*BOLDED ITEMS ARE REQUIRED* *The more info provided, the more detailed your comments from staff will be.* Project Name

Similar documents
1215 Shields Street Development PDR

W Harmony Rd. Group Home

Conceptual Review Agenda

Staybridge Suites. Aerial Site Map CCR POL. 1 inch = 17,493 feet. 1 inch = 250 feet. Vicinity Map. Zoning Map RL.

Preliminary Design Review. Poudre Garage Mixed Use December 14, 2015

Jason Holland 4/8/2015 x. *BOLDED ITEMS ARE REQUIRED* *The more info provided, the more detailed your comments from staff will be.

Drake Rd & College Ave Spradley Barr Redevelopmentl

Penny Flats North Mixed-Use Residential

Harmony Commons, Lot 1 Office

Conceptual Review Agenda

^_ ^_. Sanctuary West UV 14 «1. Aerial Site Map. 1 inch = 16,667 feet. 1 inch RL= 1,042 feet. Vicinity Map. Zoning Map.

M E M O R A N D U M SITE DATA

LEED-ND 101: Practical Strategies for Achieving Sustainability Goals. Travis Parker Lakewood Planning Director

CITY OF FORT COLLINS TYPE 1 ADMINISTRATIVE HEARING FINDINGS AND DECISION. Elevations Credit Union (2025 S. College Avenue)

Sewanee Village + Request for Builder/Developer Proposals

CITY PLANNING COMMISSION AGENDA. ITEM NO(s): C.1 C.3 STAFF: STEVE TUCK

14 October 10, 2012 Public Hearing APPLICANT: MPB, INC

D1 September 11, 2013 Public Hearing APPLICANT:

CITY OF CYPRESS 5275 Orange Avenue Cypress, California (714) DESIGN REVIEW COMMITTEE PERMIT PROCESS

Project phasing plan (if applicable) 12 copies of site plan

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

Approved: CITY OF ARDEN HILLS, MINNESOTA PLANNING COMMISSION WEDNESDAY, AUGUST 5, :30 P.M. - ARDEN HILLS CITY HALL

MONTGOMERY COUNTY PLANNING DEPARTMENT

Request Conditional Rezoning (R-15 Residential to Conditional A-24 Apartment) Staff Recommendation Approval. Staff Planner Jimmy McNamara

Harmony Technology Park Third Filing, Second Replat Custom Blending, Project Development Plan/Final Development Plan - FDP #130021

CITY OF FORT COLLINS TYPE 1 ADMINISTRATIVE HEARING FINDINGS AND DECISION. CS Commercial, LLC 1337 Riverside Avenue, Unit 1 Fort Collins, CO 80524

(DC1) Direct Development Control Provision DC1 Area 4

12 January 12, 2011 Public Hearing APPLICANT: TAILWIND DEVELOPMENT GROUP,LLC PROPERTY OWNER: CITY OF VIRGINIA BEACH

Zoning Technical Review Presented by Camiros. November 10, 2015

Rezoning Petition Pre-Hearing Staff Analysis May 21, 2018

Request for Proposals For the purchase and redevelopment of Cityowned property in the Historic Downtown. 109 South Boyd Street

Conceptual Review Agenda

Jason D. Sutphin, Community Development Division Chief. Through: Brooke Hardin, Director of Community Development and Planning

City of Lafayette Study Session Staff Report Design Review Commission

REQUEST Current Zoning: O-15(CD) (office) Proposed Zoning: TOD-M(CD) (transit oriented development mixed-use, conditional)

Rezoning Petition Pre-Hearing Staff Analysis April 16, 2018

The following concept plans and illustrations are the result of this 10 month study of the alley connections from CSU to the River District.

Agenda Item. Applicant Logan Virginia Properties, LLC Property Owners Byler Azalea, LLC & Gateway Free Will Baptist Chuch

PROJECT DESCRIPTION. Providing a mix of housing options supporting a diversity of needs (800-1,600 sf 1-3 bd flats and Townhomes).

