Richard B. Alpert, P.E. Senior FPE, Clark Nexsen

Similar documents
Open to Below: A Discussion of Allowed Floor Openings. Jay A. Ierardi, Ph.D., P.E., LEED AP. Kevin S. Hastings, P.E., LEED AP

Preview of the MA Building Code (780 CMR) 9 th edition

Common Building Code Misinterpretations

Building & Fire Code Academy. Building Better With Our Greatest Resource Education. Welcome!

Questions related to specific materials, methods, and services will be addressed at the conclusion of the presentation.

MA Electric Code Challenges for Architects

SP07: Coordinating New Door Assembly Installation with Access Control Systems

The Residences at Christina Landing Wilmington, DE

Sprinklers in Wood-Frame Construction:

DEALING WITH FIRE SAFETY

CHAPTER 7 ALTERATIONS LEVEL

PERFORMANCE COMPLIANCE METHODS

Report on First Revisions with Statement June 2014 NFPA 101

January 1, 2014 Mandatory Effective Date

JOINT COMMISSION PREPAREDNESS / STATEMENT OF CONDITIONS DRAWINGS WSSHE SOUTHWEST CHAPTER NOVEMBER 19, 2015

NFPA 101 Code Update from 2012 Edition to the 2015 Edition

PERFORMANCE COMPLIANCE METHODS

Fire Alarm System Fundamentals

NFPA 45 NFPA 211 NFPA 1600

Life Safety - Means of Egress/Exits NFPA 101

12F052 ADVANCED FLORIDA (MULTIPLE OCCUPANCY BUILDINGS)

Presented by: Bill Lauzon, PE Lauzon Life Safety Consulting, LLC Web: Lauzon-LSC.com

Overview of Fire Alarm Provisions Based on the 2012 IBC, IFC and NFPA 72, 2013 Edition

PERFORMANCE COMPLIANCE METHODS

Agency for Health Care Administration

3/6/2018. Design Tips For Fire and Smoke Barriers. Professional Development Hours (PDH) Certificates. Copyright Materials

BUILDING CODE OF THE CITY OF NEW YORK. New York City Department of Buildings 4 June 2007

COMPLIANCE ALTERNATIVES

COMPLIANCE ALTERNATIVES

Welcome to the AccessibilityOnline Webinar Series. Listening to the Webinar. Listening to the Webinar, continued

The Physical Environment Portal: Module 5, LS Leadership

Public. Mike Free Health. State of Alabama Department of

Building Analytics and Compliance: How analytics can be used to aid in performancebased certifications. Bryant M. Kirkland Jr, PE, CCP, LEED AP

Agency for Health Care Administration

2012 International Fire Code Significant Changes. IFC Background. Purpose IBC and 2012 NFPA 101 Significant Means of Egress Changes

Welcome to the AccessibilityOnline Webinar Series. Listening to the Webinar

Taming the Health Care Building Codes NFPA vs. The International and Chicago Building Codes JENSEN & HALSTEAD LTD.

Establishing the Risk Basis of Building Size Limits

Fire Rated Door Assemblies: Compliant Designs

SCHULTE & ASSOCIATES Building Code Consultants 880D Forest Avenue Evanston, IL fpeschulte.

Public Health Fax: Web Site:

By: Russell Bainbridge March 18th, 2016 FPE 596

ELEVATORS. Integration of Codes between Fire Alarm, Sprinklers, and Elevators 12/5/2017

M E M O R A N D U M. All Licensed Assisted Living Facilities. Felicia Cooper, Deputy State Fire Marshal Administrator Don Zeringue, Chief Architect

FIRE PROTECTION KEY DESIGN CONCEPTS IN HEALTHCARE FACILITIES Scott Twele, Aman Shah Steven Dannaway. AIA Healthcare Group

California Fire Code (CFC) Part III contains requirements. Building and Equipment Design Features PART. Chapters 5 through 19

Agency for Health Care Administration

Balloting Version First Draft NFPA 101 Life Safety Code Proposed 2015 Edition

M E M O R A N D U M. Diane Matthews, Administrator, Technical Projects. NFPA 101 First Draft Letter Ballot (A2014)

Fire Protection Coffee Break Training May 2016

NFPA 101, 2012 EDITION IMPACT ON NEW AND EXISTING HEALTH CARE FACILITIES

RESIDENTIAL CARE USER GUIDE UPDATES TO MANITOBA BUILDING/FIRE CODE:

FIRE SAFETY REQUIREMENTS FOR PRE RESIDENTIAL BUILDINGS OF THREE OR MORE STORIES (DOROTHY MAE ORDINANCE - NO. 158,963)

American Fire Sprinkler Association. An Introduction to the IBC and IFC

Agency for Health Care Administration

NFPA Siemens Industry, Inc. All rights reserved. usa.siemens.com/infrastructure-cities

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

Review of Revisions to NFPA 1, 2015 Edition

2012 International Building Code Errata (Portions of text and tables not shown are unaffected by the errata)

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

Changes to NFPA 101A 2013 Edition for Health Care Facilities

Code Technologies Committee Report Elevator Lobby Group A changes: Elevator Lobby

NFPA 101 and NFPA 99, 2012 Editions Code Update. where art meets engineering

9/23/ :47 AM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement

GROUP SR SPECIAL (ASSISTED SELF-PRESERVATION) OCCUPANCIES

Building Codes & Standards for Healthcare. Healthcare Construction Certificate - Level 1

Are there any policies regarding outlets that contain USB ports?

