ECHANICAL LEGEND LI OF ABBREVIAION AND CONROL AFF ABOVE FINIHED FLOOR.O.D. OP OF DUC C/W COPLEE WIH.O.P. OP OF PIPE RWL RAIN WAER LEADER U.O.D. UNDERIDE OF DUC F/A, /A FRO ABOVE, O ABOVE U.O.P. UNDERIDE OF PIPE F/B, /B FRO BELOW, O BELOW U/ UNDERIDE N NO O CALE DN DOWN O/A OUIDE AIR FRR FIRE REIANCE RAED R/A REURN AIR U.N.O. UNLE NOED OHERWIE E/A EXHAU AIR CE CONNEC O EXIING /A UPPLY AIR LI OF YBOL AND ERVICE EXIING ERVICE RELOCAED IE REOVED ERVICE REOVE IE UPPLY LINE XXX GENERAL DEOLIION NOE:. PACH AND AKE GOOD (O BAE BUILDING ANDARD) ECHANICAL COPONEN AND FINIHE DAAGED DURING HE RENOVAION. PROVIDE INULAED CAPPED CURB EQUAL O OR BEER HAN ROOF R-VALUE FOR FAN, GOOE NECK OPENING AND VEN BEING ADDED AND REOVED.. ECHANICAL RADE BIDDING DEOLIION WORK HALL ALLOW FOR A FULL DAY ON IE O REVIEW EXIING ECHANICAL ERVICE AND EQUIPEN IN DEOLIION AND RENOVAED AREA. ACCE WILL BE GIVEN O ROOF AND EXIING ECHANICAL AND ELECRICAL ROO A REQUIRED. EE ENDER FOR FOR DAE OF ANDAORY IE EEING.... INCLUDE FOR DIPOAL (FRO IE) OF ALL REOVED EQUIPEN AND ERVICE, DUCWORK, PIPING, PLUBING, EC. INCLUDING INULAION AND HANGER. DEOLIHED WORK HALL INCLUDE FOR EPORARY AND PERANEN WORK (I.E. ERVICE DIENION) REQUIRED O KEEP ACIVE PREIE IN OPERAION. COORDINAE IE, ACCE, EPORARY HOARDING, EPORARY CAFFOLDING, OOL/LIGH POWER REQUIREEN AND OHER ICELLANEOU IE NEEDED O COPLEE WORK WIH GENERAL CONRACOR IN OCCUPIED AREA A NIGH OR IN ACCORDANCE WIH HE OWNER APPROVED CHEDULE. DEOLIION OF EXERIOR AND INERIOR WALL, ROOF CEILING AND FLOOR O BE EQUENCED WIH HE OWNER. IN AREA WHERE ADJACEN OCCUPANCIE ARE NO IN HE DEOLIION AREA BU AFFECED BY NOIE OF DEOLIION, OR WHERE RADE REQUIRE ACCE O EXIING OCCUPIED PACE, CONRACOR HALL COORDINAE IE OF WORK HROUGH HE OWNER. REURN LINE XXXR. UPPLY AIR DUCWORK AND PIPING NO HOWN HACHED I O BE REAINED, ANY DAAGE O EXIING INULAION AND DUC O BE REPAIRED O ACH EXIING. ANIARY DRAIN AN CLEAN OU CO 7. INULAE NEW DUC AND PIPE CAP. OR DRAIN VEN PIPE DOEIC COLD WAER W V FLOOR/ ROOF/ HUB/ AREA DRAIN PLUBING FIXURE AG??. DURING DEOLIION WORK, ALL ECHANICAL YE AND BUILDING ERVICE ERVING OCCUPIED AREA. HALL BE AINAINED OPERAIONAL. WHERE YE OR ERVICE INERRUPION ARE REQUIRED, COORDINAE AFER HOUR ACCE REQUIREEN AND ECURIY EXECUE WORK WIH CONRUCION ANAGER. DOEIC HO WAER DOEIC HO WAER RECIRC PIPE ELBOW RIER / DROP P & RELIEF VALVE PIPE EE DOWN BALANCING VALVE ACK UP/ DOWN HU OFF VALVE GLOBE VALVE UPERVIED VALVE GENERAL COPE NOE: -WAY CONROL VALVE -WAY CONROL VALVE PLUG VALVE PREURE REDUCING VALVE. PROVIDE ENIRELY NEW DDC YE HA INCLUDE HARDWARE, OFWARE AND GRAPHIC. YE O BE CAPABLE OF REOE DAIL-IN. INERNE CONNECION O BE PROVIDED BY OWNER. CHECK VALVE UNION OR FLANGE RAINER -Y OR BAKE AUOAIC AIR VEN DOUBLE CHECK VALVE AEBLY PREURE GAUGE CAP OR PLUG AAV DCVA FLEXIBLE CONNECION PIPE ANCHOR PIPE GUIDE