Applicant Name Phone / Fax / Address City State Zip Code . Property Owner Phone / Fax / Address City State Zip Code

DENVER DESIGN DISTRICT GDP

3.1 community vision. 3.3 required plan elements

Developer s Program. The Station at East 54

- INVITATION - COURTESY INFORMATIONAL MEETING

Rezoning Petition Post-Hearing Staff Analysis July 31, 2018

PINE CURVE REZONING. Property does not meet criteria for open space preservation and is not a candidate for a park

SUBJECT: PREDEVELOPMENT PLAN REVIEW OF PROJECT LOCATED AT E. COLORADO BOULEVARD (PASEO COLORADO)

MONTGOMERY COUNTY PLANNING DEPARTMENT THE MARYLAND-NATIONAL CAPITAL PARK AND PLANNING COMMISSION

PLANNING BOARD REPORT PORTLAND, MAINE

PLANNED UNIT DEVELOPMENT & SUBDIVISION STAFF REPORT Date: May 18, 2017

REDLANDS TRANSIT VILLAGES SPECIFIC PLAN

Request Modification of Proffers Approved by City Council on May 8, 2012 Modification of Conditions (Mini- Warehouse) Staff Recommendation Approval

The Maryland-National Capital Park and Planning Commission Prince George's County Planning Department Development Review Division

DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES Planning Division m e m o r a n d u m

public review draft Key objectives for this chapter are:

The subject site plan amendment proposes the following revisions to the approved site plan:

Walnut Creek BART Station

SEMSWA s Role in the Land Development Process

KASPER. City of Georgetown, Texas PUD Planned Unit Development. December 30, 2015 Revised January 27, 2016

NOTICE OF AVAILABILITY (NOA) OF A DRAFT ENVIRONMENTAL IMPACT REPORT AND NOTICE OF PUBLIC HEARING 2190 Shattuck Avenue Mixed-Use Project

City of Lafayette Study Session Project Data

TO: CITY COUNCIL DATE: MARCH 23,2009

DRAFT. 10% Common Open Space

MEMORANDUM. I2 District Downtown Parking Overlay District 24,000 square feet /.55 acres. Industrial Employment District North Loop Small Area Plan

11 March 9, 2011 Public Hearing APPLICANT: BUDDHIST EDUCATION CENTER OF AMERICA DONG HUNG TEMPLE, INC. PROPERTY OWNER: MOY FAMILY, LLC

Architectural Review Board Report

PDR /21/15 Noah Beals 1/7/15 xx

Illustration of Eastlake Farmer s Cooperative Grain Elevator. Chapter 5: implementation 5-1

CITY OF MERCER ISLAND DESIGN COMMISSION STAFF REPORT

Drexel, Barrell & Co.

AvalonBay Communities + BRIDGE Housing. Mission Housing Habitat for Humanity Pacific Union Development Corporation

4 C OMMUNITY D ISTRICTS

Village of Glenview Appearance Commission

CITY OF KEIZER MASTER PLAN APPLICATION & INFORMATION SHEET

DESIGN REVIEW COMMITTEE AGENDA ITEM

Conceptual Review Agenda

Notice of Preparation (NOP) of an Environmental Impact Report and Public Scoping Meeting for the Alameda Shipways Residential Project

Winston-Salem State University Campus Master Plan 2016 Update

REQUEST FOR QUALIFICATIONS THURGOOD MARSHALL COLLEGE NEIGHBORHOOD PLANNING STUDY UNIVERSITY OF CALIFORNIA, SAN DIEGO

MIXED-USE VILLAGE OVERLAY FLOATING DISTRICT

KENDALL SQUARE INITIATIVE. Planned Unit Development Special Permit Application - SoMa September 8, 2015

Village of Glenview Appearance Commission

SYRINGA VALLEY SPECIFIC PLAN NARRATIVE

Rezoning Petition Post-Hearing Staff Analysis July 31, 2018

4.1.3 LAND USE CATEGORIES

Design Review Application *Please call prior to submittal meeting to determine applicable fees*

LOW DENSITY RESIDENTIAL

September 25th, 2018 $2000 fee pd CC

New Rochelle Arts + Cultural District Master Plan Conceptual Plan. February 4, 2015

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

EcoVerde MADISON TO DOWNTOWN TO BEACH. Legend Highway Major Connection Major Street Local Street Proposed Access. Response to Tropicana Field RFP

Staff Report and Recommendation

3.0 URBAN DESIGN. December 6, OVERVIEW

419 Canyon Ave, Suite 200 Fort Collins, CO 80521

TEN MILE & FRANKLIN LAND 39± ACRES 2954 WEST FRANKLIN ROAD MERIDIAN, ID

ELECTION DISTRICT: PRINCESS ANNE

Conceptual Review Agenda

Deerfield Township Community Development Department

The petition proposes the development of five townhomes on a vacant parcel between Charlotte Latin School and Providence Presbyterian Church.

