Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017

Similar documents
DONALD H. BERG, ARCHITECT

Solicitation No.: The enclosed addendum amends the bid documents for the above referenced Project.

SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Fort Rouge Leisure Centre Section HVAC Upgrades Phase 2 Page 1 of 5 Bid Opportunity No March 2013 FIRE ALARM SYSTEMS

CITY OF PORTSMOUTH Department of Public Works MUNICIPAL COMPLEX FIRE ALARM. Bid # Addendum #1

STATEMENT OF WORK ELECTRICAL REPAIR / MAINTENANCE BUILDING PROJECT FDC RACCOON CREEK STATE PARK (BEAVER COUNTY)

Michigan State University Construction Standards COMMISSIONING OF FIRE ALARM SYSTEMS PAGE

DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM

2019 COURSE CATALOG (rev )

SECTION CONDUCTORS AND CABLES FOR ELECTRONIC SAFETY AND SECURITY

M001. Revenue Services ISSUED FOR CONSTRUCTION SEPTEMBER. 2, East State Parkway Schaumburg, Illinois Do Not Scale Drawings

Item No. Description 1. BID PROPOSAL FORM Make the following revisions: a. Replace the BID PROPOSAL FORM with the attached BID PROPOSAL FORM.

SECTION ISOLATED POWER SYSTEMS

1. Floor above/floor below notification. 2. Private alarm notification. 3. Not Used 4. Voice alarm notification. 5. Not Used.

D. The work addressed in this section consists of a fire protection system, which may include coordination with one or more of the following:

DIVISION 21: FIRE SUPPRESSION SYSTEMS SECTION Fire Protection Systems Protecting Cold Storage and Unheated Warehouses

Fire Alarm Inspection, Testing, Maintenance. Assuring the System s Operational Reliability

COMMERCIAL (IBC) FIRE ALARM SUBMITTAL GUIDE

SECTION WET-PIPE SPRINKLER SYSTEMS

D. Reference Standards (Utilize latest editions available):

COMMISSION ORDER. IT IS FURTHER ORDERED that the Request for Bid and Notice to Bidders be displayed on the Franklin County website.

Design & Construction Standards, Revised January

BUILDING, FIRE, AND LIFE SAFETY CODE ENFORCEMENT AND CERTIFICATION OF INSPECTORS FOR HEALTH FACILITIES LICENSED BY THE STATE OF COLORADO

NOTICE TO ALL FIRMS. Bid RFI Questions and Answers

SECTION FIRE ALARM SYSTEMS

ADDENDUM NO. 1. for. MARQUETTE HOUSING COMMISSION Pine Ridge Apartments Fire Alarm Replacement Project #A1140. Marquette, Michigan.

IN2 Lighting Control Devices

Design & Construction Standards, Revised January

SECTION GENERATOR PARALLELING CONTROLS

ADDENDUM #1: MODIFICATIONS AND ADDITIONS TO CONTRACT DOCUMENTS

RE: Clark East Tower Renovations DATE: November 16, 2015 Ypsilanti, Michigan

Second Revision No. 104-NFPA [ Section No ] Submitter Information Verification. Committee Statement

Hinesville First United Methodist Church SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

Division 21: FIRE SUPRESSION WET-PIPE SPRINKLER PROTECTION SYSTEM. The Academy Sept Table of Contents 1 Division 21

DEPARTMENT OF PUBLIC SAFETY DIVISION OF FIRE PREVENTION AND CONTROL

1.3 REFERENCE STANDARDS

PART 1 GENERAL Quality Assurance A. Fire Alarm Contractor Qualifications:

DETEX ARCHITECTURAL SPECIFICATIONS, June 2012 AO19 SERIES HEAVY DUTY LOW-ENERGY ELECTRIC SWING DOOR OPERATOR

ADDENDUM NO. 3 March 19, 2018

Annual Fire Systems and Backflow Preventers Testing

UNIFIED FACILITIES GUIDE SPECIFICATIONS

LIGHTING CONTROL DEVICES

ADDENDUM No. 3 BID NO TRANSMISSION WAREHOUSE OFFICE REMODEL

Pinky Lewis Recreation Centre Interior Renovations in the City of Hamilton

Lake County / Multi-Department Storage Facility / Project / December 12, 2016 SECTION DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM

PART 1 GENERAL Quality Assurance A. Fire Alarm Contractor Qualifications:

PROJ. NO SECTION PAGING, SPEAKERS AND HARD-WIRED CLOCK SYSTEMS

APPENDIX H (DESIGN SUBMISSION CRITERIA)

Florida Department of Transportation 1000 NW 111 th Avenue, Room 6203 Miami, Florida

Architect s Project Number of 12 Fire Alarm/Smoke Detection Systems District Master Specs 2013 Edition