PUP REDUCED PREURE BACKFLOW AEBLY AUOFLOW CONROL VALVE HEROEER RPBA... PROVIDE ALL COPONEN AND COORDINAE WIH HE ELECRICAL RADE FOR POWER CONNECION. ALL ELECRICAL POWER WIRING CO FOR DDC YE O BE ALLOWED FOR BY CONROL CONRACOR, INCLUDING POWER DIRIBUION FRO BREAKER O RANFORER. PROVIDE DDC HEROA HA ARE LCD YPE UNI WIH CO ENOR IN HE WEIGH ROO FOR HV- AND HE GY OFFICE FOR HV-. PROVIDE A BLANK HEROA WIH CO ENOR IN HE GYNAIU FOR HV-. GY OFFICE AND GYNAIU ARE O BE AVERAGING HEROA. ACCEPABLE CONROL YE ANUFACURER: DELA CONROL, RELIABLE CONROL. ACCEPABLE CONROL CONRACOR: EC AUOAION, FRAER VALLEY CONROL, HUOLE ELECRIC, WEBBER.. REFER O ECH PEC FOR FULL COPE DEAIL.. DUCWORK ANDARD BRANCH ROUND DUC RIER INGLE LINE BRANCH ROUND DUC DROP /A OR O/A DUC O OR FRO ABOVE /A OR O/A DUC O OR FRO BELOW R/A OR E/A DUC O OR FRO ABOVE R/A OR E/A DUC O OR FRO BELOW HEAING/COOLING COIL +/- UPPLY OULE REURN OR EXHAU INLE BALANCING DAPER BD EQUIPEN AG - LI OF EPARAE PRICE # DECRIPION EPARAE PRICE # RE-LOCAE EXIING GA FIRE DHW, ALL AOCIAED PIPING, AND HOUEKEEPING PAD O INCREAE ACCEIBILIY O NEW BOILER. uite 0-00 Granville treet Vancouver BC Canada VC 0.7.00 DWG. NO. ILE CALE -0 ILE HEE N -0 PLAN ROO PLAN /"='-0" -0 HYDRONIC CHEAIC N -0 CHEDULE N -0 DEAIL N
XCU- XB- XP- 7 XDHW- XP- XP- DEOLIION NOE: REOVE EXIING GA FIRED BOILER XB- AND AOCIAED HEAING UPPLY AND REURN PIPING, PUP AND VALVE A HOWN. CAP AND AKE GOOD FOR RECONNECION. REOVE EXIING GA PIPING GA HOWN. CAP AND AKE GOOD FOR RECONNECION. COPLEELY REOVE EXIING PUP AND REPLACE WIH NEW. PUP O BE WIRED O DDC. EXIING COBUION AIR O REAIN X- 9 XRPBA COPLEELY REOVE EXIING XB- FLUE UP HROUGH ROOF. CONRACOR O PACH AND AKE GOOD ALL EXIING BAE BUILDING WALL AND ROOF O ACH BAE BUILDING A REQUIRED FOR DEOLIION OF DUCWORK. RELOCAE DOEIC WAER EPERING VALVE AND AOCIAED PIPING A REQUIRED O POIION BOILER WIHIN 0" OF WALL. AINAIN INIU CLEARANCE REQUIREEN OF ANUFACURER. XHV- XHV- EXIING CONDENING UNI ERVING XHV- LOCAED OUIDE UNDER AIR CAE O BE COPLEELY REOVED INCLUDING REFRIGERAN PIPING. EXIING DUCWORK O REAIN 7 EXIING DOEIC HO WAER ANK O REAIN. RELOCAE EIIC BRACING O OPPOIE IDE OF ANK O ALLOW FOR BOILER CLEARANCE. COPLEELY REOVE EXIING HV-. CAP AND AKE GOOD EXIING DUCWORK CONNECION AND AKE GOOD FOR RE-CONNECION. CONRACOR O COORDINAE DOWN IE OF AHU WIH CLIEN ON IE AND PROVIDE EPORARY VENILAION A REQUIRED. CONRACOR O REVIE ELECRICAL DICONNEC CONNECION O HV- A REQUIRED. 9 REOVE AND REPLACE EXIING RPBP WIH NEW O ACH EXIING IZE. PLAN ROO - DEO 0 CALE: " = '-0" CU- 0 0 0 0 B- B- B- B- XDHW- P- P- CONRUCION NOE: CONNEC NEW PUP AND AOCIAED PIPING/VALVE O EXIING PIPING. ENURE ALL NEW PUP RI AND VALVE ARE INALLED A HOWN ON ECHANICAL DRAWING. RE-BALANCE NEW PUP CONNEC NEW PIPING O EXIING. CONNEC GA O EXIING. PIPE NEW "ø GA PIPE O EACH BOILER COPLEE WIH HUOFF VALVE AND REGULAOR. PROVIDE NEW GA OLENOID WIRED O EERGENCY GA HUOFF BUON O DE-ACIVAE BOILER AND GA UPPLY O BOILER. 