scope of Work General Sprigging Sodding thru 241-3

Advanced Foundation Engineering. Sheet-Pile Walls

LEADING INNOVATIONS IN SUSTAINABLE URBAN DRAINAGE

RISKTOPICS. Photovoltaic systems

RECOMMENDED BEST MANAGEMENT PRACTICES FOR RESTORATION OF WETLANDS AFTER TEMPORARY IMPACTS

Paving Systems Using Clay Pavers

MUST READ PRIOR TO CONSTRUCTION!

Homeowners Guide to Stormwater BMP Maintenance

Concrete pavers with sand filled joints. Bedding sand 1-1/2 in. (25-40 mm) thick

Load-Carrying Capacity of Stone Column Encased with Geotextile. Anil Kumar Sahu 1 and Ishan Shankar 2

SECTION EARTHWORK

Page 19 L.L.C. (Previously the United Salad Co. Garage) 939 SE Alder St.

Paving - 8 easy steps for DIY and professional landscapers

PROVIDING GROWTH TO RESEARCH.

RE: Extreme Cold: Preventing Ice Dams, Frozen Pipes February 13, 2015

Transcription:

1.0 Scope The scope of this Guideline is to: Define construction techniques associated with cold weather installation of the backfill zone; and, Identify measures that have been used successfully to allow winter construction to proceed. These measures are intended to assist Contractors with the development of an application specific installation program for cold weather construction. This document is a general guideline and is not intended to be used as a project specific procedure. The guideline is not applicable for construction in areas subject to continuous or discontinuous permafrost. For assistance with projects subject to these conditions please contact CSPI. 2.0 Definitions Cold weather construction refers to working in temperatures whereby either in-situ or imported materials are at risk of freezing and/or in conditions where materials may be affected by ice and/or snow.

3.0 Typical Challenges Encountered During the Backfill Process: Cold weather construction presents environmental conditions that may adversely affect the properties of the engineered backfill, as well as the stability and load carrying capacity of the structure. Some of the challenges that have been documented include: During construction Weather changes that can cause shut-downs, unpredictable snow events, breakdowns in heating the underlying foundation and backfill (stockpiles, placement), equipment breakdowns, snow-melt infiltrating the backfill zone causing frost lensing, complications in pouring concrete, freezing of the backfill zone from the structure interior, safety issues (ice). After construction Long term consolidation of the foundation and/or backfill material as it thaws over time (i.e. months or even years). This can cause the backfill to sink relative to the structure, applying unquantifiable loads on the structure causing the structure to deform over time. The figure below illustrates how ineffective compaction effort can be at sub-zero temperatures.

4.0 Engineered Backfill Material Pre-Selection Backfill Installation measures include: 1. Pre-selection of the backfill material by the Contractor to comply with the backfill design parameters plus accommodate cold weather construction. 2. Engineered backfill used for cold weather installation should be a non-frost-susceptible clean crushed stone that is not dependent on water to achieve compaction. The gradation requirements should be as per the recommendation of a Geotechnical Engineer. 3. Additives are sometimes used to lower the freezing temperature of the water within the engineered backfill. Calcium chloride should not be used in a steel structure installation under any circumstances as it is corrosive to the metal. Non-corrosive additives shall not be used without completion of laboratory investigations that evaluate the additive s impact on compaction. The Contractor should seek the advice of a Geotechnical Engineer if considering the use of additives. 5.0 Backfill Stockpile Backfill materials are commonly sourced from nearby pits or stockpiles which can be exposed to weather and segregation and may not reflect the material that was pre-selected by the Contractor. When left uninsulated or unheated, backfill material can become frozen, making it unsuitable for use. Measures that can be taken to protect the backfill material include: 1. The stockpile of engineered backfill should be placed on a smooth hard surface. 2. The storage surface should be sloped away from the stockpile to promote water and snow melt run off. An accumulation of moisture within the stockpile is undesirable as it may become frozen and adversely affect the workability of the fill. 3. Depending on site conditions, consideration should be given to insulating and/or heating the stockpile otherwise freezing may occur. 4. Only unfrozen material may be used. 5. Monitor temperature of material being hauled to confirm it is unfrozen.