For the Florida Building Commission And the Fire Code Advisory Council

Table EXIT ACCESS TRAVEL DISTANCE a OCCUPANCY SYSTEM SYSTEM. A, E, F-1, I-1, M, b,d R, S-1. B c. F-2, S-2, U c

Module 3. Water-Based Suppression Systems (WBSS) Part II: Highlights of Code Requirements

FIRE SERVICE FEATURES

Recommended Amendments to the 2015 International Existing Building Code North Central Texas Council of Governments Region

Date: February 22, 2005 Kimbalton DUSEL, Pre-S-2 Submittal CNA0402 PRELIMINARY CODE REVIEW. International Plumbing Code Edition

2015 Recommended Building Code with Amendments. The Executive Committee of the Central Iowa Code Consortium does ordain as follows:

Questions/Comments for Richard Roux from Webinar on 7/11/13

Design for New Construction and

Copyright 2018 American Wood Council 1

SECTION 907 FIRE ALARM AND DETECTION SYSTEMS

2. The Group F occupancy has have an a combined occupant load of 500 or more above or below the lowest level of exit discharge.

2000 to 2012 Hospital K-tag crosswalk matrix for hospitals 2000 Tag #

LIFE SAFETY COMPLIANCE: ADAPTING TO THE 2012 LIFE SAFETY CODE

Agency for Health Care Administration

CHILD CARE CENTER INSPECTION CHECKLIST 06C

IFC Significant Changes from the 2009 to the 2015 Edition Tier 1

IBC Committee Responsibility Matrix January 2017

Family Foster Home Fire Safety Evaluation Checklist Instructions

E25 (D) Automatic controls for general means of egress lighting

AHC Meeting #7 July 12-13, Occupancy WG Report

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

Recommended Amendments to the 2003 International Fire Code North Central Texas Council of Governments region

Culminating Project U.S. Federal Courthouse FPE Spring 2013

FACILITY MANAGEMENT DEFICIENCIES IN CRITICAL ACCESS HOSPITALS (CAH)

First Aspen Federal Regulation Set: K LSC 2000 Health Existing

Report on First Revisions with Statement June 2014 NFPA 101

GROUP SR SPECIAL (ASSISTED SELF-PRESERVATION) OCCUPANCIES

Emergency Planning for Institutional Facilities

PROPOSED CODE CHANGES FOR REVIEW BY THE FIRE CODE ACTION COMMITTEE

FIRE ALARM SYSTEMS & 780 CMR. Dave LeBlanc, PE, FSFPE March 17, 2015

Ch. 54 GROUP B EDUCATIONAL 34 CHAPTER 54. GROUP B EDUCATIONAL OCCUPANCY GROUP

Developing a Healthcare Facility Fire Door Inspection Program

Transcription:

Richard B. Alpert, P.E. Senior FPE, Clark Nexsen

Clark Nexsen is a Registered Provider with The American Institute of Architects Continuing Education Systems (AIA/CES). Credit(s) earned on completion of this program will be reported to AIA/CES for AIA members. Certificates of Completion for both AIA members and non-aia members are available upon request. This program is registered with AIA/CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials, methods, and services will be addressed at the conclusion of this presentation.

Copyright Materials This presentation is protected by US and International Copyright laws. Reproduction, distribution, display and use of the presentation without written permission of the speaker is prohibited. Clark Nexsen 2012

At the end of this program, participants will be able to: 1. Identify the governing documents for DOD fire protection design 2. Identify applicable IBC and NFPA 101 requirements for fire protection 3. Identify how Absence of Criteria requirements are implemented 4. Identify requirements for fire department access

UFC 1-200-01, General Building Requirements UFC 3-600-01, Fire Protection Engineering For Facilities

Current Edition: Change 2, November 28, 2011 Defines International Building Code 2009 Edition as the building code for DOD projects As modified in Chapters 2 and 3 All references in IBC to IFC shall be considered as references to NFPA 1 All references in IBC to IFGC shall be considered as references to NFPA 58

Use IBC Chapter Exclusively 1, 2, 5, 12*, 14, 17* 20, 23, 24, 25, 26, 28, 31, 32, 34*, 35* Use IBC and UFC 3-600-01 3, 6, 7, 33 Use UFC 3-600-01 in Lieu of IBC 4, 8, 9, 10, 13