9 E- P- RPBA uite 0-00 Granville treet Vancouver BC Canada VC 0.7.00 ALL NEW ELECRICAL WORK I HE REPONIBILIY OF HE CONRACOR O DEIGN AND APPLY FOR HE REQUIRED PERI. ODIFY EXIING BOILER HOUE KEEPING PAD A REQUIRED O FI NEW BOILER. 7 HV- XHV- 7 INALL NEW HV- A PER ECHANICAL CHEDULE AND PECIFICAION. ADJU EXIING DUCWORK AND HYDRONIC PIPING O UI NEW HV- CONFIGURAION. CONRACOR O REVIE WORK RELAED O ELECRICAL CONNECION O HV- A REQUIRED INCLDUING PERI COORDIAION AND INALLAION. NEW UNI O ACH DIENION OF EXIING UNI. ALLOW FOR NEW RAINER, IOLAION VALVE AND BALANCING VALVE FOR HO WAER HEAING COIL. CONNEC NEW CONDENAE DRAIN O EXIING. NEW CONDENING UNI ERVING HV- LOCAED OUIDE UNDER AIR. ALLOW FOR EXENDING CHAIN LINK FENCE ENCLOURE O FI NEW UNI. 9 NEW EXPANION ANK O ACH EXIING. OUN A HIGH LEVEL ABOVE WAER ENRY AION. 0 () NEW "ø BOILER FLUE UP HROUGH ROOF. ENURE ERINAION AND INIU DIANCE FRO FLUE EXHAU ARE INALLED A PER CA AND ANUFACURER' REQUIREEN. NEW "ø DHW FLUE UP HROUGH ROOF. ENURE ERINAION AND INIU DIANCE FRO FLUE EXHAU ARE INALLED A PER CA AND ANUFACURER' REQUIREEN. INULAED REFRIGERAN PIPING. ROUE A PER EXIING REFRIGERAN PIPING. O GY OFFICE AND GYNAIU HEROA. REFER O GENERAL NOE ON -0. PLAN ROO - NEW 0 CALE: " = '-0"
DEOLIION NOE: REOVE EXIING GA FIRED BOILER XB- AND ALL AOCIAED HEAING PIPING, PUP, AND VALVE ERVING EXIING DOEIC HO WAER ANK. CAP AND AKE GOOD FOR RECONNECION. COPLEELY REOVE EXIING -WAY VALVE AND REPLACE WIH NEW. -WAY VALVE O BE WIRED O EXIING DDC. UPDAE ALL B GRAPHIC AND CONROL A REQUIRED FOR CONROL VALVE. "ø DCW EXPANION ANK XE- RPBP XP- "ø HW/R O WEIGH ROO HV- REOVE EXIING PUP AND AKE GOOD PIPING FOR RECONNECION. - "ø HWR - "ø NG "ø NG O DHW- - "ø HW - "ø HW/R O HV- LWCO XP- XP- XB- CHEICAL PO FEEDER - "ø HW/R DOWN HYDRONIC CHEAIC - DEO CALE: N... CONRUCION NOE: CONNEC NEW PUP AND AOCIAED PIPING/VALVE O EXIING PIPING. ENURE ALL NEW PUP RI AND VALVE ARE INALLED A HOWN ON ECHANICAL DRAWING. RE-BALANCE EXIING PUP O EXIING FLOW NOED ON ECHANICAL PUP CHEDULE. UPDAE ALL B GRAPHIC AND CONROL A REQUIRED FOR NEW PUP. CONNEC NEW PIPING O EXIING AND ACH EXIING PIPE IZE. CONRACOR O CONFIR EXAC PIPE IZE ON IE. CONNEC GA O EXIING. PIPE NEW "ø GA PIPE O EACH BOILER COPLEE WIH HUOFF VALVE AND REGULAOR. EXPANION ANK E- O EXIING FLOOR DRAIN 7 RPBP P- "ø HW/R O WEIGH ROO HV- PROVIDE NEW GA OLENOID WIRED O EERGENCY GA HUOFF BUON O DE-ACIVAE BOILER AND GA UPPLY O BOILER. PROVIDE " CAPPED CONNECION C/W WIH IOLAION VALVE FOR FUURE DOEIC HO WAER HEAING IE IN. PROVIDE " CAPPED CONNECION C/W WIH IOLAION VALVE FOR FUURE BOILER 7 PIPE NEW RPBP DRAIN, C/W AIR GAP O EXIING FLOOR DRAIN. EXIING - "ø NG "ø NG O DHW- "ø HW/R HEADER 00 F 0 F - "ø HW/R. GP (YP) uite 0-00 Granville treet Vancouver BC Canada VC 0.7.00 - "ø HW/R O HV- P- P- B- B- B- B- FILER FLOW INDICAOR CRO FOR OPIONAL CORROION E - "ø HW/R O GROUND FLOOR RADIAION CHEICAL PO FEEDER HYDRONIC CHEAIC - NEW CALE: N...