Bold items are particular to the City of Euless

TABLE OF CONTENTS GENERAL... 2 A. DEFINITIONS DIGITAL, ADDRESSABLE FIRE ALARM SYSTEM... 2

SECTION : FIRE ALARM & DETECTION SYSTEMS

DOCUMENT ADVERTISEMENT FOR BIDS

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU FIRE ALARM / ELECTRICAL FIRE PLAN REVIEW CHECKLIST

Executive Summary. Shell Offshore Inc. BY: Keith M. Gonzales Sr., P.E. Regulatory Requirements for Hazardous Locations

Brighton Area Fire Authority

FIRE & LIFE SAFTEY STANDARD

SANTA FE COUNTY IFB# PW/KE CONSTRUCTION FOR THE SANTA FE MOUNTAIN CENTER KITCHENETTE AND OFFICE SPACE ADDENDUM #2

Purpose : Project Manager. Professional. Contractor: devices/system. compatibility

Please think twice about printing this matrix. You can it, along with your ballot to or

Rancho Cucamonga Fire Protection District Prevention Bureau Standard

ADDENDUM #2 DSA Appl. #

Minimum Standards for Engineers Practicing Fire Protection Engineering in the State of Oklahoma September 14, 2016

Subject: Addendum #3 IFB No CNG Gas Detection Repair and Maintenance

SECTION COMMON WORK RESULTS FOR SAFETY AND SECURITY 1.1 RELATED SECTIONS

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

CITY OF MILTON INVITATION TO BID (THIS IS NOT AN ORDER)

Recommended location under the current MasterFormat 2004 is Section Elevator Door Smoke Containment System.

AMENDMENT NO.: III INVITATION FOR BID NO.: GPA FOR

A. Provide addressable fire alarm system throughout the facility and supervise wet and preaction fire sprinkler system.

SECTION AUTOMATIC VERTICAL CONVEYOR SYSTEM CLOSURE FIRE BARRIER

CHAPTER 61G15-32 RESPONSIBILITY RULES OF PROFESSIONAL ENGINEERS CONCERNING THE DESIGN OF FIRE PROTECTION SYSTEMS

SECTION INSPECTION AND TESTING OF WORK

1. The fire detection and alarm system (including the conduit) shall be a separate bid item and not part of the general electrical contract.

SECTION FIRE ALARM AND SMOKE DETECTION SYSTEMS

ONYX FirstVision Specification Interactive Firefighters Display

SUWANNEE RIVER WATER MANAGEMENT DISTRICT REQUEST FOR BID NO. 15/16-003AO FIRE ALARM SYSTEM INSTALLATION AND MONITORING.

SACRAMENTO FIRE DEPARTMENT FIRE PREVENTION DIVISION FIRE DEPARTMENT DEVELOPMENT SERVICES UNIT CONTRATOR INFORMATION PACKET

2016 CDM Smith All Rights Reserved July 2016 SECTION FIBER OPTIC DATA NETWORK

Application for Certification for an Alarm System Contractor

SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

Princeton Joint Unified School District Invitation for Bid Installation of District-Wide Lighting Occupancy Sensors

Linear Heat Detection Engineering Specifications

SECTION (16460) - LOW-VOLTAGE TRANSFORMERS

Full Service Central Station Fire Alarm Listing Evaluation

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

SECTION C. Section Cable Trays for Electrical Systems: Additional identification requirements for cable tray systems.

LEA COUNTY NEW MEXICO Page 1 of 8 JUDICIAL COMPLEX RFP NO.: 03-(16-17)

Ventura County Community College District 761 E. Daily Drive, West Stanley Avenue, St. 200, Camarillo, CA Purchasing Department

ADDENDUM. ADDENDUM #3 DATE: February 6, 2018

350 Pine Street, Suite 720 Edison Plaza Beaumont, TX Fax

NFPA 72 Code Changes vs 2013

THIS ADDENDUM MUST BE ACKNOWLEDGED.

1. Delete BID FORM in its entirety and replace with the BID FORM attached to this Addendum.

SECTION REGULATORY REQUIREMENTS. A. Relationship between Code, Ordinances, Standards and Contract Documents

marta 2424 Piedmont Rd. N.E. Atlanta, GA

A. This Section includes the following lighting control devices:

SECTION AUTOMATIC TRANSFER SWITCHES

RULES OF DEPARTMENT OF COMMERCE AND INSURANCE DIVISION OF FIRE PREVENTION CHAPTER FIRE PROTECTION SPRINKLER SYSTEM CONTRACTORS

Transcription:

Wicomico County Purchasing 125 N. Division St. Room B-3 Salisbury, MD 21801 Ph. 410-548-4805 Fax 410-334-3130 Email: purchasing@wicomicocounty.org Addendum # 2 Wicomico County Circuit Court Second Floor Renovations Date of Addendum: 2/6/2017 NOTICE TO ALL BIDDERS AND PLANHOLDERS The Bid Documents for the above-referenced Project are modified as set forth in this Addendum. The original Bid Documents and any previously issued addenda remain in full force and effect, except as modified by this Addendum, which is hereby made part of the Bid Documents. Vendors will take this Addendum into consideration when preparing and submitting a bid, and shall acknowledge receipt of this Addendum in the space provided in the Bid Documents. BID SUBMITTAL DEADLINE The bid submittal time has not been changed. 1.0 ATTACHMENTS Item Description 1.1 ED101 Electrical Demolition Second Floor Part Plan 1.2 EF101 Electrical New Work Second Floor Fire Alarm Part Plan 1.3 Specification 283111 Digital Addressable Fire-Alarm System 2.0 CLARIFICATIONS The following clarifications are provided as a matter of information to clarify issues raised about the Bid Documents. Item Description ED101 Revised Sheet Keynotes 9 to read: Remove existing fire alarm device and turn over all 2.1 removed to the Owner. Maintain existing initiation appliance loop and notification appliance loop circuits in place to allow for reconnection of removed fire alarm devices by others. EF101 Re-issue entire drawing to show change from installing fire alarm devices to installing fire 2.2 alarm junction boxes, conduit and pull strings in conduit only. Specification 283111 Re-issue entire specification, which removes fire alarm devices from scope and 2.3 includes installing fire alarm junction boxes, conduit and pull strings in conduit only. 3.0 QUESTIONS AND ANSWERS The following questions and answers are provided as a matter of information to clarify issues raised about the Bid Documents. Item Questions and Answers Question: We are requesting approval of our BarrierDek Metal Security Ceiling for the Wicomico County Circuit Court 2nd Floor Renovation. Attached is a letter requesting approval along with our literature, 3.1 drawing details and test data for your use. 3.2 Answer: This product is acceptable and can be used for this project. Question: Please provide location the RG6 cable for the TV are to be pulled to.

3.3 Answer: The cable will be installed by others. Provide ¾ conduit with pull strings from cable television receptacles in Jury Assembly room to the MDEC equipment cabinet. Route conduit through the ceiling space of the floor below. Question: Please provide more information for the speakers that are to be replaced in the jury assembly room, type of speaker, location of court smart equipment. Answer: The speakers will be provided by others. Provide ¾ conduit with pull strings and junction boxes from the speaker locations in the Jury Assembly room to the MDEC equipment cabinet. Route conduit through the ceiling space of the floor below. END OF ADDENDUM 2

SECTION 283111 - DIGITAL, ADDRESSABLE FIRE-ALARM SYSTEM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. System smoke detectors. 2. Notification appliances. 1.2 ACTION SUBMITTALS A. Product Data: For each type of junction box and conduit. 1.3 INFORMATIONAL SUBMITTALS A. Qualification Data: For Installer. 1.4 QUALITY ASSURANCE A. Installer Qualifications: Installation shall be by personnel certified by NICET as fire-alarm Level III technician. B. NFPA Certification: Obtain certification according to NFPA 72 by an NRTL (nationally recognized testing laboratory). PART 2 - PRODUCTS 2.1 SYSTEM DESCRIPTION A. The indicated existing fire alarm, devices in the design documents shall be removed and turned-over to the owner. New junction boxes, conduit and pull strings for the fire alarm devices (not in contract) shall be provided complete from the new junction box back to an existing junction box for the fire alarm notification appliance loop and for the fire alarm initiation appliance loop. B. All components provided shall be listed for use with the existing system. C. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. CIRCUIT COURT FOR WICOMICO COUNTY 283111-1 2 nd FLOOR RENOVATION

PART 3 - EXECUTION 3.1 EQUIPMENT INSTALLATION A. Comply with NFPA 72, NFPA 101, and requirements of authorities having jurisdiction for installation. Install all electrical junction boxes and conduit to comply with requirements in NFPA 70 including, but not limited to, Article 760, "Fire Alarm Systems." B. Changes to Existing Equipment: Verify that existing fire-alarm system is operational before making changes. 3.2 PATHWAYS A. Pathways shall be installed in EMT. 3.3 IDENTIFICATION A. Identify system components, junction boxes and conduit. Comply with requirements for identification specified in Section 260553 "Identification for Electrical Systems." B. Install framed instructions in a location visible from fire-alarm control unit. 3.4 FIELD QUALITY CONTROL A. Perform the following tests and inspections: 1. Visual Inspection: Conduct visual inspection prior to testing. a. Inspection shall be based on completed record Drawings and system documentation that is required by NFPA 72 in its "Completion Documents, Preparation" table in the "Documentation" section of the "Fundamentals" chapter. b. Comply with the "Visual Inspection Frequencies" table in the "Inspection" section of the "Inspection, Testing and Maintenance" chapter in NFPA 72; retain the "Initial/Reacceptance" column and list only the installed components. B. Fire-alarm system will be considered defective if it does not pass tests and inspections. END OF SECTION 283111 283111-2 CIRCUIT COURT FOR WICOMICO COUNTY 2 nd FLOOR RENOVATION