Use of Other Uniform Facilities Criteria Chapters 16, 18, 19, 21, 22 Use Chapter and UFC 3-301-01 Chapter 27, Use Chapter and lots of other UFCs Chapter 28, Use UFC 3-410-01FA Chapter 29, Use Chapter and UFC 3-420-01 Chapter 30, Use Chapter, UFC 3-600-01 and ITG 01-01

But What Does This All Mean To Me For The Design And Review Of Projects? Let s Look At Some Specific Elements of Building Design

Building Occupancy IBC Chapter 3 So Follow IBC Criteria From Chapter 3

Building Occupant Load IBC Chapter 10 So Follow NFPA 101 Table 7.3.1.2

Occupancy Separation IBC Chapter 5 So Follow IBC Criteria from Table 508.4

Allowable Building Heights and Area IBC Chapter 5 So Use IBC Criteria from Table 503

Building Element Fire Resistance Requirements IBC Chapter 6 So Use IBC and UFC

Building Element Fire Resistance Requirements

Shaft Enclosures IBC Section 708 So Use IBC and UFC Fire Resistance Rating IBC Section 708.4 Rating Dependant on Connected Stories However

UFC 3-600-01 Section 6-30.1 For Navy and DLA projects, provide 2-hour fire resistant rated construction for all elevator hoistways.

Mezzanines IBC Section 505 So Follow IBC Area limitation (IBC 1/2 vs. LSC 1/3) Openness However

IBC Section 505.3 Egress Follow requirements of LSC Section 7.4.1.1 required number of exits Section 7.3.1.6 egress capacity (add to floor below)

IBC Chapter 9 So Follow UFC 3-600-01 for required installation Follow NFPA standards and UFC for design

UFC 3-600-01 Section 4-2.2 Complete sprinkler protection must be provided for all new or renovated DOD facilities.

Automatic Sprinkler Exceptions Non-mission critical Type I or II construction Less than 15,000 ft 2 Type III, IV, or V Less than 5,000 ft 2

UFC 3-600-01 Section 5-3 Fire alarm evacuation systems must be provided in the following locations. Buildings required by NFPA 101 Buildings requiring automatic detection or suppression systems

IBC Chapter 10 So Comply with NFPA 101 UFC 3-600-01 Section 2-1.1 Comply with NFPA 101 for building construction related to egress and safety to life

All egress requirements based on occupancy from LSC Section 6.1 This may not be the same as building occupancy used in building design

IBC A (1-5), B, E, F (1-2), H (1-5), I (1-4), M, R (1-4), S, and U LSC Assembly, Education, Day Care, Health Care, Ambulatory Health Care, Detention and Correctional, Residential, Residential Board and Care, Mercantile, Business, and Storage

Absence of Criteria Section 1-3.3 When a specific application is not covered by the criteria of this UFC, follow national building codes, recognized industry standards, and standard engineering practices. In absence of such technical information, contact the DOD component authority having jurisdiction

Vertical Openings What is Opening Atrium Convenience Opening Communicating Space

Atrium Follow IBC or NFPA 101 Criteria IBC Section 404, Atriums NFPA 101 Section 8.6, Vertical Openings What are Advantages and Consequences of Each?

Automatic Sprinkler and Fire Alarm Systems Smoke Control Enclosure Standby Power Low Fire Hazard Travel Permitted Within Atrium

Automatic Sprinkler Protection Engineering Analysis (smoke control) Enclosure Low or Ordinary Fire Hazards Travel Permitted Within Atrium

Is Space Under Consideration an Atrium or is it a: Communicating Space? Convenience Opening?

Connect not more than 3 stories Lowest or next to lowest story is street floor Open and unobstructed 1-hour separation (smoke barrier and AS) Ordinary hazard with sprinkler system (low) Considered as single floor area for egress capacity Occupant in, egress to not less than 1 exit on level Occupant out, 1 exit without having to enter

Connect not more than 2 adjacent stories Separated from other unprotected openings Separated from corridors Shall not serve as a means of egress

Building Access UFC 3-600-01, Section 2-10 Floor area greater than 5,000 ft 2 More than two stories Then At least one all weather ground access Paved Start from road Terminate maximum 33 feet from building

Building Access Residential Facilities Then All weather ground access to 3 sides Minimum 2 sides having access to sleeping rooms

Building Access Aerial Apparatus 4 stories or more New warehouses Then All weather ground access to 2 sides of perimeter

Roof Access UFC 3-600-01, Section 2-9 Three stories or more Then Enclosed exit stairs extending to top floor Approved hatch opening with appropriate ladder Minimum one stairway with standard door opening to roof surface

Course Evaluations In order to maintain high-quality learning experiences, please access the evaluation for this course by logging into CES Discovery and clicking on the Course Evaluation link on the left side of the page.

This concludes The American Institute of Architects Continuing Education Systems Course Richard B. Alpert, P.E. Clark Nexsen Architecture & Engineering 6160 Kempsville Circle, Suite 200A Norfolk, Virginia 23502 757-455-5800 Voice 757-455-5638 Fax