PUP CHEDULE Electrical Details otor Details AG No. Description Design Capacity (gpm) elected Capacity (gpm) Design Head (ft w.g.) elected Head (ft w.g.) Electrical Voltage (V) Electrical upply Phase ( or ) Frequency (Hz) otor tarting ethod otal inimum Efficiency (%) Absorbed Power (BHP) otor Rating (BHP) otor peed (RP) anufacturer odel P- Ground Floor Radiation echanical Room 9. 0..0. 0 INV 0 0. frac 70 Grundfos agna, P- Heating & Ventilation Unit echanical Room...0. 0 INV 0 0. 0. 70 Grundfos agna, P- Heating & Ventilation Unit echanical Room. 7..0 9.7 0 INV 0 0.0 farc 70 Grundfos agna, ) Constant speed pumping control c/w BACNE output/input ) Complete with agna Integrated Variable peed Drive (VFD) BOILER CHEDULE (B- to B-) AIR HANDLING UNI CHEDULE (HV-) Expansion ank chedule anfacturer Engineered Air Bladder Expansion ank Information E- ag No. B- to B- odel L/C/R echanical Room Boiler Information upply Air Fan ervice Heating Water echanical Room Air Flow Rate (CF),000 Fan peed * (RP) 7 anufacturer Amtrol anufacturer Viessman External tatic Pressure (in wg) 0.0 Absorbed Power * (HP) 0. odel Extrol odel Vitocrossal 00 CUA-7 otal tatic Pressure (in wg).7 otor Rating * (HP).0 Orientation Horizontal ype Gas Fired High ass Condensing Boiler Inverter Driven (Yes/No) No CA* (Amps).0 aterial teel Fan ype Centrifugal OCP* (Amps) 0.0 Working Pressure (psi).0 Design Information otal Fan Efficiency * (%) Electrical upply 0//0 aximum Working Pressure (psi).0 Input Gas Requirement (BUH) 99,000 Boiler Output Capacity (BUH),000 hermal Efficiency (%) 9.0 in/ax Natural Gas Pressure (in w.g.) / Water Flow (gpm). aximum Water Pressure Drop (ft w.g.) aximum Operating Pressure (psi) 0 Weight (lbs) Gas ype Natural Gas Burner stages Fully odulating Dimensions (WxDxH) (in) x. x 7 Heating Coil Information Air On Coil emperature ( F).0 upply Water emperature ( F) 00 Air Off Coil emperature ( F).0 Return Water emperature ( F) 0 Duty (Btuh),00 Water Flow Rate (gpm). aximum Pressure Drop DX Cooling Coil Information Air On Coil emperature ( F) 0.0 ensible Cooling (BU/HR), Air Off Coil emperature ( F) 7.7 otal Cooling (BU/HR) 9,00 Compressor ype Digital croll Refrigerant R-0A ank Volume (gal) Dimensions (øxl) (Inch) x Acceptance Volume (gal) Weight Note: ) All anks should be Bladder type, designed and constructed as per AE ection V, Division- tandards. CONDENING UNI CHEDULE ag No. Boiler Information (lbs) CU- Boiler Connections Gas Valve (in) / upply (in) / upply Filtration Panel Filter Grade ERV anufacturer odel Outdoor Engineered Air CUE Return (in) / Flue Gas (in) Drain Valve (in) upply