SUBMITTAL REQUIREMENTS: FINAL PLAN REVIEW- PROJECT DEVELOPMENT PLAN (PDP)

Transcription:

Development Review Guide STEP 2 of 8 PRELIMINARY DESIGN REVIEW: APPLICATION General Information Preliminary design review is an opportunity for an applicant to discuss the requirements, standards, procedure, and potential modifications of standards or variances that may be necessary for a project and to generally consider the development proposal design which has been evaluated as a part of the conceptual review process. While the conceptual review process is a general consideration of the development proposal, a Preliminary Design Review considers the development proposal in greater detail. Problems of both a major and minor nature can be identified and solved during the preliminary design review before a formal application is made. Preliminary design review applications must be submitted to City Staff no later than 5 pm, two weeks prior to the Wednesday meeting date. Application materials can be e-mailed to currentplanning@fcgov.com or sent to/dropped off at 281 North College Avenue. Representatives of Community Development and Neighborhood Services (Zoning, Environmental Planning, Current Planning, and Development Review Engineering), Light and Power, Stormwater, Water/Waste Water, Advance Planning (Long Range Planning and Transportation Planning), Historic Preservation and Poudre Fire Authority regularly attend preliminary design review meetings. Additionally, other public or quasi-public agencies which may be impacted by the development project are invited and encouraged to attend the preliminary design review. These agencies may include the gas utility, water and/or wastewater utility districts, ditch companies, railroads, cable television service providers and other similar agencies. Upon receipt of a preliminary development proposal for review, and after review of such proposal with the applicant, the staff shall furnish the applicant with written comments and recommendations regarding such proposal in order to inform and assist the applicant prior to preparing components of the development application. The staff shall provide the applicant with a critical issues list, which will identify those critical issues that have surfaced in the preliminary design review as issues that must be resolved during the review process of the formal development application. To the extent that there is a misunderstanding or a misrepresentation of facts, the opinion of the staff may change during the course of development review. Section to be filled out by City Staff Date of Meeting Submittal Date PDR150009 5/27/2015 5/13/2015 X Project Planner Fee Paid ($500) *BOLDED ITEMS ARE REQUIRED* *The more info provided, the more detailed your comments from staff will be.* Project Name Spring Creek Station Mixed Use Project Address (parcel # if no address) 97231-08-003 and 97231-08-005 Contact Name(s) and Role(s) (Please identify whether Consultant or Owner, etc) Linda Ripley - Consultant Business Name (if applicable) Ripley Design, Inc. Applicant Mailing Address 419 Canyon Ave., Fort Collins, CO 80521 Phone Number E-mail 970-224-5828 Address linda.ripley@ripleydesigninc.com Basic Description of Proposal (a detailed narrative is also required) 299 multi-family dwelling units, 15,000sf retail (see attached narative) Zoning GC Proposed Use Multi-Family / Retail Existing Use Retail Total Building Square Footage 389,655 GSF S.F. Number of Stories 5 Lot Dimensions 715'x335' approx. Age of any Existing Structures east bldg. 1960, west bldg. 1978 +/- Info available on Larimer County s Website: http://www.co.larimer.co.us/assessor/query/search.cfm *If any structures are 50+ years old, good quality, color photos of all sides of the structure are required. Increase in Impervious Area no increase S.F. (Approximate amount of additional building, pavement, or etc. that will cover existing bare ground to be added to the site) Community Development & Neighborhood Services 281 North College Avenue Fort Collins, CO 80522-0580

Spring Creek Station Mixed Use Project Narrative Introduction Collegiate Development Group (CDG) and Campus Apartments are excited to propose their vision of a state-of-the-art off-campus student housing facility to the City of Fort Collins. CDG is a leading developer in the student housing industry. Our firm maintains a focus on in-fill development in locations that benefit the student body, university, and greater community. We are committed to developing innovative, institutional-quality student housing throughout the United States. As long-term investors, we deliver student communities in irreplaceable locations and strive to be known as the developer/investor/operator known for responsiveness, integrity, professionalism, innovation, and quality. Our partner, Campus Apartments, is widely recognized as one of the nation s premier developers and managers of university-related real-estate. Their portfolio consists of over 27,000 beds in 20 states, representing over $2 billion in assets under management. Collectively, we are currently partnering in the development of 6 student housing projects across the country, totaling over 3,700 beds and representing over $318 million in total investment. Project Site The infill site is 3.78 acres located north of Whole Foods Market, east of the MAX Spring Creek Station, south of the Sherwood Lateral irrigation canal and west of Peloton Cycles in Midtown Fort Collins. The site is currently developed and fully paved, so there should not be an increase in impervious area. The project will replace two existing onestory buildings that currently house various small scale retail/commercial businesses and a small storage facility. The westerly building was constructed in 1960 and is therefore over 50 years old. The application package includes photos of all sides of this building so that it can be evaluated in regard to historical significance. The site is unusual in that it does not face a public street. Vehicular access is from College Avenue directly south of the Peloton Cycle retail store as well as from the parking lot north of Whole Foods Market. The site is zoned General Commercial District and is located within the Transit Overlay District (TOD). In addition to being adjacent to the Spring Creek MAX Station, the site is within easy bike and walking distance of the CSU Campus, adjacent to a grocery store (Whole Foods Market) and a major activity center (University Plaza). Page 1 of 2