6.0 Prior to Backfill Placement During cold weather construction, the structure can be exposed to freezing temperatures at various locations including: Foundation below the backfill zone If excavated and left exposed to cold weather, frost can penetrate this surface. Interior of the structure If left open to cold weather, the metal can act like a heat sink transferring heat from the backfill zone and allowing frost penetration. To mitigate these risks, Contractors commonly: Maintain heat at the foundation areas directly beneath the backfill zone; and Close off the ends of the structure and install heaters. Monitoring of the air quality should be done in compliance with work safety regulations.

7.0 Engineered Backfill Installation & Monitoring It is imperative to ensure that transport, placement and compaction of the backfill material can be achieved without it freezing and becoming unsuitable for use. Below are some measures to assist the Contractor with the development of this installation process: Transport the backfill material to the site with minimal haul distance and time (i.e. stockpile to placement), and use heated truck boxes. During transport, protect the backfill in the truck boxes against freezing and/or mixing with snow. Haul only unfrozen material. The backfill zone should be protected with insulation and heaters. Areas that have backfill added should be kept to a small footprint to minimize exposure. Minimize delays and interruptions to the backfill placement/compaction process. The temperature of the backfill material should be checked at the time of placement to confirm that it is unfrozen. Graders or dozers should be used to blade off any frozen uncompacted fill before additional fill is placed. As well, high ruts should be leveled before they freeze. Thicker lifts will provide more time before freezing, provided the full lift thickness can be compacted to the design requirements. Compact the backfill to the design requirements immediately after placement to minimize the time loose backfill is exposed to snow and/or freezing temperatures. In extreme cold, consideration should be given to 24/7 backfill placement to avoid overnight frost penetration during the course of construction. Snow and ice should not be present on the engineered backfill zone. Snow piles should be situated down-grade from the engineered backfill zone to keep melt runoff from the engineered backfill zone. Current weather forecast conditions should be continuously monitored to anticipate and control the thawing of water within the backfill during intermittent warmer weather. Any increase in weather temperature can cause the thawed moisture at the surface to re-freeze on the lower level frozen backfill resulting in ice lensing build up. Ice lenses can cause significant settlement and deformation when temperatures remain above freezing. Shut down backfill placement during extreme cold and snow conditions.

A QA/QC program should be prepared to monitor the engineered backfill and the structure shape as the backfill proceeds. The contractor may wish to enlist the expertise of a Geotechnical Engineer to direct the activity. Identify heaving and loosening of the backfill due to frost penetration; Monitor compaction, soil temperature and moisture content of each lift (nuclear densometer moisture contents should be spot checked with oven dried moisture contents), then subsequently check for frozen material after compaction and prior to construction of the next lift. If frozen material is found, it should be removed and replaced with unfrozen material that is properly compacted. Conduct additional shape monitoring of the structure as a precaution. 8.0 Temporary Installation Shut-Downs Following a project shut down, the following measures should be considered: Cover the Backfill To protect against damage from frost and moisture penetration of the backfill zone, it should be tarped and heated. Records should be made of all temporary covering locations to ensure all coverings are located and removed prior to resuming backfilling operations. Drainage of the Backfill - Peripheral surface drainage system should be checked and reworked where necessary to provide positive drainage of any surface water away from the structure. Additional Structural Checks. The structure is designed to be backfilled, not left exposed to heavy wind and snow loads over the course of months. If the structure is to be left partially backfilled, the supplier should be contacted to evaluate the need to perform a wind and snow load analysis if a winter shutdown is anticipated. The analysis should indicate whether any precautions, such as snow removal, are required. At Project Re-start: Upon resuming installation of the structure all temporary coverings shall be removed. The engineered backfill shall be inspected for any heaving or loosening and the compaction should be checked. Any frozen or compromised material shall be removed and replaced with properly placed engineered backfill.

9.0 Concrete Placement Concrete shall not be placed and/or cured against frozen materials. Adequate frost protection of the footings shall be maintained throughout the construction process. Concrete placed during cold weather should be enclosed and properly cured at an appropriate temperature through the use of heaters and insulation if necessary. The footing designer should be made aware of the construction controls put in place.