Fan ound Power Levels otal Hz Hz 0Hz 00Hz khz khz khz khz Intake * (db(a)) Discharge * (db(a)) Design Information Nominal ons (ons) Compressor tages Condensate Drain (in) / Electrical Requirements Burner otor HP frac. Electrical Requirements Volt / Phase 0//0 Unit to come complete with: ) Variable capacity digital scoll compressor ) Expoxy painted casing and fan and Heresite coated coils ) ACO 00W dampers Dimensions (L x W x H) (Inch) 9 x x Weight (lbs) 70 Refrigerant R-0A Electrical Information. CPVC flue gas system installed to manufacturer's recommnedations. Flue material is to be certified together with boiler as a constructed unit.. Complete with boiler control with cascade and/or DDC interface. ) Freezestat and flash intercoolers Voltage V / Ph 0 CA uite 0-00 Granville treet Vancouver BC Canada VC 0.7.00. Complete with Viessman acid neaturalization sysetm. ) Confirm existing voltage/phase and match existing.. ultiple boiler installation requires detached boiler native cascade control (Vitotronic 00-K WC Cascade Control) ) Complete with uction Accumulators, Low Pressure Bypasses, Discharge Holding anks. Any aluminum, baffle, fin, or fire tube down fired design is not considered equal. ) Complete with epoxy painted casing and fan and heresite coated coils. eparate 0V/Ph required for boilers and controllers ) Contractor to confirm electrical data of existing condensing unit on site prior to submission of shop drawings. 7. Contractor resopnsible to register boiler with BC afety Authority prior to substantial completion.
UPPOR FOO BOLED O PUP FLANGE UPPOR FOO CONRUCED FRO 0mm [/"] HICK EEL PLAE. CHEICAL PO FEEDER BALANCE LINE VIBRAION IOLAOR A PECIFIED. UNION END VIEW DRAIN VALVE EIIC PRING IOLAOR UNION IOLAION BALL VALVE PUP PIPE IZE A HOWN ON PLAN IOLAION BALL VALVE IOLAION BALL VALVE GAE VALVE GAE VALVE P UCION GUIDE RAINER VIBRAION IOLAOR (EE PECIFICAION) 00mm ["]CONC. PAD COBINAION BALANCING/ CHECK VALVE OR LONG WEEP ELBOW & INDIVIDUAL CHECK W/ BALANCE VALVE. AX. 0mm [0"] 00 in. CHEICAL PO FEEDER CALE N FRON VIEW NOE: UPPOR FOO O BE BOLED O HE FLOOR LAB, HROUGH HE CONC. PAD UING NEOPRENE WAHER AND BUHING ON HE BOL (IN. BOL). VERICAL IN LINE PUP INALLAION CALE N FOR NP -/ PIPE AND LARGER. REFER O PEC. FOR INER OR HIGH DENIY INULAION A INULAION PROECION HIELD. HANGER ROD LOCKING NU UPPOR NU CLEVI HANGER REFER O PEC. VAPOUR EAL PREFORED PIPE INULAION. REFER O PEC. NOE: PIPE HANGER DEAIL FOR PIPING WIH VAPOUR EALED INULAION (FOR COLD PIPING 0 C [0 F] OR LE) INULAION PROECION HIELD A HANGER. REFER O PEC. uite 0-00 Granville treet Vancouver BC Canada VC 0.7.00 HANGER ROD LOCKING NU UPPOR NU CLEVI HANGER REFER O PEC. PREFORED PIPE INULAION IF REQ''D. REFER O PEC. PIPE HANGER DEAIL FOR INULAED HO PIPING UP O NP (7mm) OR ALL IZE OF BARE PIPE PIPE HANGER CALE N