Proposed Project The proposed mixed-use project includes 299 multi-family residential dwelling units and 15,000 square feet of retail development on the ground floor. The residential portion of the project includes 907 bedrooms that will be marketed to students and rented individually. The project includes a 6-tier parking garage wrapped on all sides by the 5-story residential building. In accordance with the recently adopted TOD parking standards, the project will provide.75 parking spaces per bedroom reduced by 20% for incorporating two demand mitigation strategies. Each resident will be provided a transit pass and the project is within 1000 feet of a MAX Station. In addition to providing the required amount of parking, the project will also include the required amount of bicycle parking with 60% indoors. The building has an attractive visual appeal and includes three interior court yards, a pool complex and clubhouse. The courtyards include a variety of site amenities, such as seat walls, outdoor furniture, shade, special lighting, generous landscaping and internet access. Each courtyard is unique offering a variety of places to sit, socialize, study or simply enjoy the outdoors. The clubhouse facility located on the ground floor will include study rooms, computer lab, a recreation/game room, fitness center, yoga studio and cyber café. The Applicant proposes to begin construction in the Fall of 2016 and be ready for movein August 2018. Page 2 of 2

SPRING CREEK STATION MIXED USE PDR SUBMITTAL FORT COLLINS, CO PREPARED BY: DRAINAGE DITCH SHERWOOD LATERAL IRRIGATION CANAL Owner Name: WATTERSON ANN REVOCABLE TRUST Site Address: 2121 S COLLEGE AVE Parcel Num: 9723108005 Owner Name: IMAGO ENTERPRISES INC Site Address: 2101 S COLLEGE AVE Parcel Num: 9723108001 land planning landscape architecture urban design entitlement 419 Canyon Ave. Suite 200 Fort Collins, CO 80521 phone 970.224.5828 fax 970.225.6657 www.ripleydesigninc.com APPLICANT RIPLEY DESIGN INC. Linda Ripley 419 Canyon Ave. Suite 200 Fort Collins, CO 80521 p. 970.224.5828 f. 970.225.6657 A'S STORAGE PELOTON CYCLES COLLEGE AVE. ROCKY MOUNTAIN RECUMBENTS ONCE AGAIN THRIFT NORTH 0 25 50 100 SCALE: 1"=50'-0" Owner Name: BANKCENTER GROUP LLC site Address: 2105 S COLLEGE AVE Parcel Num: 9723108003 MOUNTAIN STATE ELECTRONICS Owner Name: DELITZ DONALD O DELITZ TANYA L Site Address: 2107 S COLLEGE AVE Parcel Num: 9723108002 ORIGINAL SIZE 24X36 ISSUED No. DESCRIPTION DATE 01 PDR SUBMITTAL 05/12/15 REVISIONS No. DESCRIPTION DATE Owner Name: ARCP MT FORT COLLINS CO LLC Site Address: 2201 S COLLEGE AVE Parcel Num: 9723441001 FLOYD'S BARBERSHOP RADIO SHACK Owner Name: PALMER 2109 S COLLEGE LLC Site Address: 2109 S COLLEGE AVE Parcel Num: 9723405001 SEAL: AERIAL EXHIBIT WHOLE FOODS MARKET PROJECT No.: DRAWN BY: REVIEWED BY: R15-066 DS LR DRAWING NUMBER: L-100

SPRING CREEK STATION MIXED USE PDR SUBMITTAL FORT COLLINS, CO PREPARED BY: land planning landscape architecture urban design entitlement 419 Canyon Ave. Suite 200 Fort Collins, CO 80521 phone 970.224.5828 fax 970.225.6657 www.ripleydesigninc.com APPLICANT RIPLEY DESIGN INC. Linda Ripley 419 Canyon Ave. Suite 200 Fort Collins, CO 80521 p. 970.224.5828 f. 970.225.6657 NORTH SIDE VIEW EAST SIDE VIEW ORIGINAL SIZE 24X36 ISSUED No. DESCRIPTION 01 PDR SUBMITTAL DATE 05/12/15 REVISIONS No. DESCRIPTION DATE HISTORIC BUILDING SEAL: SOUTH SIDE VIEW WEST SIDE VIEW Property Type: Commercial Built As: Retail Store Occupancy: Storage Warehouse Year Built: 1960 Note: Images are distorted due to the panoramic camera. Buildings are not "rounded." PROJECT No.: DRAWN BY: REVIEWED BY: R15-066 DS LR DRAWING NUMBER: L-101